Transit Facility Development: Lessons Learned Overview Vision Project Size & Scope Funding Approach Concept Design Project Delivery Due Diligence Validation Efforts Close Out Vision Drives Plans/Programming Vision Project Size & Scope What is in the Long Range Vision? Vision Specifics! Methodology for Fixed Route/Demand Response Timeframe/Planning Horizon Phasing Vehicle Requirements Staffing Requirements Maintenance Requirements Technology Project Size & Scope Project Size & Scope Funding Approach Local Funding Property Acquisition FTA Capital/Local Construction Concept Design MultiDisciplined Interactive/ Iterative Facility Design Multi-Modal Functional Relationships Project Delivery Benefits 1 Design-Bid-Build • Design Completion Before Bid • No Re-Engineering in Later Phases • Cost Estimates Based Upon 100% Design 2 CMAR (Construction Manager At Risk) • Synchronize Design and Construction Management • Design Changes – Cost Impacts/GMP • Qualification-Based Procurement Due Diligence Project Sponsor • • • • Owner Direct Purchase/Change Orders PMP/Compliance Monitoring Safety and Security Plans/Acceptance Field Reports/Monitoring Peer Review Process • • Validate Design Improve Functionality Experienced Prime and Subs • • • • • • Two Week Look Ahead Issue/Resolution Logs Permitting/Plans Review Staging Activities Minimal Delays Change Order Notification Process • • PM/Field Presence and Reports • • Oversight for Prime Contractor Site Security and Safety Easy/Quick Access to Files Progress Reports/Concerns Validation Efforts Engineering Coordination Transit Agency Coordination o Materials Testing o Shop Drawings o RFIs o o o o Buy America E-Verify DBE/Prompt Payment Davis Bacon Project Close Out • Training/Testing/Acceptance for New Equipment • Substantial Completion and Final Inspections Key Considerations • As-Builts from Contractor • Warranty Documentation • Final Payments and Reports • Move-In Plan Lessons Learned 1. 1 Third Party Consultant Help (Buy America Audits, Security) 2 2. Design Flaws = Big Problems 3 3. Staff PM is Very Important 4. 4 Multi-Disciplined Concept Design is Critical 5 5. Change Orders are Part of the Process (ODP, New Project Elements)