T11.1 Chapter Outline Chapter 11 Project Analysis and Evaluation Chapter Organization 11.1 Evaluating NPV Estimates 11.2 Scenario and Other “What-if” Analyses 11.3 Break-Even Analysis 11.4 Operating Cash Flow, Sales Volume, and Break-Even 11.5 Operating Leverage 11.6 Additional Considerations in Capital Budgeting 11.7 Summary and Conclusions CLICK MOUSE OR HIT SPACEBAR TO ADVANCE Finance 3040 T11.2 Evaluating NPV Estimates I: The Basic Problem The basic problem: How reliable is our NPV estimate? Projected vs. Actual cash flows Estimated cash flows are based on a distribution of possible outcomes each period Forecasting risk The possibility of a bad decision due to errors in cash flow projections - the GIGO phenomenon Sources of value What conditions must exist to create the estimated NPV? “What If” analysis: A. Scenario analysis B. Sensitivity analysis U of L Finance 3040 Slide 2 T11.3 Evaluating NPV Estimates II: Scenario and Other “What-If” Analyses Scenario and Other “What-If” Analyses “Base case” estimation Estimated NPV based on initial cash flow projections Scenario analysis Position best- and worst-case scenarios and calculate NPVs Sensitivity analysis How does the estimated NPV change when one of the input variables changes? Simulation analysis Vary several input variables simultaneously, then construct a distribution of possible NPV estimates U of L Finance 3040 Slide 3 NPV - Incremental Well Case CAPEX Year 2002 Net of Royalties at 20% Fixed Well Costs Variable Costs Total Well Costs Net Cash Flow 434940 324220 267000 224280 192240 160200 145340 125730 105120 95440 85260 74580 63400 52720 52720 347952 259376 213600 179424 153792 128160 116272 100584 84096 76352 68208 59664 50720 42176 42176 30000 30000 30000 31000 31500 32000 32000 32500 33000 33500 34000 34500 35500 36000 36500 52500 48000 38000 30000 24000 18500 14500 10000 7500 5000 3000 3000 3000 3000 3000 82500 78000 68000 61000 55500 50500 46500 42500 40500 38500 37000 37500 38500 39000 39500 -300,000 265452 181376 145600 118424 98292 77660 69772 58084 43596 37852 31208 22164 12220 3176 2676 2403190 1922552 -300,000 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Total Incremental Price WI @50%WI Revenues Production$Cdn/bbl $ m bbls m bbls 33 29 25 21 18 15 13 11 9 8 7 6 5 4 4 -300,000 26.36 22.36 21.36 21.36 21.36 21.36 22.36 22.86 23.36 23.86 24.36 24.86 25.36 26.36 26.36 208 16.5 14.5 12.5 10.5 9 7.5 6.5 5.5 4.5 4 3.5 3 2.5 2 2 104 492000 NPV at 15% NPV at 10% U of L Finance 3040 Slide 4 263000 $394,442.02 $505,363.01 755000 116755 T11.4 Fairways Driving Range Example Fairways Driving Range expects rentals to be 20,000 buckets at $3 per bucket. Equipment costs $20,000 and will be depreciated using SL over 5 years and have a $0 salvage value. Variable costs are 10% of rentals and fixed costs are $40,000 per year. Assume no increase in working capital nor any additional capital outlays. The required return is 15% and the tax rate is 15%. Revenues $60,000 Variable costs 6,000 Fixed costs 40,000 Depreciation 4,000 EBIT $10,000 Taxes (@15%) 1500 Net income U of L Finance 3040 $ 8,500 Slide 5 T11.4 Fairways Driving Range Example (concluded) Estimated annual cash inflows: $10,000 + 4,000 - 1,500 = $12,500 net income plus dep’n - taxes At 15%, the 5-year annuity factor is 3.352. Thus, the base-case NPV is: NPV = $-20,000 + ($12,500 3.352) = $21,900. U of L Finance 3040 Slide 6 T11.5 Fairways Driving Range Scenario Analysis INPUTS FOR SCENARIO ANALYSIS Base case: Rentals are 20,000 buckets, variable costs are 10% of revenues, fixed costs are $40,000, depreciation is $4,000 per year, and the tax rate is 15%. Best case: Rentals are 25,000 buckets, variable costs are 8% of revenues, fixed costs are $40,000, depreciation is $4,000 per year, and the tax rate is 15%. Worst case: Rentals are 18,000 buckets, variable costs are 12% of revenues, fixed costs are $40,000, depreciation is $4,000 per year, and the tax rate is 15%. U of L Finance 3040 Slide 7 T11.5 Fairways Driving Range Scenario Analysis (concluded) Revenues Net Income Project Cash Flow NPV $21,250 $25,250 $64,635 Scenario Rentals Best Case 25,000 $75,000 Base Case 20,000 60,000 8,500 12,500 21,900 Worst Case 18,000 54,000 2,992 6,992 3,437 U of L Finance 3040 Slide 8 T11.6 Fairways Driving Range Sensitivity Analysis INPUTS FOR SENSITIVITY ANALYSIS Base case: Rentals are 20,000 buckets, variable costs are 10% of revenues, fixed costs are $40,000, depreciation is $4,000 per year, and the tax rate is 15%. Best case: Rentals are 25,000 buckets and revenues are $75,000. All other variables are unchanged. Worst case: Rentals are 18,000 buckets and revenues are $54,000. All other variables are unchanged. U of L Finance 3040 Slide 9 T11.6 Fairways Driving Range Sensitivity Analysis (concluded) Net Sensitivity Rentals Revenues Best case 25,000 $75,000 Base case 20,000 Worst case 18,000 cash flow NPV $19,975 $23,975 $60,364 60,000 8,500 12,500 21,900 54,000 3,910 7,910 6,514 U of L Finance 3040 income Project Slide 10 T11.7 Fairways Driving Range: Rentals vs. NPV Fairways Scenario Analysis - Rentals vs. NPV NPV Best case $60,000 NPV = $64,635 x Base case NPV = $21,900 x Worst case 0 NPV = $3,437 x -$60,000 15,000 20,000 Rentals per Year U of L Finance 3040 Slide 11 25,000 Break - Even Analysis Where the crucial variable for a project and its success is sales volume - various forms of break-even analysis can be developed essentially addressing the question of ‘how bad can sales get before we start losing money’ an understanding of the fixed and variable costs associated with the project is important in developing the break-even analysis. Variable Costs - ‘costs that change when the quantity of output changes.’ Variable cost VC = total quantity (Q) * cost per unit (v) Fixed Costs - ‘costs that do not change when the quantity of output changes during a particular time period’ • fixed costs are not fixed forever - only for a prescribed period of time; in the long run all costs are variable Total Costs TC for a given level of output is the sum of the Variable costs VC and fixed costs FC TC = VC+FC or v*Q + FC Marginal or incremental cost is the change in costs that occurs when there is a small change in output - what happens to our costs when we produce one more unit U of L Finance 3040 Slide 12 Accounting Break-Even Accounting break-even is the sales level that results in zero project net income P = Selling Price per unit v = Variable cost per unit Q = total units sold FC = Fixed Costs D = Depreciation t = Tax rate VC = Variable cost in dollars Accounting break-even; Q =(FC+D)/(P-v) U of L Finance 3040 Slide 13 T11.10 Fairways Driving Range: Accounting Break-Even Quantity Fairways Accounting Break-Even Quantity (Q) Q = (Fixed costs + Depreciation)/(Price per unit - Variable cost per unit) = (FC + D)/(P - V) = ($40,000 + 4,000)/($3.00 - .30) = 16,296 buckets If sales do not reach 16,296 buckets, the firm will incur losses in an accounting sense. U of L Finance 3040 Slide 14 Operating Cash Flow, Sales Volume and Break-Even Given our focus on cash flow, the next evolution in break-even analysis is to look at the relationship between operating cash flow and sales volume Cash break-even - the point where operating cash flow (OCF) is zero OCF = (P-v) *Q - FC or Q = (FC + OCF)/(P-v) Cash break-even then is where OCF = 0 Q = (FC + 0)/(P-v) $40,000/2.70 =‘s 14,815 buckets U of L Finance 3040 Slide 15 Financial Break-Even The point where the sales level results in a zero NPV the first step is determining OCF for the NPV to be zero a zero NPV occurs when the PV of the OCF equals the original investment - if the cash flow is the same each year we can use the annuity formula to solve for OCF • original investment or PV = OCF * annuity future value factor • OCF = original investment/Annuity future value factor • OCF=(P-v)*Q-FC or Q = (FC +OCF)/(P-v) the financial break-even is often greater than the accounting break-even or conversely when a project just breaks even in an accounting sense it will usually be losing money in a financial or economic sense U of L Finance 3040 Slide 16 T11.8 Fairways Driving Range: Total Cost Calculations Total Cost = Variable cost + Fixed cost Rentals 0 Variable Revenue cost $0 Fixed cost $0 $40,000 Total cost Dep’n Total acct. cost $40,000 $4,000 $44,000 15,000 45,000 4,500 40,000 44,500 4,000 48,500 20,000 60,000 6,000 40,000 46,000 4,000 50,000 25,000 75,000 7,500 40,000 47,500 4,000 51,500 U of L Finance 3040 Slide 17 Break-Even Example Assume you have the following information about Vanover Manufacturing: Price = $5 per unit; variable costs = $3 per unit Fixed operating costs = $10,000 Initial cost is $20,000 5 year life; straight-line depreciation to 0, no salvage value Assume no taxes Required return = 20% U of L Finance 3040 Slide 18 Break-Even Example A. Accounting Break-Even Q = (FC + D)/(P - V) = ($10,000 + $4,000)/($5 - 3) = 7,000 units IRR = 0 ; NPV = -$8,038 B. Cash Break-Even Q = FC/(P - V) = $10,000/($5 - 3) = 5,000 units IRR = -100% ; NPV = -$20,000 C.. Financial Break-Even Q = (FC + $6,688)/(P - V) = ($10,000 + 6,688)/($5 - 3) = 8,344 units IRR = 20% ; NPV = 0 U of L Finance 3040 Slide 19 T11.12 Summary of Break-Even Measures (Table 11.1) I. The General Expression Q = (FC + OCF)/(P - V) where: FC = total fixed costs P = Price per unit v = variable cost per unit II. The Accounting Break-Even Point Q = (FC + D)/(P - V) At the Accounting BEP, net income = 0, NPV is negative, and IRR of 0. III. The Cash Break-Even Point Q = FC/(P - V) At the Cash BEP, operating cash flow = 0, NPV is negative, and IRR = -100%. IV. The Financial Break-Even Point Q = (FC + OCF*)/(P - V) At the Financial BEP, NPV = 0 and IRR = required return. U of L Finance 3040 Slide 20 Operating Leverage Operating leverage is ‘ the degree to which a firm or project relies on fixed costs’ - what is the relationship between fixed and variable costs for the firm or project. Low operating leverage means low fixed costs as a proportion of total costs High operating leverage reflects high fixed costs - often high investment in plant and equipment OR in the ‘new economy high investment in research and development to develop software for example. Once a break-even point is reached, firms or projects with high operating leverage generate higher cash flow/earnings or NPV for each additional unit sold vs firms with low operating leverage conversely lower sales volume can magnify cash flow/earnings or NPV in the other direction! The higher the degree of operating leverage the greater the impact from forecasting risk U of L Finance 3040 Slide 21 Operating Leverage continued The degree of operating leverage (DOL) is ‘the percentage change in operating cash flow relative to the percentage change in quantity sold’ % change in OCF = DOL * % change in Q DOL = 1+ FC/OCF The issue of sub-contracting out certain functions is often a question of operating leverage - sub-contracting has the effect of reducing the DOL as more costs become variable and fixed costs are reduced Firms operating in the ‘new economy’ e.g. High tech firms can have a high DOL as much of the their investment in research and development is a fixed cost that does not vary with sales volumes - thus the higher degree of leverage to sales volumes U of L Finance 3040 Slide 22 Fairways Driving Range DOL Since % in OCF = DOL % in Q, DOL is a “multiplier” which measures the effect of a change in quantity sold on OCF. For Fairways, let Q = 20,000 buckets. Ignoring taxes, OCF = $14,000 and fixed costs = $40,000, and Fairway’s DOL = 1 + FC/OCF = 1 + $40,000/$14,000 = 3.857. In other words, a 10% increase (decrease) in quantity sold will result in a 38.57% increase (decrease) in OCF. Two points should be kept in mind: Higher DOL suggests greater volatility (i.e., risk) in OCF; Leverage is a two-edged sword - sales decreases will be magnified as much as increases. U of L Finance 3040 Slide 23 Managerial Options and Capital Budgeting Managerial options and capital budgeting What is ignored in a static DCF analysis? Management’s ability to modify the project as events occur. Contingency planning 1. The option to expand 2. The option to abandon 3. The option to wait Strategic options 1. “Toehold” investments 2. Research and development U of L Finance 3040 Slide 24 Capital Rationing Capital rationing Definition: The situation in which the firm has more good projects than money. Soft rationing - limits on capital investment funds set within the firm. Hard rationing - limits on capital investment funds set outside of the firm (i.e., in the capital markets). …firm is in financial distress, external capital essentially becomes unavailable What would be the opposite of capital rationing – more money than good projects – what then? ………firms start buying back shares U of L Finance 3040 Slide 25 DOL Example A proposed project has fixed costs of $20,000 per year. OCF at 7,000 units is $55,000. Ignoring taxes, what is the degree of operating leverage (DOL)? If units sold rises from 7,000 to 7,300, what will be the increase in OCF? What is the new DOL? DOL = 1 + ($20,000/$55,000) = 1.3637 % Q = (7,300 - 7,000)/7,000 = 4.29% and % OCF = DOL(% Q) = 1.3637 (4.29) = 5.85% New OCF = ($55,000)(1.0585) = $58,218 DOL at 7,300 units = 1 + ($20,000/$58,218) = 1.3435 U of L Finance 3040 Slide 26