STATag Milestones Presentation Daniel Tubbs Jason Sadler Joseph Williams April 14, 2004 Brian Easton Latricia Simon Francis Doligosa 1 The STATag Solutions for Real-Time Equipment Tracking April 14, 2004 2 Problem Hospitals need to reduce costs to increase profitability – From 1997 to 2001, spending on hospital care increased by $83.6 Billion3 – Hospital gross margins have declined annually every year since 19973 – Wages & Benefits for nurses account for 36% of Hospital costs ($166.4 Billion)3 April 14, 2004 3 Percent of Total Hospital Costs by Type of Expense Wages & Benefits 17% Other Products (excluding Rx drugs) Capital 5% 8% 13% 57% Prescription Drugs Other Services Cost of Caring: Key Drivers of Growth in Spending on Hospital Care, PriceWaterhouseCoopers, February 19, 2003 (Appendix B) April 14, 2004 4 The Cost of Inefficiency 35-60% of a nurse’s time is wasted on5 – Searching for equipment – Clarifying orders – Entering redundant information Wasting $58 - $99 Billion annually6 April 14, 2004 5 Solution The use of STATags will: Reduce man hours searching for needed equipment Lower operating costs – Save a real $1 for every $4 of efficiency gained7 (Reduction of overtime, increased turnaround, etc.) Increase staff efficiency – Increase a nurse’s efficiency at least 10%5 April 14, 2004 6 “Brilliant Idea” - Cindy Jimmerson, founder of reVIEW (Realizing Exceptional Value in Everyday Work), and National Lecturer on Hospital Efficiency April 14, 2004 7 User Interface Views •Default screen presents the user with a list of items that can be queried •User selects item and selects ‘Query Nearest Device’ to locate that closest particular item An ‘Administrative Use’ button is also available for authorized personnel to make any necessary maintenance to the system April 14, 2004 8 User Interface View Following query execution, a next screen presents a map of the facility and the location of the nearest queried item April 14, 2004 9 STATag Network ` STATag Web Browser User STATag STATag Network Coordinator DB Server Internal Webserver STATag STATag Database April 14, 2004 10 Individual STATag 802.15.4 Module Battery Microcontoller Flash RAM (1MB) April 14, 2004 Usage Module (In use switch) Movement Detection Module (Gyroscopes & Accelrometers) Tamper Detection Module (Tag Removed Switch) 11 Software Interface (STATag – Server) General Specifications – All STATags have a unique ID – STATags transmit their location periodically or when queried – STATag location data is stored in the database by STATag ID – Software interface updates the database using SQL April 14, 2004 12 User Interface Allows for fast lookups User selects type equipment to locate Query is sent to web server Web server retrieves the location of the closest piece of equipment of the selected type Position is displayed on a map for the user April 14, 2004 13 Underlying Interface Abstraction Installation associates the equipment’s serial number and equipment type with the STATag’s unique ID Equipment type queries return all STATag IDs associated with the requested type Each STATag’s location is compared to the requester’s location Location of the closest STATag not in use is returned April 14, 2004 14 Objective Create a Real-Time Equipment Tracking system using STATags that increases staff efficiency and allows hospitals to reduce operating costs April 14, 2004 15 STATags will: Use “Dead Reckoning” to determine current location Use network security Self-discover & self-configure network Handle large quantities of equipment April 14, 2004 16 STATags will (continued): Activate Alarms Store historical location and usage data Run without intervention for long periods – Battery lasts 5-7 years – Need calibration only when battery is changed April 14, 2004 17 STATags will not: Prevent theft Collect or transmit personally identifiable health information (covered under HIPAA) Communicate further than 100 feet between STATags April 14, 2004 18 Major Risks Interference with hospital monitoring equipment – STATag transmits 1% the power of other safe wireless devices – Most major Hospitals are implementing WiFi Conflicts with other 2.4 GHz networks – 802.15.4 has been designed for interoperability 802.15.4 and ZigBee are new standards and therefore there maybe unknown issues – Hardware issues are being resolved by manufactures – Software issues will be correctable by patching April 14, 2004 19 Management Plan The management plan encapsulates the following: – Program management overview – Management structure – Project team – Project planning – Financial management – Management reviews April 14, 2004 20 Team Distribution Project Lead / Computer Engineer Daniel Tubbs Manufacturing Director Personnel Director Francis Doligosa Joseph Williams Inventory Manager Installation Engineers Help Desk Coordinator Development Staff Support Staff April 14, 2004 Marketing & Web Development Financial Director R&D / QA Latricia Simon Brian Easton Jason Sadler Technical Writer Graphics Designer Sales Manager Salesmen Computer Engineer Drafter Office Manager Accounts Manager Accounts Receivable 21 Evaluation Plan Monitor milestones Track budget and schedule Monitor quality assurance Track customer impact and satisfaction Evaluate areas for improvements April 14, 2004 22 Marketing Plan Target market: US Hospitals Installation cost: approximately $392,000 The hospital will recover the installation cost in only 7.5 months The hospital will save $6.1 Million over 10 years Sold via direct sales April 14, 2004 23 Market Analysis Our target market is US hospitals: Hospitals: 5,7942 Total Registered Beds: 975,9622 Estimated mobile medical equipment in US: Approximately 10 Million4 Potential future market: International hospitals April 14, 2004 24 Market Analysis (continued) Hospital equipment is very expensive and highly mobile Equipment tracking is a large problem that causes: – Time consuming equipment searches – Unnecessary equipment purchases Locating equipment is one of the Top 10 most wasteful hospital activities7 April 14, 2004 25 Hospital Savings Total Savings $7,000,000 $6,163,266 $6,000,000 $5,507,717 $5,000,000 $4,852,169 $4,196,620 $4,000,000 $3,541,072 $3,000,000 Total Savings $2,885,524 $2,229,975 $2,000,000 $1,574,427 $1,000,000 $918,878 $263,330 $0 1 2 3 4 5 6 7 8 9 10 Year April 14, 2004 26 Funding Plan Phase 1 – $100,000 SBIR Phase 1 Grant Phase 2 – $750,000 SBIR Phase 2 Grant Phase 3 – $200,000 SBA Loan Break even point – August 15, 2006 Net Profit as of December 31, 2007 $76.4 Million April 14, 2004 27 n, 2 F e 00 b, 4 2 M 00 ar 4 ,2 Ap 004 r, M 200 ay 4 ,2 Ju 00 n, 4 20 Ju 0 4 l, Au 200 g, 4 Se 200 p, 4 2 O 00 4 ct ,2 0 N ov 04 , D 200 ec 4 ,2 Ja 004 n, F e 200 b, 5 2 M 005 ar ,2 Ap 00 r, 5 2 M 00 ay 5 ,2 Ju 00 n, 5 20 Ju 0 5 l, Au 200 g, 5 2 Se 00 p, 5 2 O 00 5 ct ,2 N 00 ov 5 , D 200 ec 5 ,2 Ja 00 n, 5 2 F e 00 b, 6 2 M 00 ar 6 ,2 Ap 006 r, M 200 ay 6 ,2 Ju 00 n, 6 20 06 Ja Balance Sheet: Phases 0-2 Balance $700,000.00 $600,000.00 $500,000.00 $400,000.00 Balance $300,000.00 $200,000.00 $100,000.00 $0.00 April 14, 2004 28 Balance Sheet: Phase 3 Balance $90,000,000.00 $80,000,000.00 $76,672,141.46 $70,331,538.42 $70,000,000.00 $64,092,001.53 $60,000,000.00 $57,953,530.78 $51,969,526.16 $50,000,000.00 $46,033,187.68 Balance $40,197,915.33 $40,000,000.00 $34,463,709.13 $30,000,000.00 $28,830,569.06 $23,351,895.12 $20,000,000.00 $10,000,000.00 $0.00 $18,434,218.02 $14,120,831.12 $10,401,627.82 $7,319,901.50 $4,758,745.56 $2,761,453.36 $1,317,918.31 $451,433.79 Jul, 2006 April 14, 2004 Aug, 2006 Sep, 2006 Oct, 2006 Nov, 2006 Dec, 2006 Jan, 2007 Feb, 2007 Mar, 2007 Apr, 2007 May, 2007 Jun, 2007 Jul, 2007 Aug, 2007 Sep, 2007 Oct, 2007 Nov, 2007 Dec, 2007 29 Major Milestones – Phase 0 3-May-04 3-May-04 April 14, 2004 SBIR Grant Application SBIR Presentation 30 Deliverables - Phase 0 12-Jan-04 Project Start 11-Feb-04 Individual Project Presentation 17-Mar-04 Feasibility Presentation 14-Apr-04 Milestone Presentation 3-May-04 Website Complete April 14, 2004 31 Major Milestones – Phase 1 10-Sep-04 Prototype Specifications (Draft) Complete 19-Nov-04 Lab Prototype Built 25-Nov-04 Lab Prototype Testing Complete 2-Dec-04 Product Specification (final) Complete 10-Dec-04 SBIR Phase 2 Application Submitted April 14, 2004 32 Deliverables - Phase 1 8-Oct-04 29-Oct-04 Complete 1-Nov-04 Complete 28-Oct-04 18-Nov-04 April 14, 2004 Parts Acquired Computer Interface Dead Reckoning Module 802.15.4 Module Complete Software Interface Complete 33 Major Milestones – Phase 2 25-Feb-05 SBA Loan Obtained 9-May-05 Database Development Complete 11-Aug-05 Web Interface Development Complete 28-Sep-05 Integration Testing Complete 25-Feb-05 Documentation Complete 26-Apr-05 Design Finalized 3-Jan-06 FCC Approval Received 10-Jan-06 STATags ready for Real World Testing 2-May-06 STATags Ready for Sale April 14, 2004 34 Major Milestones – Phase 3 8-Aug-06 11-Jul-06 Established 8-Aug-06 Trained 15-Aug-06 April 14, 2004 Full Production Support Department Installation Engineers Break Even Point 35 Project Budget Phase 1 Phase 2 Phase 3 Total April 14, 2004 $96,600 $836,000 $3,431,600 $4,364,200 36 Budget by Year 2004 – $206,976 Phases 0 & 1 Complete 2005 – $505,512 Production Sample Complete, FCC Testing Complete 2006 – $1,599,104 Phase 2 Complete, Full Production, Installed in 43 hospitals 2007 – $2,052,600 Installed in 271 hospitals Total $4,364,192 April 14, 2004 37 Resources - Phase 1 Office Space 2600 Sq. Feet Utilities Telephone/Internet Office Furniture Electrical Eng. Equipment Office Computers Peachtree 2004 Network / Server MS Visio / MS Project Web Site Hosting Prototype Parts Total April 14, 2004 $7,200 $2,000 $1,600 $6,000 $2,500 $8,000 $1,000 $3,500 $3,000 $200 $1,000 $36,000 38 Personnel - Phase 1 Francis Deligosa - Manufacturing Director Daniel Tubbs - Team Manager / Computer Engineer Joseph Williams - Personnel Manager Latricia Simon - R & D Manager / QA Manager Brian Easton - Finance Officer Jason Sadler - Marketing Director Drafter (plastic parts) Computer Engineer Total April 14, 2004 $9,000 $9,000 $9,000 $9,000 $9,000 $9,000 $600 $6,000 $60,600 39 Resources - Phase 2 Office Space 2600 Sq. Feet Utilities Office Furniture Network / Server Web Site Hosting Trade Show Booth Rental Airfare to Tradeshow Entertainment Test DB Server Plastic Tooling Test Run FCC Approval Testing Total April 14, 2004 $30,600 $8,500 $6,000 $6,000 $850 $30,000 $4,000 $1,000 $2,500 $40,000 $5,000 $20,000 Car Rental Telephone/Internet Office Computers Development Software Graphics Designer Trade Magazine Ad Hotel Test WWW Server Test Workstations Production Engineering Error Reporting Software $400 $6,800 $12,000 $8,000 $1,600 $55,000 $1,000 $2,500 $3,000 $15,000 $5,000 $264,750 40 Personnel - Phase 2 Daniel Tubbs - Team Manager Joseph Williams - Personnel manager Brian Easton - Finance Manager Latricia Simon - R&D Manager / QA Manager Jason Sadler - Marketing Director Francis Deligosa - Manufacturing Director Office Manager Lawyer Software Engineer 2 Technical Writer Installation Engineer Network Engineer Total April 14, 2004 $68,000 $59,500 $59,500 $59,500 $59,500 $59,500 $42,500 $54,000 $76,500 $8,750 $12,000 $12,000 $571,250 41 Resources - Phase 3 Office Space 6000 Sq. Feet Utilities Telephone/Internet Office Furniture Office Computers Network / Server Development Software Web Site Hosting Trade Show Booth Rental Trade Magazine Ad Airfare to Tradeshow Car Rental Hotel Entertainment Ticket Tracking Software Retool Plastic Mold Total April 14, 2004 $80,000 $20,000 $12,000 $10,000 $20,000 $10,000 $10,000 $1,000 $120,000 $44,000 $32,000 $1,600 $8,000 $8,000 $5,000 $320,000 $701,600 42 Personnel - Phase 3 Daniel Tubbs - Team Manager Joseph Williams - Personnel manager Latricia Simon - R&D Manager / QA Manager Brian Easton - Finance Manager Jason Sadler - Marketing Director Francis Delegosa - Manufacturing Director Office Manager Accounts Manager Accounts Receivable Lead Installation Engineer Installation Engineers (6) Help Desk Coordinator Tech Support (3) Sales Manager Salesmen (6) Software Engineers 1 (3) Inventory Manager Total April 14, 2004 $100,000 $80,000 $80,000 $80,000 $80,000 $80,000 $70,000 $80,000 $70,000 $100,000 $540,000 $60,000 $150,000 $140,000 $720,000 $240,000 $60,000 $2,730,000 43 References & Calculations 1 $462,221,560,0002 x 57%3 (all wages & Benefits) x 63%3 (nurses wages & benefits) 2 Hospital Statistics, 2004 edition, American Hospital Association, as reported by the American Hospital Association website (Appendix B) 3 Cost of Caring: Key Drivers of Growth in Spending on Hospital Care, PriceWaterhouseCoopers, February 19, 2003 (Appendix C) 4 975,9622 Beds x 10 Mobile Medical Devices per bed = 9.76 Million Mobile Medical Devices April 14, 2004 44 References & Calculations 5 Cindy Jimmerson, April 7, 2004 6 $166 Billion (Nurse’s Salary and Benefits)1 x 35% = $58 Billion $166 Billion (Nurse’s Salary and Benefits)1 x 60% = $99 Billion 7 Murphy, Mark: Eliminating Wasteful Work in Hospitals Improves Margin, Quality, and Culture (Appendix D) April 14, 2004 45 Questions? April 14, 2004 46