Prepared by: Adam Hamer ENHANCED DIABETIC MANAGER 2008 ODU CS 410 Green Evaluation Plan Enhanced Diabetic Management Resource Plan Purpose This document defines the hard resources associated with the project per phase. The purpose of this document is to define what hard resources are necessary per phase and to explain their purpose. Each phase defines new hard resources that are introduced; however it should be assumed by the reader that any hard resource that is used in a previous phase will be used for the same purpose in subsequent phases unless otherwise noted. Although human resources are in integral part of the resource plan, these resources have been addressed in the separate document, Staffing Plan, contained within this SBIR. The reader is referred to the funding plan for any detailed financial information. Phase 0 In this phase the initial SBIR proposal is created along with a proposal presentation and product website. Since this phase only involves research and the proof of concept, no hard resources are required. Phase 1 In this phase a lab prototype will be developed and the SBIR Phase 2 proposal will be developed. Success will be measured by the successful completion of those two deliverables. Resource Quantity Database Software (mySQL) 1 $ Laptop(Toshiba Satellite L355D) 2 $ 800 $1,600 Router(Linksys WRT54GS Wireless-G broadband router) 1 $ 100 $ 100 Ethernet Cables(10 ft. CAT5) 3 Workstation 1 Last Updated: Tuesday, July 26, 2016 Cost $ 0 10 Total $ $ 0 30 $1,200 $1,200 Total Resource Cost (Phase 1) $2,930 Page 1 of 3 Prepared by: Adam Hamer ENHANCED DIABETIC MANAGER 2008 ODU CS 410 Green Evaluation Plan The following hard resources are needed for Phase 1: 1. Database Software (mySQL) – This software will allow us to write eDM's database that will contain a wide assortment of food types, as well as, data collected based on our eDM's glucose management software. 2. Laptops – These will act as our portable devices in testing our transfer of data between multiple devices. 3. Router – The router is needed so that we can transfer information to the other computers. 4. Ethernet Cables – This will act as the median in which we will connect the laptop computers and workstation, to the router, in tern to one another. 5. Workstation – The workstation is needed so that we can have a central area to upload modules of our project EDM, as well as act at a non portable device. Phase 2 In this phase the actual prototype of the product will be developed. The following hard resources are needed for Phase 2: Resource Quantity Cost Total Laptop(Toshiba Satellite L355D) 4 $ 800 $3,200 Workstation (2GB Ram, 120 GB Harddrive) 1 $1,000 $1,000 Glucose Monitor with download capability 1 $ 100 $ 100 Insulin Pump with wireless device or download capability 1 $1,200 $1,200 Device Software INC CDs (100 pack) 5 $ $ 0 20 $ 100 Total Resource Cost (Phase 2) $5,500.00 6. Database Software (mySQL) – This software will allow us to write eDM's database that will contain a wide assortment of food types, as well as, data collected based on our eDM's glucose management software. 7. Laptops – These computers will be needed as we increase the number of people working on the project to meet deadlines. 8. Workstation – The workstation will be needed for back up of information. 9. Glucose Monitor - This will be need when we continue testing our software will be able to communicate with a portable monitoring system. 10. Insulin Pump – This will be needed when we continue testing our software will be able to communicate with an Insulin pump that sends out information, to create a better analysis of the diabetics health. Last Updated: Tuesday, July 26, 2016 Page 2 of 3 Prepared by: Adam Hamer ENHANCED DIABETIC MANAGER 2008 ODU CS 410 Green Evaluation Plan 11. eDM – This software will be needed to be loaded onto the devices to show its functionality. 12. CD's – will be needed so that we can with the assistance of a Doctor distribute our device as a possible way to manage Diabetes. Phase 3 This phase is the main rollout of the product. In this phase the warehouse and manufacturer is secured and actual production begins. The marketing campaign also begins in this phase. The following hard resources are needed for Phase 3: Resource Quantity Cost Total Database Software (SQL Server) 1 $1,500 $ 1,500 Laptop(Toshiba Satellite L355D) 4 $ 800 $ 3,200 Web & DB Server 2 $8,000 $16,000 Total Resource Cost (Phase 3) $20,700 13. Database Software – This software will be needed so that we can insure database integrity of information needed for the user to input information to the device with our software. 14. Laptops – These computers will be needed as we increase the number of people working on the project, and maintenance of the server. 15. Web & DB Server – These will be act as the the device that will utilize the Database Software. Out Years The phase is the functional and support phase of the project. The tasks in this phase are ongoing and are not part of the project. Since Out Years maintains and supports the products that are created in the project, any hard resources needed for that support would have been identified and setup in Phase 3. Therefore there are no hard resources defined specifically for Out Years the Out Years hard resources come from previous phases. Last Updated: Tuesday, July 26, 2016 Page 3 of 3