Daniel Suter Unknown Data Center Somewhere, USA 4.12.2011

advertisement
Unknown Data Center
Somewhere, USA
4.12.2011
Daniel Suter
Construction Management
AE Senior Thesis Presentation
The Pennsylvania State University
Unknown Data Center
Somewhere, USA
4.12.2011
Presentation Outline:
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
•
Electrical Breadth
Tablet PC’s for Commissioning
Acknowledgements
Questions
Daniel Suter
Construction Management
AE Senior Thesis Presentation
The Pennsylvania State University
PROJECT OVERVIEW
Presentation Outline:
Project Overview
o Owner – Anonymous
Façade Redesign/Tilt-Up Construction
o Occupancy Type - Business
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Conclusions
Acknowledgements
Questions
Unknown Data Center
Somewhere, USA
o Size - 17,445 SF South Expansion
o Cost - $ 50 Million (Design+Construction)
o Construction Duration - December 2008 – August 2010
o Delivery Method - Design-Bid-Build
oProject Team
CM – Turner Construction
Architect/Engineers – Sigma 7 Design Group
Civil – Birdsall Services Group
Structural – Goldstein Associates
3
Daniel Suter | Construction Management | 4.12.2011
PROJECT OVERVIEW
Presentation Outline:
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Conclusions
Acknowledgements
o Building Enclosure
•
Architectural Precast Panels
•
Total of 33 Panels to enclose the building
•
Penthouse enclosed with EIFS
Questions
o Existing Roof Structure:
•
Primary Roof - Composite, EPDM w/ Concrete Pavers
•
Penthouse Roof – Composite, Standing Seam Metal Roof
4
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Façade Redesign/Tilt-Up Construction
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
•
Area of Potential Improvement
•
Proposed Design
•
Tilt-Up Sequence
•
Redesigning the 20’ Parapet Wall
•
Cost Analysis
•
Tilt-up vs. Precast
•
Schedule Impact
•
Conclusion
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Acknowledgements
o Opportunity
o Objective
•
Lower Material/Labor Cost
•
Accelerate Schedule
Questions
5
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Façade Redesign/Tilt-Up Construction
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
•
Area of Potential Improvement
•
Proposed Design
•
Tilt-Up Sequence
•
Cost Analysis
•
Schedule Impact
•
Conclusion
o Conceptual Design:
o Deduction of 10’
o Design Criteria:
Alternate Roof Type – Photovoltaic System
o Line of Sight
Tablet PC’s for Commissioning
o Penthouse vs. Building Enclosure
Acknowledgements
Questions
6
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Façade Redesign/Tilt-Up Construction
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
•
Area of Potential Improvement
•
Proposed Design
•
Tilt-Up Sequence
•
Cost Analysis
•
Schedule Impact
•
Conclusion
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Acknowledgements
o Sequence
o Follow the same sequence as Precast (33)
o Panels are formed and stacked onsite
o Site Layout
o Need to Revise Site Layout Plan
o Tilt-up Increases Site Congestion
Questions
7
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Façade Redesign/Tilt-Up Construction
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
•
Area of Potential Improvement
•
Proposed Design
•
Tilt-Up Sequence
o $41.5/ SF – Precast
•
Cost Analysis
o $15/ SF – Tilt-up
•
Schedule Impact
•
Conclusion
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Acknowledgements
o RS Means:
o Total Savings
o $160,000 – Includes design
o $327,000 – Includes design and method
Questions
8
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Façade Redesign/Tilt-Up Construction
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
•
Area of Potential Improvement
•
Proposed Design
•
Tilt-Up Sequence
•
Cost Analysis
o Precast – 3.3 panels / day
•
Schedule Impact
o Tilt-up – 4 panels / hour
•
Conclusion
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
o Schedule Impact:
o 33 panels in a nine hour work day
o 9 days cut off cut from the critical path
Acknowledgements
Questions
9
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Façade Redesign/Tilt-Up Construction
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
o Conclusion:
•
Area of Potential Improvement
•
Proposed Design
o Total Savings of 327,000
•
Tilt-Up Sequence
o 9 Days off the Critical Path
•
Cost Analysis
•
Schedule Impact
•
Conclusion
o Recommendations:
o The owner should pursue Tilt-up Method, but take note on the
Alternate Roof Type – Photovoltaic System
safety issues and quality concerns.
Tablet PC’s for Commissioning
o Highly recommended for the Redesign – Savings of $160,000
Acknowledgements
o Money could pay for PV system
Questions
10
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Alternate Roof Type – Photovoltaic System
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
o Opportunity
•
Area of Improvement
o Building is Oriented South
•
Proposed PV System
o Opportunity to utilize the Penthouse roof for design
•
Electrical Breadth
•
Cost Analysis/Schedule Impact
•
Conclusion
Tablet PC’s for Commissioning
Acknowledgements
Questions
o Objective
o Design a Preliminary Photovoltaic System
o Perform a Financial Feasibility Study
o Reduce Energy Cost of the Building
11
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Alternate Roof Type – Photovoltaic System
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
•
Area of Improvement
•
Proposed PV System
•
Electrical Breadth
•
Cost Analysis/Schedule Impact
•
Conclusion
o What will the power from the panels essentially replace?
o Conclusion:
o The design will be able to power all of the lighting fixtures in the
building.
Tablet PC’s for Commissioning
o 125 panels required – Design consist of 129 panels
Acknowledgements
o 105 panels located on west penthouse
Questions
o 24 panels located on east penthouse
12
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Alternate Roof Type – Photovoltaic System
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
o Calculate Optimal Tilt in Panels
•
Area of Improvement
•
Proposed PV System
o West Penthouse – 40°
•
Electrical Breadth
o East Penthouse - 32°
•
Cost Analysis/Schedule Impact
•
Conclusion
Tablet PC’s for Commissioning
Acknowledgements
o Determine Most Efficient Panel:
o Sanyo Electric, HIP-200BA19/20
Questions
13
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Alternate Roof Type – Photovoltaic System
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
•
Area of Improvement
•
Proposed PV System
•
Electrical Breadth
•
Cost Analysis/Schedule Impact
•
Conclusion
o PV Watts Calculations:
o System Produces 31,000 kWh / Year
o Yearly Savings of $3900
Tablet PC’s for Commissioning
Acknowledgements
Questions
14
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Alternate Roof Type – Photovoltaic System
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
o Energy Distribution:
•
Area of Improvement
o DC – Inverter – AC – Grid system
•
Proposed PV System
o Inverter:
•
Electrical Breadth
•
Cost Analysis/Schedule Impact
•
Conclusion
Tablet PC’s for Commissioning
o Sunny Tower ST 36
o Easy mount
o Includes all DC/AC connections
Acknowledgements
Questions
o Voltage Drop:
o DC - Use #8 AWG Wire
15
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Unknown Data Center
Somewhere, USA
Alternate Roof Type – Photovoltaic System
Project Overview
Façade Redesign/Tilt-Up Construction
o Schedule Impact:
Alternate Roof Type – Photovoltaic System
•
Area of Improvement
•
Proposed PV System
•
Electrical Breadth
•
Cost Analysis/Schedule Impact
•
Conclusion
Tablet PC’s for Commissioning
o Once the penthouses are constructed, the PV contractor can start
o Main Concern is Crane Usage
o Should not affect the critical path
o Total System Cost:
Acknowledgements
o $250,000
Questions
o W/ Rebates and Incentives: = $160,000
o Potential Buy back – 17-18 years
Daniel Suter | Construction Management | 4.12.2011
16
Presentation Outline:
Alternate Roof Type – Photovoltaic System
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
•
Area of Improvement
•
Proposed PV System
•
Electrical Breadth
•
Cost Analysis/Schedule Impact
•
Conclusion
o Conclusion :
o Up front cost - $160,000
o Potential Buyback of 17-18 years
o Does not affect schedule’s critical path
o Recommendation:
Tablet PC’s for Commissioning
o Highly recommended for the owner to consider this preliminary
Acknowledgements
design.
Questions
o Owner has potential to pay for the whole up front cost of this
system
Daniel Suter | Construction Management | 4.12.2011
17
Presentation Outline:
Tablet PCs for Commissioning
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
o Tablet PC Use:
o Quality Control
o Punch List Management
•
Introduction
•
Potential Benefits/Challenges
•
Case Study
o Materials Management
•
Conclusion
o Safety
o Production Tracking
Acknowledgements
o Commissioning
Questions
o BIM in the Field
o Visual Reporting
18
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Unknown Data Center
Somewhere, USA
Tablet PCs for Commissioning
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
•
Introduction
•
Potential Benefits/ Challenges
o Potential Benefits:
o Store PDF and paper forms of the budget, schedule, and specs.
o Easier to organize and manage while onsite
•
Case Study
o Record performance of mechanical equipment
•
Conclusion
o Record issues during the commissioning process
Acknowledgements
o Reference the data on future projects
o Challenges:
o Tablet are exposed to hazards on the construction jobsites
o Weather may affect the life of the tablet
o Lack of knowledge in this industry
oUsing the tablets to it’s full advantage
Questions
19
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Tablet PCs for Commissioning
o Case Study (Maryland General Hospital)
o Barton Malow – CM
Introduction
o Includes an array of indoor AHU
•
Potential Benefits/Challenges
o 650 –ton electric chillers/cooling towers
•
Case Study
•
Conclusion
Questions
“The same tasks that used to take us days to manage and track,
now take just hours”
o $57 Million renovation
•
Acknowledgements
Unknown Data Center
Somewhere, USA
o Tablets for commissioning
o Collected data and documents as one integrated unit with their 3D
model.
o Eliminated all data re-entry
o Commissioning and their BIM Model totally in synched
Daniel Suter | Construction Management | 4.12.2011
20
Presentation Outline:
Tablet PCs for Commissioning
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
•
Introduction
•
Potential Benefits/Challenges
•
Case Study
•
Conclusion
Acknowledgements
Questions
o Recommendations:
o All CM firms to use tablet PCs for the whole construction process
o For commissioning – highly recommended for complex MEP
projects (hospitals, data centers)
o Conclusion:
o Hard to determine actual value in cost and schedule acceleration.
21
Daniel Suter | Construction Management | 4.12.2011
Presentation Outline:
Acknowledgements
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
o Academic Acknowledgments
Alternate Roof Type – Photovoltaic System
o Penn State AE Faculty
Tablet PC’s for Commissioning
o Dr. Rob Leicht
Acknowledgements
Questions
o Industry Acknowledgements:
o Turner Construction
o Sigma 7 Design Group
o Special Thanks to:
o Frank Forcino @ Turner Construction
o Tom Atrens @ Turner Construction
o Family and Friends
Daniel Suter | Construction Management | 4.12.2011
22
Presentation Outline:
Questions
Unknown Data Center
Somewhere, USA
Project Overview
Façade Redesign/Tilt-Up Construction
Alternate Roof Type – Photovoltaic System
Tablet PC’s for Commissioning
Acknowledgements
Questions
23
Daniel Suter | Construction Management | 4.12.2011