Notice-of-Intent to Provide Offer for GEORGIA POWER COMPANY

advertisement
Notice-of-Intent to Provide Offer for
Consideration as a Company Self Build Proposal
GEORGIA POWER COMPANY
Entities desiring to offer the Company a solar photovoltaic generation resource that would be developed,
constructed, and ultimately sold to the Company, can do so by contacting the Company self-build team. Contact can
and should be made via the completion of this Notice-of-Intent (“NOI”) document and should be communicated to
the Company (through the provided contact and address below) prior to the close of business January 13, 2014, to be
given consideration. Consideration of an entity’s project(s) by the self-build team does not disqualify that entity
from submitting bids for consideration into the RFP process. However, any project(s) submitted by the self-build
team for consideration pursuant to the RFP will be disqualified from being offered as a bid into the RFP.
Entities desiring to supply a proposed project should provide the information listed below. A separate NOI should
be provided for each project with specifics for that project (Proposals will be considered for new and existing
projects as well as projects where location is undefined):
Bidder:
________________________________________________________________
Address:
________________________________________________________________
City:
_________________________ State: _____________ Zip: ________________
Contact:
_________________________
Title: ___________________________
Telephone:
_________________________
Fax No: ___________________________
E-mail Address: ___________________________________________________________
Proposal Information Requested. Bidders should make a bona fide effort to complete this
form as fully as possible. Emailing of this NOI in PDF format to the designated contact
identified on the following page (William Houser) is the required method of transmission of
an indicative offer. Entities who have questions concerning the Requested Information,
submission of the Offer for Consideration as a Company Self Build Proposal, or the
process for working with Georgia Power for such consideration by the self-build team may
contact the self build team prior to the required notice date by e-mail or phone to:
Chris Habig
CJHabig@southernco.com
205-257-6185
For the avoidance of doubt, any Offers for Consideration as a Company Self Build
Proposal must be submitted to the self-build team and will not be processed through this
RFP website.
1.
2.
3.
Requested Information
Facility type (Description: Fixed plate, Single axis or dual axis tracking):
Net of station service:
Total facility capacity (Maximum alternating current (AC) rating)
Anticipate facility annual total plant energy (Net AC, a 8760 hour annual generation profile specific
to the project is desired)
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Facility annual degradation amount or rate (as applicable to maximum facility capacity and annual
energy)
Location (County inside the state of Georgia). Map showing location of the facility (If provided or
known), and statement of property control if attained. Latitude/longitude coordinates (if available)
Proposed panel/module vendor(s) to be used in the project
Proposed inverter vendor(s) to be used in the project
Proposed vendors for facility transformation equipment to be used in the project (includes any
intermediate and final transformation equipment (GSU))
Final transformation voltage level (voltage level high side of the GSU)
Proposed facility block sizing (number of mega-watts aggregated per inverter)
Proposed facility configuration/layout (description on shape and orientation)
Prior project experience (provide number of and details of all projects completed of a size greater
than or equal to 5MW)
Please provide your most recent safety metrics as it relates to your construction and development
efforts and experience (Recordable Incident Rate or other)
Anticipated In-Service Date
Indicative total installed cost (nominal US dollars, noting the year of project completion). Please
include costs associated with step-up transformation suitable for delivery of power onto the
proposed transmission or distribution system provider’s power delivery system.
Current credit rating (if applicable)
Dun and Bradstreet number (if applicable)
Two most recent years of financial statements: Balance sheet; Profit and loss statement; Cash flow
statement)
This submittal is made by:
______________________________ (Signature)
______________________________ (Print Name)
______________________________ (Title)
______________________________ (Date)
This notice must be received by close of business (5:00PM EST) on January 20, 2014 by:
Georgia Power Company
Attn: William Houser- Renewable Development Project Manager
Georgia Power Company
241 Ralph McGill Blvd.
Atlanta, Georgia 30308
WHOUSER@southernco.com
Download