Page 1 of 2 Motlow State Community College Action Plan & Outcome Assessment Report for Institutional Effectiveness Planning Year: July 1, 2015 – June 30, 2016 Assessing Year: July 1, 2014 – June 30, 2015 Unit: Facilities Services Related Strategic Goal: 4.2 Advance our college as a role model for sustainability. Action Plan #: FACS-04 Action Plan Title: Efficiency Plan Desired Outcome: Implement at least one new best practice for efficiency in support of sustainability Description of Action Plan and Related Activities: Maintain Motlow facilities in the most efficient manner by utilizing new technology where applicable and making improvements using a holistic approach by not only considering the implementation cost but also the operating cost and life of the facility. To continually make improvements by searching for and implementing best practices that suit Motlow conditions and needs. Implement and continue five new best practices for efficiency in support of sustainability by 2016. Facilities Services personnel to continue to search for new best practices that suit Motlow conditions and needs. Once these items have been identified then implement these practices into the Motlow facilities. 1. Install new roof on buildings that are 25 plus years old to reduce roof leaks. 2. Replace the 40 plus year old steel single pane glass doors with new aluminum double insulated glass doors in buildings to conserve energy. 3. Replace underground piping that is 40 plus years old to reduce water treatment chemical loss. 4. Replace and upgrade interior and exterior lighting with new lighting technologies to include LED, high efficiency fluorescent and lighting controls. 5. Replace one of Moore counties gas fired chillers with new variable speed higher efficiency electrical unit. Team Members: Facilities Services personnel Timeline: Annually reviewed Est. Cost: Varies Evidence of Success: Report of best practice including potential effect on cost savings, efficiency and sustainability Current Status: On Schedule Describe Progress: 2014-15 Meet goal campus has five practices in implementation. Finished replacement of Underground Chill/Hot water piping upgrade from Ingram to Eoff buildings. Which reduced makeup water to boiler and chiller feed water systems. This also allowed for a reduction Page 2 of 2 in the chemicals required for water treatment. Upgraded Faculty Staff Parking lot with new LED fixtures that reduced the energy consumption by 75% while still maintaining the same light output. Began the design and project implementation for the chiller replacement on Moore Country Campus which will be completed by end of Calendar year 2015. Plan to upgrade lighting in the Regions student parking lot in the coming school year. Also on course for roof replacement for Nisbett and Power Buildings in fy 1516. 2013-14 Meet Goal. Installed new roofs on Ingram and Forrester buildings. Began completion of the next phase of the Underground Chill/Hot water piping upgrade from Ingram to Eoff buildings. Requested approval and have been granted approval to continue during the 2014-2015 school year the Simon Hall renovation, Chiller replacement for power house mechanical room, Powers Auditorium upgrade in Eoff, Two upgrade projects in Forrester and upgrades of both the baseball and softball complexes. Describe Needed Changes: The desired outcome was achieved on the above listed buildings but this is an ongoing need as all buildings continue to age. The project list for 2014-2015 is aggressive but will move us forward at a rapid pace in continuing to grow student and faculty levels of satisfaction toward their institution. 2012-13 Installed a new roof on Eoff Hall and Crouch buildings. Installed new exterior doors on Nisbett, Simon Hall, and Forrester buildings. Installed another section of the underground piping system between the Clayton-glass library building and the Ingram building. Describe Needed Changes: With a change in staffing sustainability continues to be implemented with internal and capital funding. A Certified Energy Manager has been hired by the college in the Director of Facilities Services position which will help in the evaluation of new initiatives. The capital maintenance funding cycle continues to be one of the major concerns, but use of other funds available has helped in moving forward with sustainability. List of Supporting Documentation: Parking lot lighting spec sheet Date Last Updated: 9/10/2015