Requirements for Establishing Interconnections for Energy Storage Devices Effective July 1, 2015 Purpose The purpose of this business practice is to identify the requirements to establish an interconnection for energy storage devices. This business practice applies to all Interconnection Customers unless explicitly contradicted by existing contract terms. Definitions Small Generating Facility – The Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generating Facility Capacity shall mean the net capacity of the generating Facility and the aggregate net capacity of the Generating facility where it includes multiple energy production devices. Practice Consistent with FERC Order 792, Puget Sound Energy (PSEI) shall consider all energy storage devices as generation subject to the Small Generation Interconnection Process. All energy storage devices shall also comply with Puget Sound Energy’s posted Technical Specifications, as appropriate. Interconnection requests will evaluate the Generating Facility Capacity to include any incremental increases to the Generating Facility Capacity or material modifications. Initiating the Interconnection Process Customers desiring to initiate the Small Generation Interconnection Procedure will be required to follow Annex B of PSEI’s Open Access Transmission Tariff. Customers desiring to initiate the Large Generation Interconnection Procedure are required to follow Annex A of PSEI’s tariff. If there are questions regarding specific requests for interpretations, Customers will submit their specific requests in writing. PSEI will then contact the Customer to obtain further technical information about the project to permit PSEI to sufficiently evaluate the request. Requests should be sent to the following address: Puget Sound Energy Manager, Transmission Policy and Contracts P.O. Box 97034, EST-06E Bellevue, WA 98009-9734 Attn: Debbie Yount Contact for Assistance: transmaster@pse.com June 8, 2015 Page 1 Revision History Version Initial Draft 0.0 June 8, 2015 Posted Date Change Summary n/a – 6/5/2015 Initial draft for internal review and comment 6/8/2015-6/26/2015 Initial draft for external comment Page 2