DB 59 Upcoming Requirements
Model & Contract Implementation
4/30/2012
Agenda
• DB59 Dates
• Requirements
– Various Submissions/ Notifications
New Resource Interconnection
DB59 Critical Dates
6/14/12 – Estimated Model Release to Production
+7C days - Master File Data Freeze
+2B days - System Operations Approval
New Resource Interconnection
PGA/ MSA/ QF-PGA Request Sheets
• Complete and Submit
– PGA/ MSA information request sheets
– PGA Schedule 1 template
• Email to regulatorycontracts@caiso.com and ISO
assigned project manager
Please submit the above to CAISO at least 4 to 6 weeks prior to initial
synchronization
• Submit a copy of the SGIA/ LGIA to the ISO as soon as
the agreement is executed
New Resource Interconnection
Resource Data Template
• Complete and Submit Resource Data Template (RDT)
Owner/SC – Email the RDT to RDT@caiso.com after your
Scheduling Coordinator has reviewed the RDT.
(Please submit this to CAISO before 05/08/2012)
New Resource Interconnection
Control & Protection Documentation
Submit Control & Protection Documentation to CAISO for
Review (Grid-connected resources: 10 MW or greater
and 75 MW or greater for Wind Resources)
Requirements:
• Control & Protection for high voltage bus, generators and generator
step up transformers;
• One-line showing relaying/metering, CT/PT;
• Complete list of relay settings, including selected CT and PT ratios,
frequency set points if used, and copy of relay Certified Test Reports
after relay settings have been approved.
Please submit this to CAISO at least 4 weeks prior to initial
synchronization
New Resource Interconnection
Information Required to connect
• Please email a control room phone number with the
project tracking number and project name to
newresourceimplementation@caiso.com
Must be received by CAISO 2 weeks prior to initial sync
New Resource Interconnection
Required Letters to connect
• Seven Day Notification of Synchronization by email to
NewResourceImplementation@CAISO.com
• Final Interconnection Approval Letter from Transmission
Owner Sent to CAISO by email to
NewResourceImplementation@CAISO.com
All the above letters must be received by CAISO a minimum of 7
calendar days prior to initial synchronization
New Resource Interconnection
Required SC Letters to connect
• Provide Letter of New SC Selection to CAISO by email
to NewResourceImplementation@CAISO.com
• Provide Letter of Acceptance from new SC Sent to
CAISO by email to
NewResourceImplementation@CAISO.com
All the above letters must be received by CAISO a minimum of 2 weeks
prior to initial synchronization
New Resource Interconnection
Required Information to Connect
• Provide the Twenty-Four Hour Notice of Initial
Synchronization to CAISO (By telephone) –
– Contact CAISO Outage Management Monday-Friday 7AM3:30PM PST at (916) 351-2241
• Submit Test Energy Schedule to CAISO Outage
Management via e-mail or FAX –
– Submit a minimum of 1 business day prior to any generation
to outage.folsom@caiso.com or FAX to (916) 351-2367
New Resource Interconnection
Initial Sync
• Receive overall approval for initial synchronization from
CAISO System Operations through the CAISO Project
Manager
CAISO System Operations has 2 business days to approve new
resource synchronization. All requirements must be met prior to
the submission of the resource to CAISO System Operations
• Contact CAISO Real-Time Generation Desk at (916)
351-2488 for initial and all subsequent synchronizations
New Resource Interconnection
COD letter
• Approval letter from transmission owner to ISO
approving commercial operation by email to
newresourceimplemenation@caiso.com