230923S12 ACCEPTANCE TESTING System checkout and acceptance testing shall be included as part of this contract. Contractor shall provide a signed document to the owner when all points are installed and this document shall include a statement to the effect that all points have been verified to exist and proven to be 100% operational. Contractor shall provide a signed document to the owner stating what programs are provided and that the operation of each has been tested and proven to operate 100% without error. 230923S12- ACCEPTANCE TESTING Dated: 12/2015 Applies to: All Projects University of Kentucky Page 1 of 1