Form Approved Through 05/2004 OMB No. 0925-0001 LEAVE BLANK—FOR PHS USE ONLY. Type Activity Number Review Group Formerly Department of Health and Human Services Public Health Services Grant Application Council/Board (Month, Year) Do not exceed character length restrictions indicated. Date Received 1. TITLE OF PROJECT (Do not exceed 56 characters, including spaces and punctuation.) STATag - Real Time Equipment Tracking for Hospitals 2. RESPONSE TO SPECIFIC REQUEST FOR APPLICATIONS OR PROGRAM ANNOUNCEMENT OR SOLICITATION (If “Yes,” state number and title) Number: Title: 3. PRINCIPAL INVESTIGATOR/PROGRAM DIRECTOR New Investigator 3a. NAME (Last, first, middle) 3b. DEGREE(S) Tubbs, Daniel L. AS 3c. POSITION TITLE No NO YES Yes BS 3d. MAILING ADDRESS (Street, city, state, zip code) Project Manager 838 Old George Washington Highway Suite D Chesapeake, VA 23323 3e. DEPARTMENT, SERVICE, LABORATORY, OR EQUIVALENT Research 3f. MAJOR SUBDIVISION None E-MAIL ADDRESS: 3g. TELEPHONE AND FAX (Area code, number and extension) TEL: 757-647-5911 FAX: 757-558-5585 4. HUMAN SUBJECTS 4a. Research Exempt RESEARCH No tubbs_d@cs.odu.edu 5. VERTEBRATE ANIMALS Yes No Yes If “Yes,” Exemption No. No 4b. Human Subjects Assurance No. 4c. NIH-defined Phase III 5a. If “Yes,” IACUC 5b. Animal welfare assurance no. 6. DATES OF PROPOSED PERIOD OF SUPPORT (month, day, year—MM/DD/YY) approval Date Clinical Trial No Yes 7. COSTS REQUESTED FOR INITIAL BUDGET PERIOD 8. COSTS REQUESTED FOR PROPOSED PERIOD OF SUPPORT From 7a. Direct Costs ($) 8a. Direct Costs ($) Yes Through 8/3/2004 12/10/2004 $96,600 9. APPLICANT ORGANIZATION Name Digital Inventory Systems Address 7b. Total Costs ($) $100,000 8b. Total Costs ($) $96,600 $100,000 10. TYPE OF ORGANIZATION 838 Old George Washington Highway Suite D Chesapeake, VA 23323 Public: Private: For-profit: Federal State Local Private Nonprofit General Woman-owned Small Business Socially and Economically Disadvantaged 11. ENTITY IDENTIFICATION NUMBER Application Pending DUNS NO. VA 04 Institutional Profile File Number (if known) Congressional District 12. ADMINISTRATIVE OFFICIAL TO BE NOTIFIED IF AWARD IS MADE Name Tubbs, Daniel, Lee 13. OFFICIAL SIGNING FOR APPLICANT ORGANIZATION Name Tubbs, Daniel, Lee Title Title Address Tel: Project Manager 838 Old George Washington Highway Suite D Chesapeake, VA 23323 757-647-5911 tubbs_d@cs.odu.edu FAX: Address 757-558-5585 Tel: Project Manager 838 Old George Washington Highway Suite D Chesapeake, VA 23323 757-647-5911 FAX: E-Mail: tubbs_d@cs.odu.edu 14. PRINCIPAL INVESTIGATOR/PROGRAM DIRECTOR ASSURANCE: I certify that the SIGNATURE OF PI/PD NAMED IN 3a. statements herein are true, complete and accurate to the best of my knowledge. I am (In ink. “Per” signature not acceptable.) 757-558-5585 E-Mail: aware that any false, fictitious, or fraudulent statements or claims may subject me to criminal, civil, or administrative penalties. I agree to accept responsibility for the scientific conduct of the project and to provide the required progress reports if a grant is awarded as a result of this application. SIGNATURE OF OFFICIAL NAMED IN 13. 15. APPLICANT ORGANIZATION CERTIFICATION AND ACCEPTANCE: I certify that the statements herein are true, complete and accurate to the best of my knowledge, and (In ink. “Per” signature not acceptable.) accept the obligation to comply with Public Health Services terms and conditions if a grant is awarded as a result of this application. I am aware that any false, fictitious, or fraudulent statements or claims may subject me to criminal, civil, or administrative penalties. PHS 398 (Rev. 05/01) Face Page DATE May 3, 2004 DATE May 3, 2004 Form Page 1 Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. DESCRIPTION: State the application’s broad, long-term objectives and specific aims, making reference to the health relatedness of the project. Describe concisely the research design and methods for achieving these goals. Avoid summaries of past accomplishments and the use of the first person. This abstract is meant to serve as a succinct and accurate description of the proposed work when separated from the application. If the application is funded, this description, as is, will become public information. Therefore, do not include proprietary/confidential information. DO NOT EXCEED THE SPACE PROVIDED. From 1997 to 2001, spending on hospital care increased by $83.6 Billion. Hospital gross margins have also declined annually every year since 1997. This is due in large part to higher wages due to nurse shortages and a higher volume of patients. By 2003, 57% of total hospital expenses were due to wages and benefits. For nurses alone, wages and benefits account for 36% of all hospital costs. With this in mind, a real problem is at hand. Hospitals have a history of losing and spending unnecessary money. This money is wasted consequently on inefficiency of nurses and hospital staff. From our studies, 35-60% of a nurse’s time is wasted on searching for equipment, clarifying orders, and entering redundant information. All together this cost of inefficiency rounds in at about $58 - $99 billion annually. At this point, hospitals need to reduce total costs in order to increase profitability. The use of STATags will aid in reducing this cost. It provides a solution for real-time equipment tracking (RTET). With STATags, man-hours searching for equipment will be reduced drastically. As a result, this will increase staff efficiency and improve equipment utilization. Also, operating costs are higher than it should be. STATags will lower operating costs by means of reducing overtime, and providing an increased turnaround rate. Thus more hospitals will be able to maintain profitability and continue to provide services to the public. PERFORMANCE SITE(S) (organization, city, state) Digital Inventory Systems 838 Old George Washington Highway Suite D Chesapeake, VA 23323 KEY PERSONNEL. See instructions. Use continuation pages as needed to provide the required information in the format shown below. Start with Principal Investigator. List all other key personnel in alphabetical order, last name first. Name Organization Role on Project Daniel Tubbs Francis Doligosa Joseph Williams Jason Sadler Latricia Simon Brian Easton Digital Inventory Systems Digital Inventory Systems Digital Inventory Systems Digital Inventory Systems Digital Inventory Systems Digital Inventory Systems Disclosure Permission Statement. Applicable to SBIR/STTR Only. See instructions. PHS 398 (Rev. 05/01) Page 2 Project Lead Manufacturing Director Personnel Director Marketing Director R&D / QA Manager Finacial Director Yes No Number pages consecutively at the bottom throughout the application. Do not use suffixes such as 2a, 2b. Form Page 2 Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. The name of the principal investigator/program director must be provided at the top of each printed page and each continuation page. RESEARCH GRANT TABLE OF CONTENTS Page Numbers Face Page .................................................................................................................................................. Description, Performance Sites, and Personnel ................................................................................... Table of Contents ..................................................................................................................................... Detailed Budget for Initial Budget Period (or Modular Budget) .......................................................... Budget for Entire Proposed Period of Support (not applicable with Modular Budget) ............................. 1 2 3 4 5 Budgets Pertaining to Consortium/Contractual Arrangements (not applicable with Modular Budget) Biographical Sketch – Principal Investigator/Program Director (Not to exceed four pages) .................. Resources ................................................................................................................................................. 7 8-12 13 Research Plan ........................................................................................................................................... 14 Other Biographical Sketches (Not to exceed four pages for each – See instructions) ......................... Introduction to Revised Application (Not to exceed 3 pages) ......................................................................................................... Introduction to Supplemental Application (Not to exceed one page) .............................................................................................. A. Specific Aims ...................................................................................................................................................................... B. Background and Significance ............................................................................................................................................. C. Preliminary Studies/Progress Report/ (Items A-D: not to exceed 25 pages*) Phase I Final ReportReport (SBIR/STTR), or Phase II ONLY) Phase I Progress (SBIR/STTR * SBIR/STTR Phase I: Items A-D limited to 15 pages. SBIR/STTR Fast Track Product........................................................................................................................................... Development Plan ........................................................................................................... D. Research Design and Methods E. Human Subjects ................................................................................................................................................................. 14 15 15 16 46 Protection of Human Subjects (Required if Item 4 on the Face Page is marked “Yes”) ................................................... Inclusion of Women (Required if Item 4 on the Face Page is marked “Yes”) ................................................................. Inclusion of Minorities (Required if Item 4 on the Face Page is marked “Yes”) ............................................................... Inclusion of Children (Required if Item 4 on the Face Page is marked “Yes”) ................................................................. Data and Safety Monitoring Plan (Required if Item 4 on the Face Page is marked “Yes” and a Phase I, II, or III clinical trial is proposed ...................................................................................................................................................... J. Product Development Plan (SBIR/STTR Phase II and Fast-Track ONLY) .......................................................................... 46 46 46 47 47 Checklist.................................................................................................................................................... 48 F. Vertebrate Animals ............................................................................................................................................................. G. Literature Cited ................................................................................................................................................................... H. Consortium/Contractual Arrangements ............................................................................................................................... I. Letters of Support (e.g., Consultants) ................................................................................................................................. Appendix (Five collated sets. No page numbering necessary for Appendix.) Appendices NOT PERMITTED for Phase I SBIR/STTR unless specifically solicited. ............................................................. Check if Appendix is Included Number of publications and manuscripts accepted for publication (not to exceed 10) Other items (list): PHS 398 (Rev. 05/01) Page 3 Form Page 3 Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. DETAILED BUDGET FOR INITIAL BUDGET PERIOD DIRECT COSTS ONLY PERSONNEL (Applicant organization only) ROLE ON PROJECT NAME Principal Investigator Manufact. Director Personnel Director Marketing Director R&D / QA Manager Finacial Director Daniel Tubbs Francis Doligosa Joseph Williams Jason Sadler Latricia Simon Brian Easton FROM THROUGH 8/3/2004 12/10/2004 TYPE APPT. (months) % EFFORT ON PROJ. 12 100.0 27,000 9,000 0 9,000 12 100.0 27,000 9,000 0 9,000 12 100.0 27,000 9,000 0 9,000 12 100.0 27,000 9,000 0 9,000 12 100.0 27,000 9,000 0 9,000 12 100.0 27,000 9,000 0 9000 54,000 0 54,000 DOLLAR AMOUNT REQUESTED (omit cents) INST. BASE SALARY SUBTOTALS SALARY REQUESTED FRINGE BENEFITS TOTAL CONSULTANT COSTS Computer Engineer, Drafter 6,600 EQUIPMENT (Itemize) Office Furniture, Computers, Software 18,000 SUPPLIES (Itemize by category) Prototype Parts 1,000 TRAVEL None PATIENT CARE COSTS INPATIENT None OUTPATIENT None 0 0 0 ALTERATIONS AND RENOVATIONS (Itemize by category) 0 OTHER EXPENSES (Itemize by category) 0 SUBTOTAL DIRECT COSTS FOR INITIAL BUDGET PERIOD $ CONSORTIUM/CONTRACTUAL COSTS 17,000 FACILITIES AND ADMINISTRATIVE COSTS TOTAL DIRECT COSTS FOR INITIAL BUDGET PERIOD (Item 7a, Face Page) $ 96,600 3,400 SBIR/STTR Only: FEE REQUESTED PHS 398 (Rev. 05/01) 79,600 DIRECT COSTS Page 4 Form Page 4 Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. BUDGET FOR ENTIRE PROPOSED PROJECT PERIOD DIRECT COSTS ONLY BUDGET CATEGORY TOTALS PERSONNEL: Salary and fringe benefits. Applicant organization only. CONSULTANT COSTS EQUIPMENT ADDITIONAL YEARS OF SUPPORT REQUESTED 2nd 3rd 4th 5th 54,000 6,600 18,000 SUPPLIES 1,000 TRAVEL PATIENT CARE COSTS INITIAL BUDGET PERIOD (from Form Page 4) 0 INPATIENT 0 OUTPATIENT 0 ALTERATIONS AND RENOVATIONS 0 OTHER EXPENSES 0 SUBTOTAL DIRECT COSTS 79,600 CONSORTIUM/ DIRECT CONTRACTUAL COSTS F&A TOTAL DIRECT COSTS 0 17,000 96,600 TOTAL DIRECT COSTS FOR ENTIRE PROPOSED PROJECT PERIOD (Item 8a, Face Page) SBIR/STTR Only Fee Requested ––––– $ 96,600 $ 3,400 3,400 SBIR/STTR Only: Total Fee Requested for Entire Proposed Project Period (Add Total Fee amount to “Total direct costs for entire proposed project period” above and Total F&A/indirect costs from Checklist Form Page, and enter these as “Costs Requested for Proposed Period of Support on Face Page, Item 8b.) JUSTIFICATION. Follow the budget justification instructions exactly. Use continuation pages as needed. . PHS 398 (Rev. 05/01) Page 5 Form Page 5 Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. BUDGET JUSTIFICATION PAGE MODULAR RESEARCH GRANT APPLICATION Initial Budget Period Second Year of Support Third Year of Support Fourth Year of Support Fifth Year of Support 96,600 Total Direct Costs Requested for Entire Project Period $ 96,600 Personnel Daniel Tubbs, Project Lead (100% effort) - will supervise and coordinate the entire project, and will perform compter engineering tasks. Francis Doligosa, Manufacturing Director (100% effort) - will coordinate hardware manufacturing and assist in software development. Joseph Williams, Personnel Director (100% effort) - will locate and hire personell and assist in software development. Jason Sadler, Marketing Director (100% effort) - will design web interface, raise public awareness, and lead the marketing campaign. Latricia Simon, R&D / QA Manager (100% effort) - will assist in product development and ensure quality assurance standards are met. Brian Easton, Financial Director (100% effort) - will oversee funding and expenditures and assist in software development. Consortium Fee (SBIR/STTR Only) A fee of 3.52% of direct costs is requested. This contributes to the capitalization of Digital Inventory Systems. PHS 398 (Rev. 05/01) Page 6 Modular Budget Format Page Tubbs, Daniel L. Principal Investigator/Program Director (Last, First, Middle): BIOGRAPHICAL SKETCH Provide the following information for the key personnel in the order listed on Form Page 2. Follow this format for each person. DO NOT EXCEED FOUR PAGES. NAME POSITION TITLE Daniel Lee Tubbs Project Lead EDUCATION/TRAINING (Begin with baccalaureate or other initial professional education, such as nursing, and include postdoctoral training.) DEGREE (if applicable) YEAR(s) A.S.A.S.T. 1996 B.S. Pending) 2000-2004 INSTITUTION AND LOCATION Thomas Edison State College, Trenton, NJ Old Dominion University, Norfolk, VA FIELD OF STUDY Nuclear Engineering Technology Computer Science A. Positions and Honors. List in chronological order previous positions, concluding with your present position. List any honors. Include present membership on any Federal Government public advisory committee. 1986-1988 Manager, Adam’s Tri-city Enterprises, Kennewick, WA. 1988-1996 Engineering Watch Supervisor, United States Navy, Norfolk, VA. 1996-2004 Senior Network Analyst, Capital Group Companies, Inc., Norfolk, VA. 2004-Present Owner, Chesapeake Digital Solutions, Chesapeake, VA. B. Selected peer-reviewed publications or manuscripts in press (in chronological order). Do not include manuscripts submitted or in preparation. C. Research Support. List both selected ongoing and completed (during the last three years) research projects (federal or non-federal support). Begin with the projects that are most relevant to the research proposed in this application. Briefly indicate the overall goals of the projects and responsibilities of the key person identified on the Biographical Sketch. Note: Do not include percent of effort or direct costs. PHS 398/2590 (Rev. 05/01) Page 7 Continuation Format Page Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. BIOGRAPHICAL SKETCH Provide the following information for the key personnel in the order listed on Form Page 2. Follow this format for each person. DO NOT EXCEED FOUR PAGES. NAME POSITION TITLE Brian E. Easton Financial Director EDUCATION/TRAINING (Begin with baccalaureate or other initial professional education, such as nursing, and include postdoctoral training.) INSTITUTION AND LOCATION Liberty University, Lynchburg, VA Old Dominion University, Norfolk, VA DEGREE (if applicable) B.S.(Pending) YEAR(s) 2001-2002 2002-2004 FIELD OF STUDY Computer Science Computer Science A. Positions and Honors. List in chronological order previous positions, concluding with your present position. List any honors. Include present membership on any Federal Government public advisory committee. 2001-2002 RESNET Technician, Liberty University, Lynchburg, VA 2000 – Present Head Technician, Providence Computers, Chesapeake, VA B. Selected peer-reviewed publications or manuscripts in press (in chronological order). Do not include manuscripts submitted or in preparation. C. Research Support. List both selected ongoing and completed (during the last three years) research projects (federal or non-federal support). Begin with the projects that are most relevant to the research proposed in this application. Briefly indicate the overall goals of the projects and responsibilities of the key person identified on the Biographical Sketch. Note: Do not include percent of effort or direct costs. PHS 398/2590 (Rev. 05/01) Page 8 Continuation Format Page Tubbs, Daniel L. Principal Investigator/Program Director (Last, First, Middle): BIOGRAPHICAL SKETCH Provide the following information for the key personnel in the order listed on Form Page 2. Follow this format for each person. DO NOT EXCEED FOUR PAGES. NAME POSITION TITLE Francis Daniel Hill Doligosa Manufacturing Director EDUCATION/TRAINING (Begin with baccalaureate or other initial professional education, such as nursing, and include postdoctoral training.) INSTITUTION AND LOCATION Old Dominion University, Norfolk, VA DEGREE (if applicable) B.S. (Pending) YEAR(s) 1999-2004 FIELD OF STUDY Computer Science A. Positions and Honors. List in chronological order previous positions, concluding with your present position. List any honors. Include present membership on any Federal Government public advisory committee. 2001-2001 Sales Representative, 7-11, Virginia Beach, VA 2001-2003 Instructor/Advisor, C.H.R.O.M.E., Norfolk, VA 2000-Present Teaching Assistant, ODU ME Department, Norfolk, VA 2002-Present System Administrator, ODU CS Department, Norfolk, VA B. Selected peer-reviewed publications or manuscripts in press (in chronological order). Do not include manuscripts submitted or in preparation. C. Research Support. List both selected ongoing and completed (during the last three years) research projects (federal or non-federal support). Begin with the projects that are most relevant to the research proposed in this application. Briefly indicate the overall goals of the projects and responsibilities of the key person identified on the Biographical Sketch. Note: Do not include percent of effort or direct costs. PHS 398/2590 (Rev. 05/01) Page 9 Continuation Format Page Tubbs, Daniel L. Principal Investigator/Program Director (Last, First, Middle): BIOGRAPHICAL SKETCH Provide the following information for the key personnel in the order listed on Form Page 2. Follow this format for each person. DO NOT EXCEED FOUR PAGES. NAME POSITION TITLE Jason Ray Sadler Marketing Director EDUCATION/TRAINING (Begin with baccalaureate or other initial professional education, such as nursing, and include postdoctoral training.) DEGREE (if applicable) YEAR(s) AA&S B.S.(Pending) 1996-2000 2001-2004 INSTITUTION AND LOCATION Paul D. Camp Community College, Suffolk, VA Old Dominion University, Norfolk, VA FIELD OF STUDY Computer Science Computer Science A. Positions and Honors. List in chronological order previous positions, concluding with your present position. List any honors. Include present membership on any Federal Government public advisory committee. 1999-1999 Computer Service Technician, Peninsula Computers, Yorktown, VA 1999-2000 Computer Service Technician, NTK Computer, Richmond, VA 2000-2000 Computer Service Technician, Technology Source, Suffolk, VA 2000-2001 Computer Service Technician, Interlink Computer, Newport News, VA 2003-Present OCCS Student Technology Support, Old Dominion University, Norfolk, VA B. Selected peer-reviewed publications or manuscripts in press (in chronological order). Do not include manuscripts submitted or in preparation. C. Research Support. List both selected ongoing and completed (during the last three years) research projects (federal or non-federal support). Begin with the projects that are most relevant to the research proposed in this application. Briefly indicate the overall goals of the projects and responsibilities of the key person identified on the Biographical Sketch. Note: Do not include percent of effort or direct costs. PHS 398/2590 (Rev. 05/01) Page 10 Continuation Format Page Principal Investigator/Program Director (Last, first, middle): Tubbs, Daniel L. BIOGRAPHICAL SKETCH Provide the following information for the key personnel in the order listed for Form Page 2. Follow the sample format for each person. DO NOT EXCEED FOUR PAGES. NAME POSITION TITLE Williams, Joseph Lamar Personnel Manager EDUCATION/TRAINING (Begin with baccalaureate or other initial professional education, such as nursing, and include postdoctoral training.) INSTITUTION AND LOCATION Old Dominion University, Norfolk, VA DEGREE (If applicable) YEAR(s) B.S. Pending) 2000-2004 FIELD OF STUDY Computer Science A. Positions and Honors. List in chronological order previous positions, concluding with your present position. List any honors. Include present membership on any Federal Government public advisory committee. 2000-2001 Technician, Old Dominion University, Norfolk, VA 2003-2004 Student Worker, Old Dominion University, Norfolk, VA 2003-2004 Floor Manager, Downtown Locker Room, Norfolk, VA B. Selected peer-reviewed publications or manuscripts in press (in chronological order). Do not include manuscripts submitted or in preparation. C. Research Support. List both selected ongoing and completed (during the last three years) research projects (federal or non-federal support). Begin with the projects that are most relevant to the research proposed in this application. Briefly indicate the overall goals of the projects and responsibilities of the key person identified on the Biographical Sketch. Note: Do not include percent of effort or direct costs. PHS 398/2590 (Rev. 05/01) Page 11 Continuation Format Page . Tubbs, Daniel L. Principal Investigator/Program Director (Last, First, Middle): BIOGRAPHICAL SKETCH Provide the following information for the key personnel in the order listed on Form Page 2. Follow this format for each person. DO NOT EXCEED FOUR PAGES. NAME POSITION TITLE Latricia Simon QA and R&D Manager EDUCATION/TRAINING (Begin with baccalaureate or other initial professional education, such as nursing, and include postdoctoral training.) DEGREE (if applicable) INSTITUTION AND LOCATION Christopher Newport University, Newport News, VA Old Dominion University, Norfolk, VA B.S. Pending) YEAR(s) 1999 2000-2004 FIELD OF STUDY Accounting Computer Science A. Positions and Honors. List in chronological order previous positions, concluding with your present position. List any honors. Include present membership on any Federal Government public advisory committee. 1998-2002 Sales Associate, Stein Mart, Virginia Beach, VA 2002-2003 Pool Attendant, Brandywine Apartments, Virginia Beach, VA B. Selected peer-reviewed publications or manuscripts in press (in chronological order). Do not include manuscripts submitted or in preparation. C. Research Support. List both selected ongoing and completed (during the last three years) research projects (federal or non-federal support). Begin with the projects that are most relevant to the research proposed in this application. Briefly indicate the overall goals of the projects and responsibilities of the key person identified on the Biographical Sketch. Note: Do not include percent of effort or direct costs. PHS 398/2590 (Rev. 05/01) Page 12 Continuation Format Page Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. RESOURCES FACILITIES: Specify the facilities to be used for the conduct of the proposed research. Indicate the performance sites and describe capacities, pertinent capabilities, relative proximity, and extent of availability to the project. Under “Other,” identify support services such as machine shop, electronics shop, and specify the extent to which they will be available to the project. Use continuation pages if necessary. Laboratory: None Clinical: None Animal: None Computer: None Office: None Other: None MAJOR EQUIPMENT: List the most important equipment items already available for this project, noting the location and pertinent capabilities of each. None PHS 398 (Rev. 05/01) Page 13 Resources Format Page A. Specific Aims According to a recent Price Waterhouse Coopers study conducted to uncover the reasons for increases in health care spending over the last decade from 1997 to 2001, spending on hospital care increased by $83.6 Billion and hospital gross margins have declined annually every year since 1997. The study leads one to the conclusion that Hospitals are being asked to do more with less. 3 Of the total of all health care costs in American hospitals wages and benefits for nurses account for 36%, or $166.4 Billion annually. 3 That figure is derived by taking the total cost of all health care wages and benefits ($462 Billion), of which 36% is nurses' wages and benefits. Additionally there are currently 5,794 hospitals registered with the American Hospital Association with a total of 975,962 registered beds. 2 Our estimate based on these statistics is that there is approximately 10 pieces of mobile medical equipment in a hospital per registered bed. These items would include EKGs, portable X-Ray machines, crash carts, IV poles, wheelchairs, mobile beds, glucometers, ultrasound machines, transfusers, drug carts, and many other pieces of equipment. Additionally, almost every piece of hospital equipment that is not physically installed in a room is mobile. All hospital equipment is very costly. According to another recent study performed by Mark Murphy showed that finding needed equipment is one of the top ten most wasteful activities at hospitals. 1 Therefore, up to the minute inventory tracking is a real problem in hospitals all across America today. The goal of the STATag project is to enable hospitals to eliminate waste, reduce operating costs, and stay in the business of providing health care to the community. Digital inventory system’s solution for reducing cost in hospitals is the STATag. It is a Real Time Inventory Tracking system that will reduce the man hours needed to search for equipment, lower operating costs and increase staff efficiency in maintaining medical devices. All this is accomplished using the five modules contained inside STATag, the user interface and a database server. STATags will reduce the effort needed to locate a device by displaying its location on an easy to use interface. No longer will hospital staff have to go room to room to locate medical devices. All the staff will have to do is query the database for the item they desire and a picture diagram will appear on the screen, showing the locations of the device they queried. The viewer of the diagram will be able to tell which device is not in use because it will show up active on the screen. From there all the staff member will have to do is go and get the item because the floor and room location of the device will be specified in the diagram. In addition to reducing searching efforts, operation cost and staff efficiency in maintaining the equipment will be affected. The type of reports this system will generate will give insight to the duration of time they had a particular item, price by usage, inventory, equipment utilization, and missing equipment report The STATag is capable of impacting the hospital community in this fashion because of the hardware components. IEEE 802.15.4 is a self configuring system capable of communicating in noisy environment using a minute amount of power. We use flash ram memory to back up the information gained in the environments where the communication signal may not be to strong. In addition to this, we have a movement module that tracks the location of the device as it moves around the hospital. All these components together provide the environment the type of communication that will be productive in a hospital environment. The Phase I goals are: 1. Construction and operation of a lab prototype of the STATag. The prototype will demonstrate network detection, network auto-configuration, and communication between other lab prototypes. Further, the lab prototype will be able to determine its current position using on-board sensors. 2. Completion of the detailed specification for the production of the STATag. B. Background and Significance From 1997 to 2001, spending on hospital care increased by $83.6 Billion. 3 Hospital gross margins have also declined annually every year since 1997. 3 This is due in large part to higher wages due to nurse shortages and a higher volume of patients. By 2003, 57% of total hospital expenses were due to wages and benefits. For nurses alone, wages and benefits account for 36% of all hospital costs. 3 With this in mind, a real problem is at hand. Hospitals have a history of losing and spending unnecessary money. This money is wasted consequently on inefficiency of nurses and hospital staff. From our studies, 35-60% of a nurse’s time is wasted on searching for equipment, clarifying orders, and entering redundant information. All together this cost of inefficiency rounds in at about $58 - $99 billion annually. At this point, hospitals need to reduce total costs in order to increase profitability. In the near future, profitability of hospitals will become increasingly difficult as the Baby Boomer generation moves to retirement. This shift of the largest population segment will cause: 1. A more severe shortage of nurses. The number of nurses approaching retirement age is much greater than the number of nurses currently in training. This will result in greater upward pressure on nurse’s wages. 2. Increased patients. As the Baby Boomers continue to age, they will account for growing percentage of patients requiring health care. 3. Decreased reimbursements. The shift of the Baby Boomers from private health insurance to Medicare and Medicaid will drastically reduce the amount of money that hospitals receive in exchange for their services. This is the effect of private health insurance paying approximately 90% of costs vs. Medicare and Medicaid paying only 45%. C. Preliminary Studies Mark Murphy of the Murphy Leadership Institute found that reducing wasteful work results in an increase in the operating margin.1 It is this fact that the STATag will leverage to accomplish its goals of enabling hospitals to eliminate waste, reduce operating costs, and stay in the business of providing health care to the community. Discussions with Cindy Jimmerson, a national lecturer on hospital efficiency, revealed that up to 65% of nurses’ time is wasted searching for equipment, entering redundant information, and clarifying orders. In one example, eliminating the need to search for equipment (a glucometer) was found to save the nurse involved 13 minutes, for each patient.4 The principle of “Dead Reckoning” has been proved in such areas as NASA’s space shuttle program. However, until recently, the technology has been too expensive to practical for large scale adoption, but advances in Micro-Electro-Mechanical Systems (MEMS) have changed that. The technology to needed to build the STATag is already commercially available. The basic building blocks that make the STATag function are the MEMS accelerometers, MEMS gyroscopes, 802.15.4 radios, and the ZigBee protocol standard. D. Research Designs and Methods The STATag project will be broken down into four phases. The overall objective of our multiple phase work breakdown structure is to design, develop, test, evaluate, benchmark and (deploy) bring to production release an equipment tagging system that will affectively monitor hospital devices. This project will be broken into the following four phases: Phase 0 - Establish the feasibility and technical ability to produce STATag. Phase 0 will consist of seven major tasks. Following is a list of specific tasks that will address the key objectives of phase 0 research. 1. Develop an initial concept and a starting point. 1 1.1 2. 3. 4. 5. 6. 7. Select a project topic to develop further. Research the topic to gain background knowledge of the ideal. Research the feasibility of our topic. Research the milestones that will define our coarse schedule. Research all the components of an SBIR grant proposal write-up. Develop STATag’s webpage. Phase 1 - Develop a lab prototype and all its specifications. Phase 1 will consist of five major tasks. Following is a list of specific tasks that will address the key objectives of phase 1 research. 1. 2. 3. 4. 5. Hire personal such as a technical writer and a software engineer to maintain integrity in all aspects of STATag’s production. Specify, implement, test, and design our lab prototype. In addition to this we will develop, execute, and evaluate test problems to demonstrate the feasibility (compatibility) of the software and hardware components. Update the webpage information. Prepare phase two grant proposal. Submit phase two grant proposal. Phase 2 - Establish, in a hospital, a real world functioning model. Phase 2 will consist of nine major. Following is a list of specific tasks that will address the key objectives of phase two research. 1. 2. 3. 4. 5. 6. 7. 8. 9. Hire additional staff. Develop a software design and a plan for integration. Design a software web interface. Specify, implement, test, and design for real world integration. In addition to this we will develop, execute, and evaluate test problems to demonstrate interface compatibility of the software and hardware components. Develop user and testing documentation. Produce finalized result of the extensive software testing. Contract a legal representative. Begin the three phase real world installment of STATag. Develop a market plan for the continuation of DIS without grant assistance. Phase 3 – Achieve self-sustaining. Phase 3 will consist of nine major tasks. Following is a list of specific tasks that will address the key objectives of phase 3 research. 1. We will hire additional staff. 2. Produce Ramp up. 3. Establish full production of STATag. 4. Develop a support Department. 5. Establish a support Department. 6. Train installation engineers. 7. Enhance our marketing and sales techniques. 8. Establish ourselves in tradeshows. 9. Develop an in-depth support team which will consist of updates, warranty and telephone support. Work Breakdown Structure Phase 0 Concept Project Start 1/12/2004 8:00 1/12/2004 17:00 5/3/2004 17:00 1/12/2004 17:00 81 days 0 days Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams 1.2 Project Selection Project Topic Ideas Team Members Selected 1/12/2004 8:00 1/12/2004 8:00 1/13/2004 8:00 2/11/2004 17:00 1/12/2004 17:00 1/15/2004 17:00 23 days 1 day 1.2.1 1.2.3 Team Organization 1/16/2004 8:00 1/22/2004 17:00 5 days 1.2.4 Define Team Responsibilities 1/23/2004 8:00 1/29/2004 17:00 5 days 1.2.5 Individual Project Research 1/13/2004 8:00 2/11/2004 17:00 22 days 1.2.6 2/11/2004 17:00 2/12/2004 8:00 2/12/2004 8:00 2/17/2004 8:00 2/18/2004 8:00 2/18/2004 8:00 2/11/2004 17:00 2/17/2004 17:00 2/16/2004 17:00 2/17/2004 17:00 3/17/2004 17:00 3/17/2004 17:00 0 days 1.4.1 Individual Project Presentation Projects Research Projects Research Team Project Selection Feasibility Research Market Research 1.4.2 Risk Analysis 2/18/2004 8:00 3/17/2004 17:00 21 days 1.4.3 Research Competitors 2/18/2004 8:00 3/17/2004 17:00 21 days 1.4.4 Feasibility Presentation Milestone Research Work break Down Structure 3/17/2004 17:00 3/18/2004 8:00 3/18/2004 8:00 3/17/2004 17:00 4/14/2004 17:00 4/6/2004 17:00 0 days 1.5.2 Budget 3 days 1.5.3 ROI Analysis 3 days Brian Easton[75%] 1.5.4 Marketing Plan 3 days Jason Sadler[60%] 1.5.5 Finance Plan 3 days Brian Easton[37%] 1.5.6 Management Plan Evaluation Plan 4/9/2004 17:00 4/14/2004 17:00 4/9/2004 17:00 4/9/2004 17:00 4/13/2004 17:00 4/9/2004 17:00 4/14/2004 17:00 5/3/2004 17:00 5/3/2004 17:00 Daniel Tubbs[75%],Latricia Simon[75%],Jason Sadler[60%],Brian Easton[75%],Francis Deligosa[75%],Joseph Williams[75%] Brian Easton[37%],Joseph Williams[75%] 5 days Francis Deligosa[75%] 3 days Latricia Simon[75%] 0 days Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams 5/3/2004 0 days 1.2.2 1.3 1.3.1 1.3.2 1.4 1.5 1.5.1 1.6.1 SBIR Grant Proposal 4/7/2004 8:00 4/12/2004 8:00 4/7/2004 8:00 4/7/2004 8:00 4/7/2004 8:00 4/7/2004 8:00 4/14/2004 17:00 2/18/2004 8:00 2/18/2004 8:00 1.6.2 SBIR Grant 5/3/2004 1.5.7 1.5.8 1.6 Milestone Presentation SBIR Research 3 days Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams Daniel Tubbs[50%],Latricia Simon[50%],Jason Sadler[50%],Brian Easton[50%],Francis Deligosa[50%],Joseph Williams[50%] Daniel Tubbs[50%],Latricia Simon[50%],Jason Sadler[50%],Brian Easton[50%],Francis Deligosa[50%],Joseph Williams[50%] Daniel Tubbs[50%],Latricia Simon[50%],Jason Sadler[50%],Brian Easton[50%],Francis Deligosa[50%],Joseph Williams[50%] Daniel Tubbs[50%],Latricia Simon[50%],Jason Sadler[50%],Brian Easton[50%],Francis Deligosa[50%],Joseph Williams[50%] Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams 4 days 3 days 1 day 21 days 21 days 20 days 14 days 54 days 54 days Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams Daniel Tubbs[25%],Latricia Simon[25%],Jason Sadler[20%],Brian Easton[25%],Francis Deligosa[25%],Joseph Williams[25%] Daniel Tubbs[25%],Latricia Simon[25%],Jason Sadler[20%],Brian Easton[25%],Francis Deligosa[25%],Joseph Williams[25%] Daniel Tubbs[25%],Latricia Simon[25%],Jason Sadler[20%],Brian Easton[25%],Francis Deligosa[25%],Joseph Williams[25%] Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams Daniel Tubbs[25%],Latricia Simon[25%],Jason Sadler[20%],Brian Easton[25%],Francis Deligosa[25%],Joseph Williams[25%] Daniel Tubbs,Latricia Simon,Jason Sadler,Brian 1.7 Application & Presentation Website 1.7.1 Website Draft 1.7.2 Website Update 1 Website Update 2 Website Complete Phase 1 - Proof of Concept Hire Personnel 1.7.3 1.7.4 2 2.1 2.2 2.2.1.2 Build Lab Prototype Prototype Documentation Prototype Specification QA 2.2.1.3 Rework 2.2.1.4 2.2.2.1 Prototype Specifications (Draft) Complete Prototype Specification Complete High Level Design Vendor Selection 2.2.2.2 Parts Selection 2.2.2.3 Acquire Parts 2.2.2.4 Parts Acquired 2.2.3 2.2.3.1.1 Develop Prototype Computer Interface Module Design Circuits 2.2.3.1.2 Build Circuit 2.2.3.1.3 Test Circuit 2.2.3.1.4 QA 2.2.3.1.5 Rework 2.2.3.1.6 Computer Interface Complete Dead Reckoning Module Design Circuits 2.2.1 2.2.1.1 2.2.1.5 2.2.2 2.2.3.1 2.2.3.2 2.2.3.2.1 17:00 17:00 Easton,Francis Deligosa,Joseph Williams 2/18/2004 8:00 2/18/2004 8:00 3/18/2004 8:00 4/15/2004 8:00 5/3/2004 17:00 8/23/2004 8:00 8/23/2004 8:00 8/23/2004 8:00 8/23/2004 8:00 8/23/2004 8:00 9/8/2004 8:00 9/9/2004 8:00 9/10/2004 17:00 5/3/2004 17:00 3/2/2004 17:00 4/6/2004 17:00 5/3/2004 17:00 5/3/2004 17:00 12/10/2004 17:00 9/17/2004 17:00 12/3/2004 13:39 9/10/2004 17:00 9/7/2004 17:00 9/8/2004 17:00 9/10/2004 17:00 9/10/2004 17:00 54 days 10 days 14 days 13 days 0 days 9/10/2004 17:00 9/10/2004 17:00 0 days 9/13/2004 8:00 9/13/2004 8:00 9/20/2004 8:00 9/27/2004 8:00 10/8/2004 17:00 9/20/2004 8:00 9/20/2004 8:00 9/20/2004 8:00 10/13/2004 13:39 10/19/2004 13:39 10/21/2004 13:39 10/28/2004 13:39 10/29/2004 13:39 10/8/2004 17:00 9/17/2004 17:00 9/24/2004 17:00 10/8/2004 17:00 10/8/2004 17:00 11/19/2004 13:39 10/29/2004 13:39 10/1/2004 17:00 10/15/2004 13:39 10/21/2004 13:39 10/22/2004 13:39 10/29/2004 13:39 10/29/2004 13:39 20 days 5 days Daniel Tubbs[25%],Francis Deligosa[90%] 5 days Daniel Tubbs[25%],Francis Deligosa[90%] 10 days 0 days Francis Deligosa[10%],Parts Vendor 9/23/2004 8:00 9/23/2004 11/1/2004 13:39 10/11/2004 27.58 days 10 80 days 20 days 74.58 days 15 days 12 days 1 day 2 days 0 days 44.58 days 29.58 days 10 days 2 days Jason Sadler[20%] Jason Sadler[20%] Jason Sadler[20%] Jason Sadler Joseph Williams[10%] Daniel Tubbs,Latricia Simon[25%],Francis Deligosa[25%],Drafter[21%] Latricia Simon Daniel Tubbs,Latricia Simon[25%],Francis Deligosa[25%] Daniel Tubbs,Latricia Simon[25%],Francis Deligosa[25%] Daniel Tubbs[90%],Computer Engineer[39%] Daniel Tubbs[90%] 2 days Daniel Tubbs[90%] 1 day Latricia Simon 1 day Daniel Tubbs[90%] 0 days Daniel Tubbs[90%],Computer Engineer[39%] 2.2.3.2.2 Build Circuit 2.2.3.2.3 Test Circuit 2.2.3.2.4 QA 2.2.3.2.5 Rework 2.2.3.2.6 2.2.3.3 Dead Reckoning Module Complete 802.15.4 Module 2.2.3.3.1 Design Circuits 2.2.3.3.2 Build Circuit 2.2.3.3.3 Test Circuit 2.2.3.3.4 QA 2.2.3.3.5 Rework 2.2.3.3.6 2.2.3.4.4 802.15.4 Module Complete Software Interface Design Software Interface Build Software Interface Test Software Interface QA 2.2.3.4.5 Rework 2.2.3.4.6 2.2.3.5.1 Software Interface Complete Integrate Components Design Circuits 2.2.3.5.2 Build Circuit 2.2.3.5.3 Test Circuit 2.2.3.5.4 QA 2.2.3.5.5 Rework 2.2.3.5.6 2.2.4 Lab Prototype Built Prototype Testing 2.2.4.1 Test Prototype 2.2.4.2 QA 2.2.4.3 Rework 2.2.3.4 2.2.3.4.1 2.2.3.4.2 2.2.3.4.3 2.2.3.5 8:00 10/15/2004 13:39 10/25/2004 13:39 10/27/2004 13:39 10/29/2004 13:39 11/1/2004 13:39 9/20/2004 8:00 9/20/2004 8:00 10/11/2004 13:39 10/21/2004 13:39 10/25/2004 13:39 10/27/2004 13:39 10/28/2004 13:39 10/29/2004 13:39 10/29/2004 13:39 11/10/2004 13:39 11/12/2004 13:39 11/16/2004 13:39 11/17/2004 13:39 11/18/2004 13:39 13:39 10/19/2004 13:39 10/27/2004 13:39 10/28/2004 13:39 11/1/2004 13:39 11/1/2004 13:39 10/28/2004 13:39 9/29/2004 17:00 10/13/2004 13:39 10/25/2004 13:39 10/26/2004 13:39 10/28/2004 13:39 10/28/2004 13:39 11/18/2004 13:39 11/10/2004 13:39 11/12/2004 13:39 11/16/2004 13:39 11/17/2004 13:39 11/18/2004 13:39 11/18/2004 13:39 days 2 days Daniel Tubbs[90%] 2 days Daniel Tubbs[90%] 1 day Latricia Simon 1 day Daniel Tubbs[90%] 11/1/2004 13:39 11/1/2004 13:39 11/11/2004 13:39 11/15/2004 13:39 11/17/2004 13:39 11/18/2004 13:39 11/19/2004 13:39 11/19/2004 13:39 11/19/2004 13:39 11/23/2004 13:39 11/24/2004 13:39 11/19/2004 13:39 11/11/2004 13:39 11/15/2004 13:39 11/17/2004 13:39 11/18/2004 13:39 11/19/2004 13:39 11/19/2004 13:39 11/25/2004 13:39 11/23/2004 13:39 11/24/2004 13:39 11/25/2004 13:39 14 days 8 days Daniel Tubbs[90%],Computer Engineer[39%] 2 days Daniel Tubbs[90%] 2 days Daniel Tubbs[90%] 1 day Latricia Simon 1 day Daniel Tubbs[90%] 0 days Daniel Tubbs[90%] 0 days 28.58 days 6 days Daniel Tubbs[90%],Computer Engineer[39%] 2 days Daniel Tubbs[90%] 2 days Daniel Tubbs[90%] 1 day Latricia Simon 1 day Daniel Tubbs[90%] 0 days 14 days 8 days Brian Easton[90%],Daniel Tubbs[10%] 2 days Brian Easton[90%],Daniel Tubbs[10%] 2 days Brian Easton[90%],Daniel Tubbs[10%] 1 day Latricia Simon 1 day Brian Easton[90%],Daniel Tubbs[10%] 0 days 4 days 2 days Daniel Tubbs[90%],Brian Easton[90%] 1 day Latricia Simon 1 day Daniel Tubbs[90%],Brian Easton[90%] 2.2.4.4 2.2.5 2.2.6 2.2.7 2.3 Lab Prototype Testing Complete Update Design Specifications Product Specification (final) Complete Prototype Demonstration Webpage 2.4 SBIR Phase 2 Application 2.5 SBIR Phase 2 Application Submitted Phase 2 Product Development Obtain SBA Loan 3 3.1 3.2 3.3 3.4 3.4.1 3.4.2 SBA Loan Obtained Hire Staff - Phase 2 Software Development Software Design 3.4.3.5 Develop Integration Plan Database Development Database Selection Finalize Database Design Develop Assets Table Develop History Table QA 3.4.3.6 Rework 3.4.3.7 Reports 3.4.3.7.1 3.4.3.7.5 Finalize Report Design List Reports Here! List Reports Here! Cost Per Use Report Aging Report 3.4.3.7.6 Inventory Report 3.4.3.7.7 Missing Equipment 3.4.3 3.4.3.1 3.4.3.2 3.4.3.3 3.4.3.4 3.4.3.7.2 3.4.3.7.3 3.4.3.7.4 11/25/2004 13:39 11/25/2004 13:39 12/2/2004 13:39 11/25/2004 13:39 12/2/2004 13:39 12/2/2004 13:39 0 days 12/2/2004 13:39 11/18/2004 13:39 8/23/2004 8:00 5 days Daniel Tubbs[90%] 0 days Daniel Tubbs[90%] 12/3/2004 13:39 12/2/2004 13:39 12/10/2004 17:00 1 day Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams Jason Sadler[50%] 12/10/2004 17:00 12/10/2004 17:00 0 days 1/3/2005 8:00 5/2/2006 17:00 1/3/2005 8:00 2/25/2005 17:00 4/5/2005 8:00 1/3/2005 8:00 1/3/2005 8:00 1/3/2005 8:00 2/14/2005 8:00 2/14/2005 8:00 3/1/2005 8:00 4/4/2005 8:00 3/29/2005 8:00 4/11/2005 8:00 4/12/2005 8:00 2/22/2005 8:00 2/22/2005 8:00 3/7/2005 8:00 3/8/2005 8:00 3/14/2005 8:00 3/15/2005 8:00 3/21/2005 8:00 3/22/2005 8:00 2/25/2005 17:00 2/25/2005 17:00 5/4/2005 17:00 9/28/2005 13:02 2/11/2005 17:00 2/1/2005 17:00 5/9/2005 17:00 2/25/2005 17:00 3/7/2005 17:00 4/8/2005 17:00 4/4/2005 17:00 4/11/2005 17:00 4/13/2005 17:00 5/9/2005 17:00 3/4/2005 17:00 3/11/2005 17:00 3/14/2005 17:00 3/18/2005 17:00 3/21/2005 17:00 3/25/2005 17:00 3/28/2005 17:00 10 days 80 days Daniel Tubbs[10%],Latricia Simon[10%],Jason Sadler[10%],Brian Easton[10%],Francis Deligosa[10%],Joseph Williams[10%] Daniel Tubbs,Latricia Simon,Jason Sadler,Brian Easton,Francis Deligosa,Joseph Williams 347 days 40 days 0 days Brian Easton[10%] 20 days 192.5 days 30 days 20 days 61 days 10 days 5 days Joseph Williams[10%] 5 days Jason Sadler 5 days Joseph Williams 1 day Latricia Simon[90%] 2 days Joseph Williams 55 days 9 days Joseph Williams,Jason Sadler 5 days Jason Sadler 5 days Joseph Williams 5 days Jason Sadler 5 days Joseph Williams 5 days Jason Sadler 5 days Joseph Williams Francis Deligosa[50%],Joseph Williams Latricia Simon[90%],Daniel Tubbs Joseph Williams,Jason Sadler Joseph Williams 3.4.3.7.9 Report Equipment Utilization Report QA 3.4.3.7.10 Rework 3.4.3.8 Database Development Complete Web Interface 3.4.3.7.8 3.4.4 3.4.4.1 3.4.4.3 Web server Selection Finalize Web Interface Design Mapping Module 3.4.4.4 Setup Module 3.4.4.5 3.4.4.6 Inventory Entry Module Alarm Module 3.4.4.7 Help Screens 3.4.4.8 QA 3.4.4.9 Rework 3.4.4.10 3.4.5.1 Web Interface Development Complete Integration Testing Hardware Testing 3.4.5.2 Database Testing 3.4.5.3 Reports Testing 3.4.5.4 3.4.5.4.1 Web Interface Testing Internet Explorer 3.4.5.4.2 Netscape 3.4.5.4.3 3.4.5.5 Pocket PC Testing QA 3.4.5.6 Rework 3.4.5.7 3.5 Integration Testing Complete Documentation 3.5.1 User Manual 3.5.1.1 Write User Manual QA 3.4.4.2 3.4.5 3.5.1.2 3/28/2005 8:00 4/4/2005 8:00 5/5/2005 8:00 5/9/2005 17:00 4/1/2005 17:00 4/5/2005 17:00 5/9/2005 17:00 5/9/2005 17:00 5 days Jason Sadler 2 days Latricia Simon[90%] 3 days Joseph Williams 2/14/2005 8:00 2/14/2005 8:00 3/7/2005 9:02 3/21/2005 9:02 3/21/2005 9:02 4/18/2005 9:02 4/18/2005 9:02 5/16/2005 9:02 8/4/2005 9:02 8/8/2005 9:02 8/11/2005 9:02 8/11/2005 9:02 3/7/2005 9:02 3/21/2005 9:02 4/18/2005 9:02 4/18/2005 9:02 5/16/2005 9:02 8/4/2005 9:02 5/30/2005 9:02 8/8/2005 9:02 8/11/2005 9:02 8/11/2005 9:02 128.13 days 10 days 10 days 20 days 20 days 20 days 15 days 10 days 2 days 8/11/2005 9:02 8/11/2005 9:02 8/11/2005 9:02 9/1/2005 9:02 8/11/2005 9:02 8/11/2005 9:02 8/18/2005 9:02 8/25/2005 9:02 9/1/2005 9:02 9/7/2005 9:02 9/28/2005 13:02 1/3/2005 8:00 1/3/2005 8:00 1/3/2005 8:00 1/28/2005 9/28/2005 13:02 9/1/2005 9:02 9/1/2005 9:02 9/22/2005 9:02 9/1/2005 9:02 8/18/2005 9:02 8/25/2005 9:02 9/1/2005 9:02 9/7/2005 9:02 9/28/2005 13:02 9/28/2005 13:02 3/18/2005 15:59 2/4/2005 15:59 1/28/2005 15:59 2/1/2005 34.38 days 15 days 15 days 15 days 15 days 5 days 0 days 3 days Francis Deligosa[90%],Software Engineer Francis Deligosa[90%],Software Engineer Francis Deligosa Software Engineer Software Engineer Francis Deligosa Software Engineer Latricia Simon[90%] Francis Deligosa[90%],Software Engineer 0 days Daniel Tubbs Francis Deligosa[90%],Software Engineer Francis Deligosa[90%],Software Engineer Joseph Williams,Jason Sadler 5 days Joseph Williams,Jason Sadler 5 days Joseph Williams,Jason Sadler 4 days Latricia Simon[90%] 10 days 0 days Francis Deligosa[90%],Jason Sadler,Joseph Williams,Daniel Tubbs 54.87 days 24.87 days 10 days 2 days Daniel Tubbs[75%],Brian Easton[10%],Francis Deligosa[10%],Technical Writer Latricia Simon[90%] 3.5.1.3 Editing 3.5.2 Training Manual 3.5.2.1 3.5.2.2 Write Training Manual QA 3.5.2.3 Editing 3.5.3 Training CBT 3.5.3.1 3.5.3.2 Create Training CBT QA 3.5.3.3 Editing 3.5.3.4 3.6.2 Documentation Complete Sample Production Contract Vendor Selection Plastic Tooling 3.6.3 Engineering 3.6.4 Sample Run 3.6.5 Hardware Testing 3.6.6 QA 3.6.7 Update Design Specification Design Finalized 3.6 3.6.1 3.6.8 3.7 3.7.2 Finalize Production Plastic Tooling Update Engineering 3.7.3 Sample Run 2 3.7.4 Retest Hardware 3.7.5 QA Certification 3.7.6 FCC Approval Testing FCC Approval Paper work FCC Approval Received FCC Labeling 3.7.1 3.7.7 3.7.8 3.7.9 3.7.10 STATags ready for Real World Testing 15:59 2/1/2005 15:59 2/4/2005 15:59 2/4/2005 15:59 2/18/2005 15:59 2/22/2005 15:59 2/25/2005 15:59 2/25/2005 15:59 3/11/2005 15:59 3/15/2005 15:59 2/25/2005 15:59 1/3/2005 8:00 1/3/2005 8:00 1/21/2005 17:00 1/21/2005 17:00 2/11/2005 17:00 3/28/2005 8:00 4/18/2005 8:00 4/22/2005 8:00 4/26/2005 17:00 4/27/2005 8:00 4/27/2005 8:00 4/27/2005 8:00 6/8/2005 8:00 7/20/2005 8:00 8/10/2005 8:00 7/20/2005 8:00 10/12/2005 8:00 1/3/2006 17:00 12/21/2005 8:00 1/10/2006 17:00 15:59 2/4/2005 15:59 2/25/2005 15:59 2/18/2005 15:59 2/22/2005 15:59 2/25/2005 15:59 3/18/2005 15:59 3/11/2005 15:59 3/15/2005 15:59 3/18/2005 15:59 2/25/2005 15:59 4/26/2005 17:00 1/21/2005 17:00 2/11/2005 17:00 2/11/2005 17:00 3/25/2005 17:00 4/15/2005 17:00 4/21/2005 17:00 4/26/2005 17:00 4/26/2005 17:00 1/10/2006 17:00 6/7/2005 17:00 5/17/2005 17:00 7/19/2005 17:00 8/9/2005 17:00 8/16/2005 17:00 10/11/2005 17:00 1/3/2006 17:00 1/3/2006 17:00 1/10/2006 17:00 1/10/2006 17:00 3 days 15 days 10 days 2 days 3 days 15 days 10 days 2 days 3 days Daniel Tubbs[75%],Brian Easton[10%],Francis Deligosa[10%],Technical Writer Daniel Tubbs[75%],Brian Easton[10%],Francis Deligosa[10%],Technical Writer Latricia Simon[90%] Daniel Tubbs[75%],Brian Easton[10%],Francis Deligosa[10%],Technical Writer Daniel Tubbs[75%],Brian Easton[10%],Francis Deligosa[10%],Technical Writer Latricia Simon[90%] Daniel Tubbs[75%],Brian Easton[10%],Francis Deligosa[10%],Technical Writer 0 days 82 days 15 days 15 days 15 days 30 days 15 days 4 days Francis Deligosa[50%],Daniel Tubbs[25%],Contract Manufacturer Francis Deligosa[10%],Contract Manufacturer[33%] Francis Deligosa[10%],Contract Manufacturer[33%] Francis Deligosa[10%],Contract Manufacturer[33%] Daniel Tubbs 3 days Daniel Tubbs[50%],Francis Deligosa[50%] Latricia Simon[90%] 0 days 185 days 30 days 15 days 30 days 15 days 5 days Francis Deligosa[10%],Contract Manufacturer[33%] Francis Deligosa[10%],Contract Manufacturer[33%] Francis Deligosa[10%],Contract Manufacturer[33%] Daniel Tubbs Latricia Simon[90%] 60 days 60 days 0 days FCC Test Lab,Latricia Simon[10%] 15 days 0 days Printers,Latricia Simon[10%] FCC Test Lab,Latricia Simon[10%] FCC Test Lab,Latricia Simon[10%] 3.8 Legal 3.8.1 Develop EULA 3.8.2 Liability Study 3.8.3 Warrenty Study 3.9 Real-World Testing Phase 1 - Ward 3.9.1 3.9.1.1 3.9.1.3 Hospital Installation Ward Debugging & Enhancements QA 3.9.2 Phase 2 - Floor 3.9.2.1 Hospital Installation Floor Debugging & Enhancements QA 3.9.1.2 3.9.2.2 3.9.2.3 3.9.3 3.9.3.1 3.9.3.2 3.9.3.3 3.9.3.4 3.10 4 Phase 3 - Entire Hospital Hospital Installation Whole Hospital Debugging & Enhancements QA STATags Ready for Sale Marketing 4.1 Phase 3 Production Out Years Hire Personnel 4.2 Product Ramp up 4.3 Full Production 4.4 Establish Support Department Support Department Established Train Installation Engineers Installation Engineers Trained Marketing/Sales 4.5 4.6 4.7 4.8 1/3/2005 8:00 1/3/2005 8:00 1/31/2005 8:00 5/23/2005 8:00 1/11/2006 8:00 1/11/2006 8:00 1/11/2006 8:00 9/9/2005 17:00 1/28/2005 17:00 5/20/2005 17:00 9/9/2005 17:00 5/2/2006 17:00 2/27/2006 17:00 1/31/2006 17:00 180 days 20 days 80 days 80 days 80 days 34 days 15 days 2/1/2006 8:00 2/22/2006 8:00 2/28/2006 8:00 2/28/2006 8:00 2/21/2006 17:00 2/27/2006 17:00 3/30/2006 17:00 3/13/2006 17:00 15 days 4 days 3/14/2006 8:00 3/28/2006 8:00 3/31/2006 8:00 3/31/2006 8:00 3/27/2006 17:00 3/30/2006 17:00 5/2/2006 17:00 4/13/2006 17:00 10 days 3 days 4/14/2006 8:00 4/28/2006 8:00 5/2/2006 17:00 10/5/2005 8:00 5/3/2006 8:00 4/27/2006 17:00 5/2/2006 17:00 5/2/2006 17:00 5/2/2006 17:00 12/31/2007 17:00 10 days 3 days 150 days 434 days Jason Sadler 5/3/2006 8:00 5/3/2006 8:00 8/8/2006 17:00 6/14/2006 8:00 7/11/2006 17:00 6/13/2006 17:00 8/8/2006 17:00 8/8/2006 17:00 7/11/2006 17:00 7/11/2006 17:00 30 days 70 days 0 days Joseph Williams[10%] 20 days 0 days Joseph Williams 6/14/2006 8:00 8/8/2006 17:00 8/8/2006 17:00 8/8/2006 17:00 40 days 0 days Daniel Tubbs,Brian Easton 6/14/2006 8:00 12/31/2007 17:00 23 days 10 days 23 days 10 days Lawyer[25%] Lawyer[25%] Lawyer[25%] Joseph Williams Joseph Williams,Francis Deligosa Latricia Simon Joseph Williams Joseph Williams,Francis Deligosa Latricia Simon Joseph Williams Francis Deligosa,Joseph Williams Latricia Simon 0 days 404 days Francis Deligosa[10%],Contract Manufacturer[10%] 4.8.1 Tradeshows 4.8.2 Publications 4.8.3 Marketing 4.8.4 Develop New Markets Support 4.9 4.9.1 4.9.2 4.9.3 4.10 4.10.1 4.10.2 4.10.3 4.10.4 4.10.5 4.10.6 4.10.7 4.10.8 4.10.9 4.10.10 4.10.11 Software Updates Warranty Support Telephone Support Plastic Tool Replacement Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) 6/14/2006 8:00 6/14/2006 8:00 6/14/2006 8:00 6/14/2006 8:00 7/12/2006 8:00 7/12/2006 8:00 7/12/2006 8:00 7/12/2006 8:00 8/15/2006 8:00 9/1/2006 8:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 12/31/2007 17:00 9/28/2006 17:00 404 days 404 days 404 days 404 days 384 days 384 days 384 days 384 days 360 days 20 days Sales Staff[15%] 10/2/2006 8:00 10/27/2006 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 11/1/2006 8:00 11/28/2006 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 12/1/2006 8:00 12/28/2006 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 1/1/2007 8:00 1/26/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 2/1/2007 8:00 2/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 3/1/2007 8:00 3/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 4/2/2007 8:00 4/27/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 5/1/2007 8:00 5/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 6/1/2007 8:00 6/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 7/2/2007 8:00 7/27/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] Sales Staff[25%] Sales Staff[50%] Sales Staff[10%] Development Staff Support Staff[50%] Support Staff[50%] Francis Deligosa[10%],Contract Manufacturer[10%] 4.10.12 4.10.13 4.10.14 4.10.15 4.10.16 4.10.17 Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Plastic Tool Replacement (every 50000 units) Break Even Point 8/1/2007 8:00 8/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 9/3/2007 8:00 9/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 10/1/2007 8:00 10/26/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 11/1/2007 8:00 11/28/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 12/4/2007 8:00 12/31/2007 17:00 20 days Francis Deligosa[10%],Contract Manufacturer[10%] 8/15/2006 8:00 8/15/2006 8:00 0 days Management Plan Program Identification This Program Management Plan (PMP) is for the STATag. The program will deliver the STATag hardware, software and documentation for the STATag. Program Management Overview Execution of the Program will be performed in accordance with the procedures defined by the set of planning documents. These documents include Program Management Plan*, System Quality Program Plan (SQPP), Software Management Plan (SMP), Configuration Management Plan (CMP), Engineering Management Plan (EMP), Manufacturing Plan (MP), and Risk Management Plan (RMP) (see Figure 1). * This Program Management Plan shall be deemed to meet the contractual requirement of a Project Management Plan. Quality Program Management System Quality Program Plan Program Management Program Management Plan Engineering Management Plan Software Management Plan Data Management Plan Figure 1. Program Management Integrated Logistics Support Plan Configuration Management Plan Acceptance Plan Installation Plan Risk Management Plan This Program Management Plan describes the management philosophy, program organization, schedule, and major milestones that serve as the guide for execution of the Program. The PMP also provides the customer and the quality team with the information they need to monitor and evaluate the progress of the effort. This plan provides the following pertinent information: Corporate Organization Program Team Organization With Areas of Responsibility Work Breakdown Structure Program Planning Progress Reporting and Team Management Detailed Program Schedule and Milestones Program Reviews The Program Management Plan provides guidance for the content and execution of the following plans: Risk Management Engineering Management Software Management ILS Support Data Management Installation Configuration Management Acceptance Management Corporate Structure The entirety of Digital Inventory Systems Corporation supports the STATag Program. The following is Digital Inventory Systems STATag Corporate organizational structure: CEO & President, Digital Inventory Systems Corporation. Group Vice President. STATag Program Office. STATag Program Office will execute the program and provide day-to-day senior management supervision, management, engineering, and administrative resources necessary to manage and administer the STATag program. Management Approach Digital Inventory Systems’ management goal is to work closely with the customer to fully understand the system requirements and field a system that meets those requirements. The management approach to executing contracts at Digital Inventory Systems is based on the philosophy that successful Programs are delivered by goal-oriented teams. A Program Manager (PM) will lead the Digital Inventory Systems team. The PM is responsible for all planning, programmatic, technical, and financial aspects of the Program. The PM is the primary Point of Contact (POC) for the customer. The primary duties include supervision of all planning, scheduling, financial, and technical activities, and customer liaison. The PM is responsible for all Program-related decisions and commitments with approval, as required, from the Corporate Management Team. A key element of Digital Inventory Systems’ program management approach is customer involvement. Digital Inventory Systems encourages the customer to retain an active role in monitoring the progress of all aspects of the Program. The customer is encouraged to discuss technical details directly with members of the Program team, provide planning and schedule recommendations, and assist in resolution of technical and programmatic issues. In order to facilitate customer involvement, Digital Inventory Systems will provide access to program information including, but not limited to: Program Plans and Schedules Program Status Earned Value Formal Review Material Action Items System Drawings and Documentation Program Team The Program Team is committed to provide the best value by delivering COTS, open architecture, and low-risk systems at the lowest cost. This commitment is attainable because it is based on the re-use of existing technology that is field-proven. Through strategic teaming and an extensive system selection process, Digital Inventory Systems has assembled a cohesive Program Team that is experienced with the implementation of each component that will comprise the STATag Total Ship Computing Environment. Project Lead. Overall management responsibility for STATag is assigned to a Project Lead who is responsible for planning and coordination of the day-to-day technical, contractual, and financial aspects of the program. He is responsible for the generation and management of all program schedules, for the coordination of program staff assignments and for coordinating all program activities. His principal assistants are: Manufacturing Director. The Manufacturing Director is responsible for all system electronics hardware components, production, and test activities at Digital Inventory Systems. He will ensure production, testing, and installation schedules. The Production Manager is assigned responsibility to provide technical oversight during installation phase, Set-to-Work, and formal testing. His primary responsibilities include coordination of installation plans; managing the configuration, and developing system level installation documentation. Personel Director. The Personal Director administers the personnel and contract workers hired at Digital Inventory Systems. In addition to supporting the Project Lead he is primarily responsible for the selection, recommendation, orientation, and training of all new employees. He is involved in the oversight of the team of installation engineers, the support help desk, and all contractual workers throughout the project. Marketing and Web Development Director. The Marketing and Web Development Director is primarily responsible for market analysis, marketing of the STATag, marketing decisions, the sales team and all customer relations prior to installation. He will also oversee the development of the STATag and Digital Inventory Systems marketing web site. Research and Development / Quality Assurance Director. The Research and Development / Quality Assurance Director is primarily responsible for the oversight and evaluation of all research, prototype development, production prototype development, software development, quality assurance, and research documentation. Additionally, they are responsible for accurate and timely documentation of all research and development activities. Financial Director. The Financial Directory is primarily responsible for the oversight of all financial activities of the STATag team and Digital Inventory Systems. The FD is responsible for oversight of the Office Manager, the Customer Accounts Manager, and the Accounts Receivable. They will work closely with the Project Lead to provide accurate financial information and they will ensure accurate and timely financial reporting. They will ensure the STATag team is on schedule and within the provided budget. Program Duration The STATag program is a 4-year project through delivery of fully integrated STATag systems in approximately 300 hospitals. The Phase 0 schedule consists of a preliminary design down selection milestone in the first quarter of 2004. To be completed at the end of the second quarter of 2004. Phase 1 is primarity the prototype fabrication phase and will begin in the third quarter of 2004 and end in the fourth quarter of 2004. Phase 2 is primarily the product development phase and will last from the first quarter of 2005 to the end of the second quarter of 2006. Phase 3 is open ended and will begin at the end of phase 2 in the second quarter of 2006. Work Breakdown Structure The program Work Breakdown Structure (WBS) reflects the budgeted cost versus resources required to complete each task. The WBS phase numbers are integrated as part of the master program schedule. Budgets for work planned are entered into Digital Inventory Systems’ financial tracking system for each WBS element, actual costs and estimates to complete are managed by the Program Manager. The WBS element numbers will be structured according to the Contract Statement of Work and will be used to track program costs, progress, earned value and progress relative to the master program schedule. The WBS management tool that Digital Inventory Systems will use is Microsoft Project 2003. Program planning The Digital Inventory Systems Team Lead will maintain the program master schedule. The master schedule contains a line item for each WBS element and will be used to track the progress of each element. All deviations from the master schedule must be coordinated with the program office. It is the responsibility of each team member to call attention to possible schedule deviations at the earliest opportunity. The team lead will coordinate the program schedule with the STATag team members. The program will be developed in phases; within each phase, formal reviews will play an integral part in monitoring program progress. All formal reviews will be announced four weeks in advance of the starting date. Digital Inventory Systems will take a “top down approach” to the Program Schedule, meaning that we will pace our workload to fit the overall Program requirements. Particular attention will be given to timely milestone completions. It is recognized that the schedule is particularly tight, containing critical program milestones during the first year, and adequate personnel will be available in order to keep the program moving forward. Progress PERFORMANCE ASSESSMENT All Digital Inventory Systems Team members will participate in progress reporting and team management. Digital Inventory Systems will track technical and financial progress of the program. Reviews will be held monthly or as mutually agreeable between Digital Inventory Systems team members. Report on progress to date Present work to be performed during the next month Present status of all deliverables and review planned delivery dates Plan and coordinate activities Discuss technical or programmatic issues as necessary. In preparation for the meetings the Digital Inventory Systems Program Manager will collect the current status data on relevant on-going activities, progress against schedule and budget, and planned activity for the next reporting period. Quality reviews of all program documentation and procedures will be held periodically. In particular, the quality program will be involved with program deliveries and milestones and will work off of the master program schedule to plan program audits. Technical, financial and quality progress and status reporting will be conducted according to the following general guidelines. Technical Progress and Reporting The schedule for the program is established during the planning phase and monitored throughout the performance period. The schedule contains an entry for each WBS element. The percentage of completion for each WBS element is determined as necessary to manage program progress and is reviewed at least quarterly during the General Manager’s review. Financial Management and Reporting The financial profile for the Program is established during the planning phase and monitored throughout the performance period. This profile is generated by assigning accounting phase numbers to every Program activity that has been identified as a scheduled event. A budget representing labor costs, materials purchase, and other expenditures (such as travel expenses) is then prepared for every phase. The schedule and budgets are then integrated to provide a spending profile for the phase. The Program spending profile represents a summary of phase spending profiles. The Team Lead is provided an information package that identifies the phase numbers assigned to each activity, the corresponding budgets and schedules, the overall spending profile for the program, and a synopsis of all major deliverables and milestones specified in the contract. The Team Lead uses this information, combined with an on-line financial summary of the Program to track its financial status on a weekly basis. An updated spending profile is provided automatically by the Financial Director on a monthly basis, or upon request from the Team Lead. The Team Lead uses the financial summary in conjunction with his assessments of technical progress to track the overall status of the efforts. Earned Value Earned Value Ratios will be reported as required. At a minimum, Digital Inventory Systems will determine earned value quarterly at the overall Program level and will report at the 2 nd level of WBS indenture in order to provide additional information. Ratios will be reported in the form of the Schedule Performance Index (SPI) and the Cost Performance Index (CPI). Ratios below 0.90 will be explained in further detail. SPI is to be calculated as follows: SPI = BCWP (Budgeted Cost of Work Performed) BCWS (Budgeted Cost of Work Scheduled) CPI is to be calculated as follows: CPI = BCWP (Budgeted Cost of Work Performed) ACWP (Actual Cost of Work Performed) Digital Inventory Systems will use a combination of its Peachtree Accounting and Microsoft Project Software Programs in order to calculate the ratios. On a monthly basis, actual costs will be downloaded into Project into Peachtree. Quality Process and Reporting Quality management on the program will be a team effort. The Research and Development / Quality Assurance Director will coordinate conduct, quality reviews, and audits. The Team Lead is ultimately responsible for the development and implementation of the System Quality Program Plan. The SQPP is an umbrella plan which incorporates the quality programs of the program team members. The SQPP describes a team quality concept, including Process Coordination and Quality Evaluators. Team members are responsible for performing the processes required to complete Program tasks. Quality Evaluators are responsible for verifying that the development, production, and handling of all documentation, software, and hardware are performed in accordance with the SQPP and its component processes. The team is also responsible for conducting periodic reviews and evaluations of work-in-process; attending in-house test events, and supporting in-house Program reviews. All planned quality program activities and quality evaluations (internal audits) are submitted to the Team Lead for review. Monthly Progress Report Digital Inventory Systems will submit a monthly progress reports. The report shall cover, at a minimum, the following: Progress Summary; The variance statement; Critical Path Analysis; Milestone Deliverables, planned actual and forecast; Earned Value Schedule and Cost Performance Indices; Dependencies: a ‘critical items list’ of all items, whether or not the Contractor’s direct responsibility, which could jeopardize timely completion of the work or any significant parts of the program; Risk Status: update of risk register; Look Ahead (Future action and Forecast); Resource Profile; Work Package/Activities planned, actual & forecast status; Milestone/Deliverables planned, actual & forecast status; Configuration Change Control issues; Quality Actions (Reviews, audits); One Page Plans and Reports summarising the above for inclusion in the Purchaser’s monthly report; and Commercial: amendments to Contract status report; No later than meeting + 10 working days. Reviews Reviews will play an integral part in the management and monitoring of all phases of the STATag Program. Informal reviews with the Program team members will be held at all levels on a weekly basis to ensure that the program stays on track. Formal technical reviews will be held to ensure that the program is proceeding as planned. The types of reviews, their purpose and presented information are addressed in the following paragraphs. Program Management Reviews Program Management Reviews (PMRs) will be conducted with STATag and subcontract representatives. The first PMR will be conducted in July 2004; thereafter PMRs will be conducted approximately every six months (immediately preceding each technical review). The PMRs are scheduled to discuss programmatic issues related to the development and implementation of the Program. The reviews will provide the opportunity to review the progress of the effort; as well as to conduct milestone reviews of deliverables, and identifies and resolves any issues that may arise during the execution of the tasking. The Team Lead will ensure that all program-related information required to meet the objectives of the review are prepared and delivered not later than two weeks prior to the scheduled review date. The Team Lead will also be responsible for identifying the Digital Inventory Systems STATag Program Team personnel who will attend the review. The Team Lead will attend all Program Management Reviews. The following information will be prepared in support of each PMR. Recorded during the review and delivered before the completion of the review. Technical Reviews Formal technical reviews will be conducted on the dates specified in the master schedule. The reviews will be held jointly with STATag, Digital Inventory Systems Team members and sub-suppliers as necessary. An agenda and review material will be submitted to STATag two weeks prior to the scheduled meeting. Review meeting minutes will be delivered before the completion of the review. The objectives for each review are outlined below. Reviews will be held to validate the direction taken for the design, development and test of the system. The System Requirements Review (SRR), Preliminary Design Review (PDR), and Critical Design Review (CDR) will be formal reviews held at Digital Inventory Systems’ facility. The Test Readiness Reviews (TRR) will be formal reviews held prior to HAT & SAT. System Requirements Review is conducted to ensure that the Program team fully understands the system performance requirements specified in the System/Segment Specification. A detailed review of requirements for the system and each subsystem will be reviewed. The System/Segment Specification (Technical Specification) will be used in the review. System Design Review is conducted to present and review the system design. System requirement allocation to each system component will be discussed. The general approach to be taken for the integration of each system component will be presented. The documents listed below will be used in the review. This will be an informal review. The data will be included in the PDR. System/Segment Design Document System Interface Design Document Software Requirements Review is conducted to review the software specification and interface requirement specifications. This review will be conducted as part of the PDR. Preliminary Design Review is conducted to present the preliminary design of the Program System. The functional requirements of each subsystem will be discussed in detail. The following documents will be used in the review: Critical Design Review is conducted to review system integration issues. In particular the review will focus on system interfaces. Test Readiness Reviews are held to determine if the system is ready to proceed to the next level of test. Test configurations and results from the previous test efforts will be presented. The test report from the previous test will be used in the review. The following TRRs will be performed: Prior to FAT Prior to HAT Prior to SAT Quality Reviews The Team Lead supported by the Research and Development / Quality Assurance Directory will establish the time and identify attendees for all formal reviews. He will also coordinate with the appropriate managers to conduct quality reviews at key program milestones, and in preparation for formal reviews with the customer. Informal peer review and engineering planning meetings will also be held at the discretion of each subsystem manager to discuss technical issues, conduct internal comment reviews, and provide technical guidance to members of the Program team. As part of the quality activities for the program, the quality team will conduct informal reviews to: Evaluate the processes used by the Program team members to perform program tasks; Evaluate deliverable products for compliance with contract requirements; Evaluate work-in-process during engineering reviews; Document results of each evaluation; and Recommend corrective and preventive actions if necessary. Evaluation Plan Our company, Digital Inventory System, will conduct evaluations for each phase of STATag’s development. These evaluations will contain a checklist of deliverables needed at the end of each phase. During these evaluations we will track our progress to date then re-evaluate future productions and address any technical issues or risk that have risen. We plan to evaluate our efficiency in maintaining our scheduled budget, and its impact on our business’s present and future success. In addition to this, we plan to track our product’s impact on our customers in respect to its optimization within their system. Our project plan will continually be evaluated at the end of each phase. Phase zero will be considered a success when we have secured a SBIR grant. Phase one will be considered a success when our prototype is fully functional and has passed all testing. Phase two will be considered a success when we have a real world working model up and running in the hospital. Phase three will be considered a success when our product reaches full production and our company has reached a break-even point. In addition to this our customers have to reach their break-even point in order to deem this phase a success. The evaluation plan is as follows: Program Design Reviews Assessment of the project at the end of each phase Technical Testing Evaluate the direction taken in design, development, and testing of the project o Prototype testing o Integration testing o Web interface testing Quality Testing/Reviews Evaluate the processes used by team members to perform tasks Evaluate deliverables for completeness at the end of each phase Evaluate any new or pending risks as they occur Periodical Reporting Used to evaluate our efficiency in maintaining our scheduled budget for this project Used to evaluate our progress at each phase Our work break down structure outlines the time schedule we have planned to follow. Marketing Plan A market has been opened for STATag with the emergence of reVIEW, a program founded by Cindy Jimmerson that employs the Toyota Production System. This system helps to create a more “defect-free” product or service, reduce or eliminate waste, and improve workplace appreciation. This program was spawned off the top ten wasteful prospects. One of the most wasteful concerns was equipment locating. It has been found that 35 to 60% of a nurse’s time is wasted on, partly, searching for equipment. This figure results in 58 to 99 billion dollars wasted on an annual basis. The marketing strategy addresses several facets. The problem with time wasted for locating equipment can be drastically reduced. In a matter of seconds, a hospital employee can learn the location of a particular piece of equipment with the click of a mouse. The benefit of saving hospitals time and money is an incentive in itself. With the acquisition of STATag by a medical facility, a return on investment can be achieved in as little as 8 months, allowing the hospital to return a profit from the system use in the first year. Savings in subsequent years continue to ascend as product usage continues. This will provide us with valid arguments when approaching a medical facility as a potential customer. We will be able to show that a hospital will be able to achieve a higher level of service for its patients, and maximize efficiency for profitable gain. With the acquisition of funding from SBIR, we will be able to begin realistic marketing strategies. Marketing strategies include medical journals and magazines, web advertising, attendance of medical trade events as well as technological expos and events. In addition to the benefits attained by the use of the solution, a medical facility can advertise to its customers that a high level of service and efficiency can be expected. This would encourage facilities without such technology to consider using a product such as STATag to maintain competitiveness. STATag will use the IEEE 802.14.5 standard which specifies ultra-low power self configuring wireless networks. A main marketing strategy is the ease in maintenance with such a network. Most wireless networking technologies in medical facilities employ IEEE 802.11, which require administrative overhead. This overhead can be eliminated in IEEE 802.14.5 because of the specification that calls for self discovery on the network. For advertising of the solution, we plan to use $30,000 for booth rental of a trade show, with $4,000 (for four employees) used for airfare. For a trade show exhibit, we have considered the Florida International Medical Expo (FIME). FIME is an attractive venue for our solution as it attracts medical experts from across the world, in addition to selling out the 2003 event. We also plan to expand advertising to medical journals. According PERQ/HCI, in 1998, advertising in medical journals topped the response effectiveness at 66.5%. This concept alone shows that we can obtain market awareness and message penetration with the use of medical journal advertising. Out of the top five rated best journals, the FDA Consumer Magazine published by the FDA would be an obvious choice for our paper and web advertisements.(Note to group – this is a bimonthly journal) It will cost approximately $932,600 to build STATag. $850,000 comes from SBIR grants and another $200,000 will come from an SBA loan. Competition The STATag uses an upcoming efficient wireless networking standard that is easy to maintain. Our competitors use technology that requires additional expensive hardware, and includes wireless technology that requires administration overhead. With STATag, no expensive access points are required, and the wireless technology used is self-configuring and self-discovering. This means no time wasted with IT administrative overhead. Provides Real Time Location Provides Real Time Location in 3D Tag has serial number Tag knows location Location history when out of building Low cost infrastructure Low administrative overhead Triggered location update on movement Can trigger alarms Can detect tag removal Allows for update based on local switch Digital Inventory Systems X WhereNet Intermec Symbol Technologies X X X X X X X X X X* X X X X X X X X X The WhereNet solution only provides 2D locating. It does not address locating devices that are on different floors. WhereNet’s solution also does not keep track of its location. In addition, WhereNet uses 802.11b IEEE standard which requires expensive access points once it has reached the ranges boundaries. The Intermec solution does not provide any location tracking. Although it can trigger alarms, it is not able to detect tag removal which makes it’s alarm mechanism defeatable. Symbol Technologies provides no location tracking nor provides any alarm mechanisms. It is assumed that’s its primary function is for inventory tracking alone and not for equipment location. Funding Plan The funding for a small startup company is arguably the one of most important aspect of planning. To that end, the STATag team will be submitting an SBIR Grant proposal for the Phases I and Phases II of product development. We will be submitting our application for a Small Business Innovation Research (SBIR) grant to the Department of Health and Human Services in order to establish our development on sound financial footing. Our SBIR application requests approximately $100,000 for Phase I development. Phase I will last approximately 4 months and our team will be primarily focused on the development of our prototype. We are additionally requesting $750,000 for Phase 2 of our project. During phase 2 our team will develop a real-world version of the STATag system and we plan to implement the Real Time Equipment Tracking in a test hospital. Following phases 1 and 2 we anticipate receiving funding from Federal Small Business Administration backed loan and sales revenue from completed STATag systems. These funding sources will provide the funds for phase 3, our production ramp-up phase. From the beginning of phase 3 on our primary funding source will be STATag sales, installation, and support revenue. We will require $200,000 start-up capital from a funding organization before the beginning of phase 3. During phase 3 our goal will be to repay the loan, build a customer base, and increase sales to approximately 20 hospitals a month. Following phase 3 we anticipate being a financially self-sufficient company turning an estimated profit of $75,000,000 at the end of that phase. At that time we expect to expand into additional inventory tracking markets. We are anticipating, at this time, to proceed from SBIR Grant money to becoming a self-sufficient company. However, the possibility of being either acquired or invested in by a larger company is a distinct possibility our team is receptive to. Possible companies that would take a financial interest in the STATag and the Real Time Equipment Tracking technology include medical supply companies, medical equipment manufacturers, and current inventory tracking solution providers. There are, however, currently no offers for acquisition of our product or company at this time. The STATag is, in our opinion, a very viable product and a sound investment. As our financial plan currently stands we anticipate being able to develop the STATag in the financial and time constraints previously stated. We believe that this product will revolutionize inventory tracking in not only the medical equipment market but in any market for which it is introduced. The following are the proposed budgets for phases I to III. Staffing Plan Initial Staff Project Lead The project lead is instrumental in managing the direction, resources, and personnel of the project. He is responsible for upper management for the progress of the project; in addition, the project lead has the final word over any department decision, and thus must have experience in dealing with the various departmental operations of his team. Manufacturing Director The manufacturing director is responsible for the planning of the production schedule within budgetary limitations and time constraints. This includes analyzing the project’s personnel and resources, and selecting the best way to meet the production quota. The manufacturing director will determine which machines to be used, and the sequence of production. Also, manufacturing duties will include monitoring the production to make sure it stays on schedule and correcting any problems that may arise. Personnel Manager The personnel manager is responsible for making sure the team gets the best from the people who work for them. This role is characterized by a manager involved in selecting the right sort of staff and promoting practices which ensure they are managed effectively. This includes recruitment and selection of staff which includes drawing up job descriptions, preparing advertisements, and checking application forms. The personnel manager will aid in employee relations, employee services, pay and benefits, and human resource planning. Quality Assurance / R&D Manager The quality manager will monitor products and documentation to ensure they meet specifications and standards of presentation and quality. This includes the following tasks: -Study product specifications -Sample products to determine whether they meet specifications and quality standards, and take corrective action if necessary -Analyze quality assurance data, and make recommendations for improvement. -Train and assist operators to carry out their quality control functions. Financial Manager The financial manager will plan, organize, direct, control and evaluate the operation of financial and accounting departments. Managing duties include developing and implementing the financial policies and systems of establishments. This includes establishing the budget and making sure the team stays within the budget. Marketing Director The marketing director will design, implement, and facilitate annual marketing plan for the team, and is responsible for the development of the overall plan for how to approach the market. Marketing strategies will be to support and facilitate development and implementation of section business/marketing plans. Also, the director will plan and administer the team’s marketing operations budget. Contracted Staff Technical Writer The technical writer is responsible for complete documentation through the project phases. Duties will include writing project plans, documents, and recording any events taken place during the project process. Drafter The drafter is responsible for drawing the final production blueprints of the plastic housing for the STATag. Computer Engineer The computer engineer will assist in the design of the lab prototype during phase 1. Lawyer The lawyer will conduct legal research, write the EULA and warranty documents, and provide legal advice. Hired Staff Office Manager The office manager will organize and supervise all of the administrative activities that take places in the office. The main goal of the office manager is to keep the office running efficiently and smoothly which includes arranging meetings, delegating work, and supervising the work of the staff. Software Engineer The software engineer is in charge of designing, coding, and debugging all software related to the development of the system as well as the necessary encryption to keep the data secure. Installation Engineer The installation engineer will be solely responsible for installation of the STATags in hospitals. Planning of this installation will require the engineer to plan out the mapping process of the building including precise placement of tracking tags in order to monitor position of the STATags. Network Engineer The network engineer will be responsible for setting up and maintaining all DIS owned computers and servers, including cabling, network switches, servers, workstations, operating systems, and applications. Accounts Manager The accounts manager will be responsible for the company accounting and the accounting staff (if hired after phase 3). Accounts Receivable The accounts receivable person will be responsible for prompt billing and the record keeping associated with billing. Help Desk Coordinator The help desk coordinator will be responsible for training, supervising, and scheduling the tech support personnel. Tech Support The tech support personnel will be responsible for answering the phones and assisting customers by answering questions and assisting troubleshooting. Inventory Manager The inventory manager will be in charge of delegating the distribution of the inventory. Sales Manager The sales manager will delegate, organize, and lead the sales team. The overall responsibility of the sales manager is to make sure all sales reach their goals. Duties will include recruiting and training sales staff, supervising and monitoring the sales team, and establishing sale goals. Salesman The salesman’s job will be to sell the product during different business ventures. Duties will include speaking at conferences or tradeshows to convince the public to buy our product. The overall responsibility of the salesman is to find buyers and meet the sale goal. Resource Plan Our resource plan will be developed throughout three phases. During the first phase, resources will consist mainly of office equipment and prototype development equipment. The second phase will consist of additional office and prototype testing equipment. Finally in the third phase, budget resources will be allocated towards the expansion of the business. For the first phase, we have allocated 36,000 dollars toward essential office and prototype resources. With this money we will purchase and furnish the office. In furnishing the office we will purchase computers and the necessary software components, along with telephones and a network server. In addition to this we will buy the prototype parts and electrical equipment to test the hardware components. Phase two we have allocated 264,750 dollars for office, and marketing expansion. Along with this we have allocated some of the funds toward developing the prototype. For the office we will expand and add more furniture, more computers, and more Internet components. We will begin an extensive market campaign, which will cause us to buy rental booths and advertising spots in tradeshow productions. In addition to this we will have to buy testing and tooling equipment for our prototype. Office, prototype and market develop are where we have projected our resource to encompass. The last phase, phase three, we have allocated 701,600 dollars towards the expansion of production and our marketing. Production expansion includes expanding our office, and purchasing more tooling supplies. The marketing expansion includes airfare and car rentals at distant locations, and website site hosting. As we anticipate expansion of our business, we need to anticipate expansion everywhere. Throughout each phase we have accounted for staff, production and marketing to increase. By thinking ahead about the necessary resources in each of these areas we have eliminated potential expansion problems. Budgets Phase 1 Phase Length (Months) 4 Overhead Units Office Space 2600 Sq. Feet Utilities Telephone/Internet Cost Qty $1,800 $500 $400 4 4 4 $7,200 $2,000 $1,600 $6,000 1 $6,000 $2,500 1 $2,500 $8,000 1 $8,000 $1,000 1 $1,000 $3,500 1 $3,500 MS Visio / MS Project Month Month Month OneTime OneTime OneTime OneTime OneTime OneTime $3,000 1 $3,000 $34,800 Web Site Hosting Jason Sadler - Marketing Director Month Month $50 $2,250 4 4 $200 $9,000 $9,200 Drafter (plastic parts) Computer Engineer Prototype Parts Hourly Hourly One- $30 $60 $1,000 20 100 1 $600 $6,000 $1,000 Office Furniture Electrical Eng. Equipment Office Computers Peachtree 2004 Network / Server Total Overhead Marketing Total Marketing Prototype Development Sub-Total Time Total Electrical Manufacturing Total Manufacturing $7,600 Francis Doligosa - Manufacturing Director Month $2,250 4 $9,000 $9,000 Month Month $2,250 $2,250 4 4 $9,000 $9,000 Month Month $2,250 $2,250 4 4 Total Management $9,000 $9,000 $36,000 Total Phase 1 Costs $96,600 Management Daniel Tubbs - Team Manager / Computer Engineer Joseph Williams - Personnel Manager Latricia Simon - R & D Manager / QA Manager Brian Easton - Finance Officer Phase 2 Phase Length (Months) 17 Overhead Units Office Space 2600 Sq. Feet Utilities Telephone/Internet Cost Qty SubTotal Month Month Month Per Hire Per Hire Per Hire Per Hire $1,800 $500 $400 17 17 17 $30,600 $8,500 $6,800 $1,000 6 $6,000 $2,000 6 $12,000 $1,000 6 $6,000 $1,000 8 $8,000 $77,900 Month Month Hourly OneTime OneTime OneTime OneTime OneTime OneTime $50 $3,500 $40 17 17 40 $850 $59,500 $1,600 $30,000 1 $30,000 $11,000 5 $55,000 $2,000 2 $4,000 $400 1 $400 $500 2 $1,000 $500 2 $1,000 $153,350 $2,500 1 $2,500 $2,500 1 $2,500 $3,000 1 $3,000 $20,000 2 $40,000 $15,000 $50 1 100 $15,000 $5,000 $20,000 1 $20,000 $88,000 $4,500 $3,500 17 2.5 $76,500 $8,750 Error Reporting Software Month Month OneTime $50 100 $5,000 $90,250 Manufacturing Total Manufacturing Francis Deligosa - Manufacturing Director Month $3,500 17 $59,500 $59,500 Management Daniel Tubbs - Team Manager Month $4,000 17 $68,000 Office Furniture Office Computers Network / Server Development Software Total Overhead Marketing Web Site Hosting Jason Sadler - Marketing Director Graphics Designer Trade Show Booth Rental Trade Magazine Ad Airfare to Tradeshow Car Rental Hotel Entertainment Total Marketing Prototype Development Test WWW Server Test DB Server Test Workstations Plastic Tooling Production Engineering Test Run FCC Approval Testing OneTime OneTime OneTime OneTime OneTime Per Tag OneTime Total Prototype Software Software Engineer 2 Technical Writer Total Software Joseph Williams - Personnel manager Brian Easton - Finance Manager Latricia Simon - R&D Manager / QA Manager Office Manager Lawyer Month Month $3,500 $3,500 17 17 $59,500 $59,500 Month Month Hour $3,500 $2,500 $300 17 17 180 $59,500 $42,500 $54,000 $343,000 Installation Engineer Network Engineer Month Month $4,000 $4,000 3 3 $12,000 $12,000 Total Management Hospital Installation Total Hospital Installation $24,000 Total Phase Cost $836,000 Phase 3 Phase Length (Months) 20 Overhead Units Cost Qty Office Space 6000 Sq. Feet Utilities Telephone/Internet Office Furniture Office Computers Network / Server Development Software Month Month Month One-Time One-Time One-Time One-Time $4,000 $1,000 $600 $1,000 $2,000 $1,000 $1,000 20 20 20 10 10 10 10 $80,000 $20,000 $12,000 $10,000 $20,000 $10,000 $10,000 $162,000 Web Site Hosting Jason Sadler - Marketing Director Trade Show Booth Rental Trade Magazine Ad Airfare to Tradeshow Car Rental Hotel Entertainment Month Month One-Time One-Time One-Time One-Time One-Time One-Time $50 $4,000 $30,000 $11,000 $2,000 $400 $500 $500 20 20 4 4 16 4 16 16 $1,000 $80,000 $120,000 $44,000 $32,000 $1,600 $8,000 $8,000 $294,600 Sales Manager East Coast Sales West Coast Sales Midwest Sales East Coast Sales West Coast Sales Midwest Sales Month Month Month Month Month Month Month $7,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 20 20 20 20 20 20 20 $140,000 $120,000 $120,000 $120,000 $120,000 $120,000 $120,000 $860,000 Software Engineer 1 Software Engineer 1 Software Engineer 1 Month Month Month $4,000 $4,000 $4,000 20 20 20 $80,000 $80,000 $80,000 $240,000 Francis Deligosa - Manufacturing Director Inventory Manager Month Month $4,000 $3,000 20 20 $80,000 $60,000 Total Overhead Marketing Total Marketing Sales Total Sales Development Total Development Manufacturing Sub-Total Per 50000 $20,000 16 $320,000 $460,000 Daniel Tubbs - Team Manager Joseph Williams - Personnel manager Latricia Simon - R&D Manager / QA Manager Brian Easton - Finance Manager Office Manager Accounts Manager Accounts Receivable Month Month $5,000 $4,000 20 20 $100,000 $80,000 Month Month Month Month Month $4,000 $4,000 $3,500 $4,000 $3,500 20 20 20 20 20 $80,000 $80,000 $70,000 $80,000 $70,000 $560,000 Lead Installation Engineer Installation Engineer Installation Engineer Installation Engineer Installation Engineer Installation Engineer Installation Engineer Month Month Month Month Month Month Month $5,000 $4,500 $4,500 $4,500 $4,500 $4,500 $4,500 20 20 20 20 20 20 20 $100,000 $90,000 $90,000 $90,000 $90,000 $90,000 $90,000 Retool Plastic Mold Total Manufacturing Management Total Management Installation Department Total Hospital Installation Support Department Total Hospital Installation Total Phase Cost $640,000 Help Desk Coordinator Tech Support Tech Support Tech Support Ticket Tracking Software Month Month Month Month One-Time $3,000 $2,500 $2,500 $2,500 $5,000 20 20 20 20 1 $60,000 $50,000 $50,000 $50,000 $5,000 $215,000 $3,431,600 E. Human Subjects: Not Applicable No human subjects are involved in this project. F. Vertebrate Animals: Not Applicable No vertebrate animals are involved in this project. G. Literature Cited 1. Mark Murphy, Research Brief: Eliminating Wasteful Work in Hospitals Improves Margin, Quality and Culture, Murphy Leadership Institute, 2003 2. Hospital Statistics, American Hospital Association, 2004 3. Cost of Caring: Key Drivers of Growth in Spending on Hospital Care, PriceWaterhouseCoopers, 2003 4. Cindy Jimmerson, RN, Dorthy Weber, MSW, and Durward Sobek, PhD, Reducing Waste and Errors: Piloting Lean Principles at IHC, not yet published. H. Consortium/Contractual Agreements None consortium/contractual agreements are involved in this project. I. Letters of Support None. J. Product Development Plan: Not Applicable SBIR/STTR Phase II and Fast-Track only. Principal Investigator/Program Director (last, First, Middle): Tubbs, Daniel L. CHECKLIST TYPE OF APPLICATION (Check all that apply.) NEW application. (This application is being submitted to the PHS for the first time.) SBIR Phase I SBIR Phase II: SBIR Phase I Grant No. SBIR Fast Track STTR Phase I STTR Phase II: STTR Phase I Grant No. STTR Fast Track REVISION of application number: (This application replaces a prior unfunded version of a new, competing continuation, or supplemental application.) INVENTIONS AND PATENTS (Competing continuation appl. and Phase II only) COMPETING CONTINUATION of grant number: (This application is to extend a funded grant beyond its current project period.) No Previously reported SUPPLEMENT to grant number: Yes. If “Yes,” Not previously reported (This application is for additional funds to supplement a currently funded grant.) CHANGE of principal investigator/program director. Name of former principal investigator/program director: FOREIGN application or significant foreign component. 1. PROGRAM INCOME (See instructions.) All applications must indicate whether program income is anticipated during the period(s) for which grant support is request. If program income is anticipated, use the format below to reflect the amount and source(s). Budget Period Anticipated Amount Source(s) 2. ASSURANCES/CERTIFICATIONS (See instructions.) The following assurances/certifications are made and verified by the signature of the Official Signing for Applicant Organization on the Face Page of the application. Descriptions of individual assurances/ certifications are provided in Section III. If unable to certify compliance, where applicable, provide an explanation and place it after this page. •Debarment and Suspension; •Drug- Free Workplace (applicable to new [Type 1] or revised [Type 1] applications only); •Lobbying; •NonDelinquency on Federal Debt; •Research Misconduct; •Civil Rights (Form HHS 441 or HHS 690); •Handicapped Individuals (Form HHS 641 or HHS 690); •Sex Discrimination (Form HHS 639-A or HHS 690); •Age Discrimination (Form HHS 680 or HHS 690); •Recombinant DNA and •Human Subjects; •Research Using Human Embryonic Stem Cells• Human Gene Transfer Research; •Financial Conflict of Interest (except •Research on Transplantation of Human Fetal Tissue •Women and Phase I SBIR/STTR) •STTR ONLY: Certification of Research Institution Minority Inclusion Policy •Inclusion of Children Policy• Vertebrate Animals• Participation. 3. FACILITIES AND ADMINSTRATIVE COSTS (F&A)/ INDIRECT COSTS. See specific instructions. DHHS Agreement dated: No Facilities And Administrative Costs Requested. DHHS Agreement being negotiated with Regional Office. No DHHS Agreement, but rate established with Date CALCULATION* (The entire grant application, including the Checklist, will be reproduced and provided to peer reviewers as confidential information.) a. Initial budget period: Amount of base $ x Rate applied % = F&A costs $ b. 02 year Amount of base $ x Rate applied % = F&A costs $ c. 03 year Amount of base $ x Rate applied % = F&A costs $ d. 04 year Amount of base $ x Rate applied % = F&A costs $ e. 05 year Amount of base $ x Rate applied % = F&A costs $ TOTAL F&A Costs $ *Check appropriate box(es): Salary and wages base Modified total direct cost base Other base (Explain) Off-site, other special rate, or more than one rate involved (Explain) Explanation (Attach separate sheet, if necessary.): 4. SMOKE-FREE WORKPLACE PHS 398 (Rev. 05/01) Yes No (The response to this question has no impact on the review or funding of this application.) Page 47 Checklist Form Page Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. Place this form at the end of the signed original copy of the application. Do not duplicate. PERSONAL DATA ON PRINCIPAL INVESTIGATOR/PROGRAM DIRECTOR The Public Health Service has a continuing commitment to monitor the operation of its review and award processes to detect—and deal appropriately with—any instances of real or apparent inequities with respect to age, sex, race, or ethnicity of the proposed principal investigator/program director. To provide the PHS with the information it needs for this important task, complete the form below and attach it to the signed original of the application after the Checklist. Do not attach copies of this form to the duplicated copies of the application. Upon receipt of the application by the PHS, this form will be separated from the application. This form will not be duplicated, and it will not be a part of the review process. Data will be confidential, and will be maintained in Privacy Act record system 09-25-0036, “Grants: IMPAC (Grant/Contract Information).” The PHS requests Social Security Numbers for accurate identification, referral, and review of applications and for management of PHS grant programs. Provision of the Social Security Number is voluntary. No individual will be denied any right, benefit, or privilege provided by law because of refusal to disclose his or her Social Security Number. The PHS requests the Social Security Number under Sections 301(a) and 487 of the PHS Acts as amended (42 U.S.C 241a and U.S.C. 288). All analyses conducted on the date of birth and race and/or ethnic origin data will report aggregate statistical findings only and will not identify individuals. If you decline to provide this information, it will in no way affect consideration of your application. Your cooperation will be appreciated. DATE OF BIRTH (MM/DD/YY) 11/22/33 SEX/GENDER SOCIAL SECURITY NUMBER 123-45-6789 Female Male ETHNICITY 1. Do you consider yourself to be Hispanic or Latino? (See definition below.) Select one. Hispanic or Latino. A person of Mexican, Puerto Rican, Cuban, South or Central American, or other Spanish culture or origin, regardless of race. The term, “Spanish origin,” can be used in addition to “Hispanic or Latino.” Hispanic or Latino Not Hispanic or Latino RACE 2. What race do you consider yourself to be? Select one or more of the following. American Indian or Alaska Native. A person having origins in any of the original peoples of North, Central, or South America, and who maintains tribal affiliation or community attachment. Asian. A person having origins in any of the original peoples of the Far East, Southeast Asia, or the Indian subcontinent, including, for example, Cambodia, China, India, Japan, Korea, Malaysia, Pakistan, the Philippine Islands, Thailand, and Vietnam. (Note: Individuals from the Philippine Islands have been recorded as Pacific Islanders in previous data collection strategies.) Black or African American. A person having origins in any of the black racial groups of Africa. Terms such as “Haitian” or “Negro” can be used in addition to “Black” or African American.” Native Hawaiian or Other Pacific Islander. A person having origins in any of the original peoples of Hawaii, Guam, Samoa, or other Pacific Islands. White. A person having origins in any of the original peoples of Europe, the Middle East, or North Africa. Check here if you do not wish to provide some or all of the above information. PHS 398 (Rev. 05/01) DO NOT PAGE NUMBER THIS FORM Personal Data Form Page Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. Targeted/Planned Enrollment Table This report format should NOT be used for data collection from study participants. Study Title: Total Planned Enrollment: TARGETED/PLANNED ENROLLMENT: Number of Subjects Ethnic Category Females Sex/Gender Males Total Hispanic or Latino Not Hispanic or Latino Ethnic Category: Total of All Subjects * Racial Categories American Indian/Alaska Native Asian Native Hawaiian or Other Pacific Islander Black or African American White Racial Categories: Total of All Subjects * * The “Ethnic Category: Total of All Subjects” must be equal to the “Racial Categories: Total of All Subjects.” PHS 398/2590 (Rev. 05/01) Page 49 Targeted/Planned Enrollment Format Page Principal Investigator/Program Director (Last, First, Middle): Tubbs, Daniel L. Inclusion Enrollment Report This report format should NOT be used for data collection from study participants. Study Title: Total Enrollment: Protocol Number: Grant Number: PART A. TOTAL ENROLLMENT REPORT: Number of Subjects Enrolled to Date (Cumulative) by Ethnicity and Race Sex/Gender Unknown or Ethnic Category Females Males Not Reported Total ** Hispanic or Latino Not Hispanic or Latino Unknown (individuals not reporting ethnicity) * Ethnic Category: Total of All Subjects* Racial Categories American Indian/Alaska Native Asian Native Hawaiian or Other Pacific Islander Black or African American White More Than One Race Unknown or Not Reported * Racial Categories: Total of All Subjects* PART B. HISPANIC ENROLLMENT REPORT: Number of Hispanics or Latinos Enrolled to Date (Cumulative) Racial Categories Females Males Unknown or Not Reported Total American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Black or African American White More Than One Race Unknown or Not Reported ** Racial Categories: Total of Hispanics or Latinos** * These totals must agree. ** These totals must agree. PHS 398/2590 (Rev. 05/01) Page 50 Inclusion Enrollment Report Format Page STTR Research Institution Budget Additional Page Principal Investigator/Program Director: (Last, First, Middle) BUDGET of RESEARCH INSTITUTION (STTR ONLY) Tubbs, Daniel L. FROM THROUGH NAME AND ADDRESS OF RESEARCH INSTITUTION PERSONNEL ROLE ON PROJECT NAME TYPE APPT. (months) % EFFORT ON PROJ. DOLLAR AMOUNT REQUESTED (omit cents) INST. BASE SALARY SALARY REQUESTED FRINGE BENEFITS TOTAL Principal Investigator SUBTOTALS $ CONSULTANT COSTS EQUIPMENT (Itemize) SUPPLIES (Itemize by category) TRAVEL PATIENT CARE COSTS INPATIENT OUTPATIENT ALTERATIONS AND RENOVATIONS (Itemize by category) OTHER EXPENSES (Itemize by category) TOTAL DIRECT COSTS (also enter as Consortium/Contractual Costs on Budget Page of Small Business Concern) FACILITIES and ADMINISTRATIVE COSTS (show calculation) (also enter as Consortium/Contractual Costs on Budget of Small Business Concern) $ $ CERTIFICATION OF RESEARCH INSTITUTION PARTICIPATION. Through the signature below of the duly authorized representative of the research institution on this “Certification of Research Institution” page, and by way of the signature of the official signing for applicant organization (small business concern) on the Face Page of the application, the small business concern and the research institution certify jointly that: (1) the proposed STTR project will be conducted jointly by the small business concern and the research institution in which not less than 40 percent of the work will be performed by the small business concern and not less than 30 percent of the work will be performed by the research institution (“cooperative research and development”); (2) the proposed STTR project is a cooperative research or research and development effort to be conducted jointly by the small business concern and the research institution in which not less than 40 percent of the work will be performed by the small business concern and not less than 30 percent of the work will be performed by the research institution (“performance of research and analytical work”); and (3) regardless of the proportion of the proposed project to be performed by each party, the small business concern will be the primary party that will exercise management direction and control of the performance of the project. If the research institution is a contractor-operated federally funded research and development center, the duly authorized representative of the contractor-operated federally funded research and development center certifies, additionally, that it: (4) is free from organizational conflicts of interests relative to the STTR program; (5) did not use privileged information gained through work performed for an STTR agency or private access to STTR agency personnel in the development of this STTR grant application; and (6) used outside peer review, as appropriate, to evaluate the proposed project and its performance therein. Signature of Duly Authorized Representative Printed Name Title Date of Signature PHS 398 (Rev. 05/01) Page 51 STTR Research Institution Budget Form Page STTR Additional Page Research Institution Certification Modular Applications ONLY Principal Investigator/Program Director: (Last, First, Middle) Tubbs, Daniel L. Certification of Research Institution for Small Business Technology Transfer Grants Through the signature below of the duly authorized representative of the research institution on this “Certification of Research Institution” page, and by way of the signature of the official signing for applicant organization (small business concern) on the Face Page of the application, the small business concern and the research institution certify jointly that: (1) the proposed STTR project will be conducted jointly by the small business concern and the research institution in which not less than 40 percent of the work will be performed by the small business concern and not less than 30 percent of the work will be performed by the research institution (“cooperative research and development”); (2) the proposed STTR project is a cooperative research or research and development effort to be conducted jointly by the small business concern and the research institution in which not less than 40 percent of the work will be performed by the small business concern and not less than 30 percent of the work will be performed by the research institution (“performance of research and analytical work”); and (3) regardless of the proportion of the proposed project to be performed by each party, the small business concern will be the primary party that will exercise management direction and control of the performance of the project. If the research institution is a contractor-operated federally funded research and development center, the duly authorized representative of the contractor-operated federally funded research and development center certifies, additionally, that it: (4) is free from organizational conflicts of interests relative to the STTR program (5) did not use privileged information gained through work performed for an STTR agency or private access to STTR agency personnel in the development of this STTR grant application; and (6) used outside peer review, as appropriate, to evaluate the proposed project and its performance therein. Signature of Duly Authorized Representative Date of Signature Printed Name and Title of Duly Authorized Representative Research Institution Total Costs = (Direct costs + F&A Costs) PHS 398 (Rev. 05/01) Page 52 STTR Research Institution Certification Format Page Mailing address for application Use this label or a facsimile All applications and other deliveries to the Center for Scientific Review must come either via courier delivery or via the United States Postal Service (USPS.) Applications delivered by individuals to the Center for Scientific Review will no longer be accepted. Applications sent via the USPS EXPRESS or REGULAR MAIL should be sent to the following address: CENTER FOR SCIENTIFIC REVIEW NATIONAL INSTITUTES OF HEALTH 6701 ROCKLEDGE DRIVE ROOM 1040 – MSC 7710 BETHESDA, MD 20892-7710 NOTE: All applications sent via a courier delivery service (non-USPS) should use this address, but CHANGE THE ZIP CODE TO 20817 The telephone number is 301-435-0715. C.O.D. applications will not be accepted. For application in response to RFA Use this label or a facsimile IF THIS APPLICATION IS IN RESPONSE TO AN RFA, be sure to put the RFA number in line 2 of the application face page. In addition, after duplicating copies of the application, cut along the dotted line below and staple the RFA label to the bottom of the face page of the original and place the original on top of your entire package. Failure to use this RFA label could result in delayed processing of your application such that it may not reach the review committee on time for review. Do not use the label unless the application is in response to a specific RFA. Also, applicants responding to a specific RFA should be sure to follow all special mailing instructions published in the RFA. RFA No. ____ _______________ RFA Mailing address for application Use this label or a facsimile All applications and other deliveries to the Center for Scientific Review must come either via courier delivery or via the USPS. Applications delivered by individuals to the Center for Scientific Review will no longer be accepted. Applications sent via the USPS EXPRESS or REGULAR MAIL should be sent to the following address: CENTER FOR SCIENTIFIC REVIEW NATIONAL INSTITUTES OF HEALTH 6701 ROCKLEDGE DRIVE ROOM 1040 – MSC 7710 BETHESDA, MD 20892-7710 NOTE: All applications sent via a courier delivery service (non-USPS) should use this address, but CHANGE THE ZIP CODE TO 20817 The telephone number is 301-435-0715. C.O.D. applications will not be accepted. For application in response to SBIR/STTR Use this label or a facsimile IF THIS APPLICATION IS IN RESPONSE TO AN SBIR/STTR Solicitation, be sure to put the SBIR/STTR Solicitation number in line 2 of the application face page. In addition, after duplicating copies of the application, cut along the dotted line below and staple the appropriate SBIR or STTR label to the bottom of the face page of the original and place the original on top of your entire package. If this SBIR or STTR application is in response to an RFA, be sure to also include the RFA No. in the space provided below. SBIR RFA No. ___________________(if applicable) STTR RFA No. ___________________(if applicable)