REQUEST FOR PROPOSALS Title: CONTRACTOR FOR FRASER HEIGHTS RECREATION CENTRE EXPANSION Reference No.: 1220-30-25-10 TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................. 1 1.1 1.2 1.3 2. INSTRUCTIONS TO PROPONENTS .................................................................................. 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 3. Package .................................................................................................................... 4 Form of Proposal ....................................................................................................... 4 Signature ................................................................................................................... 4 EVALUATION AND SELECTION ....................................................................................... 5 4.1 4.2 4.3 4.4 4.5 4.6 4.7 5. Closing Time and Address For Proposal Delivery ...................................................... 2 Information Meeting ................................................................................................... 3 Number of Copies ...................................................................................................... 3 Late Proposals........................................................................................................... 3 Amendments to Proposals ......................................................................................... 3 Inquiries ..................................................................................................................... 3 Addenda .................................................................................................................... 4 Examination of Contract Documents and Site ............................................................ 4 Opening of Proposals ................................................................................................ 4 Status Inquiries .......................................................................................................... 4 PROPOSAL SUBMISSION FORM AND CONTENTS ........................................................ 4 3.1 3.2 3.3 4. Purpose and Background .......................................................................................... 1 Forms of Contract ...................................................................................................... 2 Definitions .................................................................................................................. 2 Evaluation Team ........................................................................................................ 5 Evaluation Criteria ..................................................................................................... 5 Discrepancies in Proponent's Financial Proposal....................................................... 5 Litigation .................................................................................................................... 6 Additional Information ................................................................................................ 6 Interviews .................................................................................................................. 6 Negotiation of Contract and Award ............................................................................ 6 GENERAL CONDITIONS ................................................................................................... 7 5.1 5.2 5.3 5.4 5.5 5.6 No City Obligation ...................................................................................................... 7 Proponent’s Expenses ............................................................................................... 7 No Claims .................................................................................................................. 7 Conflict of Interest ...................................................................................................... 7 Solicitation of Council Members and City Staff ........................................................... 7 Confidentiality ............................................................................................................ 7 SCHEDULE A – SCOPE OF SERVICES & SCOPE OF WORK..................................................8 SCHEDULE A-1 – SCHEMATIC DRAWINGS........................... .................................................9 SCHEDULE B – FORMS OF CONTRACT...................................................................................10 SCHEDULE C – FORM OF PROPOSAL....................................................................................11 FHRC June 18, 2010 i REQUEST FOR PROPOSALS 1. INTRODUCTION 1.1 Purpose and Background (a) Purpose The purpose of this RFP is to invite competitive Proposals for the performance of the Services, and potentially the Work, under Contracts with the City. (b) Project Background Proposed project (the “Project”) is the Fraser Heights Recreation Centre Expansion, located at 10588 – 160th Street, Surrey, BC. It is proposed to be an expansion to an existing recreation centre recently built, adding approximately 15,800 sq.ft. of new construction consisting of the following: • 6,500 sq.ft. new Gymnasium • 800 square feet of Gym storage • Additional men’s and women’s washrooms • 6,500 sq.ft. fitness and aerobics area • New multi-purpose space • Renovated Activity Lounge • Exit stairwells • Approximately 40 new parking spaces • Exterior landscaping The Project is intended to be completed before the end of 2011. The project construction budget is presently $4.85 million, which does not include soft costs such as consulting fees, or furniture and fixtures. The project will not be LEED Certified, however, the design and construction will shadow LEED Gold principles. The facility will remain operational during construction, and program downtime will be minimized. The tentative schedule indicates site works are expected to commence in October 2010 and be completed in Fall 2011. For additional background, schematic drawings are attached as part of Schedule A. (c) Architect Shape Architecture Inc. has been retained by the City as the prime consultant for the design consultant team, and has commenced design work on the Project. The subconsultants include: (d) Wicke Herfst Maver (Structural) AME (Mechanical) AES (Electrical) Gage-Babcock & Associates (Code & CP) BTY (QS) Perry & Associates (Landscape) Core Group (Civil) Project Manager Stantec Consulting Ltd. (Stantec) has been retained by the City of Surrey as Project Manager. RFP #1220-30-25-10 1 of 18 FHRC RFP June 18, 2010 1.2 Forms of Contract (a) The Contract for the Services will be based on the City’s Professional Services Agreement. (b) The Contract for the Work will be based on a standard CCDC 2-2008 document (as amended by the City’s Supplementary General Conditions). 1.3 Definitions In this RFP the following definitions shall apply: “City” means the City of Surrey; “City Representative” has the meaning set out in section 2.6; “City Website” means www.surrey.ca; “Closing Time” has the meaning set out in section 2.1; “Contract” means a formal written contract generally in the forms attached as Schedule B between the City and the Preferred Proponent for the performance of the Services and/or the Work; “Evaluation Team” means the team appointed by the City; “Information Meeting” has the meaning set out in section 2.2; “Preferred Proponent” means the Proponent selected by the Evaluation Team to enter into negotiations for a Contract; “Project” has the meaning set out in section 1.1; “Proponent” means an entity that submits a Proposal; “Proposal” means a proposal submitted in response to this RFP; “RFP” means this Request for Proposals; “Services” has the meaning set out in Schedule A of this RFP; “Site” means the place or places where the Work is to be performed; and “Statement of Departures” means Schedule C-1 to the form of Proposal attached as Schedule C; “Work” has the meaning set out in Definition 25 of CCDC2-2008; 2. INSTRUCTIONS TO PROPONENTS 2.1 Closing Time and Address For Proposal Delivery Proposals must be received at the office of the: RFP #1220-30-25-10 2 of 18 FHRC RFP June 18, 2010 Manager, Purchasing & Payments City of Surrey - Purchasing Section 6645 – 148th Street Surrey, British Columbia V3S 3C7 CANADA Tel: 604-590-7274 Fax: 604-599-0956 on or before the following date and time (the “Closing Time”): Time: 3:00 pm PST Date: July 7, 2010 Submissions by fax or email will not be accepted. There will be no extension to the Closing Time for the submission of Proposals. 2.2 Information Meeting An information meeting will be hosted by the City Representative on Wednesday, June 23rd, 2010 at 2:00 p.m. at the Site to discuss the City’s requirements under this RFP (the “Information Meeting”). While attendance is at the discretion of Proponents, Proponents who do not attend will be deemed to have attended the Information Meeting and to have received all of the information given at the Information Meeting. 2.3 Number of Copies Proponents should submit the original plus 4 hard copies (5 in total) of their Proposals. 2.4 Late Proposals Proposals received after the Closing Time will not be accepted or considered. Delays caused by any delivery, courier or mail service(s) will not be grounds for an extension of the Closing Time. 2.5 Amendments to Proposals Proposals may be revised by written amendment, delivered to the location set out in section 2.1, at any time before the Closing Time but not after. An amendment must be signed by an authorized signatory of the Proponent in the same manner as provided by section 3.3. Fax amendments are permitted, but such fax may show only the change to the proposal price(s) and in no event disclose the actual proposal price(s). A Proponent bears all risk that the City’s fax equipment functions properly so as to facilitate timely delivery of any fax amendment. Email amendments are not permitted. 2.6 Inquiries All inquiries related to this RFP should be directed in writing to the person named below (the “City Representative”). Information obtained from any person or source other than the City Representative may not be relied upon. Contact: Address: Phone: Fax: Email: RFP #1220-30-25-10 Kam Grewal - Internal Audit Manager, Acting Purchasing & AP Manager City of Surrey – Purchasing 6645 – 148 Street Surrey, BC V3S 3C7 604-590-7274 604-599-0956 purchasing@surrey.ca 3 of 18 FHRC RFP June 18, 2010 Proponents finding discrepancies or omissions in the Contract or RFP, or having doubts as to the meaning or intent of any provision, should immediately notify the City Representative. If the City determines that an amendment is required to this RFP, the City Representative will issue an addendum in accordance with section 2.7. No oral conversation will affect or modify the terms of this RFP or may be relied upon by any Proponent. 2.7 Addenda If the City determines that an amendment is required to this RFP, the City will post a written addendum on the City website at www.surrey.ca (the "City Website") and upon posting will be deemed to form part of this RFP. Upon submitting a Proposal, Proponents will be deemed to have received notice of all addenda that are posted on the City Website. 2.8 Examination of Contract Documents and Site Proponents will be deemed to have carefully examined the RFP, including all attached Schedules, the Contract and the Site (as applicable) prior to preparing and submitting a Proposal with respect to any and all facts which may influence a Proposal. 2.9 Opening of Proposals The City intends to open Proposals in private but reserves the right to open Proposals in public at its sole discretion. 2.10 Status Inquiries All inquiries related to the status of this RFP, including whether or not a Contract has been awarded, should be directed to the City Website and not to the City Representative. 3. PROPOSAL SUBMISSION FORM AND CONTENTS 3.1 Package Proposals should be in a sealed package, marked on the outside with the Proponent's name, title of the Project and reference number. 3.2 Form of Proposal Proponents should complete the form of Proposal attached as Schedule C, including Schedules C-1 to C-5. Proponents are encouraged to respond to the items listed in Schedules C-1 to C-5 in the order listed. Proponents are encouraged to use the forms provided and attach additional pages as necessary. 3.3 Signature The legal name of the person or firm submitting the Proposal should be inserted in Schedule C. The Proposal should be signed by a person authorized to sign on behalf of the Proponent. (a) If the Proponent is a corporation then the full name of the corporation should be included, together with the names of authorized signatories. The Proposal should be executed by all of the authorized signatories or by one or more of them provided that a copy of the corporate resolution authorizing those persons to execute the Proposal on behalf of the corporation is submitted. (b) If the Proponent is a partnership or joint venture then the name of the partnership or joint venture and the name of each partner or joint venturer should be included, and each RFP #1220-30-25-10 4 of 18 FHRC RFP June 18, 2010 partner or joint venturer should sign personally (or, if one or more person(s) have signing authority for the partnership or joint venture, the partnership or joint venture should provide evidence to the satisfaction of the City that the person(s) signing have signing authority for the partnership or joint venture). If a partner or joint venturer is a corporation then such corporation should sign as indicated in subsection (a) above. (c) If the Proponent is an individual, including a sole proprietorship, the name of the individual should be included. 4. EVALUATION AND SELECTION 4.1 Evaluation Team The evaluation of Proposals will be undertaken the Evaluation Team. The Evaluation Team may consult with others including City staff members, third party consultants and references, as the Evaluation Team may in its discretion decide is required. The Evaluation Team will give a written recommendation for the selection of a Preferred Proponent to the City. 4.2 Evaluation Criteria The Evaluation Team will compare and evaluate all Proposals to determine the Proponent's strength and ability to provide the Services and the Work in order to determine the Proposal which is most advantageous to the City, using the following criteria: (a) Experience, Reputation and Resources The Evaluation Team will consider the Proponent's responses to items (i) to (x) in C-2 of Schedule C including supplementary information. (b) Technical The Evaluation Team will consider the Proponent's responses to items (i) to (vii) in C-3 and C-4 of Schedule C. (c) Financial The Evaluation Team will consider the Proponent's response to C-5 of Schedule C. (d) Statement of Departures The Evaluation Team will consider the Proponent's response to C-1 of Schedule C. The Evaluation Team will not be limited to the criteria referred to above, and the Evaluation Team may consider other criteria that the team identifies as relevant during the evaluation process. The Evaluation Team may apply the evaluation criteria on a comparative basis, evaluating the Proposals by comparing one Proponent's Proposal to another Proponent's Proposal. All criteria considered will be applied evenly and fairly to all Proposals. 4.3 Discrepancies in Proponent's Financial Proposal If there are any obvious discrepancies, errors or omissions in C-5 of a Proposal (Proponent's Financial Proposal), then the City shall be entitled to make obvious corrections, but only if, and to the extent, the corrections are apparent from the Proposal as submitted, and in particular: (a) if there is a discrepancy between a unit price and the extended total, then the unit prices shall be deemed to be correct, and corresponding corrections will be made to the extended totals; RFP #1220-30-25-10 5 of 18 FHRC RFP June 18, 2010 4.4 (b) if a unit price has been given but the corresponding extended total has been omitted, then the extended total will be calculated from the unit price and the estimated quantity; (c) if an extended total has been given but the corresponding unit price has been omitted, then the unit price will be calculated from the extended total and the estimated quantity. Litigation In addition to any other provision of this RFP, the City may, in its absolute discretion, reject a Proposal if the Proponent, or any officer or director of the Proponent submitting the Proposal, is or has been engaged directly or indirectly in a legal action against the City, its elected or appointed officers, representatives or employees in relation to any matter. In determining whether or not to reject a Proposal under this section, the City will consider whether the litigation is likely to affect the Proponent’s ability to work with the City, its consultants and representatives and whether the City’s experience with the Proponent indicates that there is a risk the City will incur increased staff and legal costs in the administration of the Contract if it is awarded to the Proponent. 4.5 Additional Information The Evaluation Team may, at its discretion, request clarifications or additional information from a Proponent with respect to any Proposal, and the Evaluation Team may make such requests only to selected Proponents. The Evaluation Team may consider such clarifications or additional information in evaluating a Proposal. 4.6 Interviews The Evaluation Team may, at its discretion, invite some or all of the Proponents to appear before the Evaluation Team to provide clarifications of their Proposals. In such event, the Evaluation Team will be entitled to consider the answers received in evaluating Proposals. 4.7 Negotiation of Contract and Award (a) If the City selects a Preferred Proponent, then it may invite the Preferred Proponent to enter into discussions with the City to reach agreement on a Contract for the performance of the Services as listed in Schedule A herewith. The Contract for “Services” would be in the form of the City’s Professional Services Agreement. (b) If at any time the City reasonably forms the opinion that a mutually acceptable agreement for the Services is not likely to be reached within a reasonable time, the City will give the Preferred Proponent written notice to terminate discussions, in which event the City may then either open discussions with another Proponent or terminate this RFP and retain or obtain the Services in some other manner. (c) Upon the successful completion of the Services, and to the satisfaction of the City, the City may enter into discussions with the Preferred Proponent to reach agreement of a Contract for the performance of the Work. The Contract for “Work” would be in the form of a CCDC2-2008 as amended by the City’s Supplemental Conditions. (d) If at any time the City reasonably forms the opinion that a mutually acceptable agreement for the Work is not likely to be reached within a reasonable time, the City will give the RFP #1220-30-25-10 6 of 18 FHRC RFP June 18, 2010 Preferred Proponent written notice to terminate discussions, in which event the City may then either open discussions with another Proponent or retain or obtain the Work in some other manner. 5. GENERAL CONDITIONS 5.1 No City Obligation This RFP is not a tender and does not commit the City in any way to select a Preferred Proponent, or to proceed to negotiations for a Contract, or to award any Contract, and the City reserves the complete right to at any time reject all Proposals, and to terminate this RFP process. 5.2 Proponent’s Expenses Proponents are solely responsible for their own expenses in preparing, and submitting Proposals, and for any meetings, negotiations or discussions with the City or its representatives and consultants, relating to or arising from this RFP. The City and its representatives, agents, consultants and advisors will not be liable to any Proponent for any claims, whether for costs, expenses, losses or damages, or loss of anticipated profits, or for any other matter whatsoever, incurred by the Proponent in preparing and submitting a Proposal, or participating in negotiations for a Contract, or other activity related to or arising out of this RFP. 5.3 No Claims By submitting a Proposal and participating in the process as outlined in this RFP, Proponents expressly agree that in no event, including a clam for breach or fundamental breach of contract by the City, will they have any claim against the City, or any of their employees, or representatives or advisors, including any claim to reimburse or compensate the Proponent in any manner whatsoever, including but not limited to costs of preparation of a Proposal, cost of participation in the processes described in the RFP, loss of anticipated profits, loss of opportunity or for any other matter. 5.4 Conflict of Interest A Proponent shall disclose in its Proposal any actual or potential conflicts of interest and existing business relationships it may have with the City, its elected or appointed officials or employees. The City may rely on such disclosure. 5.5 Solicitation of Council Members and City Staff Proponents and their agents will not contact any member of the City Council or City staff with respect to this RFP, other than the City Representative named in section 2.6, at any time prior to the award of a contract or the termination of this RFP. 5.6 Confidentiality All submissions become the property of the City and will not be returned to the Proponent. All submissions will be held in confidence by the City unless otherwise required by law. Proponents should be aware the City is a “public body” defined by and subject to the Freedom of Information and Protection of Privacy Act of British Columbia. RFP #1220-30-25-10 7 of 18 FHRC RFP June 18, 2010 SCHEDULE A SCOPE OF SERVICES & SCOPE OF WORK SCOPE OF SERVICES 1. This section refers to Schedule C-5: Price #1 2. Provide Pre-construction Services for a period of approximately (3) months commencing July 2010 3. Attendance at 5 to 7 meetings with the City, City Representatives, and Designers, to provide insight/suggestions/expertise with regards to the following: (a) Current design & specifications review (b) Options analysis (value engineering, constructability, affordability) (c) Scheduling, sequencing of work, phasing (d) Quality, Safety, Communications, other as applicable 4. Estimating and Quantity Surveying (a) Review and validate the 50%, and 75% cost estimates prepared by Owner’s Cost Consultant (b) Provide comprehensive written analysis for comparison 5. Request for Quotation (RFQ) Procurement Services (a) In collaboration with the City’s Purchasing Section, solicit quotations from all sub-trades, vendors, and suppliers required to meet all of the project requirements per design & specification issued (b) Obtain a minimum of 3 quotes per discipline or body of work (c) At completion of the RFQ period, present to the City and their representatives a comprehensive pricing proposal which in the performance of the Work meets all project requirements per design and specification SCOPE OF WORK 1. This section refers to Schedule C-5: Price #2 & #3 2. The attached Schematic Drawings (Schedule A-1) are for information purposes and may form part of the Work. The full Scope of Work will be finalized during and/or after the provision of the Services above. Drawing Name Date SD004 – Programming Plan Ground Floor SD005 – Programming Plan Second Floor SD006 – Schematic Ground Floor Plan SD007 – Schematic Second Floor Plan SD008 – Schematic Sections SD009 – Site Plan SD010 – Perspective RFP #1220-30-25-10 June, 2010 June, 2010 June, 2010 June, 2010 June, 2010 June, 2010 June, 2010 8 of 18 Pages 1 1 1 1 1 1 1 FHRC RFP June 18, 2010 SCHEDULE A-1 SCHEMATIC DRAWINGS 30-25 Schematic Drawings.pdf RFP #1220-30-25-10 9 of 18 FHRC RFP June 18, 2010 SCHEDULE B FORMS OF CONTRACT The form of contracts to be used for the Services and the Work are as follow: For the SERVICES: 1. City of Surrey – Professional Services Agreement (enclosed) 30-25 PSA Agreement_SAMPLE.pdf For the WORK: 2. CCDC 2-2008 Stipulated Price Standard Form Contract 3. City of Surrey’s Supplementary Conditions to CCDC 2-2008 (enclosed) CCDC2-2008 Supplementary Conditions _Revised June 18, 2010.pdf RFP #1220-30-25-10 10 of 18 FHRC RFP June 18, 2010 SCHEDULE C FORM OF PROPOSAL RFP Project Title: CONTRACTOR FOR FRASER HEIGHTS RECREATION CENTRE EXPANSION RFP Reference No.: 1220-30-25-10 Name of Proponent: Contact Person and Title: Business Address: Telephone: Fax: E-Mail Address: TO: Acting Purchasing & AP Manager Finance & Technology Department Purchasing Section, City of Surrey, 14245 – 56th Avenue, Surrey, BC, Canada V3X 3A2 Dear Sir or Madame: 1.0 I/We, the undersigned duly authorized representative of the Proponent, having received and carefully reviewed all of the Proposal documents, including the RFP and any issued addenda posted on the City Website, and having full knowledge of the Site, and having fully informed ourselves as to the intent, difficulties, facilities and local conditions attendant to performing the Services and/or the Work, submit this Proposal in response to the RFP. 2.0 I/We confirm that the following appendices are attached to and form a part of this Proposal: Schedule C-1 – Statement of Departures; Schedule C-2 – Proponent’s Experience, Reputation and Resources; Schedule C-3 – Proponent’s Technical Proposal (Services & Work); Schedule C-4 – Proponent's Technical Proposal (Schedule); and Schedule C-5 – Proponent’s Financial Proposal. 3.0 I/We confirm that this proposal is accurate and true to best of my/our knowledge. RFP #1220-30-25-10 11 of 18 FHRC RFP June 18, 2010 4.0 I/We confirm that, if I/we am/are awarded the Agreement, I/we will at all times be the “Prime Contractor” as provided by the Worker's Compensation Act (British Columbia) with respect to the Work. I/we further confirm that if I/we become aware that another contractor at the place(s) of the Work has been designated as the “Prime Contractor”, I/we will notify the City immediately, and I/we will indemnify and hold the City harmless against any claims, demands, losses, damages, costs, liabilities or expenses suffered by the City in connection with any failure to so notify the City. This Proposal is submitted this _____________________ day of _________________________, 2010. I/We have the authority to bind the Proponent. _______________________________________ _______________________________________ (Name of Proponent) (Name of Proponent) _______________________________________ _______________________________________ (Signature of Authorized Signatory) (Signature of Authorized Signatory) _______________________________________ _______________________________________ (Print Name and Position of Authorized (Print Name and Position of Authorized Signatory) Signatory) RFP #1220-30-25-10 12 of 18 FHRC RFP June 18, 2010 SCHEDULE C-1 STATEMENT OF DEPARTURES 1. I/We have reviewed the proposed Contracts attached to the RFP as Schedule “B”. If requested by the City, I/We would be prepared to enter into the Contracts, amended by the following departures (list, if any): Section 2. Departure / Alternative The City of Surrey requires that the successful Proponent have the following in place before commencing the Services or the Work: a) Workers’ Compensation Board coverage in good standing and further, if an “Owner Operator” is involved, personal operator protection (P.O.P.) will be provided, Workers' Compensation Registration Number _________________________________________; b) Insurance coverage for the amounts required in the proposed Contract as a minimum, and generally in compliance with the City’s sample insurance certificate form (available on the City's web site at www.surrey.ca (search "revenue and risk") titled City of Surrey Certificate of Insurance Standard Form); d) City of Surrey business license; and e) If the Proponent is a company, the company name indicated above is registered with the Registrar of Companies in the Province of British Columbia, Canada, Incorporation Number ___________________. As of the date of this Proposal, we advise that we have the ability to meet all of the above requirements except as follows (list, if any): Section 3. Departure / Alternative I/We offer the following alternates to improve the Services or the Work described in the RFP (list, if any): Section RFP #1220-30-25-10 Departure / Alternative 13 of 18 FHRC RFP June 18, 2010 SCHEDULE C-2 PROPONENT’S EXPERIENCE, REPUTATION AND RESOURCES Proponents should provide information on the following (use the spaces provided and/or attach additional pages, if necessary): (i) Location of branches, background, stability, structure of the Proponent; (ii) Proponent’s financial strength (with evidence such as financial statements, bank references); (iii) Proponent’s relevant experience and qualifications in delivering Services and Work similar to those required by the RFP; (iv) Proponent’s demonstrated ability to provide the Services and Work including Proponent’s system for managing LEED Certification requirements and Proponent’s policy on quality assurance and quality control; (v) Proponent’s references (name and telephone number). The City's preference is to have a minimum of three references; (vi) Provide information on the background and experience of all key personnel proposed to undertake the Services and Work, and who have direct experience in construction of similar or comparable projects. Include the following personnel as a minimum: - Designated Site Superintendent responsible for day-to-day on-site coordination - Designated Senior Project Manager responsible for the operations and project advancement - Estimator - Support Staff (Safety Coordinator, Project Coordinator, etc.) Use the following format (or similar): Name: Years of Experience: Project Name: Responsibility: (vii) Contract management, processing of documents, bills, certification of work, commissioning; (viii) Fire and work place safety program and emergency preparedness. (ix) Customer service quality – ability to provide responsive and versatile support is very important, such that problems are quickly resolved or escalated. (x) Demonstrate an understanding of the complexities of this specific project. Identify specific items such as sourcing, administration and direction of experienced specialty trades. RFP #1220-30-25-10 14 of 18 FHRC RFP June 18, 2010 SCHEDULE C-3 PROPONENT’S TECHNICAL PROPOSAL (SERVICES & WORK) Proponents should provide the following (use the spaces provided and/or attach additional pages, if necessary): (i) a narrative that illustrates an understanding of the City’s requirements; (ii) a narrative that illustrates how the Proponent will complete the Scope of Services & Work, manage the Services & Work, and accomplish required objectives within the City’s schedule. Plan should include project management procedure and methods and any technology based tools used to document, monitor and control scope, schedule, budget and quality of work and include a brief narrative approach to the following issues: communication, cost control during design and construction, value engineering, scheduling, qualification of trade contractors, incorporation of LEED® and sustainable strategies; (iii) a description of the standards to be met by the Proponent in providing the Services & Work; (iv) experience with complex additions and/or expansions; (v) experience with phasing of project; successful experience with scheduling projects while a facility maintains operations (facility remains open for business); include a description of the Proponent’s plan to enable the Fraser Heights Recreation Centre to remain operational during construction; (vi) experience with materials handling, site management and traffic control; (vii) experience with on site quality control methods; RFP #1220-30-25-10 15 of 18 FHRC RFP June 18, 2010 SCHEDULE C-4 PROPONENT’S TECHNICAL PROPOSAL (SCHEDULE) See the following dates as a draft guideline: Design & Permits by Others: July 2010 – August 2010 (Design Development by Consultant Team) August 2010 – October 2010 (Construction Documents preparation by Consultant Team) August 2010 (Building Permit Submission by Certified Professional) September 2010 (Development Permit issued by City) Activities by Proponent: July 2010 – (Professional Services Agreement contract negotiation) July 2010 – October 2010 (3 months of “Preconstruction Services”) October 2010 (Cost finalization & Stipulated Price CCDC2–2008 contract negotiation) October 2010 (Construction Start) Fall 2011 (Substantial Completion) Proponents should provide the following: (i) Provide a detailed schedule from Construction Start in mid October 2010 to the Proponent’s planned Substantial Completion date. Include major item descriptions and time (ii) Indicate a commitment to perform the Work within the time specified (iii) Clearly indicate total number of weeks for construction RFP #1220-30-25-10 16 of 18 FHRC RFP June 18, 2010 SCHEDULE C-5 PROPONENT’S FINANCIAL PROPOSAL Indicate the Proponent’s proposed fees (excluding GST/HST), and the basis of calculation (use the spaces provided and/or attach additional pages, if necessary) as follows (as applicable). Having fully examined the site, existing building and all conditions affecting the Work, and having carefully read and examined the RFP documents and addenda (if any) issued, we offer to furnish all Services and Work covered by this RFP for the stipulated separate prices of: Price #1 – the Services: A Lump Sum Fixed cost for Pre-construction Services for a period of approximately (3) months commencing July 2010. Refer to Scope of Services in Schedule A. $________________________ Price #2 – the Work: A Lump Sum Fixed Cost for General Conditions, Expenses & Overheads for CCDC 2-2008 Stipulated Sum contract (as modified by the City’s Supplementary Conditions). Provide detailed breakdown of General Conditions as attached. $ ________________________ Price #3 – the Work: Fixed Percentage Fee based on a CCDC 2-2008 Stipulated Sum contract (as modified by the City’s Supplementary Conditions) ________________________% The proposed Fixed Percentage Fee includes, but not be limited to the following: (1) the contract profit for the General Contractor; and (2) costs for all office functions, not directly related to the site operations of the project, the corporate project director, general accounting, project estimating, purchasing, and administrative functions. The Fixed Percentage Fee will be applied against the sub-trade and/or supplier RFQ prices and will be used to calculate the Stipulated Price Contract total. Proponent confirms that the prices stated in Schedule C-5 herewith include all applicable Federal and Provincial sales taxes and customs and excise taxes in force at this date but excludes the Federal Goods and Services Tax (GST) and Harmonized Sales Tax (HST) as applicable. RFP #1220-30-25-10 17 of 18 FHRC RFP June 18, 2010 Price #2 General Conditions, Expenses & Overheads Please complete the form below and submit with your Proposal. This list should not be considered as exhaustive and Proponents should provide pricing to items on the list that are applicable, and extend the list as necessary to include other items they consider required for the complete performance of the Work. Proponents are advised that the City does not intend to perform or be responsible for any General Conditions, Expenses & Overheads as they relate to the performance of the Work. Proponents are to avoid excluding items that will be required in the performance of the Work, as such it is suggested Proponents refrain from entering language such as “By Owner”, “By Other”, or “By City”. Where an item is not applicable to the performance of the work, the proponent should enter “N/A”. Price #2 may relate in part to the proposed construction schedule. However, any change in the final construction schedule duration, from that proposed, will not be cause to change Price #2. CODE CATEGORY Superintendent (Structure/Trades) Superintendent (Finishes) Site Engineer / Coordinator Quality Control Project Manager(s) Other staffing Administrative Expenses Safety Officer / First Aid First Aid Equip / Trailer Site Security: gates / regular time Site Security: off hours Employee Travel / Expenses Site Offices / meeting / lunch rooms Owner’s / consultant office Site Office Equip / Supplies Fax/ copier / computer / email Printing / additional drawings Courier / deliveries Storage Buildings Hoarding / street use Ladders / Barricades Fire Protection / Equipment Project Signage / site signage Traffic Control Street cleaning On-going Clean Up Garbage Bins / disposal fees Final Clean Communication / Radios Photographs / video Equipment Rentals Small Tools Miscellaneous pumping / submersibles Inspections / Testing Surveying / Layout Hoisting Crane-age Man / material hoist Cartage / Delivery Finish Protection Heritage Protection Temp. – Phones / cells / cable RFP #1220-30-25-10 QUANTITY 18 of 18 UNIT RATE PRICE FHRC RFP June 18, 2010 CODE CATEGORY Temp. – Hydro Connection Temp. – Hydro Usage Temp. – Distribution / wire / lights Temp. – Water Temp. – Heat / hoard / snow Temp. – Waterproofing / Roofing Temp. – Toilets / washrooms City sidewalk / lane rentals Permits / Licenses / Fees Insurance 50% Performance & L&M Bonding Close out, manuals, as built Legal / Statutory declarations / contracts Additions items QUANTITY UNIT RATE PRICE Total General Expenses & Overhead: TOTAL PROPOSAL PRICE (excluding taxes): Additional Expenses: The proposed Contract attached as Schedule "B" to the RFP provide that expenses are to be included within the fee, other than the expenses listed in the Contract as disbursements. Details of disbursements are to be shown in the chart above. Please indicate any expenses that would be payable in addition to the proposed fee and proposed disbursements set out above: Payment Terms: A cash discount of _______% will be allowed if account is paid within _____ days, or the_________ day of the month following, or net 30 days, on a best effort basis. RFP #1220-30-25-10 19 of 18 FHRC RFP June 18, 2010