11315 version 2
Page 1 of 3
Level 2
Credits 3
Purpose People credited with this unit standard are able to remove detritus and litter from the road reserve, and clear the worksite on completion of work.
Subfield Highway Construction and Maintenance
Domain
Status
Status date
Date version published
Roading Maintenance
Registered
25 September 2006
25 September 2006
Planned review date
Entry information
31 December 2012
Open.
Accreditation Evaluation of documentation by NZQA and industry.
Standard setting body (SSB) Infrastructure ITO
Accreditation and Moderation Action Plan (AMAP) reference 0101
This AMAP can be accessed at http://www.nzqa.govt.nz/framework/search/index.do.
Special notes
1 The following legislation and regulations must be complied with: Health and Safety in
Employment Act 1992; and Health and Safety in Employment Regulations 1995.
2 Assessment against this unit standard must take place in a workplace environment.
Assessment parameters will be dependent on company and site specific equipment, procedures, and practices. Practices must reflect industry best practice and comply with legislative requirements.
New Zealand Qualifications Authority 2020
11315 version 2
Page 2 of 3
3 Definitions
Company requirements include the policy, procedures, and methodologies of the company. They include legislative and regulatory requirements which may apply across the company or to a specific site. Requirements are documented in the company ’s health and safety plans, traffic management plans, contract work programmes, quality assurance programmes, policies, and procedural documents.
Contract specifications include plans, diagrams, and special technical conditions.
They do not include special administrative conditions.
Element 1
Remove detritus and litter from the road reserve.
Performance criteria
1.1 Detritus is loosened and removed from the road surface in accordance with contract specifications.
Range equipment may include – mechanical or manual broom, shovel, water-blaster.
1.2 Litter is removed from the road reserve in accordance with contract specifications.
Element 2
Range may include but is not limited to
Clear the worksite on completion of work.
– bins, drains, berms, shoulders.
Performance criteria
2.1 Surplus and loose materials are cleared from the site in accordance with company requirements.
2.2 Temporary traffic control measures are removed in accordance with company requirements.
Please note
Providers must be accredited by the Qualifications Authority, or an inter-institutional body with delegated authority for quality assurance, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment.
Industry Training Organisations must be accredited by the Qualifications Authority before they can register credits from assessment against unit standards.
Accredited providers and Industry Training Organisations assessing against unit standards must engage with the moderation system that applies to those standards.
New Zealand Qualifications Authority 2020
11315 version 2
Page 3 of 3
Accreditation requirements and an outline of the moderation system that applies to this standard are outlined in the Accreditation and Moderation Action Plan (AMAP). The
AMAP also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements.
Comments on this unit standard
Please contact Infrastructure ITO askus@infratrain.co.nz
if you wish to suggest changes to the content of this unit standard.
New Zealand Qualifications Authority 2020