WG11 Snapshot July ‘10 Date: Authors: Name

advertisement
doc.: IEEE 802.11-10/0692r0
July 2010
WG11 Snapshot July ‘10
Date: 2010-07-10
Authors:
Name
Company
Address
Phone
email
Bruce Kraemer
Marvell
5488 Marvell Ln
Santa Clara, CA
95054
+1-321-4274098
bkraemer@marvell.com
Submission
Slide 1
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
WG11 Task Group
TGp PAR expires Dec 31, 2010
TGu PAR expires Dec 31, 2010
TGs PAR expires Dec 31, 2010
TGv PAR expires Dec 31, 2010
Submission
Slide 2
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
WG11 Task & Study Group Officers - Roster
Cat
Group
WG
WG11
TG
Vice Chair
Technical Editor
Secretary
Bruce Kraemer
Jon Rosdahl
Adrian Stephens
Adrian Stephens
Peter Ecclesine
Stephen McCann
Mb
Dorothy Stanley
Michael Montemurro
Adrian Stephens
Jon Rosdahl
TG
P
Lee Armstrong
none
Wayne Fisher
Susan Dickey
TG
S
Dee Denteneer
Guido Hiertz
Kazuyuki Sakoda
Guenael Strutt
TG
U
Stephen McCann
none
Necati Canpolat
Dave Stephenson
TG
V
Dorothy Stanley
none
Emily Qi
-OPEN-
TG
Z
Menzo Wentink
none
Menzo Wentink
Daniel Borges
TG
AA
Ganesh Venkatesan
Alex Ashley
Hang Liu
Ganesh Venkatesan
TG
AC
Osama Aboul-Magd
Menzo Wentink, Joonsuk Kim
-NYRQ-
-OPEN-
TG
AD
Eldad Perahia
Vinko Erceg, James Yee
-NYRQ-
-OPEN-
TG
AE
Michael
Montemurro
TG
AF
Richard Kennedy
SG
S1G
Dave Halasz
Dave Halasz
SG
FIA
Hiroshi Mano
Marc Emmelmann
Ad hoc
ARC
Dave Bagby
Ad hoc
SG
Submission
Chair
-OPENPeter Ecclesine
Peter Ecclesine
Zhou Lan
Bruce Kraemer
NYRQ = Not yet required, nominations are not open
Slide 3
Bruce Kraemer (Marvell)
OPEN = Candidate Nominations are open
doc.: IEEE 802.11-10/0692r0
July 2010
WG11 Task & Study Group Officers – July adjustments
Cat
Group
WG
WG11
TG
Vice Chair
Technical Editor
Secretary
Bruce Kraemer
Jon Rosdahl
Adrian Stephens
Adrian Stephens
Peter Ecclesine
Stephen McCann
Mb
Dorothy Stanley
Michael Montemurro
Adrian Stephens
Jon Rosdahl
TG
P
Lee Armstrong
none
Wayne Fisher
Susan Dickey
TG
S
Dee Denteneer
Guido Hiertz
Kazuyuki Sakoda
Guenael Strutt
TG
U
Stephen McCann
none
Necati Canpolat
Dave Stephenson
TG
V
Dorothy Stanley
none
Emily Qi
-OPEN-
TG
Z
Menzo Wentink
none
Menzo Wentink
Daniel Borges
TG
AA
Ganesh Venkatesan
Alex Ashley
Hang Liu
Ganesh Venkatesan
TG
AC
Osama Aboul-Magd
Menzo Wentink, Joonsuk Kim
-NYRQ-
-OPEN-
TG
AD
Eldad Perahia
Vinko Erceg, James Yee
-NYRQ-
-OPEN-
TG
AE
Michael
Montemurro
TG
AF
Richard Kennedy
SG
S1G
Dave Halasz
Dave Halasz
SG
FIA
Hiroshi Mano
Marc Emmelmann
Ad hoc
ARC
Dave Bagby
Ad hoc
SG
Submission
Chair
-OPENPeter Ecclesine
Peter Ecclesine
Zhou Lan
Bruce Kraemer
NYRQ = Not yet required, nominations are not open
Slide 4
Bruce Kraemer (Marvell)
OPEN = Candidate Nominations are open
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11 Standards Pipeline
802.11mb
Maintenance
k+r+y
MAC
802.11aa
Video Transport
802.11s
Mesh
802.11u
WIEN
802.11r
Fast Roam
802.11V
Network
Management
802.11k
RRM
802.11Y
Smart Grid
802.11ae
QoS Mgmt Frm
FIA
S1G
802.11p
WAVE
802.11af
TVWS
802.11W
Management
Frame
Security
802.11ad
VHT 60GHz
PHY Submission
Study
groups
TG without draft
Contention
Based
Protocol
802.11n
High
Throughput
(>100 Mbps)
802.11ac
VHT 5GHz
Discussion
Topics
802.11 -2007
802.11z
TDLS
TG
Letter Ballot
Slide 5
Sponsor
Ballot
Published
Amendment
e
QoS
h
DFS & TPC
i
Security
f
Inter AP
a 54 Mbps
5GHz
g
54 Mbps
2.4GHz
802.11b (’99)
11 Mbps
2.4GHz
Published
Standard
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
WG11 Editor Abstract / Agenda – July 2010
•
•
•
•
•
Roll Call / Contacts / Reflector
Go round table and get brief status report
Review action items from previous meeting
Numbering Alignment process
Amendment Ordering / ANA Status / Draft
Snapshots
• RevCom preparation process discussion
• Conference Call?
Submission
Slide 6
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
WNG SC – July 2010
•
•
•
•
Review of objectives
<TBD>
<TBD>
Review Objectives for September 2010 Meeting
Submission
Slide 7
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11 ARC SC – July 2010
• 802.11 ARC SC meets “as needed”
• Topics for July 802 Plenary
– 802.1 architecture document revision effort
– There were no 802.1 meetings re the architecture revision project
between March and July
Last minute change- Not meeting in July
Submission
Slide 8
David Bagby
Bruce
(Calypso
Kraemer
Ventures,
(Marvell)
Inc)
doc.: IEEE 802.11-10/0692r0
July 2010
TGmb - July 2010
• Draft 4.0 was balloted in LB163 between May &
July 2010 meetings
– LB 163 votes = Pool 246, 164 affirmative – 89%, 20 Disapprove, 28
Abstain
– LB 163 comments = 98 comments
• Major task of this meeting is comment resolution,
agenda in 11-10-0722
• Anticipate requesting EC conditional approval for
sponsor ballot at this July meeting
• Plan to incorporate published amendments (11p,
11z, 11v, 11u) during SB process
Submission
Slide 9
John
Bruce
Doe,
Kraemer
Some Company
(Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
TGp Snapshot for July 2010
Conditional approval by EC to submit to RevCom obtained in
March
Conditional approval conditions met in April
RevCom package submitted in April
RevCom/Stds Board approval granted in June
Publication target July 2010
Press release target July 2010
Awards target September 2010
Submission
Slide 10
Lee Armstrong (Armstrong
Bruce Kraemer
Consulting,
(Marvell)
Inc.)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11s Mesh Networking
• TGs Draft 6.0 passed LB#165 (closing April 15) with 88%
approval and 232 comments.
– The official announcement erroneously counted 191 comments
– Approval rate was down by 0.5% from previous LB #161
– The current comment resolution spread sheet is 11-10/725r2. See
table below for comments overview.
• TGs draft agenda is in submission 11-10/0735r1.
– The focus is on comment resolution
editorial
Comments from LB 165
Submission
89
38%
Slide 11
technical
143
62%
Bruce
Bruce Kraemer
Kraemer (Marvell)
(Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11u – July 2010
•
•
•
•
•
Review of Teleconferences
2nd Re-circulation Sponsor Ballot Comment Resolution
Possible Conditional RevCom Approval
Liaisons
Agenda in document 11-10-0733r0
Submission
Slide 12
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
TGv – July 2010
• This week
– Comment resolution, recirculation SB, request conditional approval from
EC to go to Revcom; Agenda in document 11-10-0721
• Third Recirculation SB (closed 10 June 2010) results
– 161 in ballot pool, 130/11/6 Y/N/A : 92% approve, 8% disapprove
– 1087 comments received, 1076 Technical, 7 Editorial, 4 General
(1037 comments expand/duplicate 7 prior ballot comments)
– Comments in 11-10-0696
• Fourth Recirculation SB (closed 7 July 2010) results
– 161 in ballot pool, 133/8/7 Y/N/A : 94% approve, 6% disapprove
– 1074 comments received, 1067 Technical, 2 Editorial, 5 General
– Comments in 11-10-0758
Submission
Slide 13
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11z – July 2010 -San Diego
• The third 802.11z Recirculation Sponsor Ballot passed
with 94% approval rate
– 121 yes, 8 no, 7 abstain
– 15 comments received
• TGz has 4 timeslots this week to work on comment
resolution
• A fourth recirculation SB is expected after the San Diego
meeting
Submission
Slide 14
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11aa – San Diego, California
• Goals:
•
•
•
Listen to technical proposal(s)
Joint meeting with 802.1AVB
Resolve Letter Ballot comments
• Opening report in document 10/0xxxr0
Submission
Slide 15
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11ac – July 2010
• Continue with Ad Hoc group meetings and straw polls
• Continue the development of the Specification
Framework document.
• TG approved documents:
– 11-09-059r5 is the approved TGac Selection Procedure document.
– 11-09-0161r2 is the approved TGac Usage Model document .
– 11-09-308r12 is the approved TGac Channel Models Addendum
document.
– 11-09-0451r14is the approved TGac Functional Requirements and
Evaluation Methodology document
– 09-0992r11 is the approved TGac Specification Framework document.
• Technical contributions
• Agenda in document 11-10-0714r0
Submission
Slide 16
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
TGad – July Meeting Goals
• Comment resolution on D0.1
• ITU-R 60 GHz liaison
Submission
Slide 17
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
TGae July 2010 Summary
• Find a TG Editor and TG Secretary
• Task Group working documents:
– https://mentor.ieee.org/802.11/dcn/10/11-10-0365-03-00aeproposal-for-prioritization-of-management-frames.doc
– https://mentor.ieee.org/802.11/dcn/10/11-10-0574-00-00ae-11aedraft-amendment-proposal.doc
– https://mentor.ieee.org/802.11/dcn/10/11-10-0476-02-00aemanagement-frame-policy-definition.ppt
• Produce TGae draft for Working Group Review.
• Revise plan of record.
Submission
Slide 18
John
Bruce
Doe,
Kraemer
Some Company
(Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
TGaf – Meeting Goals July 2010
•
•
•
•
Review regulatory landscape
Resolve Technical Review comments
Make necessary edits to the draft
Plan for September Interim in Waikoloa
Submission
Slide 19
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE JTC1 ad hoc – July 2010
• The agenda items that will be addressed this week are:
–
–
–
–
–
–
–
Approval of minutes from previous meetings
Review goals of JTC1 ad hoc
Review status of Sponsor Ballot drafts sent to ISO/IEC JTC1/SC6
Discuss status of liaison sent to ISO/IEC JTC1/SC6 in June 2010
Appoint an IEEE 802 representative to SC6 meeting in Sept 10
Review WAPI status in ISO/IEC JTC1/SC6
Discuss any other JTC1/SC6 liaison matters
Submission
Slide 20
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
Regulatory Ad Hoc Committee
Meeting Goals July 2010
• The regulatory summaries
• Regulatory issues status
–
–
–
–
–
The impending FCC TVWS rulings
EN 300 328 revision update; actions in TG11 and TG28
FCC 5 GHz rules changes update; full band for indoor use
Wi-Fi (2.4GHz)/LTE interference issues
60 GHz rules, RF Health discussion
• Critical issues actions
– TBD
Submission
Slide 21
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
IEEE 802.11 FIA SG – San Diego, July
2010
• Goals for the San Diego Meeting:
•
•
•
Submission
Extend Study Group
Edit and approve draft of PAR & 5C
Plan for September Interim and Teleconference
Slide 22
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
S1G Goals for July
• Respond to 802 Plenary Review comments
• Note 1: Comments received by 5 pm Tuesday, July 13
• Note 2: Response due by 5 pm Wednesday, July 14
Submission
Slide 23
Bruce
David
Kraemer
Halasz,
(Marvell)
Aclara
doc.: IEEE 802.11-10/0692r0
July 2010
Smart Grid – July 2010
• Monday pm1
Open Forum for discussing in depth what WG11 should do to
service requirements for NIST Smart Grid PAP#2
• Thursday am1
• Open Forum for discussing in depth what 802 should do to
service requirements for NIST Smart Grid NIST PAP#2
Update of activities in P2030
Open SG
Submission
Slide 24
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
Submission
Slide 25
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
TGmb – WG recirculation
802.11 Ballot #162 was a 25 day Working Group technical recirculation Ballot asking
the question "Should P802.11mb D3.0 be forwarded to Sponsor Ballot?".
Results:
Ballot Opening Date:
Ballot Closing Date:
Wednesday
Sunday
March31, 2010 - 23:59 ET
Apr 25, 2010 - 23:59 ET
246 eligible people are in this ballot group
167 affirmative votes
20 negative votes
25 abstention votes
===
212 votes received = 86.2% valid returns
= 11.8% valid abstentions
167 affirmative votes
=
20 total negative votes =
89.3 % affirmative
10.7 % negative
Motion passes.
There were 149 comments received.
Submission
Slide 26
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11s – WG Recirculation
IEEE 802.11 WG Letter Ballot #161 was a 15 day Working Group technical recirculation
Ballot asking the question "Should P802.11s D5.0 be forwarded to Sponsor Ballot?".
Results:
Ballot Opening Date: Wednesday
Ballot Closing Date: Thursday
Mar 31, 2010 - 23:59 ET
Apr 15, 2010 - 23:59 ET
248 eligible people are in this ballot group.
159 affirmative votes
19 negative votes
32 abstention votes
===
210 votes received = 84.68% valid returns
= 15.24% valid abstentions
159 affirmative votes
19 total negative votes
=
=
89.33 % affirmative
10.67 % negative
Motion passes.
There were 323 comments received.
Submission
Slide 27
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11u - 1st Sponsor recirculation
The 15 day IEEE P802.11u (Interworking with External Networks) 1st recirculation Sponsor
Ballot asked the question “Should P802.11u Draft 9.0 be forwarded to RevCom?”
Results:
Ballot Opening Date: Thursday
Ballot Closing Date:
Friday
April 08 , 2010 - 23:59 ET
April 23, 2010 - 23:59 ET
154 eligible people are in this ballot group.
115 affirmative votes
10 negative votes with comments
2 negative votes without comments
13 abstention votes
=======
140 votes received = 90.1 % returns
= 9.3% valid abstentions
115 affirmative votes
=
10 total negative votes =
92.0 % affirmative
8.0 % negative
Motion passes
There were 127 comments received
Submission
Slide 28
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11v – 2nd Sponsor Recirculation
The IEEE P802.11v (Wireless Network Management) 15 day 2nd recirculation Sponsor
Ballot asked the question “Should P802.11v Draft 10.0 be forwarded to RevCom?”
Results:
Ballot Opening Date: Monday
March 29 , 2010 - 23:59 ET
Ballot Closing Date: Tuesday
April 13, 2010 - 23:59 ET
161 eligible people are in this ballot group.
122 affirmative votes
18 negative votes with comments
0 negative votes without comments
6 abstention votes
=======
146 votes received = 90.7% valid returns
= 4.1 % valid abstentions
122 affirmative votes
18 total negative votes
=
=
87.1 % affirmative
12.9 % negative
The Motion passes.
There were 1181 comments received
Submission
Slide 29
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11p – 2nd Sponsor Recirculation
The 2nd IEEE P802.11p (Wireless Access in Vehicular Environments) 15 day recirculation
Sponsor Ballot asked the question “Should P802.11p Draft 11.0 be forwarded to
RevCom?”
The official results for this Sponsor Ballot follow:
Ballot Opening Date: Tuesday
March 23, 2010 - 23:59 ET
Ballot Closing Date:
Wednesday
April 07, 2009 - 23:59 ET
164 eligible people are in this ballot group
131 affirmative votes
1 negative votes with comments
0 negative votes without comments
13 abstention votes
=======
145 votes received = 88.4 % valid returns
= 9.0% valid abstentions
131 affirmative votes
=
1 total negative votes =
99.2 % affirmative
0.8 % negative
Submitted to RevCom.
Submission
Slide 30
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11z - 2nd Sponsor Recirculation
The second IEEE P802.11z (Extensions to Direct Link Setup) 15 day recirculation
Sponsor Ballot asked the question “Should P802.11z Draft 8.0 be forwarded to
RevCom?”
Ballot Opening Date: Monday
Ballot Closing Date: Tuesday
April 19, 2010 - 23:59 ET
May 04, 2010 - 23:59 ET
Results:
144 eligible people are in this ballot group.
121 affirmative votes
8 negative votes with comments
0 negative votes without comments
7 abstention votes
=======
136 votes received = 94.4 % valid returns
= 5.1% valid abstentions
121 affirmative votes
=
93.8 % affirmative
8 total negative votes = 6.2 % negative
The motion passes.
There were 15 comments received
Submission
Slide 31
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
Submission
Slide 32
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11u - 2nd Sponsor Recirculation
The 15 day IEEE P802.11u (Interworking with External Networks) 2nd recirculation Sponsor Ballot asked
the question “Should P802.11u Draft 10.0 be forwarded to RevCom?”
Results for this Sponsor Ballot follow:
Ballot Opening Date: Wednesday
Ballot Closing Date: Thursday
June 23 , 2010 - 23:59 ET
July 08, 2010 - 23:59 ET
RESPONSES:
This ballot has met the 75% returned ballot ratio requirement
154 eligible people are in this ballot group.
120 affirmative votes
7 negative votes with comments
1 negative vote without comments
14 abstention votes
=======
142 votes received = 92.2 % returns
= 9.9% valid abstentions
APPROVAL RATE:
120 affirmative votes
=
7 total negative votes =
94.5 % affirmative
5.5 % negative
Motion passes
There were 13 comments received
Submission
Slide 33
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11v - 3nd Sponsor Recirculation
The 15 day, third recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management)
asked the question “Should P802.11v Draft 11.0 be forwarded to RevCom?”
Results for this Sponsor Ballot follow:
Ballot Opening Date: Wednesday
Ballot Closing Date: Thursday
May 26, 2010 - 23:59 ET
June 10, 2010 - 23:59 ET
RESPONSES:
161 eligible people are in this ballot group.
130 affirmative votes
11 negative votes with comments
0 negative votes without comments
6 abstention votes
=======
147 votes received = 91.3% valid returns
= 4.1 % valid abstentions
APPROVAL RATE:
130 affirmative votes
=
11 total negative votes =
92.2 % affirmative
7.8 % negative
The Motion passes.
There were 1087 comments received
Submission
Slide 34
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11v – 4th Sponsor Recirculation
The 15 day, fourth recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management)
asked the question “Should P802.11v Draft 12.0 be forwarded to RevCom?”
Results for this Sponsor Ballot :
Ballot Opening Date: Tuesday
Ballot Closing Date: Wednesday
June 22, 2010 - 23:59 ET
July 07, 2010 - 23:59 ET
RESPONSES:
161 eligible people are in this ballot group.
133 affirmative votes
8 negative votes with comments
0 negative votes without comments
7 abstention votes
=======
148 votes received = 91.9% valid returns
= 4.7 % valid abstentions
APPROVAL RATE:
133 affirmative votes
8 total negative votes
=
=
94.3 % affirmative
5.7 % negative
The Motion passes.
There were 1074 comments received
Submission
Slide 35
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11z - 3nd Sponsor Recirculation
The third IEEE P802.11z (Extensions to Direct Link Setup) 15 day recirculation Sponsor Ballot asked
the question “Should P802.11z Draft 9.0 be forwarded to RevCom?”
Results for this Sponsor Ballot:
Ballot Opening Date: Wednesday
Ballot Closing Date: Thursday
May 26, 2010 - 23:59 ET
June 10, 2010 - 23:59 ET
RESPONSES:
144 eligible people are in this ballot group.
123 affirmative votes
6 negative votes with comments
0 negative votes without comments
7 abstention votes
=======
136 votes received = 94.4 % valid returns
= 5.1% valid abstentions
APPROVAL RATE:
123 affirmative votes
=
6 total negative votes =
95.3 % affirmative
4.7 % negative
The motion passes.
There were 12 comments received
Submission
Slide 36
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11mb - WG Recirculation
802.11 Ballot #163 was a 15 day Working Group technical recirculation Ballot asking the question
"Should P802.11mb D4.0 be forwarded to Sponsor Ballot?".
The ballot results are:
Ballot Opening Date: Thursday
Ballot Closing Date: Friday
Jun 10, 2010 - 23:59 ET
Jun 25, 2010 - 23:59 ET
RESPONSES:
246 eligible people are in this ballot group.
164 affirmative votes
20 negative votes
28 abstention votes
=======
212 votes received = 86.2% valid returns
= 13.2% valid abstentions
APPROVAL RATE:
164 affirmative votes
=
20 total negative votes =
89.1 % affirmative
10.9 % negative
Motion passes.
There were 98 comments received.
Submission
Slide 37
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11s - WG Recirculation
IEEE 802.11 WG Letter Ballot #165 was a 15 day Working Group technical recirculation Ballot
asking the question "Should P802.11s D6.0 be forwarded to Sponsor Ballot?".
The ballot results follow:
Ballot Opening Date: Sunday
Ballot Closing Date: Monday
Jun 13, 2010 - 23:59 ET
Jun 28, 2010 - 23:59 ET
RESPONSES:
248 eligible people are in this ballot group.
157 affirmative votes
20 negative votes
33 abstention votes
=====
210 votes received = 84.68% valid returns
= 15.71% valid abstentions
APPROVAL RATE:
157 affirmative votes
=
20 total negative votes =
88.70 % affirmative
11.30 % negative
Motion passes.
There were 191 comments received.
Submission
Slide 38
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-10/0692r0
July 2010
P802.11aa – Initial WG Ballot
IEEE 802.11 WG Letter Ballot #164 was a 30 day Working Group technical Ballot asking the question
"Should P802.11aa D1.0 be forwarded to Sponsor Ballot?".
The ballot results follow:
Ballot Opening Date: Sunday
Ballot Closing Date: Saturday
June 10, 2010 - 23:59 ET
July 10, 2010 - 23:59 ET
RESPONSES:
xxx eligible people are in this ballot group.
xxx affirmative votes
xx negative votes
xx abstention votes
=====
xxx votes received = 84.68% valid returns
= 15.71% valid abstentions
APPROVAL RATE:
xxx affirmative votes
=
xx total negative votes =
88.70 % affirmative
11.30 % negative
Motion passes.
There were xxx comments received.
Submission
Slide 39
Bruce Kraemer (Marvell)
Download