The University of Wisconsin System 2011-13 Biennium MAJOR PROJECT REQUEST 1. Project Title: CLOW – NURSING EDUCATION REMODEL Institution: UW – OSHKOSH Estimated Cost: $ 26,689,000 0 0 0 0 $26,689,000 General Fund Supported Borrowing Program Revenue Supported Borrowing Building Trust Funds Gifts and Grants Program Revenue Cash Total 2. Project Description and Scope: SPACE IMPLICATIONS Remodel Clow Faculty Tower (17,170 ASF/29,934 GSF) and Classroom Building (45,975 ASF/77,553 GSF) & Nursing Education Basement (11,213 ASF/ 16,507 GSF) Remodel Clow for the College of Education and Human Services; the College of Letters and Science departments of Psychology and Foreign Language & Literature’s instructional labs and support space; twenty-six (26) general access classrooms; a small food service component; AV processing/storage facility; department shared conference rooms and development of student study/social gathering space Remodel NE basement to update and expand the existing Nursing labs and build additional simulator and clinical type labs and associated support space, as well as remodel the public spaces on this level. PHYSICAL DEVELOPMENT IMPLICATIONS Building Systems: Clow – Replace HVAC system (including air handlers, fans etc) and electrical systems (including electrical switchgear, emergency generator etc); add ducted return air system; install sprinkler system; replace roofing; install year-round cooling system for the computer lab type spaces; and install standalone HVAC system for the Psychology animal colony. Nursing Ed – Modify/upgrade HVAC and electrical service for the various lab requirements; update plumbing to existing labs; rework existing sprinkler system Both Buildings - Replace electrical outlets/switches and install additional electrical circuits; upgrade existing network and telecom system, including adding VoIP; add total building wireless access system, security cameras and emergency notification/clock system (including all infrastructure and equipment); add all building entrances, computer labs, animal colony and other critical lab spaces to the campuses existing electronic card access system. Design Standards: Both Buildings - Replace interior building finishes and components such as ceiling, flooring, wall finishes, doors, chalkboards; reconfigure spaces as required for the future occupants; install systems furniture in faculty/staff offices and open office areas; install modern audio-visual technology in all classrooms and conference rooms; provide and 7/12/2016 219472395 page 1 of 4 install specialized equipment used in the instructional labs; comply with all ADA accessibility requirements. Upon completion of construction, the entire Clow faculty and classroom buildings shall have been updated and all backlog maintenance taken care of. Health, Safety, and Environmental Protection: Both Buildings – Remove asbestos containing floor tile, ceiling tile and piping insulation. 3. Background: BUILDING HISTORY AND STATISTICS CLOW SOCIAL SCIENCE CENTER (70,261 ASF/120,334 GSF) – 1966 Classroom building – past, present and future Current Occupants o College of Business Administration o Seven (7) departments from the College of Letters and Science o General access computer lab o Thirty-one (31) general access classrooms (including 3 large lecture halls) o Small food service area o AV processing/storage facility o Instructional TV Services function. Building has received no major renovations NURSING EDUCATION (48,772 ASF/87,381 GSF) – 1970 Classroom/lab/office building – past, present and future Current Occupants o College of Nursing o College of Education and Human Services Building has received no major renovations PLAN IMPLICATIONS Project Intent: Complete renovation of the areas involved Planning Issues: Significant instructional lab, research, grant and office space growth needed for both colleges; additional instructional and research labs required for the department of Psychology; additional instructional lab required for Foreign Languages & Literature; upgrade of existing classrooms Project Sequence: Addressing space needs of these two colleges is the highest priority for the campus. Remodeling Clow for the COEHS frees up the needed space in the basement of NE for the additional lab space the CON requires for accreditation and to meet the industry demand for nursing graduates. 4. Analysis of Need: PROGRAM COLLEGE OF NURSING Existing Nursing Labs - These labs will continue to serve the colleges needs well into the future with some minor upgrades. Cost effective to update rather than totally rebuild in a different location. Need additional instructional lab and support space for undergraduate, graduate and family nurse practitioner programs – both wet lab and simulator labs 7/12/2016 219472395 page 2 of 4 o Changes in health care industry limited access to patients for clinical learning higher expectations of students when in a clinical setting computer mannequins (simulators) allow students to experience patient scenarios that are high risk but have a low occurrence in the clinical setting increased minimum skill competencies before students work with live patients – 3 to 4 times more laboratory learning required COLLEGE OF EDUCATION AND HUMAN SERVICES Need an enlarged/functional Counselor Education suite that provides appropriate privacy and security Need a Science Ed lab, which can emulate a typical K-12 science lab to show new teachers how to teach science. This lab will allow the college to become involved with STEM initiatives Need additional dedicated instructional computer lab and enlarged faculty development computer lab Need a significant amount of faculty/instructional staff/graduate assistant office and support space Need additional outreach and special project/grant workspace Need to relocate the SEIMC (from N. Polk basement) to be co-located with the college PSYCHOLOGY Need an enlarged/secure animal colony for instructional and research needs Need additional undergrad and graduate instructional lab spaces Need additional faculty and graduate research spaces FOREIGN LANGUAGES & LITERATURE Convert an existing classroom into a 2nd instructional lab adjacent to the existing lab to allow shared use of head end equipment and to provide support to both labs efficiently GENERAL ACCESS CLASSROOMS Remodel/update, including instructional technology, twenty-six (26) classrooms for use by all colleges 5. Alternatives: Option 1: Do nothing to the existing facilities. This option does not address the critical needs of the colleges/departments involved. This decision would have a significant impact on the University’s ability to serve the needs of NE Wisconsin, particularly in the area of nursing. 6. Schedule: Program Approval A/E Selection Design Report Approval Bid Date Start Demolition Start Construction Substantial Completion Final Completion 7/12/2016 January 2012 April 2012 November 2012 September 2013 N/A November 2013 May 2015 July 2015 219472395 page 3 of 4 7. Project Delivery: The university may later request the use of alternative delivery methods that would be advantageous to the university and the state. 8. Estimated Costs: a. Project Budget Summary: Budget Item Construction A/E Design Fees Other Fees DSF Management Fees Contingency Movable & Special Equipment Percent for Arts Total Project % $ 8.00 0.00 4.00 10.00 0.25 $ Cost 16,468,000 1,370,000 487,000 725,000 1,647,000 5,943,000 67,000 26,689,000 b. Impact on Operating Budget: None – As the building already exists and we are not proposing adding any sq ft. c. Fee Impact: None 9. Previous Action: None 7/12/2016 219472395 page 4 of 4