Implementation of the Financial Planning Tool at Armvodocanal Sofya Hovhannisyan Armvodocanal Helsinki, Finland 24-25 May 2007 1 Why is the FPTWU Necessary? PROBLEMS • EECCA water utilities remain financially weak, unstable, with inadequate level of funding • There are many reasons for such a situation. One of main reasons is lack of mediumand long-term financial planning SOLUTION • Implementing such a financial planning scheme presumes the water utility has practical experience in regular comprehensive analysis of all the financial and economic aspects • However, such a systemic analysis is only possible if there is a financial modeling and planning tool in place TOOL FOR IMPLEMENTING SOLUTION •The main objective of the project was to develop such a Financial Planning Tool for Water Utilities (FPTWU) EAP Task Force 2 Concept of the FPTWU Tool Computerized Model in Excel: User DATA INPUT MODEL CALCULATIONS DATA OUTPUT Decision making, statements, monitoring 3 EAP Task Force FPTWU Tool Features SIMPLE EXPANDABLE MULTI-PURPOSE It is enough to have basic computer skills. User-friendly and includes user manual Can be expanded by adding additional modules/tables Adaptable to the EECCA country contexts (e.g. various tax regimes) Graphical presentation of key operational and VISIBLE financial parameters possible 4 EAP Task Force General Features of the FPTWU Tool Consists of 34 linked spreadsheets (Excel) Model navigation is done through the menu Planning period – quarterly model for three years (with a possibility to extend the forecast period of the model to twenty years) Calculations can be done either in nominal prices or in reference year prices Information presented separately by water supply and wastewater collection Allows entering “historical/actual” data “Historical/actual” data period can be modified Data entry is concentrated mostly in two spreadsheets (facilitates the entry process and reduces room for error) 5 EAP Task Force Input – TI Input – TD Assets Water supply and wastewater collection Revenues and Collection Cost indexation CIP module Financial plan Tariff module Budget Affordability assessment Demand dynamics Costs Financial statements 6 EAP Task Force Taxation accounting Outcomes and financial gap analysis Implementation at Armvodocanal Structure Utility assets Consumers Taxation Unaccounted-for-water Accounting practice Payments structure Method of tariff calculation and approval Costs calculation Investment plan 7 Financial Gap Analysis Финансовый дефицит/профицит Financial Gap/Surplus 10,000 8,000 млн НДЕ 6,000 4,000 2,000 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 (2,000) (4,000) Cash Поступление денежных средств 8 Use of cash Расходование денежных средств NetПрофицит/Дефицит Чистый surplus/gap Graphical Presentation of Parameters Revenue and costs Выручка и Затраты 9,000 8,000 Выручка и Затраты, млн НДЕ 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 2005 2006 2007 2008 2009 2010 2011 Total Revenue 2012 Всего выручка за реализацию услуг 9 2013 2014 2015 2016 2017 2018 2019 O&M costs 2020 Операционные затраты 2021 Graphical Presentation of Parameters Тариф дляpopulation населения Tariff for 200.00 175.00 150.00 НДЕ/М3 125.00 100.00 75.00 50.00 25.00 0.00 2005 2007 2009 2011 2015 2017 2019 2021 Расчетный тариф для населения, вода, с НДС Расчетный тариф для населения, канализация, с НДС Действующий для tariff населения, вода, с НДС Factualтариф water Действующий для населения, канализация, с НДС Factualтариф wastewater tariff Water tariff 10 2013 Wastewater Tariff Graphical Presentation of Parameters Процент подключения к централизованным системам Water вand rates< % о д о сwastewater н а б ж е н и я и в о connection д о о тв е д е н и я , в % 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2004 2006 2008 2010 2012 Multi-storey buildings,water многоэтажные дома, вода Multi-storey buildings, wastewater многоэтажные дома, канализация 11 2014 2016 2018 2020 частный сектор, вода Private housing sector, water Private housing sector, частный сектор, канализация wastewater Necessary input-data set (1/3) Economical data – – – – – Inflation Exchange rate Процентные ставки Income per capita and per household Population and households Water demand – – – – Water consumption by consumer categories Wastewater by consumer categories Water consumption norms Metering Service level – Water and wastewater coverage – Water infrastructure capacities – Wastewater infrastructure capacities 12 Necessary input-data set (2/3) Technical conditions and assumptions – – – – Infrastructure age (pipes, pumps etc) УWear and tear of infrastructure Service level Assets lifetime Capital costs – – – – Plan of replacement/repair/reconstruction of assets Capital costs by assets categories Materials costs Construction and installation works costs O&M costs – – – – – – 13 Prices for energy and materials Staff costs Maintenance costs Overhead costs Costs distribution by consumers categories Costs distribution for water and wastewater Necessary input-data set (3/3) Financial Data – – – – – Revenues by consumer groups Water and wastewater tariffs Billed and collected amounts Public budget/municipal subsidies Other revenues Financing – Conditions and characteristics local loans – Conditions and characteristics international loans Accounting and taxation – Depreciation – Income tax, VAT and other taxes Operating assets 14