ZIMBABWE’S DELIVERY TEAM TOPPING UP SYSTEM: ADDING HIV TESTS AND NEVIRAPINE FOR PMTCT David Alt, Country Director Naomi Printz, Technical Advisor Background for DTTU • Started in late 2003 as the logistics system for condoms and contraceptives • Run by Zimbabwe National Family Planning Council • Funded by USAID through USAID | DELIVER PROJECT and DfID through Crown Agents • Forced ordering delivery truck inventory control system • Delivery truck loaded with commodities drives to all facilities (1600+ total) once in 4 months • Facilities do not place orders 2 PEPFAR Implementing Partner How a DTTU delivery works • Delivery team arrives at facility and: • Questions SDP staff about losses and adjustments and days out of stock • Carries out physical counts of commodities • Calculates the average monthly consumption • Calculates maximum quantity for the facility • Tops up the facility to maximum quantity level • Facility Staff sign for the stock delivered • All calculations and receipts recorded on Delivery/Receipt Voucher (DRV) 3 PEPFAR Implementing Partner DTTU Achievements • 97% Coverage (3% facilities not delivered to) • More than 95% availability for condoms and contraceptives • Reliable Logistics Management Information System (LMIS) with data on stock on hand, consumption, and losses & adjustments 4 PEPFAR Implementing Partner Background to HIV test kit and NVP management • Managed under the AIDS & TB Unit of the Ministry of Health and Child Welfare • No national logistics data available reporting rates less than 30% • No delivery system in place sites had to travel to central warehouse to collect stocks • Reports of stockouts and overstocks • HIV test kits and NVP for PMTCT are FULL SUPPLY commodities 5 PEPFAR Implementing Partner Pilot for Adding HIV RTKS & NVP to DTTU • MOHCW AND ZNFPC decided to pilot the addition of HIV RTKs and NVP- Jul to Dec 2007 • In 2 provinces: Matebeleland South and Mashonaland Central 6 PEPFAR Implementing Partner Objectives of the pilot To determine whether including HIV tests and NVP into DTTU would: 1. Make HIV RTKs and NVP widely available 2. Improve reporting rates for RTKs and NVP (Create a reliable LMIS) 7 PEPFAR Implementing Partner Delivery Coverage – Mash. Central Delivery Run Total Facilities Received Deliveries % Delivery Coverage 1 66 66 100 2 87 86 99 3 87 66 75 8 PEPFAR Implementing Partner Delivery Coverage – Mat South Delivery Run Total Facilities Received Deliveries % Delivery Coverage 1 52 52 100 2 54 50 93 3 56 52 93 9 PEPFAR Implementing Partner Delivery coverage – new facilities • Total of 30 new facilities in Mash Central • Total of 25 new facilities in Mat South • 38% of total coverage = new facilities 10 PEPFAR Implementing Partner Reasons facility missed • Heaviest rainy season flooded rivers • Drug rooms locked • Nurse away 11 PEPFAR Implementing Partner Stock Out Rates - Mash Central Product Run 1 Run 2 Run 3 Chase Buffer 33 37 2 Determine 11 5 2 SD Bioline 19 5 2 Oraquick 77 83 100 Infant Nev. 39 9 2 Matern. Nev 33 15 2 12 PEPFAR Implementing Partner Stock Out rates – Mash Central 40 35 30 Chase Buffer 25 Determine 20 SD Bioline Infant Nevirapine 15 Maternal Nevirapine 10 5 0 Run1 Run2 Run3 13 PEPFAR Implementing Partner Stock Out Rates Mat. South Product Run 1 Run 2 Run 3 Chase Buffer 65 25 16 Determine 0 4 6 SD Bioline 3 4 6 Oraquick 68 100 100 Infant Nev. 39 2 2 Matern. Nev 39 2 2 14 PEPFAR Implementing Partner Stock Out Rates: Mat South 70 60 50 Chase Buffer 40 Determine SD Bioline 30 Infant Nevirapine 20 Maternal Nevirapine 10 0 Run1 Run2 Run3 15 PEPFAR Implementing Partner Linking logistics data and service statistics • Elizabeth Glaser Paediatric AIDS Foundation (EGPAF) supporting PMTCT activities in Zimbabwe • In conjunction with EGPAF, wanted to determine whether improved commodity availability led to an increase in clients served 16 PEPFAR Implementing Partner Uptake of Maternal and Infant NVP Prophylaxis Percentage Women and Infants Dispensed with sdNVP 12 Sites from Matabeleland South Jan-Dec 2007 % Women Dispensed w ith sdNVP % Infants Dispensed sdNVP 100% 88% 82% 83% 80% 66% 60% 66% 55% 61% 55% 40% 20% 0% Jan - Mar Apr - Jun Jul - Sep Oct - Dec Quarter - 2007 17 PEPFAR Implementing Partner Issues highlighted in the pilot • Chase buffer use & unit of recording • Shelf Life of Oraquick new tiebreaker has been identified • Packaging of nevirapine syrup • New PMTCT regimens 18 PEPFAR Implementing Partner Results of the pilot 1. Rapid test kits and PMTCT NVP now widely available in the 2 provinces. 2. LMIS in the 2 provinces captures essential logistics data. 3. Reporting rate in the 2 provinces improved from 30% to 97% after only 3 deliveries. It was recommended that HIV test kits and NVP to be added to the DTTU system and rolled out nationally as soon as possible. 19 PEPFAR Implementing Partner Changes made to DTTU • Number of commodities increased from 5 to 11 • Deliveries were changed from every 4 months to every 2 months • Maximum stock reduced from 8 months to 4 months • Standard operating procedures developed (along with new forms) • All team leaders trained 20 PEPFAR Implementing Partner Now…. • Integrated deliveries are being incrementally implemented throughout the country • By end July, every facility in the country will be receiving integrated deliveries • Pilot to automate the completion of the Delivery/Receipt Voucher has been started 21 PEPFAR Implementing Partner Mazviita, Siyabonga, Thank you! Questions????? 22 PEPFAR Implementing Partner