Don Beatty Architectural Drafting Teacher Lake Norman High School dbeatty@iss.k12.nc.us 704-799-8555 ext. 1347 Class: Architecture III Assign Date: Assignment: Foundation Design Due Date: and Construction Test Date: MiTiReLa: Unit 4 Requirements: ***Turn in one complete and bound size “B” drawing packet and one bound size “A” test packet containing three chapter tests, typed and stapled together with cover page. Know the terms located in the Architecture III curriculum guide beginning on page 33 Study and know the following: o pages 33-39 of the Architecture III curriculum guide o information contained in this handout o textbook chapters 25, 26 and 27 (pages 638-717) o MiTiReLa section 4 Replicate pages 716 with changes to reflect your specific application o Ignore BWP (Braced Wall Panel) and AWBP (Alternate BWP) Using the text book Residential Design, Drafting and Detailing (RDDD) please complete the following: Read Section 7 Chapters: o 25 Foundation Systems o 26 Floor Systems and Foundation Support o 27 Foundation Plan Layout Complete the “Foundations Systems Test” on page 668 Complete the “Floor Systems and Foundation Support Test” on page 693 Complete the “Foundation Plan Layout Test” on page 717 Don Beatty Architectural Drafting Teacher Lake Norman High School dbeatty@iss.k12.nc.us 704-799-8555 ext. 1347 Foundation Project Directions 1. Create a new sheet on the existing file. 2. Develop a complete foundation plan (plan view and elevation views with stepped footings) for your house and garage. The land that the house sits on has a change in elevation and must be accounted for in the way of stepped footings. Therefore, design all footings and foundation walls accordingly. Include the following: Poured Foundation Wall Details (including pilasters) Pier Details (Poured footing with CMU pier) Door openings Gravel fill or compacted sand base for slabs Ventilation Termite protection Insulation Re-bar and anchor bolt specifications Vapor Barrier Concrete strength Concrete joints Slope for drainage (Slabs) Exterior drainage Wood type and grade for sill Crawl Space Access 3. Check the required footing depth for our area to make the design meets the requirement. Calculate the amount of concrete required, in cubic yards, for the footings, foundation walls and slabs. Show all work. ***Turn in all completed and bound work on due date. *** Grading Four grades will be given as follows. 1 Chapter tests (each test counting 33%) 2 Foundation plan drawing 15 bullet points (see section 2 above) at 5 points each (70 points) 30 points for clarity of design and professionalism of drawing package 3 Four elevation drawings. (Front right side, rear and left side) Use existing elevations as a starting point. Include trees and landscaping. 4 Concrete calculations. Page 2 of 2