PQA Return to Green (RTG) Strategy 17 July 2008 2 Objectives Lockheed Martin Aeronautics Company At the conclusion of the training, the participant should: Understand how the Return-To-Green (RTG) process compliments the PQA strategy for managing Suppliers Understand the responsibilities of PQA and Supplier roles in managing the RTG plan from Red back to Green Understand PQA management’s expectations for engaging a Supplier 3 PQA Transition to Prevention Lockheed Martin Aeronautics Company PQA Strategy 2008 • Full delegation to supply base – end item final acceptance by Lockheed Martin by exception • Level of oversight will be determined based on data and the supplier’s quality performance as measured by PQA’s new rating system • More intense and focused oversight activities implemented at suppliers with performance issues or identified as being at a high probability of developing performance issues based on early warning measure and on-site PQA Supplier Quality Engineer (SQE) knowledge • Requires a formalized plan be developed for the supplier engagement • Plan must include measurable milestones • Implementation of Oregon Productivity Matrix (OPM) to measure progress and sustainment of improvement activities and to provide early warning signals of potential process and performance degradation History proves when a joint focused effort is implemented to address performance issues, sustained improved performance can be realized 4 PQA Strategy Change – 2008 Forward Lockheed Martin Aeronautics Company PERFORM PROCESS/QUALITY MANAGEMENT SYSTEM OVERSIGHT Supplier Approval & Control The following SSP Matrices must be performed annually: Contract Review Control of Purchases FOD End Item Acceptance Suppliers •Quality System Approval • 3’rd Party Registered • Partner Approval • LM Site Survey - 3 year intervals for QMS re-assessment for manufacturers - 2 year intervals for QMS re-assessment for processors • Supplier rating • Quality Excellence Board Baseline Assessments • Quality Program Integration • Performance • FAI Engagement • Return to Green • Structured Surveillance If additional matrices Remainder of are required the SSP Matrices supplier should be over 2 year period moved to Med or High risk Effective LM Aero PQA and Corrective Programs Action First Article Planning & Engagement Remainder of SSP Matrices annually Exempt – not delegated EIA REJECT ACCEPT ACCEPT OUTPUT End Item Acceptance INPUT Supplier Production Process To Stock Or Customer Process Approvals Special Process Sources Full process checklist performed for each process approval level / specification and every two years thereafter Surveillance performed on at least one area within each discipline at the following frequency Surveillance once every 90 days Critical / High Volume Processors Non-Critical / Low Volume Processors Surveillance once every 180 days SCORE 10 9 8 7 6 5 4 3 2 1 0 PERF. SCORE WEIGHT VALUE SUMMARY GOAL ACTUAL HISTORY Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 SCHEDULE CUM DEL MATERIAL PROCESS 100.00% 100.00% 100.00% 99.90% 96.88% 96.88% 99.80% 93.75% 93.75% 99.70% 90.63% 90.63% 99.60% 87.50% 87.50% 99.50% 84.38% 84.38% 99.40% 81.25% 81.25% 99.30% 78.13% 78.13% 99.20% 75.00% 75.00% 99.10% 71.88% 71.88% 99.00% 68.75% 68.75% 107.00% 100.00% 100.00% 10 10 10 10 10 10 100 100 100 SCHEDULE 300 300 300 250 200 150 100 50 0 Performance Feedback & Assessment 350 350 305 305 200 300 300 300 300 300 300 300 350 350 350 350 350 350 350 350 350 350 350 350 RTV AGE 0 10 20 30 35 40 45 50 55 60 61 47 3 20 60 QUALITY RTV QTY 0 2 3 4 5 6 7 8 9 10 11 3 8 10 80 QUALITY FAR 0 2 4 6 8 10 12 14 16 18 20 3 8 5 40 ARRAY 12.00% 8.00% 4.00% 0.00% -4.00% -8.00% -12.00% -16.00% -20.00% -24.00% -28.00% -10.10% 4 10 40 YIELD SCA 12.00% 8.00% 4.00% 0.00% -4.00% -8.00% -12.00% -16.00% -20.00% -24.00% -28.00% 3.00% 7 10 70 YIELD 350 180 350 300 250 200 150 100 50 0 265 255 265 265 270 225 225 185 185 180 170 120 0 FPA 12.00% 8.00% 4.00% 0.00% -4.00% -8.00% -12.00% -16.00% -20.00% -24.00% -28.00% 7.00% 8 15 120 350 230 350 300 300 300 300 250 300 300 200 300 300 150 300 100 300 300 50 300 0 300 0 230 230 240 230 240 240 230 230 230 230 230 230 350 350 350 350 350 350 350 350 350 350 350 350 COMMENTS STRETCH GOAL TARGET GOAL NOTES: TOTAL STRETCH GOAL = 1000; TARGET GOAL = 700 710 = ACTUAL SCORE 1000 900 800 845 835 810 700 800 600 710 500 765 400 755 300 715 200 715 100 710 0 700 650 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 Purpose of RTG Process • PQA has shifted its focus from managing all Suppliers equally, to identifying those suppliers creating the greatest quality impact on LM Aero operations and focusing valuable PQA resources to manage them back to health. • It is the Supplier’s responsibility to get back to Green. PQA’s role is to define the performance issue and to monitor the supplier’s progress. 5 RTG Process Map No Yes RTG not required Yes Entranc e criteria met? Yes Define performance issues and jointly develop RTG items with Suppliers Save RTG plan to OAT HUD and submit for RTG review Approved by PQA, Program and MM Revise RTG plan and status ? Monitor seller progress on actions No No No Exit criteri a met? Yes Reduce oversight level to “Watch List” 6 Supplier Defines Action Items • All Action Items need to be clear, concise and SMART. – Specific – Measurable (objective evidence) – Agreed to (between the supplier and SQE) – Realistic – Time bound- Timeframes and deadlines are stated and specific. • Clear statement of expectations: “What needs to be improved?” • Any/All action items shall have assigned owner(s) and estimated completion date. 7 Communicate with supplier • As the RTG plan is created, evaluated and revised with new status, the SQE is expected to communicate with the supplier – In addition to the RTG action items, the SQE should communicate and collaborate with the supplier on all specific findings, corrective actions, supporting tasks, etc. – The collaborative and coordinated efforts of the SQE and supplier are believed to provide the greatest value in the RTG process. 8 Monitor supplier Progress/Actions • As the supplier meets its action items and deliverables, the SQE shall monitor the suppliers progress at the minimum monthly to determine if the supplier has met the exit criteria. • If the action item is not effective and does not meet the original intent, SQE needs to re-evaluate the suppliers RTG plan and update accordingly. 9 Revise RTG Plan & Status • The RTG action items shall be revised to reflect the latest status. – The minimum requirement is that the SQE shall update the RTG plan monthly. – SQE’s are encouraged to update the plan more frequently. • SQE’s ask and verify if the supplier: – On track to completion of action items ? – Needs to revise their action items or completion date? 10 Exit Criteria Met? • When the supplier is complete in every action item, the SQE shall present the supplier’s case to the PQA chain of command to request the supplier to be returned to Green status. • If supplier is Red in any action item, then it shall remain under RTG management oversight level. *Note: The RTG exit criteria are intentionally stringent. Once a supplier dips into Red, it must achieve a higher level of performance to get out of the RTG process. The expected result of the RTG process is significant, sustained improvement in supplier performance. 11 RTG Gantt Chart Example- Top Level Export to excel High Quality Machine Shop Clickable area to view Detailed Gantt Chart High Quality Machine Shop 12 RTG Gantt Chart Example- Second Level High Quality Machine shop This is the group of actions. All actions under the group must be scheduled to be complete on or before the group’s end date. Hyperlinked items that go to the view action item screen. Milestones are represented by a diamond. Action items with dependencies forming a critical path. 13