9451 28-Jun-16 1 of 6 MARITIME ENGINEERING Operate marine auxiliary steam raising plant and service plant outside normal parameters level: 6 credit: 14 planned review date: January 1998 sub-field: Maritime purpose: This unit standard is for people in the maritime engineering industry. People credited with this unit standard are able to: initiate start up and shut down operations to marine auxiliary steam raising plant and service plant during abnormal operation; maintain output of auxiliary steam raising plant and service plant during abnormal operation; and respond to changes in demand during abnormal operation of auxiliary steam raising plant and service plant. entry information: Open. accreditation option: Evaluation of documentation and visit by NZQA and industry. moderation option: A centrally established and directed moderation system has been established by Maritime Qualifications New Zealand Inc. special notes: 1 Safety rules, regulations, legislation, and their subsequent amendments include: Safety of Life at Sea (SOLAS); Marine Pollution (MARPOL); Resource Management Act (RMA) 1994; Company or Organisational rules and regulations; Manufacturer’s guidelines. New Zealand Qualifications Authority 2016 9451 28-Jun-16 2 of 6 MARITIME ENGINEERING Operate marine auxiliary steam raising plant and service plant outside normal parameters 2 Plant includes: Auxiliary boilers; Electrical systems; Auxiliary services. 3 Parameters include: Pressures; Levels; Flow; Temperatures; Speeds; Volts; Amps; Power; Frequency; Vibrations. 4 Correct personnel include: Chief Engineer; Master; Officer of the Watch. 5 Technical engineering practices are defined by: Company specific operating procedures; Manufacturer’s instructions; Chief Engineer’s instructions; New Zealand Qualifications Authority 2016 9451 28-Jun-16 3 of 6 MARITIME ENGINEERING Operate marine auxiliary steam raising plant and service plant outside normal parameters Elements and Performance Criteria element 1 Initiate start up and shut down operations to marine auxiliary steam raising plant and service plant during abnormal operation. Range: start up and shut down of plant - on request for assistance, necessary for operation of malfunctioning plant, necessary for operation outside of normal parameters and methods. performance criteria 1.1 Operations are planned and carried out in accordance with established safety rules and regulations. 1.2 The timing and degree of preparation required of the plant are consistent with the condition of the plant and the nature of the malfunction. 1.3 Revised parameters and methods mitigate the risk of plant damage and support the continuation of operations. 1.4 Revised parameters and methods are communicated to the operational personnel impacted by the change in plant operating status. 1.5 The sequence and timing of the start up or shut down of plant are consistent with the condition of the plant and the nature of any malfunction. New Zealand Qualifications Authority 2016 9451 28-Jun-16 4 of 6 MARITIME ENGINEERING Operate marine auxiliary steam raising plant and service plant outside normal parameters element 2 Maintain output of auxiliary steam raising plant and service plant during abnormal operation. Range: plant output - on request for assistance, necessary for operation of malfunctioning plant, necessary for operation outside of normal parameters and methods. performance criteria 2.1 Operations are planned and carried out in accordance with safety rules and regulations. 2.2 Revised operating output parameters and methods mitigate the risk of plant damage and support the maintenance of ship operations. 2.3 Demand output is maintained within operating parameters given the plant’s fault or condition. 2.4 Revised parameters and methods are communicated to operational personnel impacted by the change in status of plant operation. 2.5 Plant output is at a level which maintains ship safety. New Zealand Qualifications Authority 2016 9451 28-Jun-16 5 of 6 MARITIME ENGINEERING Operate marine auxiliary steam raising plant and service plant outside normal parameters element 3 Respond to changes in demand during abnormal operation of auxiliary steam raising plant and service plant. Range: alterations in output - on request for assistance, necessary for operation of malfunctioning plant, necessary for operation outside of normal parameters and methods. performance criteria 3.1 The need for alterations to routine operations is identified, confirmed, and communicated to the correct personnel prior to initiation of response action. 3.2 Operations are planned and carried out in accordance with established safety rules and regulations. 3.3 New demand requirements are actioned within a time frame which maintains the safe operation of the ship and the plant. 3.4 Preparations for alterations in output comply with engineering practices. 3.5 The timing and sequence of adjustments during alteration of output meet the requirements of the operation. Range: operation - manual adjustment of controls to achieve new demand, monitoring of remote operation. 3.6 Revised output matches demand within the limitations of the plant fault or condition. 3.7 Revised parameters are communicated to personnel impacted by the change in demand within a time frame which supports the maintenance of their functions. New Zealand Qualifications Authority 2016 9451 28-Jun-16 6 of 6 MARITIME ENGINEERING Operate marine auxiliary steam raising plant and service plant outside normal parameters Comments to: Maritime Qualifications New Zealand Inc Unit Standard Revision PO Box 160 WELLINGTON by January 1998. Please Note: Providers must be accredited by the Qualifications Authority before they can offer programmes of education and training assessed against unit standards. Accredited providers assessing against unit standards must engage with the moderation system that applies to those unit standards. [Please refer to relevant Plan ref: 0054]. New Zealand Qualifications Authority 2016