L Missiles and Fire Control Form: _____4-4-009-1____ Supplier Quality Page __1__ of __4__ Source Engineer Guidelines Date: _ _01/22/04____ ------------------------------------------------------------------------------------------------------------------------------------------------------- P.O. Review Form 4-4-009-1 Instruction: Complete form as documented and record responses. A “NO” responses require documentation of problem and estimated resolution date entry in the “Unresolved Problems” and “Open Items” section. Items not applicable shall be marked as not applicable ( N/A). Supplier Supplier Code or Duns No. P.O. Number & Revision Line Item Part Description Program Code Buyer & Phone No. SQE & Phone No. Part Number – MSFU Revision / NOR SQSE & Phone No. . Item Section 1 – Pre-Production Review Criteria General P.O. Requirements 1 Is the supplier contact information in SQS and SEAM correct? 2 Does the suppliers PO REV/NOR level agree with the latest LM engineering? 3 Are all supplier, Lockheed Martin Corporation ( LMC ) Engineering, government and industry documents available and released and at the correct revision as verified in IHS Engineering Services, OBE6N71A – General Document Inquiry or the supplier’s document control system? LMC released Engineering Documents are identified with an encircled or IR in the revision block. Record all specifications used in Section 3 If applicable - When unreleased engineering (Green Engineering) is to be used in manufacturing; does an approved Operations Directive (OD) exist to permit production per 3-2-001 Data Work Product Release and Revision. 4 5 Does the P.O. Adequately Describe the Scope Of Work? 6 The supplier MUST be cognizant of contract requirement SP 401 (US) or SP 402 (International). “The SELLER shall make no changes to work under this contract including any change in design, manufacturing process, materials, or otherwise which may affect form, fit, or function of the work without prior notification to and approval by the Lockheed Martin Procurement Representative. Such notification shall consist of detailed drawings clearly defining such changes and the date such changes are proposed to be effective. Such notification shall not constitute approval of the proposed change not relieve Seller’s obligation to comply with requirements contained in this contract. If the proposed change is approved, the change shall be incorporated into this Contract by Amendment.” Response Yes No * Denotes Latest Revision ANY HARD COPY OF THIS PROCEDURE IS CONSIDERED UNCONTROLLED. L Missiles and Fire Control Form: _____4-4-009-1____ Supplier Quality Page __2__ of __4__ Source Engineer Guidelines Date: _ _01/22/04____ ------------------------------------------------------------------------------------------------------------------------------------------------------- 7 8 9 10 11 12 Does the supplier have revision controlled procurement procedures that include flowdown requirements to subtier processors? Does a revision controlled manufacturing processing plan ( traveler ) exist for this part number? Does the supplier have documented process controls, inspection points, inspection methods and test plans that identify proper accept / rejection criteria? When First Article Inspection (FAI) or Acceptance Test Procedure (ATP) requirements are identified on the P.O. is an approved FAI report or ATP exist that meets the criteria of the quality text notes? If applicable - When reduced dimension drawing apply has the supplier been successfully qualified for data translation per 4-2-041 Acquiring Products from Suppliers Using Reduced Dimension Drawings? Is the Supplier Document History within SQS up to date for FAI, ATP or other special program requirements? Section 2 - P.O. Quality Text Note Review Item List and review the Quality Text notes listed on the P.O. Supplier Concurrence Yes No 13 14 15 16 17 18 19 20 21 22 Section 3 Documentation / Engineering Specification Review Record each LMC, supplier and other engineering specifications used for this purchase order identified in Section 1. Item Specification Revision Released Yes No 23 24 25 26 27 28 29 * Denotes Latest Revision ANY HARD COPY OF THIS PROCEDURE IS CONSIDERED UNCONTROLLED. L Missiles and Fire Control Form: _____4-4-009-1____ Supplier Quality Page __3__ of __4__ Source Engineer Guidelines Date: _ _01/22/04____ ------------------------------------------------------------------------------------------------------------------------------------------------------- 30 31 32 33 Section 4 Special Requirements List all special requirements for this purchase order including manufacturing inprocess and special process acceptance. Item Requirement Supplier Concurrence Yes No 34 35 36 37 38 39 40 41 42 43 44 45 Section 5 Special Process Requirements List all special process requirements identified on the purchase order and expiration per CPS Supplier Gateway. Item Process Subtier Processor Approved Expiration Supplier Concurrence Y/N Yes No 46 47 48 49 50 51 52 53 54 55 Section 6 Special Acceptance Tooling Requirements Verify the supplier has Lockheed Martin approval of acceptance tool designs. Item Tool Number Description LMC Owned Expiration Yes No 56 57 Supplier Concurrence Yes No * Denotes Latest Revision ANY HARD COPY OF THIS PROCEDURE IS CONSIDERED UNCONTROLLED. L Missiles and Fire Control Form: _____4-4-009-1____ Supplier Quality Page __4__ of __4__ Source Engineer Guidelines Date: _ _01/22/04____ ------------------------------------------------------------------------------------------------------------------------------------------------------- 58 59 60 61 Section 7 Mandatory LMC Source Verification Steps Identify mandatory in-process / final inspection steps required for this part number Item Inspection Point Operation Supplier Concurrence Yes No 62 63 64 65 Section 8 Documentation Required for Final Acceptance Identify all required documentation needed for final source inspection Item Documentation Item 66 67 68 69 70 71 72 73 74 75 76 Supplier Concurrence Yes No Raw Material Certification for all hardware P.O. supplier Special Process Certifications Subtier Special Process Certifications with supplier identification First Article Report Statistical Process Control Data Certification Of Conformance to Process and Materials Evidence Of LMC approved ATP or Inspection plan Actual Test/Inspection or Environmental Data Section 9 Open Items Track and record all open items on the attached Continuous Improvement Plan. Comments Supplier Representative Signature Date LMC Source Engineer Signature Date * Denotes Latest Revision ANY HARD COPY OF THIS PROCEDURE IS CONSIDERED UNCONTROLLED.