802.16 Project Planning Committee (PPC): Session #67 Closing Plenary Report

advertisement
802.16 Project Planning Committee (PPC): Session #67 Closing Plenary Report
IEEE 802.16 Presentation Submission Template (Rev. 9)
Document Number:
IEEE 802.16ppc-10/0005
Date Submitted:
2010-05-10
Source:
Jose Puthenkulam
E-mail: jose.p.puthenkulam@intel.com
Project Planning Committee Chair
Venue:
Bangalore, India
Base Contribution:
None
Purpose:
802.16 Project Planning Committee Session #67 Closing Plenary Report of activities
Notice:
This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed
in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw
material contained herein.
Release:
The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of
an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the
IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that
this contribution may be made public by IEEE 802.16.
Patent Policy:
The contributor is familiar with the IEEE-SA Patent Policy and Procedures:
<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.
Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
Outline
•
•
•
•
•
7/26/2016
PPC Plan and Agenda this week
Input Contributions
Joint Session with GRIDMAN SG
Project Planning Map
Motions
2
Plan and Agenda this week
• PPC Meeting Room was Sigma II/III
• Timeslots and Agenda this week:
– Tue: AM1: 9-11AM; AM2: 11:15AM-1PM
• Comment resolution on M2M Study Report and M2M PAR & 5C
• Future Project Study Items
– Wed: AM1: 9-11AM;
• Comment resolution on M2M Study Report and M2M PAR & 5C
• Future Project Study Items
– Wed: AM2: 11:15AM-1PM
• Joint session with GRIDMAN
• Discuss any PAR issues
– Thu: AM1: 9-11AM; AM2: 11:15AM-1PM
• Finalization of M2M Study Report
• Finalization of M2M PAR & 5C for WG Approval
• Finalization of Plans for future Project Study items
– Hierarchical Networks, Coexistence with other legacy Wireless systems
7/26/2016
3
Input Contributions
• M2M Study Report:
– C802.16ppc-10/0033 – Study Report comments
• M2M PAR & 5C:
– C8021.6ppc-10/0032 – PAR & 5C comments
• New Study Items:
7/26/2016
– C802.16ppc-10/0034 – Recommendations for new
study item
– C802.16ppc-10/0035 – New study item for Coexistence enhancement for legacy of other wireless
technologie
4
Wednesday AM2- Joint Session with
GRIDMAN SG
• Discussion on the GRIDMAN PAR and M2M PAR Potential
Overlap Concerns
–
–
–
–
–
Two-way Group calling
Protocol for Group Management
Priority Access
Data Services (short packet and normal packet)
MAC Protocol Operation Overlap (For example: faster connection
setup time/maintenance, )
– M2M applications in emergency situations
– Operational portion (ex: provision of services) of the GRIDMAN based
reconfigured network
• Intent to address the overlap concerns in the respective System
requirement documents and ensure close co-ordination
7/26/2016
5
802.16 Project Planning Map (1/2)
Study Items
M2M
Description
First Phase: New requirements for massive
number of devices to be connected over
16 Networks.
Current PPC
Interest Level
(High, Med,
Low)
High
Later Phase: More Advanced M2M
capabilities
802 Multi-RAT: Advanced network
topologies offering high capacity at low
cost
High
Study item started: May 2010
WG PAR Approval: Sep 2010
EC PAR Approval: Nov 2010
TG Start: Jan 2011
Std Completion: TBD
High
Study item started: May 2010
WG PAR Approval: Sep 2010
EC PAR Approval: Nov 2010
TG Start: Jan 2011
Std Completion: TBD
Client Collaboration: Co-operation
amongst clients
Co-existence with nonCo-existence with non-802 TDD systems.
802 TDD systems
Example: TDS-CDMA, TD-LTE
7/26/2016
Study Item started: Mar 2010
WG PAR Approval: May 2010
EC PAR Approval: Jul 2010
TG Start: Sep 2010
Std Completion: Jul, 2012
TBD
Same RAT: Extensions to Advanced Air
Interface (802.16m) for multi-tier
deployments
Hierarchical Networks
Project Target TimeLine
6
802.16 Project Planning Map (2/2)
Study Items
Enhanced QOE
Description
Improved quality of experience for mobile
internet applications
Ultra High Speed
Advanced MIMO, Higher Order Modulation,
Networks (>1-5Gbps)
Higher Bandwidths, Multicarrier
Green RAN
7/26/2016
Energy savings at Client and Network
Current PPC
Interest Level
(High, Med,
Low)
Project Target TimeLine
Med
WG PAR Approval: 2011
EC PAR Approval: TBD
TG Start: TBD
Std Completion: TBD
High
WG PAR Approval: 2011
EC PAR Approval: TBD
TG Start: TBD
Std Completion: TBD
Med
WG PAR Approval: 2011
EC PAR Approval: TBD
TG Start: TBD
Std Completion: TBD
7
Closing Motions
• Motion 1: To Approve the 802.16ppc-10/0002r7 as the M2M Study Report
– Moved: Kerstin Johnsson
– Second: Vibhor Julka
– Approved with Unanimous Consent
• Motion 2: To Approve the 802.16ppc-10/0003r4 as the M2M PAR and 5C
and submit it for WG approval
– Moved: Kerstin Johnsson
– Second: HanGyu Cho
– Approved with Unanimous consent
• Motion 3: To Approve initiation of study reports for Hierarchical Networks
and Co-existence with non-802 TDD systems and issue call for
contributions towards the July meeting
– Moved: Shilpa Talwar
– Seconds: Huiying Fang
– Approved with Unanimous consent
7/26/2016
8
Motion to WG
• Motion: To Approve the 802.16ppc-10/0003r4
as the M2M PAR &5C and authorize the WG
chair to submit it for 802 EC approval
– Moved:
– Second:
7/26/2016