PART 1 ITEM NO. (OPEN TO THE PUBLIC) _____________________________________________________________________________________ REPORT OF THE DEPUTY DIRECTOR ENVIRONMENT _____________________________________________________________________________________ TO THE LEAD MEMBER FOR ENVIRONMENT ON 28th July 2008 _____________________________________________________________________________________ TITLE: Improvements within Clifton Country Park _____________________________________________________________________________________ RECOMMENDATIONS: Under Part 4: Section 7 of Contractual Standing Orders 2.1 Exceptions to Contractual Standing Orders may be authorised: where there is a sole supplier of patented or proprietary articles, or materials or services exclusively provided by a statutory undertaker or other bodies. That £69,939 related to the S106 commuted sum associated with planning ref: 05/50070/OUT for the implementation of specialist play equipment and fencing, safety surfacing and enhancement work on the Wet Earth Trail in Clifton Country Park is accepted. _____________________________________________________________________________________ EXECUTIVE SUMMARY: _____________________________________________________________________________________ BACKGROUND DOCUMENTS: (available for public inspection) Section 106 legal agreement Detailed plans/drawings of the scheme _____________________________________________________________________________________ COMMENTS OF THE STRATEGIC DIRECTOR OF CUSTOMER AND SUPPORT SERVICES (or his representative): 1. LEGAL IMPLICATIONS: N/A 2. FINANCIAL IMPLICATIONS: Provided by: Allison Woods SCC Accountants Environment Directorate. Confirmation that a balance of £69,939.00 in relation to the S106 commuted sum associated with planning ref: 05/50070/OUT has been received. 3. ICT STEERING GROUP IMPLICATIONS Provided by: n/a PROPERTY (if applicable): n/a HUMAN RESOURCES (if applicable): n/a _____________________________________________________________________________________ CONTACT OFFICER: Alan Rowley. Tel: 909 6500 _____________________________________________________________________________________ WARD(S) TO WHICH REPORT RELATE(S) Pendlebury _____________________________________________________________________________________ KEY COUNCIL POLICIES: Budget Monitoring Community Strategy Cultural Strategy Environmental Strategy Equalities Health Planning Strategy Procurement Policies Regeneration _____________________________________________________________________________________ DETAILS: Further to the receipt of a commuted sums of £69,939, via the Section 106 agreement associated with planning ref: 05/50070/OUT it is proposed to carry out the following enhancement work at Clifton Country Park. The project consists of the following: Installation of an individual piece of play equipment and railings. Installation of safety surface around existing pieces of play equipment. Enhancement scheme on the Wet Earth Trail. Consultation has been carried out with the park rangers and users of the park to determine the type of equipment to be installed. From a selection of six pieces of play equipment the preferred choice was a double space net, enclosed with fencing to prevent dogs entering the area, giving older children a greater range of challenging equipment. The installation of the wet pour safety surface will make the existing play equipment more accessible and provide play facilities for the younger children all year round. To conserve the industrial heritage of Wet Earth Colliery and enhance visitors experience and the educational value of the site. This will be achieved by: interpret the activities of the former colliery through the installation of 3 pieces of sculpture, creation of way marked trail and production of a interpretive material around the site’s features incorporating historical photographs and images. This work will be carried out working closely with local school children, volunteers and local history groups. The maintenance of the area will be achieved using existing revenue budgets associated with previous S106 legal agreements. The following scheme does not require planning permission. _____________________________________________________________________________________ TENDER APPROVAL - PROFORMA For use in seeking the approval of the Lead Member for Customer and Support Services to proceed with a capital proposal REPORT TO LEAD MEMBER FOR CUSTOMER AND SUPPORT SERVICES Title of Scheme : Enhancement Scheme within Clifton Country Park Recommendations (please append report to Lead Member for Directorate only if preferred) Approval is given to proceed with the above Scheme Details (please append report to Lead Member for Directorate only if preferred) Please see attached report Tender Details (please append report to Lead Member for Directorate only if preferred) Please see attached report Estimated - Start Date : OCT 2008 Estimated - End Date : March 2009 FINANCIAL DETAILS Breakdown of Scheme Cost : 07/08 £000‘s 08/09 £000‘s Contract (Wicksteed) Fees (Env. Services Project Design and Management) Other – Installation of safety surface and paths within existing play area, wet earth trail & contingency 09/10 £000‘s Later £000‘s Total £000‘s 26 7 26 7 37 37 70 70 2008/09 only - Phasing of Capital Expenditure (£000‘s) Apr May 0 June 0 July 0 Aug 0 Sept 0 Oct 0 Nov Dec 0 0 Jan 0 Feb Mar 0 70 Note : The monthly cash flow above should be consistent with the contract start and end dates shown above and should allow for normal time lapses which will occur between work being done, claimed for, certified and paid, as well as retentions. Please consult your Capital Accountant if you need assistance with this or any other part of this proforma. Is Scheme In The Current Approved Capital Programme ? Funding Identified : 07/08 £000‘s Supported Borrowing Unsupported Borrowing (see note 1) Grant (Specify) Capital Receipts (S106 commuted sums 05/50070/OUT) Other (Specify) Approved Capital Programme Total Yes / No 08/09 £000‘s 09/10 £000‘s Later £000‘s Total £000‘s 70 70 70 70 Other Financial Implications Decision Lead Member Customer and Support Services Approved/Not Approved