CHAPTER 10 Alternative Approach: Purchasing Systems 10.1 © Prentice Hall 2002 SYSTEMS DEVELOPMENT APPROACHES • SYSTEMS DEVELOPMENT LIFE CYCLE (SDLC) • PROTOTYPING • PURCHASED SOFTWARE • OUTSOURCING (SYSTEMS INTEGRATOR) • END USER DEVELOPMENT * 10.2 © Prentice Hall 2002 MAKE-OR -BUY DECISION • ASSESS RISKS & BENEFITS • MAKE: Use SDLC , prototyping, RAD if organization has IS skills. Can save cost, speed implementation • BUY: If vendor offers acceptable product and required support at lower cost, faster time than in-house development could provide. Usually system must be modified to meet organization’s needs 10.3 * © Prentice Hall 2002 THE PURCHASING PROCESS DEFINITION PHASE: • • • • • • • FEASIBILITY ANALYSIS REQUIREMENTS DEFINITION SHORT LIST OF PACKAGES ESTABLISH EVALUATION CRITERIA DEVELOP AND DISTRIBUTE RFP CHOOSE PACKAGE NEGOTIATE CONTRACT 10.4 * © Prentice Hall 2002 THE PURCHASING PROCESS CONSTRUCTION PHASE: • SYSTEM DESIGN: Package modification • SYSTEM BUILDING: Package modification • SYSTEM TESTING IMPLEMENTATION PHASE: • INSTALLATION • OPERATIONS • MAINTENANCE 10.5 * © Prentice Hall 2002 REQUEST FOR PROPOSAL (RFP) • DOCUMENT SENT TO POTENTIAL VENDORS INVITING THEM TO SUBMIT A PROPOSAL TO FURNISH A SYSTEM • PROVIDES DETAILED INFORMATION ABOUT THE DESIRED SYSTEM, ITS ENVIRONMENT, MATERIAL REQUIRED FROM VENDOR, AND GENERAL CRITERIA USED TO EVALUATE PROPOSALS * 10.6 © Prentice Hall 2002 SAMPLE CONTENTS OF RFP 1. INTRODUCTION: A. STRUCTURE & SCOPE B. OBJECTIVE C. COMPANY BACKGROUND, PHILOSOPHY D. HARDWARE/SOFTWARE ENVIRONMENT E. CURRENT BUSINESS ENVIRONMENT * 10.7 © Prentice Hall 2002 SAMPLE CONTENTS OF RFP II. GUIDELINES FOR RESPONSE: A. GUIDELINES B. VENDOR’S RESPONSE C. GENERAL EVALUATION PROCESS D. HARDWARE/SOFTWARE ENVIRONMENT E. CURRENT BUSINESS ENVIRONMENT * 10.8 © Prentice Hall 2002 SAMPLE CONTENTS OF RFP III. REQUIREMENTS: A. VENDOR INFORMATION B. VENDOR SUPPORT/TRAINING C. DOCUMENTATION D. PACKAGE HARDWARE & SYSTEM SOFTWARE ENVIRONMENT E. APPLICATION & DATABASE ARCHITECTURE F. TUNING & MEASUREMENT G. FUNCTIONAL REQUIREMENTS 10.9 * © Prentice Hall 2002 SAMPLE CONTENTS OF RFP IV. COSTS: A. SUMMARY B. C. D. E. F. NON-RECURRING RECURRING PRICE GUARANTEE MAINTENANCE AGREEMENT NEW RELEASES V. SIGNATURE PAGE * 10.10 © Prentice Hall 2002 MATCHING COMPANY NEEDS WITH PACKAGE CAPABILITIES COMPANY NEEDS PACKAGE CAPABILITIES IDENTIFY DISCREPANCIES CHOOSE ALTERNATIVES MODIFY PACKAGE 10.11 CHANGE COMPANY LIVE WITH PROBLEMS © Prentice Hall 2002 ROLES FOR PURCHASING PACKAGED APPLICATIONS • PROJECT MANAGER: Manages process, responsible for the success of the project, may be user but IS expertise required • VENDOR: Must be responsive to customer’s needs • PURCHASING SPECIALIST: Helps prepare RFP, assist in entire process • ATTORNEYS: Oversee writing, approval of contract * 10.12 © Prentice Hall 2002 PURCHASING SOFTWARE ADVANTAGES: • REDUCED TIME TO IMPLEMENT • LOWER OVERALL ACQUISITION COSTS • APPLICATION QUALITY • REDUCED NEED FOR INTERNAL IS RESOURCES • INFUSION OF EXTERNAL EXPERTISE 10.13 © Prentice Hall 2002 * PURCHASING SOFTWARE DISADVANTAGES: • RISKS DUE TO LACK OF PACKAGE KNOWLEDGE • RISKS DUE TO EXTENT OF ORGANIZATIONAL CHANGES REQUIRED • INITIAL & ONGOING DEPENDENCE ON VENDOR * 10.14 © Prentice Hall 2002 SPECIAL CASE: ENTERPRISE RESOURCE PLANNING (ERP) • INTERFACES CROSS SEPARATE FUNCTIONAL SYSTEMS • MUST SUPPORT CROSS-FUNCTIONAL BUSINESS PROCESSES • COMPLEX SYSTEMS TAKE YEARS TO COMPLETE • REQUIRES EXTENSIVE TRAINING • HEAVY RELIANCE ON CONSULTANTS * 10.15 © Prentice Hall 2002 CHAPTER 10 Alternative Approach: Purchasing Systems 10.16 © Prentice Hall 2002