PIKES PEAK HILL CLIMB RACE SKYBOT Document Control File Name: SkyBot_LessonsLearned_v1.0.doc This document is confidential and should not be reproduced, distributed, electronically forwarded to those other than who are intended to receive this document by it’s author without the permission. History Version No. Date Created / Modified by Reviewed by Changes Made SkyBot Pikes Peak Hill Climb Race SkyBot_LessonsLearned_v1.0 1. Introduction The Lessons Learned document is intended as a place to record significant items that have been identified during the course of each project phase that could have an impact (positive or negative) in subsequent project phases or other projects. A description of each lesson should be documented along with any remedial action that may be needed to correct or prevent occurrence in later phases of this project. Note that not only negative items need be recorded. If the project team feels that there are positive lessons have been learned, they should be documented and shared with all team members as well as with future projects. If the team identifies any recommended solutions to Lessons Learned, they should be recorded here. Note that there may be Lessons Learned that are also appropriate for entry in the Project Issues Log along with assignment(s) for corrective action. 2. Lessons Learned Project Name: Project Ref. No. Customer: Customer Contact Phase M0 – Charter [Feasibility / Planning] Lesson(s): 1) 2) M1 – Contract [Definition] Lesson(s): 1) 2) M2 – Design [Solution Design] Lesson(s): 1) 2) M3 – Build [Solution Development] Lesson(s) 1) 2) Page 2 of 3 SkyBot Pikes Peak Hill Climb Race SkyBot_LessonsLearned_v1.0 M4 – Test [Solution Test] Lesson(s): 1) 2) M5 – Limited Production [Transition] Lesson(s): 1) 2) M6 – Production [Infant Care / Production] Lesson(s) 1) 2) Page 3 of 3