PART 1 (OPEN TO THE PUBLIC) ITEM NO. REPORT OF THE DIRECTOR OF DEVELOPMENT SERVICES TO THE LEAD MEMBER DEVELOPMENT SERVICES ON MONDAY 6TH SEPTEMBER 2004 TITLE : GREATER MANCHESTER GEOLOGICAL UNIT STAFF RESTRUCTURING RECOMMENDATIONS : The GMGU’s Joint Management Committee, in its meeting of 27th February, considered and agreed in principle to the proposed staff restructuring. As the staff affected are Salford City Council employees the GMGU Management Committee has referred the proposal to Salford City Council for a final decision with a recommendation that the proposed restructuring be approved. It is recommended: A) The proposed GMGU Staff Restructuring be approved, B) Staff regrades/redesignations be backdated to 1st April 2004, C) The post of Principle Geologist be filled asap, D) The post of Contaminated Land Officer be filled asap to reduce long term agency fees, and Approval in principle be given to the addition of a ‘GM Waste Plan’ team to the Unit structure. EXECUTIVE SUMMARY : The Greater Manchester Geological Unit is externally financed and was originally set up to provide technical support to AGMA and the ten Greater Manchester districts on matters relating to minerals and waste planning. However, the Unit now also provides a wider range of services to other local authorities and the private sector. At present approximately 40% of the Unit’s income comes from Core and SLA funding from the 10 Planning Authorities and 60% comes from a range of tendered services provided to other local authority departments and to a limited extent to the private sector. Much of the additional work the Unit receives is related to contaminated land. Specifically the Unit’s archival, site investigation and technical peer review services are all experiencing growing demand from clients. The current staff structure was based on providing a simpler range of services and a higher proportion of core and SLA funding than is presently the case. The Unit’s present productivity and efficiency has been maxamised under the current structure by collaborative working and strong personal commitments by the Unit’s staff. The Unit is operating at capacity and no longer has the flexibility to respond to either new opportunities or to the continuing growth in demand for its services without structural change. c:\joan\specimen new report format.doc The proposed changes to the staff structure are therefore needed to provide further efficiencies and clear lines of management responsibilities for the different services that are currently provided. These responsibilities build on the existing ad-hoc and informal roles that individuals have developed over the last year in response to clients needs. In addition, the proposed structure includes a new role that will be responsible for developing the Unit’s office systems and processes for the benefit of the staff and service delivery. The details of the proposed re-structuring have been discussed with senior officers within the Development Services and Personnel Directorates. An informal consultation has also been undertaken with the Unit’s staff. A revised set of Job Descriptions and Person Specifications have been drawn up in consultation with outstationed Personnel staff. These have been cross-referenced with similar posts, where these exist, elsewhere in the council. The final stage of the restructuring process has included the formal consultation with the Unions and the Unit’s staff and the incorporation of the changes that came out of these consultations. In addition to the changes to the staff structure required for the operational improvements to the Unit’s current work load, the GMGU has been identified by the AGMA Executive, at its meeting of 30th July, as the appropriate body to prepare a ‘Greater Manchester Waste Plan’. The plan will take 3 years to complete and require the recruitment of a dedicated team supported by specialist consultants. The work is estimated to cost £1.4 million and will be fully funded by the ten districts. While preliminary arrangements for the proposed team are provided in this report, a separate report will be submitted with the finalised details and costings in the near future. BACKGROUND DOCUMENTS : Diagram A – Current & Proposed Structure Diagram B – Proposed GMGU Structure with GM Waste Plan Team Permanent and Temporary Staff re-structuring tables. (Available for public inspection) ASSESSMENT OF RISK: Medium THE SOURCE OF FUNDING IS: GMGU Income & Funding from the Ten Greater Manchester Authorities LEGAL ADVICE OBTAINED: N/A FINANCIAL ADVICE OBTAINED: Yes CONTACT OFFICER : Simon Talbot Tel: 0161 275 7152 WARD(S) TO WHICH REPORT RELATE(S) N/A c:\joan\specimen new report format.doc KEY COUNCIL POLICIES: UDP 1.0 PROPOSED STAFF RESTRUCTURING 1.1 The purpose of the restructuring is four-fold. The Unit needs to: Further improve office efficiency and service delivery, Maintain high quality and flexible services for local authorities, Retain experienced and talented staff, Allow for future growth in line with local authority demand. 2.0 The current staff structure and proposed structure are shown on the accompanying diagram. 3.0 The proposed structure introduces changes to four existing posts and creates four new posts. The principle change is the establishment of four service areas with a senior member of staff (Principal Officer) responsible for the income and expenditure associated with each service. These service areas are: 3.1 Surveying and Archival Research Minerals & Waste Planning Intrusive Site Investigations and Laboratory Testing Contaminated Land Advisory Services The introduction of the ‘Principal Officer’ titles reflects designations used elsewhere within the Directorate for the proposed grades. It should be recognised that the specific needs of individual projects results in considerable overlapping of roles and the close collaboration of the Unit’s staff is always required. However, the proposed structure will allow an identified senior member of staff to take overall financial and management responsibility for a particular project instead of this role falling to the Unit Director. 3.2 To compliment this structure a new Senior ICT and Systems Manager is proposed to provide strategic management of the Unit’s administration systems. This is a key role that is designed to reduce the staff time devoted to administration and increase time spent on providing quality services to our client authorities. Overall, the proposed structure reduces the effective administration staff compliment and increases fee earning (local authority service delivery) staffing levels. 3.3 The new structure, will also release time for the Unit Director to carry out strategic management of the Unit in addition to appropriate project work. Overall, the proposed changes are in line with staff’s career aspirations and will work to the strengths and abilities of the staff within the Unit. The details of the proposed changes are discussed below (refer to Diagram A – Current and Proposed Structure). 3.4 Principal Mining Surveyor & Archival Research Manager (Regrade/Redesignation). The current Mining Surveyor is already acting at a senior level and represents a principle fee earner (service provider) within the Unit providing c:\joan\specimen new report format.doc informal supervisory role to technical support staff engaged in archival research and site surveys. The proposed regrade/redesination acknowledges current activities and formalises the increased role of the post. The proposed grade has been benchmarked to existing Principal Planner (Minerals & Waste) post. 3.5 Senior ICT Officer & Systems Manager (New Post). Responsible for continuing improvements to office administration and computer systems with the specific task of reducing the administrative burden placed on all staff. The post requires close liaison with Unit Director and all Unit staff. Post holder will supervise admin support staff. 3.6 Technical Assistant. Provides GIS, archival research and geological support to Unit. High proportion of work carried out is fee earning service provision. Existing post holder has been employed on temporary contracts since August 2000. Confirm effective change from temporary to permanent position. 3.7 Unit Administrator (Regrade). Post regraded in line with range of similar responsibilities provided elsewhere in the Directorate currently undertaken by the post-holder. 3.8 Clerical & Technical Assistant (Regrade/Redesignation). Change to job description to include 50% of workload to be fee earning GIS, archival research or geological support work in addition to current clerical support work. The current post holder is already contributing to fee earning work in this way and further improvements to the office systems will free up more time to this role. Jointly managed by Unit Administrator and Senior Mining Surveyor & Archival Research Manager. (NB. This post was partly originally created to assist with the increase in administration associated with the New Leaf land reclamation Programme. This programme will shortly be managed by Manchester Enterprises). 3.9 Principal Planner (Minerals & Waste) (Redesignation). It is recommended that the post is re-designated in-line with other posts at this grade. 3.10 Two Planning Officers (Minerals & Waste) and Geologist (New Posts). Employed as and when work load and finances permit to provide support to Principal Planner and Principal Geologist respectively. 3.11 Principal Geologist (Regrade/Redesignation). The Unit has been without a Senior Geologist from 18th March. Despite advertising the vacancy in national specialist magazines and on the internet, no interviewable candidates were identified. Subsequent instructions to a specialist recruitment agency also failed to identify suitable candidates with the required experience in the salary range offered. In order to attract suitable applicants a market supplement, equivalent to the grade of PO 4/5, need to be applied to the post. 3.12 Principal Contaminated Land Officer (New Post). The current Contaminated Land Officer is already acting at a senior level and represents a principle fee earner (service provider) in the Unit effectively responsible for the growing contaminated land services. Due to unique area of expertise and lack of experience available within Salford CC or elsewhere in market place, post is ring-fenced to current Contaminated Land Officer. Due to ‘glass ceiling’ operated within environmental protection departments for specialist contaminated land officers, there is considerable staff turnover of experienced contaminated land officers in the market-place. Every effort is required to ensure that the current post-holder is retained. The proposed grade has been benchmarked to existing Principal Geologist and Principal Planner (Minerals & Waste) posts. 3.13 Agency Staff. In order to respond to fluctuating workloads and to maintain flexibility in service provision the Unit employs agency staff as and when required. Due to the c:\joan\specimen new report format.doc current workload and the recent resignation of the Senior Geologist, the Unit is currently employing two members of agency staff through a University of Manchester Campus Ventures company, Mineral Solutions. A further have been recruited on a temporary basis. While this option is extremely beneficial there are significant additional costs associated with it. It is hoped that in future temporary staff can be employed through Salford City Council on fixed ‘Event Contracts’. Due to the continuing and growing contaminated land services, a specialist Environmental Scientist has been employed since May 2003 on a series of short term temporary contracts through an Agency. It is recommended that this expertise that has been built up over the last fifteen months is permanently captured by recruiting to the vacant Contaminated Land Officer post. 4.0 GREATER MANCHESTER WASTE PLAN TEAM 4.1 Diagram B indicates the current thinking behind the establishment of a dedicated team to undertake this piece of work. 4.2 The team will comprise a core of six members of staff headed by a Waste Plan Manager. As there is a national demand for such staff it is recognised that ‘market supplements’ will need to be applied to most of these posts. In addition, after taking note of what has happened in neighbouring authorities, it is proposed to make the key posts permanent. This will be possible by a commitment from the ten planning authorities to relocate the post holders elsewhere within Greater Manchester at the end of the 3-year project. 4.3 There are obvious advantages of locating the team within the GMGU. One of these will be the administrative cost savings arising from using the Unit’s existing support staff. This will need to be supplemented at certain times by short term agency staff. Additional savings will be achieved by not having to rent additional office space for the team but to use the GMGU’s current office space. However, in order to fit the additional staff into the current space the office layout will have to be redesigned with purpose built modular desk system. The cost of this will also be covered by the ‘Waste Plan’ establishment costs. 5.0 FINANCIAL CONSIDERATIONS 5.1 It is recognised that the long-term viability of the Unit depends on its ability to operate as an ‘in-house’ specialist consultancy for the benefit of the ten local authorities within Greater Manchester. This is irrespective of whether the Unit operates within or outside of the proposed JVC. To do this effectively it has had to operate in competition with private sector environmental consultancies. It is therefore, very important for the Unit to maintain and develop its reputation for providing cost effective, high quality services. The proposed re-structuring will increase the staff costs but these will be offset by improvements in efficiency and streamlined administration systems and processes. As a result there will be an effective increase in the ratio of fee-earning to support staff. 5.2 With the current staffing structure the Unit achieved a small surplus of approximately £3,000 at the end of the 2003/04 financial year. With increasing demand for the Unit’s services this favourable financial position is likely to continue for as long as the Unit is able to meet its clients’ expectations. The Unit’s current reputation may be jeopardised by continuing to turn work away. 5.3 The cost of the current staff structure in the current financial year, including agency c:\joan\specimen new report format.doc staffing costs, is £238,9871 (£211,807 excluding agency staff costs). Under the current structure 7 fee earners are supported by 3 admin staff. 5.4 Taking into account the appointment of a new Principal Geologist and a new Contaminated Land Officer to replace agency staff, the cost of the proposed staff structure in the current financial year would be approximately £246,346. The new structure represents a 5% increase in fee earning potential. Once the new structure has bedded in significant additional efficiencies will be achieved. 5.5 In the long term, by 2009 when salary increments reach top of grades, significant additional staffing costs over the current structure will be incurred. If the number of staff remains the same (including 1 member of agency staff) then the staff costs for the current structure in five years time would amount to £242,182 (£215,002 excluding agency staff). This compares with £271,681 if the unit were to be restructured. This represents a proposed increase of £24,909 equivalent to 6% of the Unit’s current turnover. 5.6 There is a strong expectation that the Unit will continue to grow over the next few years with additional staff recruited to the new posts created in the proposed structure. This expected growth is in line with the Unit’s recent performance. The Unit had a staff of 4½ in 1998, growing to 10 in 2003 (including long term agency staff). The new structure allows for the Salford City Council staff compliment to grow to 13. If all of these posts were filled then the full staffing cost in 2009 would amount to £340,387. 5.7 With a staff compliment of 13 the average salary cost per post would be £26,183. This figure is slightly above the average salary cost of the current structure projected to 2009 of £24,677. As it is expected that further improvements in technology and administration systems will deliver considerable further efficiencies, the projected increased staffing costs should be easily covered by the predicted increases in earned fees. 6.0 CONCLUSION 6.1 There is a need to make changes to the existing staffing structure to maintain a successful Unit and improve its operational flexibility. The re-designated and regraded posts have been considered against the background of gradings presently adopted within the Development Services Directorate and similar organisations elsewhere in Greater Manchester and have been discussed with Personnel Services, the Unit’s staff and Union representatives. 6.2 The proposed changes can be made within the predicted financial position. 6.3 It is recommended that the above staff structure be adopted and the proposed changes be implemented within the suggested time scales. Malcolm Sykes Director of Development Services 1 All figures reported are pre-annual settlement increases. Annual settlement increases will be covered by increases in charge out rates and core funding. c:\joan\specimen new report format.doc