6480 version 4 Page 1 of 4 Assist with survey and set-out on civil construction works Level 1 Credits 3 Purpose People credited with this unit standard are able to: demonstrate knowledge of survey and set-out; prepare survey equipment; prepare ancillary equipment; and assist surveyor with set-out. Subfield Civil Works and Services Domain Civil Construction Works Status Registered Status date 25 September 2006 Date version published 25 September 2006 Planned review date 31 December 2012 Entry information Open. Accreditation Evaluation of documentation by NZQA and industry. Standard setting body (SSB) Infrastructure ITO Accreditation and Moderation Action Plan (AMAP) reference 0101 This AMAP can be accessed at http://www.nzqa.govt.nz/framework/search/index.do. Special notes 1 The following legislation and regulations must be complied with: Health and Safety in Employment Act 1992; and Health and Safety in Employment Regulations 1995. 2 Assessment against this unit standard must take place in a workplace environment. Assessment parameters will be dependent on company and site specific equipment, procedures, and practices. Practices must reflect industry best practice and comply with legislative requirements. New Zealand Qualifications Authority 2016 6480 version 4 Page 2 of 4 3 Definitions Company requirements include the policy, procedures, and methodologies of the company. They include legislative and regulatory requirements which may apply across the company or to a specific site. Requirements are documented in the company’s health and safety plans, traffic management plans, contract work programmes, quality assurance programmes, policies, and procedural documents. Manufacturer’s instructions may include specifications, installation, handling, use and maintenance instructions and safety data sheets. Benchmark refers to the starting set-out position from which control marks are derived. Set-out means to set out site by survey method using pegs. Elements and performance criteria Element 1 Demonstrate knowledge of survey and set-out. Performance criteria 1.1 Description of survey and set-out identifies and explains use of trig station, control points, coordinates, tangent points, benchmarks, levels, bearing, and offsets. 1.2 Description explains the importance of preserving precise levelling benchmarks and control points. 1.3 Description explains the importance of accurate distance measurements, taking into account slope and stretch. 1.4 Description explains the importance of drying equipment before storing it. Element 2 Prepare survey equipment. Performance criteria 2.1 Survey equipment is secured in transport vehicle in accordance with surveyor’s instructions. Range 2.2 tripod, theodolite, level, prism, rods, staff, level bubble, plumb-bob, distance-measuring devices, hammer; may include – total station, laser. Level and staff are assembled in accordance with surveyor’s instructions. New Zealand Qualifications Authority 2016 6480 version 4 Page 3 of 4 2.3 Survey equipment is set up, moved, and protected in accordance with surveyor’s instructions. Range 2.4 tripod, theodolite, level, prism, rods, staff, level bubble, plumb-bob, distance-measuring devices, hammer; may include – total station, laser. Rechargeable batteries for survey equipment are checked as adequate for the task, and recharged where necessary, in accordance with company requirements. Range may include – handheld radio equipment. Element 3 Prepare ancillary equipment. Performance criteria 3.1 Quantities of pegs, stakes, paint, and tape are determined from site plans and specifications. 3.2 Personal protective equipment is selected and fitted in accordance with manufacturer’s instructions and company requirements. Range 3.3 overalls, safety footwear; may include – hard hat, eye protection, gloves, reflective vest. Standard rammer, peg bar, and hammer are selected in accordance with site conditions. Element 4 Assist surveyor with set-out. Performance criteria 4.1 Staff, prism, or laser receiver is held plumb using bull’s-eye bubble at benchmark in accordance with surveyor’s instructions. 4.2 Plumb-bob is held steady and above mark for backsight in accordance with surveyor’s instructions. 4.3 Distance is measured from specified points to determine accurate positions for pegs in accordance with surveyor’s instructions. 4.4 Lift pegs are placed plumb in horizontal position and firmed into the ground in accordance with surveyor’s instructions. 4.5 Survey pegs and stakes are placed securely in accordance with surveyor’s instructions. New Zealand Qualifications Authority 2016 6480 version 4 Page 4 of 4 Please note Providers must be accredited by the Qualifications Authority, or an inter-institutional body with delegated authority for quality assurance, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment. Industry Training Organisations must be accredited by the Qualifications Authority before they can register credits from assessment against unit standards. Accredited providers and Industry Training Organisations assessing against unit standards must engage with the moderation system that applies to those standards. Accreditation requirements and an outline of the moderation system that applies to this standard are outlined in the Accreditation and Moderation Action Plan (AMAP). The AMAP also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements. Comments on this unit standard Please contact Infrastructure ITO askus@infratrain.co.nz if you wish to suggest changes to the content of this unit standard. New Zealand Qualifications Authority 2016