WESLEYAN \\ U N I V E R S I T Y Facilities 170 Long Lan e M i d d l e t o wn , C o n n e c t i c u t 0 6 4 5 7 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #1 Date: March 19, 2013 To: Bidders of Record Project: Bid Packages 1 - 4 Annual Major Maintenance FY 14 SPECIAL NOTE: Addendum #1 information shall supersede the information contained in the Contract Documents This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated January 4, 2013. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. PreBid Meeting Minutes; 3/11/3 & 3/12/13 Bid / Construction Schedule 3/11/13 & 3/12/13 Walk Throughs Bids due: March 25, 2013 @ 1:00PM Post bid interview/bid review: March 26, 27, 28, 2013 Selection of successful bidders: April 1, 2013 Construction Start Date: May 28, 2013 Substantial Completion Date: August 1, 2013 Project Completion Date: August 16, 2013 Housing Opens/Students Arrive on campus: August 20, 2013 The prebid meeting addressed the following items: 1. Schedule: Completion dates shall be strictly adhered to. 1. Coordination of the work is critical. 2. Safety: Zero accidents. All contractors shall practice safe workmanship practices 3. Surrounding areas/buildings will be occupied throughout the project schedule. 4. OSHA Training: Contractor shall provide minimum 10 hour OSHA Training Certification for workman and minimum 30 hour OSHA Training Certification for Working Foreperson or Supervisor to Owner prior to start of work. Reference 01015 General Requirements. 5. Hazardous Materials: Contractor shall coordinate all required ACM removal with Owner. Inspection reports are available in the Owner’s office and will be posted to the MM FY13 website. 6. Lead Materials: All painted surfaces are to be treated as positive for lead containing paint due to the construction of the building prior to 1978. All contractor personnel working on the project shall be certified by the U.S. Environmental Protection Agency (EPA) for lead based paint activities 7. Parking; Parking on grass surfaces is strictly prohibited. Parking in driveway of the woodframe is acceptable. Off street parking is available. Additional parking is available at the Vine Street parking lot. 8. It is the contractors’ option to a flash drive or CD to obtain available AutoCAD drawings. 9. Contractors are encouraged to check the major maintenance website frequently for new and updated information. Addenda, specifications and additional project work will be posted to the website as it becomes available. 10. If out of office message is received when contacting R. Sillasen by phone or email, contractor is directed to call Steve Formica at 860-865-3778 or sformica@wesleyan.edu. 11. A bond is not required. Builder’s Risk insurance is not required. 12. Insurance Certificate must name Wesleyan University as additional insured. Major Maintenance FY2013/2014 Project Number 2014000000 ADDENDUM # 1 Pre-Bid Conference - 1 3/12/13 Location Plan provided at pre-bid conference. Parking locations identified. Students are home. Need to wipe feet. Take measurements / look at panels 200 College Street & 15 Pearl Place: DVD Zone: Proposal form to be revised to provide costs for vinyl windows and fiberglass windows. Fire Alarm shutdowns to be coordinated with Wesleyan University. On site walk throughs were performed Wednesday, March 13, due to heavy rains during the March 12 prebid meeting. Clarification Note: Where it is noted in the scope of work to replace stair treads, reference is to replacement of vinyl stairtreads. Contractor Question: I have a question about the fascia ,soffits, and gable trim. Is it standard procedure to cover the fascia, and rakes with break metal, and apply vinyl to the soffits of the you houses that you are installing vinyl siding? BP# Response: Reference Specification 07460; Section 2; paragraph 2.3. Response: Soffits are covered with vinyl soffit material. Type is identified in the scope. Address Short Description 1 211 B Pine Interior renovation - 2 beds 1 224 (188) Cross St Interior/Exterior renovation - 4 beds 1 76 Lawn Ave Interior Renovation - 5 beds 2 40 Fountain Ave Interior Renovation - 4 beds Major Maintenance FY2013/2014 Project Number 2014000000 Description Renovate kitchen and bathroom in toto. Refinish wood floors and patch and paint throughout. ADDENDUM #1: Note No. 9 on SK-002-3: Bathroom fan is currently vented to the exterior. Delete this work from the scope. Rehab house interior; kitchen cabinet painting & counter top replacement, new vinyl flooring, bathroom restorations, wood floor refinishing, patch and paint interior, light fixture replacements, electrical upgrades, mechanical system repairs. ADDENDUM #1: Stairwell to second floor: Contractor to install 3/8” gypsum laminate on walls; north and south elevations Contractor to install 3/8” gypsum laminate on ceiling of second floor hallway. Electrician to adjust smoke detector, junction box and light fixture to accommodate for depth of gypsum laminate. Kitchen and bathroom renovation, mechanical system replacement, electrical upgrade including light fixture replacement, interior patch and paint, removal of carpeting and wood floor refinishing, carpentry repairs. Ceiling replacements. Exterior vinyl siding installation. Paint exterior paintable surfaces. New insulated glass windows and metal wrap. Exterior carpentry repairs. ADDENDUM #1: Install new insulated glass windows in openings of enclosed porch. Grid to be 6/1. Frame stops for proper installation. Provide new frame for new steel doors to be installed at north and south entries. Second floor bedrooms 2, 3, 4, and 5: Contractor to install 3/8” gypsum laminate on ceiling of second floor hallway. Electrician to adjust smoke detector, junction box and light fixture to accommodate for depth of gypsum laminate. Bathroom renovations on 1st and 2nd floor, mechanical system repairs, electrical upgrade including light fixture replacement, interior patch and paint, wood floor refinishing, carpentry repairs. ADDENDUM #1: ADDENDUM # 1 Pre-Bid Conference - 2 3/12/13 2 34 Fountain Ave Interior Renovation - 4 beds 2 97 Lawn Ave Interior Renovation - 4 beds Replace entry doors and frames with new steel doors with peep hole; front and back. Reinstall hardware. Remove jalousie windows and frames of enclosed porch on west elevation. Patch all penetrations. Paint wood frames with Sherwin Williams Duration. Color to match BM Navajo White. Bedroom No. 1: Contractor to install 3/8” gypsum laminate on all walls. Electrician to adjust smoke detector, junction box and light fixture to accommodate for depth of gypsum laminate. First Floor entry hallway: Contractor to install 3/8” gypsum laminate on south wall. Electrician to adjust fire alarm devices, junction box and electrical devices to accommodate for depth of gypsum laminate. Kitchen and bathroom renovations, mechanical system repairs, electrical upgrade including light fixture replacement, interior patch and paint, wood floor refinishing, carpentry repairs. ADDENDUM #1: Note No. 8 on SK-005-3: Second floor hallway ceiling: Contractor to install 3/8” gypsum laminate on ceiling. Electrician to adjust smoke detector, junction box and light fixture to accommodate for depth of gypsum laminate. Note No. 8 on SK-005-3: Bedroom No. 4: Contractor to install 3/8” gypsum laminate on ceiling. Electrician to adjust smoke detector, junction box and light fixture to accommodate for depth of gypsum laminate. Stairwell to second floor: Contractor to install 3/8” gypsum laminate on walls; north and south elevations. Kitchen and bathroom renovations, mechanical system repairs, electrical upgrade including light fixture replacement, interior patch and paint, wood floor refinishing, carpentry repairs. New insulated glass windows and metal wrap. ADDENDUM #1: South Elevation, second floor: Paint wood sheathing in window opening to match BM Tudor Brown. Kitchen: Contractor to install 3/8” gypsum laminate on ceiling. Electrician to adjust smoke detector, junction box and light fixture to accommodate for depth of gypsum laminate. Second Floor Bathroom: Provide access panel in riser. 3 44 Home Av Window replacement Install insulated glass windows. Insulate weight pockets. Provide carpentry work as required for window replacement. Paint interior and exterior window trim. Do not paint stone sills. 3 200 College St Exterior Renovation - 7 beds 3 170 Cross St Vinyl Siding/ Windows 4 15 Pearl Place Exterior Paint/ Windows 4 182 (162) Cross St Interior/Exterior renovation - 5 beds Exterior Paint. perform carpentry repairs, install insulated glass vinyl windows. Remove and reinstall security screens. Plumbing required in 2nd floor bathroom, patch and paint interior, refinish wood floors. Vinyl side exterior, install metal window wrap, paint all paintable surfaces. 4 207 Pine St Rear Egress Steps Install new landing and steps at rear egress using composite materials to match 211 Pine St. Pour concrete landing at base of stairs. Major Maintenance FY2013/2014 Project Number 2014000000 Exterior Paint. perform carpentry repairs, new insulated glass windows. At entrances; replace entry stairs, landing and railings with new composite materials; replace framing as required. Install vinyl siding, wrap window trim with aluminum rolled material, perform carpentry repairs, install insulated glass vinyl windows. ADDENDUM #1: Perform carpentry repair to basement hatchway. At north elevation basement window replacement, contractor to install fixed transom. At south elevation basement window replacement under porch, contractor to frame opening and enclose with plywood and insulation. ADDENDUM # 1 Pre-Bid Conference - 3 3/12/13