Protection Coordination Analyzing and proposing protection schemes and settings At a glance Our solution Siemens Power Technologies International (Siemens PTI), the provider of network consulting, software solutions and T&D training within Siemens Energy, analyzes protection systems using state-of-the-art methods to optimize operation and eliminate weak points. With the aid of system calculations based on national and international standards, and system and protection simulations, we devise a protection system that is: Our team comprises highly skilled experts in all aspects of system and machine protection, from converter design and equipment protection to coordination of low, medium, high and extrahigh voltage protection: We can advise and offer you a comprehensive service in the wide area of power system protection. Selective, When faults occur, they must be cleared as quickly as possible in order to obtain a high level of system availability with minimum failure probability. There are a number of methods available for analyzing the causes and the behavior of the network and the protection system: System compliant, and Technically and economically suited for the customer’s requirements. The challenge An electrical power system is intended to operate in a safe manner at all times. However, no matter how well designed, faults will always occur on a power system. Faults are very special events in the life cycle of a public or industrial system, as they can greatly affect or restrict operation. They may also lead to severe damages of installations and equipment, or may cause personal injuries, including death. Therefore, the arrangement of an adequate protection system is an indispensable and integral part of power system design. Application Examples From a disturbance to an optimized system Analysis of fault records and fault annunciations from protection relays, from substation control and protection systems, and from SCADA systems Dynamic system and protection equipment simulation Weak point analysis and development of countermeasures Verification of the optimized system 30,0 27,5 25,0 22,5 20,0 17,5 X/Ohm(secondary) 15,0 12,5 10,0 7,5 5,0 2,5 0,0 -2,5 -5,0 -7,5 -10,0 -12,5 -15,0 -40 Figure 1: Lightning stroke to overhead line Siemens PTI − Network Consulting -30 -20 -10 0 R/Ohm(secondary) 10 Figure 2: Fault analysis -- Zone 1 trip of distance protection on remote-end due to wrong earth-fault compensation factor settings From the primary system to the protection equipment From the protection equipment to a coordinated system protection The choice of suitable current and voltage transformers as connection links between the primary and protection systems depends on the steady-state and transient phenomena and the technical requirements of the connected equipment. Selective system protection must take into account the system structure, the system elements, different switching conditions and supplier and customer requirements. Siemens PTI offers the following services: Classification according to national and international standards Dimensioning of instrument transformers to suit all common protection equipment Dimensioning of instrument transformers when the specifications of the primary system and protection equipment change. carried out using software aided short circuit and / or system stability calculations. Siemens PTI offers the following services: Design of protection systems Selection of suitable relays and fuses Relay consistent setting calculation Coordination of all protection equipment. The analysis is based on a comprehensive data collection in close cooperation with the customer. Thereby, the system structure, its elements and operational conditions are collected. Figure 6: SIGRADE grading path E L1 L3 L1' L2 Circuit 1 L2' L3' Circuit 2 Figure 3: CTDim dynamic simulation With our software program CTDim instrument transformers can be studied and dimensioned. For more details please refer to a separate fast facts sheet from the Siemens PTI Software Solutions portfolio. Figure 4: Example of distance zone protection settings Figure 5: Short-circuit considerations on OHL After data collection, instrument transformers are checked and / or newly dimensioned and selected, enabling proper operation of corresponding relays. In parallel, an analysis of the protection system concepts is carried out, considering the customer’s requirements, habits and state-of-the-art. Based on all these aspects the optimum protection scheme is devised which provides to the customer the technically and economically best solution. Selective protection coordination and relay consistent setting calculations are then Figure 7: SIGRADE grading diagram Published by and copyright © 2009: Siemens AG Energy Sector E D SE PTI Freyeslebenstrasse 1 91058 Erlangen, Germany Siemens Energy, Inc. Power Distribution, T&D Service Solutions Siemens Power Technologies International 400 State Street PO Box 1058 Schenectady, NY 12301-1058 For more information, please contact our Customer Support Center. Phone: +49 180 524 70 00 Fax: +49 180 524 24 71 (Charges depending on provider) E-mail: support.energy@siemens.com www.siemens.com/energy/power-technologies Siemens Transmission and Distribution Ltd PTI Sir William Siemens House, Princess Road Manchester, M20 2UR United Kingdom Power Distribution Division Printed in Germany Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract. NC3010-EN-200905