802.16 Project Planning Committee (PPC): Session #67 Closing Plenary Report

advertisement

802.16 Project Planning Committee (PPC): Session #67 Closing Plenary Report

IEEE 802.16 Presentation Submission Template (Rev. 9)

Document Number:

IEEE 802.16ppc-10/0005r1

Date Submitted:

2010-05-13

Source:

Jose Puthenkulam E -mail: jose.p.puthenkulam@intel.com

Project Planning Committee Chair

Venue:

Bangalore, India

Base Contribution:

None

Purpose:

802.16 Project Planning Committee Session #67 Closing Plenary Report of activities

Notice:

This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups . It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein.

Release:

The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the

IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16.

Patent Policy:

The contributor is familiar with the IEEE-SA Patent Policy and Procedures:

< http://standards.ieee.org/guides/bylaws/sect6-7.html#6 > and < http://standards.ieee.org/guides/opman/sect6.html#6.3

>.

Further information is located at < http://standards.ieee.org/board/pat/pat-material.html

> and < http://standards.ieee.org/board/pat >.

Outline

• PPC Plan and Agenda this week

• Input Contributions

• Joint Session with GRIDMAN SG

• Project Planning Map

• Motions

4/11/2020 2

Plan and Agenda this week

• PPC Meeting Room was Sigma II/III

• Timeslots and Agenda this week:

– Tue: AM1 : 9-11AM; AM2 : 11:15AM-1PM

• Comment resolution on M2M Study Report and M2M PAR & 5C

• Future Project Study Items

– Wed: AM1 : 9-11AM;

• Comment resolution on M2M Study Report and M2M PAR & 5C

• Future Project Study Items

– Wed: AM2 : 11:15AM-1PM

• Joint session with GRIDMAN

• Discuss any PAR issues

– Thu: AM1 : 9-11AM; AM2 : 11:15AM-1PM

• Finalization of M2M Study Report

• Finalization of M2M PAR & 5C for WG Approval

• Finalization of Plans for future Project Study items

– Hierarchical Networks, Coexistence with other legacy Wireless systems

4/11/2020 3

Input Contributions

• M2M Study Report:

– C802.16ppc-10/0033 – Study Report comments

• M2M PAR & 5C:

– C8021.6ppc-10/0032 – PAR & 5C comments

• New Study Items:

– C802.16ppc-10/0034 – Recommendations for new study item

– C802.16ppc-10/0035 – New study item for Coexistence enhancement for legacy of other wireless technologie

4/11/2020 4

Wednesday AM2- Joint Session with

GRIDMAN SG

• Discussion on the GRIDMAN PAR and M2M PAR Potential

Overlap Concerns

– Two-way Group calling

– Protocol for Group Management

– Priority Access

– Data Services (short packet and normal packet)

– MAC Protocol Operation Overlap (For example: faster connection setup time/maintenance, )

– M2M applications in emergency situations

– Operational portion (ex: provision of services) of the GRIDMAN based reconfigured network

• Intent to address the overlap concerns in the respective System requirement documents and ensure close co-ordination

4/11/2020 5

802.16 Project Planning Map (1/2)

4/11/2020

Study Items Description Project Target TimeLine

M2M

First Phase: New requirements for massive number of devices to be connected over 16

Networks.

Later Phase: More Advanced M2M capabilities

Study Item started: Mar 2010

WG PAR Approval: May 2010

EC PAR Approval: Jul 2010

TG Start: Sep 2010

Std Completion: Jul, 2012

TBD

Hierarchical Networks

Same RAT: Extensions to Advanced Air

Interface (802.16m) for multi-tier deployments

802 Multi-RAT: Advanced network topologies offering high capacity at low cost

Client Collaboration: Co-operation amongst clients

Study item started: May 2010

WG PAR Approval: Sep 2010

EC PAR Approval: Nov 2010

TG Start: Jan 2011

Std Completion: TBD

Co-existence with non-

802 TDD systems Co-existence with non-802 TDD systems.

Example: TDS-CDMA, TD-LTE

Study item started: May 2010

WG PAR Approval: Sep 2010

EC PAR Approval: Nov 2010

TG Start: Jan 2011

Std Completion: TBD

6

802.16 Project Planning Map (2/2)

Study Items Description Project Target TimeLine

Enhanced QOE

Improved quality of experience for mobile internet applications

Ultra High Speed Networks

(>1-5Gbps)

Advanced MIMO, Higher Order Modulation,

Higher Bandwidths, Multicarrier

Green RAN Energy savings at Client and Network

WG PAR Approval: 2011

EC PAR Approval: TBD

TG Start: TBD

Std Completion: TBD

WG PAR Approval: 2011

EC PAR Approval: TBD

TG Start: TBD

Std Completion: TBD

WG PAR Approval: 2011

EC PAR Approval: TBD

TG Start: TBD

Std Completion: TBD

4/11/2020 7

Closing Motions

• Motion 1: To Approve the 802.16ppc-10/0002r7 as the M2M Study Report

– Moved: Kerstin Johnsson

– Second: Vibhor Julka

– Approved with Unanimous Consent

• Motion 2: To Approve the 802.16ppc-10/0003r4 as the M2M PAR and 5C and submit it for WG approval

– Moved: Kerstin Johnsson

– Second: HanGyu Cho

– Approved with Unanimous consent

• Motion 3: To Approve initiation of study reports for Hierarchical Networks and Co-existence with non-802 TDD systems and issue call for contributions towards the July meeting

– Moved: Shilpa Talwar

– Seconds: Huiying Fang

– Approved with Unanimous consent

4/11/2020 8

Motion to WG

• Motion: To Approve the 802.16ppc-10/0003r4 as the M2M PAR &5C and authorize the WG chair to submit it for 802 EC approval

– Moved:

– Second:

4/11/2020 9