Adam Brown - Final Presentation

advertisement
CENTRAL HIGH SCHOOL
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
MID-ATLANTIC REGION
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
ADAM BROWN
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
MECHANICAL OPTION
SPRING 2014
• Central High School
• 1st floor renovation
• 2nd floor addition
Central High School
Introduction
Existing Mechanical System
• Location - Mid Atlantic Region
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
• Size - 322,000 sq. ft.
Acoustical Breadth
• Project Cost - $84 million
Construction Breadth
• Completion - February 2015
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Heating Water System
• 1 natural gas boiler
Central High School
Introduction
• Chilled Water System
• 2 air cooled chillers
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
• Air Handling Units
• 20 DOAS units
• Energy recovery wheels
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• 4 pipe fan coil units
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Peak Heating Load – 7766 Mbh
• Peak Cooling Load – 934 Tons
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Peak Electric Demand – 88681 kWh
• Peak Gas Demand – 2094 Therms
• Goals
• REDUCE energy demand
• REDUCE environmental impact
• INCREASE maintainability
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Proposal
• Ground Coupled Heat Pump System
• Heat Pumps
• Packaged ERUs
• Hydronic Pumps
Central High School
• Vertical Bore Layout
Introduction
• Well Field
• Increase depth of well
• Decrease amount of wells
Existing Mechanical System
Thesis Proposal
• Oversize Well Field
• 1000 Tons
• Soccer Field
• Future capacity
• No supplemental boiler / cooling
tower
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Cooling Load [Tons] Well Capacity [ft/Ton]
934
200
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Depth of Well [ft]
400
Number of Wells
500
Well Coverage [ft^2]
314
Number of Wells
500
Total Coverage [ft^2] Soccer Field Area [ft^2]
157080
202213
Central High School
• Well Field Layout
• 38 rows
• 13 wells per row
• Reverse return
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Individual runs
• Emergency shutoff
Central High School
Introduction
• 3 VFD pumps
• 2 primary pumps
• 1 redundant
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
• Increase maintainability
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Central High School
Introduction
Pump Selection
Manufacturer
Bell & Gossett
Model
Series 1510
Flow Rate [gpm]
1000
Head [ft]
200
Impeller Diameter [in]
8
RPM
3550
HP
60
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Heat Pump Selection
• Carrier
• Typical 1 – 3 ton units
• Energy Recovery Unit Selection
• SEMCO
• Packaged
• Water to water source heat pumps
• Enthalpy & Sensible wheels
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Electricity increase 45%
Central High School
Introduction
• Energy decrease 35%
Existing Mechanical System
• Savings of $19074 per year
Thesis Proposal
Acoustical Breadth
Construction Breadth
Electricity
Gas
Total
Conclusion
MECHANICAL OPTION
Electricity [kWh]
Gas [kBtu]
Building [Btu/ft^2-yr]
Source [Btu/ft^2-yr]
768528
3221945
18263
35187
Floor Area [ft^2]
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
ADAM BROWN
Site & Source Energy
Baseline
SPRING 2014
Energy Savings
Baseline
GCHP
Energy [10^6 Btu/yr] Cost/yr [$/yr] Energy [10^6 Btu/yr] Cost/yr [$/yr]
2623
85793
3771
70516
3221.9
3797
0
0
5845
89590
3771
70516
1104826
0
11782
35350
320000
Building Emissions
Baseline
CO2 [lbm/yr]
SO2 [gm/yr]
NOX [gm/yr]
GCHP
1028013
9257
1772
GCHP
1477859
13308
2547
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
NRC TL #
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Description
1 single layer of 1/2 in gypsum board
1 single layer of 1/2 in gypsum board
3.5 in steel studs at 16 in o.c.
TL-94-020
3.5 in glass fiber insulation
resilient channels at 24 in o.c.
1 single layer of 1/2 in gypsum board
1 single layer of 1/2 in gypsum board
STC
60
• Heat Pump closet
• Typical for classrooms
• Achieves mitigation of sound through
wall
• Meets ANSI S12.60 standard
• NC 30 required
• Low frequency issues
Central High School
Introduction
Existing Mechanical System
• Low Frequencies
• Heat Pump emits most noise
• Mitigate sound through ductwork
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
• NC 27 achieved
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Central High School
Introduction
• Cost Difference of $3643.89
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Closet
Ceiling
Acoustical Breadth
Conclusion
MECHANICAL OPTION
Duration [days]
19
17
Coordination Issues
2
4
• Duration Difference of 2 days
• Coordination Issues Difference of 2
Construction Breadth
ADAM BROWN
Cost [$]
63878.58
60234.69
SPRING 2014
• Goals
• REDUCE energy demand
• REDUCE environmental impact
• INCREASE maintainability
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Construction Breadth
Conclusion
MECHANICAL OPTION
• GCHP
• REDUCED site energy
• INCREASED environmental impact
• INCREASED maintainability
• Heat Pump Closet
• MEETS ANSI standards
• NOT feasible to construct
Acoustical Breadth
ADAM BROWN
• Conclusions
SPRING 2014
Central High School
Acknowledgements
Introduction
Jacobs
SHW Group
Thesis Advisor
AE Faculty
Family & Friends
Classmates
Existing Mechanical System
Thesis Proposal
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
THANK YOU!
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
References
Central High School
• SHW Group LLP “Final Bid Set”. Reston, Virginia.
Introduction
• Central High School “Master Specifications”.
Existing Mechanical System
• ASHRAE. Standard 62.1-2010, Ventilation for Acceptable Indoor Air Quality. Atlanta,
GA. American Society of Heating Refrigeration and Air Conditioning Engineers, Inc.
Thesis Proposal
• ASHRAE. Standard 90.1-2010, Energy Standards for Buildings Except Low-Rise
Residential Buildings. Atlanta, GA. American Society of Heating Refrigeration and Air
Conditioning Engineers, Inc.
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
• ANSI/ASA S12.60-2010, American National Standard Acoustical Performance
Criteria, Design Requirements, and Guidelines for Schools, Part 1: Permanent
Schools. Melville, NY. Acoustical Society of America.
Acoustical Breadth
Construction Breadth
• Halliwell, R.E., Nightingale, T. R. T., Warnock, A. C. C., Birta, J. A. Gypsum Board
Walls: Transmission Loss Data. 1998. NRC-CNRC.
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
• Mossman, Melville. Plumbing Cost Data, 2014. N.p.: Means, Incorporated, R. S,
2013. Print.
• Mossman, Melville. Mechanical Cost Data, 2014. N.p.: Means, Incorporated, R.
S, 2013. Print.
• Phelan, Marilyn. Assemblies Cost Data, 2014. N.p.: Means, Incorporated, R. S,
2013. Print.
• Faculty Consultations
Central High School
Introduction
Existing Mechanical System
Thesis Proposal
Questions?
Mechanical Breadth
• GCHP Sizing / Layout
• Energy Savings
Acoustical Breadth
Construction Breadth
Conclusion
ADAM BROWN
MECHANICAL OPTION
SPRING 2014
Download