Bid # 2047- Pico Rivera Educational Center Project
DSA #03-116946
Addendum # 3
May 16, 2016
To: All Prospective Bidders
THE FOLLOWING REVISIONS AND/OR CLARIFICATIONS SHALL BE MADE TO THE BIDDING
REQUIREMENTS AND CONTRACT DOCUMENTS. REVISE AND AMEND THE DOCUMENTS FOR
THE ABOVE NAMED PROJECT IN ACCORDANCE WITH THIS ADDENDUM. THE BID SHALL
REFLECT THESE ADDENDUM CHANGES AND EACH BIDDER SHALL MAKE REFERENCE IN
THEIR BID TO THIS ADDENDUM. ALL BIDDING REQUIREMENTS AND CONTRACT DOCUMENTS
SHALL APPLY TO THIS ADDENDUM AS ORIGINALLY INDICATED IN THE APPLICABLE
PORTIONS OF THE CONTRACT DOCUMENTS, UNLESS OTHERWISE MODIFIED BY THIS
ADDENDUM.
Acknowledge receipt of this Addendum in the space provided on Document 00210 – Bid Proposal. Failure
to do so may result in the bid being deemed non-responsive.
The Addendum consists of the following changes:
1. ADMINISTRATIVE ITEMS:
1.1. REPLACE: Section 00210 Bid Proposal with the attached revised Section 00210 Bid Proposal
1.2. ADD: Section 00212 Site Visit Certification
1.3. REPLACE: Section 00300 Agreement with the attached revised Section 00300 Agreement
1.4. REPLACE: Section 00800 Special Conditions with the attached revised Section 00800 Special
Conditions
1.5. ADD: Section 01010 Phasing of the Work
1.6. ADD: Section 01010 Phasing of the Work Appendix A
RIO HONDO COMMUNITY COLLEGE – Bid #2047
Page 1 of 2
ADDENDUM NO 3
May 16, 2016
2. TECHNICAL SPECIFICATIONS:
2.1. ADD: Audio Visual Standard Specification
2.2. ADD: Exhibit 1 to the scope of work. Contact Jim Wagner at (909) 790-0296 for pricing, delivery and
installation for a total of seven classrooms.
3. DRAWINGS:
3.1. ADD: Drawing E001
3.2. ADD: Drawing E008
3.2. ADD: Drawing E202
3.2. ADD: Drawing E203
4. BIDDERS QUESTIONS:
RESPONSE TO QUESTIONS FROM BIDDERS
The following questions were received as Bid RFIs. Enclosed are responses to each. The followingrevisions
and clarifications shall become a part of the Contract Documents upon award of Bid. All bidders are required to
incorporate all necessary changes, additions, or deductions into their proposals.
4.1
Q: The Bidders Check List states Item D, Site Visit Certification must be submitted with Bid
Proposal. Document was not located in the Project Manual. Is the Site Visit Certification
required to be submitted with the Bid Proposal?
A: Yes, please see attached Section 00212 Site Visit Certification
5. ENCLOSURES:
Enclosures:
 REVISED Section 00210 Bid Proposal (6 pages)
 Section 00212 Site Visit Certification (1 page)
 REVISED Section 00300 Agreement (2 pages)
 REVISED Section 00800 Special Conditions (8 pages)
 Section 01010 Phasing of the Work (3 pages)
 Section 01010 Phasing of the Work Appendix A (2 pages)
 Exhibit, Audio Visual Equipment List 1 (1 page)
 Audio Visual Standard Specification (2 pages)
 Drawing E001 (1 page)
 Drawing E008 (1 page)
 Drawing E202 (1 page)
 Drawing E203 (1 page)
END OF ADDENDUM # 3
RIO HONDO COMMUNITY COLLEGE – Bid #2047
Page 2 of 2
ADDENDUM NO 3
May 16, 2016
SECTION 00210
BID PROPOSAL
TO:
RIO HONDO COMMUNITY COLLEGE DISTRICT, a California Community
College District, acting by and through its Board of Trustees (“District"), 3600 Workman
Mill Road, Whittier, California 90601.
FROM:
(Name of Bidder as listed on License)
(Address)
(City, State, Zip Code)
(Telephone)
(Fax)
(Email)
(Name(s) of Bidder's Authorized Representative(s) & Title)
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
BID PROPOSAL
PAGE 1 OF 6
SECTION 00210
1.01
Bid Proposal.
A.
Bid Proposal Amount. Pursuant to and in compliance with the Notice to
Contractors Calling for Bids, the Instructions for Bidders and the other documents
relating thereto, the undersigned Bidder, having reviewed the Instructions for
Bidders and all other Contract Documents and upon compliance with all
requirements therein with reference to the submittal of this Bid Proposal, hereby
proposes and agrees to perform the Contract including, without limitation, all of
its component parts; to perform everything required to be performed; to provide
and furnish any and all of the labor, materials, tools, equipment, applicable taxes,
and services necessary to perform the Work of the Contract in strict compliance
with the Contract Documents and complete in a workmanlike manner all of the
Work required for the Project described as:
Bid #2047 – Pico Rivera Educational Center at 9515 Haney Street, Pico
Rivera, Ca 90660
for the sum of:
Total Bid Amount: $____________________________________________
(Total Bid Amount in Figures)
_______________________________________________________________
(Total Bid Amount in Words)
Allowance Amount: $__90,000.00__
___
(Total Bid Amount in Figures)
Ninety Thousand Dollars__________
(Total Bid Amount in Words)
_______
for the sum of:
Total Base Bid and Allowance Amount $_______________________________
(Total Base Bid Amount in Figures)
_______________________________________________________________
(Total Base Bid Amount in Words)
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
BID PROPOSAL
PAGE 2 OF 6
SECTION 00210
B.
Acknowledgment of Bid Addenda. In submitting this Bid Proposal, the
undersigned Bidder acknowledges receipt of all Bid Addenda issued by or on
behalf of the District, as set forth below. The Bidder confirms that this Bid
Proposal incorporates and is inclusive of, all items or other matters contained in
Bid Addenda.
_______ No Addenda Issued
(initial)
_______ Addenda Nos. _________________ received, acknowledged and
(initial) incorporated into this Bid Proposal.
C.
Alternate Bid Items. The Bidder’s price proposal(s) for Alternate Bid Items
is/are set forth in the form of Alternate Bid Item Proposal included herewith. The
Bidder acknowledges that the award of the Contract, if at all, shall be in
accordance with the Instructions for Bidders.
1.02
Rejection of Bid; Holding Open of Bid. It is understood that the District reserves the
right to reject this Bid Proposal and that this Bid Proposal shall remain open and not be
withdrawn for the period of time specified in the Call for Bids, except as provided by law.
1.03
Documents Comprising Bid Proposal. The undersigned Bidder has submitted as its Bid
Proposal the following: Bid Proposal (00210), List of Subcontractors (00215), NonCollusion Declaration (00220), DIR (00230) and Bid Security (Cash, Cashier’s Check,
Certified Check or Bid Bond – 00260),Statement of Bidder’s Qualifications (00240) The
Bidder acknowledges that if this Bid Proposal and the foregoing documents are not fully
in compliance with applicable requirements set forth in the Call for Bids, the Instructions
for Bidders and in each of the foregoing documents, the Bid Proposal may be rejected as
non-responsive.
1.04
Award of Contract. It is understood and agreed that if written notice of the acceptance
of this Bid Proposal and award of the Contract thereon is mailed or delivered by the
District to the undersigned after the opening of Bid Proposals and within the time this Bid
Proposal is required to remain open or at any time thereafter before this Bid Proposal is
withdrawn, the undersigned will execute and deliver to the District the Agreement in the
form attached hereto in accordance with the Bid Proposal as accepted within five (5)
working days after notification of acceptance and award. Concurrently with delivery of
the executed Agreement to the District, the Bidder awarded the Contract shall deliver to
the District: (1) the Labor and Material Payment Bond; (2) the Performance Bond; (3) the
Drug-Free Workplace Certificate; (4) Certificates of Insurance evidencing all insurance
coverages required to be provided under the Contract Documents; (5) the Certificate of
Workers’ Compensation Insurance; and (6) Letter of Assent for Project Labor Agreement.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
BID PROPOSAL
PAGE 3 OF 6
SECTION 00210
The Work under the Contract Documents shall be commenced by the undersigned Bidder,
if awarded the Contract, on the date stated in the District's Notice to Proceed issued
pursuant to the Contract Documents. Completion of the Work and all Interim Milestones
shall be achieved within the Contract Time and Interim Milestones specified in the
Contract Documents.
1.05
Notices. All notices or other correspondence shall be addressed to the District and the
Bidder at their respective addresses set forth herein. Notices shall be effective only if in
writing and in conformity with the requirements for service of notices set forth in the
Contract Documents.
1.06
Contractor's License. The undersigned Bidder is currently and duly licensed in
accordance with the California Contractors License Law, California Business &
Professions Code §§7000 et seq., under the following:
License Number:
Class
Expiration Date
Class
Expiration Date
Class
Class
Expiration Date
Expiration Date
By executing this Bid Proposal, the Bidder hereby certifies that: (a) it is duly licensed, in
the necessary class(es), for performing the Work of the Contract Documents; (b) that such
license shall be in full force and effect throughout the duration of the performance of the
Work under the Contract Documents; and (c) that all Subcontractors providing or
performing any portion of the Work of the Contract Documents shall be so similarly and
appropriately licensed to perform or provide such portion of the Work.
1.07
Designation of Subcontractors. In compliance with the Subletting and Subcontracting
Fair Practices Act (California Public Contract Code §§4100, et seq.) and amendments
thereof, each Bidder shall set forth in the Subcontractors List: (a) the name and location
of the place of business of each Subcontractor who will perform work or labor or render
services to the Bidder in or about the construction of the Work to be performed under the
Contract Documents in an amount in excess of one-half of one percent (0.5%) of the
Bidder's Bid Proposal; and (b) the trade and/or portion of the Work which will be
performed by each listed Subcontractor. The Bidder shall list only one Subcontractor for
each trade and/or portion of the Work as is defined by the Bidder in its Bid Proposal. If a
Bidder fails to list a Subcontractor for a portion of the work in excess of one-half of one
percent (0.5%) of the Bidder’s Bid Proposal or if the Bidder specifies more than one
Subcontractor for the same portion of Work to be performed under the Contract
Documents valued in excess of one-half of one percent (0.5%) of the Bidder's Bid
Proposal amount, the Bidder shall be deemed to have agreed that it is fully qualified to
perform that portion of the Work itself and that it shall perform that portion of the Work.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
BID PROPOSAL
PAGE 4 OF 6
SECTION 00210
1.08
Confirmation of Figures. By submitting this Bid Proposal, the Bidder confirms that it
has checked all of the above figures and understands that neither the District nor any of its
agents, employees or representatives shall be responsible for any errors or omissions on
the part of the undersigned Bidder in preparing and submitting this Bid Proposal.
1.09
Acknowledgment and Confirmation. The undersigned Bidder acknowledges its
receipt, review and understanding of the Drawings, the Specifications and other Contract
Documents pertaining to the proposed Work. The undersigned Bidder certifies that the
Contract Documents are, in its opinion, adequate, feasible and complete for providing,
performing and constructing the Work in a sound and suitable manner for the use
specified and intended by the Contract Documents. The undersigned Bidder certifies that
it has, or has available, all necessary equipment, personnel, materials, facilities and
technical and financial ability to complete the Work for the amount bid herein within the
Contract Time and in accordance with the Contract Documents. The undersigned Bidder
certifies that its bid amount includes funds sufficient to allow the Bidder to comply with
all applicable local, state and federal laws and regulations governing the labor and
services to be provided for the performance of the Work of the Contract and shall
indemnify, defend and hold District harmless from and against any and all claims,
demands, losses, liabilities and damages arising out of or relating to Bidder’s failure to
comply with applicable law in this regard.
By:
(Signature)
(Corporate Seal)
(Typed or Printed Name of Bidder’s Authorized Representative)
Title:
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
BID PROPOSAL
PAGE 5 OF 6
SECTION 00210
ALTERNATE BID ITEM PROPOSAL
Bidder must provide a proposal for each Additive Alternate Bid item set forth herein;
failure to do so will result in rejection of the Bid Proposal for non-responsiveness. The
proposal price for the Alternate Bid Item shall be exclusive of the base bid proposal
amounts in Paragraph 1 of the Bid Proposal.
Bidder Name: _________________________________________________________
Additive Alternates
Scope of Work: Provide all labor, transportation, miscellaneous materials, equipment,
supplies and supervision. Work is to include but not limited to the scope of work
outline in the plans and specifications.
Alternate Bid Item No. 1 Additive
Exhibit 1
Audio Visual Equipment - Total Price
_______________________________________________________ ( $
Amount in Words
)
By:
(Signature)
(Corporate Seal)
(Typed or Printed Name of Bidder’s Authorized Representative)
Title:
____________________________________
END OF SECTION
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
BID PROPOSAL
PAGE 6 OF 6
SECTION 00212
SITE VISIT CERTIFICATION
I certify that I have visited the site of the proposed work and have fully acquainted myself with the
conditions relating to construction and labor. I fully understand the facilities, difficulties, and
restrictions attending the execution of the work under contract.
I certify under penalty of perjury under the laws of the State of California that the foregoing is true
and correct.
I fully indemnify RIO HONDO COMMUNITY COLLEGE, The Architect, the Construction
Manager, and all of their respective officers, agents, employees, and consultants from any damage, or
omissions, related to conditions that could have been identified during my visit(s) to the site.
____________________________________
(Signature of Bidder)
____________________________________
(Typed name of Bidder)
_____________________________________
(Typed Company Name of Bidder)
SUBSCRIBED BEFORE ME on this ______ day of _______________, 2014
______________________________________
(Notary Public)
My commission expires: _________________
RIO HONOD COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER
ADDEDNUM NO.3 05/16/16
SITE VISIT CERTIFICATION
00212
(rev. 04-09-11)
PAGE 1 OF 1
SECTION 00300
AGREEMENT
THIS AGREEMENT is made this
day of
, 20
, in the County
of Los Angeles, State of California, by and between RIO HONDO COMMUNITY COLLEGE
DISTRICT, a California Community College District, hereinafter called the “District” and
, hereinafter called the “Contractor”, with a
principal place of business located at ______________________________.
WITNESSETH, that the District and the Contractor in consideration of the mutual
covenants contained herein agree as follows:
1.01
The Work. Within the Contract Time and for the Contract Price, subject to adjustments
thereto pursuant to the Contract Documents, the Contractor shall perform and provide all
necessary labor, materials, tools, equipment, utilities, services and transportation to
complete in a workmanlike manner all of the Work required in connection with the work
of improvement commonly referred to as: BID #2047 Pico Rivera Educational Center
Project at 9515 Haney Street, Pico Rivera, Ca 90660
Contractor shall complete all Work covered by the Contract Documents, including
without limitation, the Drawings and Specifications prepared by the Architect, and other
Contract Documents enumerated in Article 5 below, along with all modifications and
addenda thereto issued in accordance with the Contract Documents.
1.02
Contract Time. The Work shall be commenced on the date stated in the District’s
Notice to Proceed. The Contractor shall achieve Substantial Completion of the Work
within SEVENTY-NINE (79) calendar days after the date stated in the District’s Notice
to Proceed (see Section 1.01 of the Contract Special Conditions and as otherwise
provided in the Contract Documents).
1.03
Contract Price. The District shall pay the Contractor as full consideration for the
Contractor’s full, complete and faithful performance of the Contractor’s obligations
under the Contract Documents, subject to any additions or deduction as provided for in
the Contract Documents, the Contract Price of
Dollars ($
). The Contract Price is based upon the
Contractor’s Base Bid Proposal and the following Alternate Bid Items, if any:
The District’s payment of the Contract Price shall be in accordance with the Contract
Documents.
1.04
Liquidated Damages. In the event of the failure or refusal of the Contractor to achieve
Completion of the Work of the Contract Documents within the Contract Time, as
adjusted, the Contractor shall be subject to assessment of Liquidated Damages in
accordance with the Contract Documents.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
AGREEMENT
PAGE 1 OF 2
1.05
The Contract Documents. The Contract Documents consist of the following:
Notice to Contractors Calling for Bids
Instructions for Bidders
Bid Proposal
Subcontractors List
Non-Collusion Declaration
DIR
Bid Bond
Agreement
Statement of Bidders Qualifications
Construction Forms
Soils Report
1.06
Civil Engineering Survey
Labor and Material Payment Bond
Performance Bond
Certificate of Workers Compensation
Drug Free Workplace Certification
General Conditions
Special Conditions
Labor Compliance Program
Drawings
Specifications
Guarantee
Authority to Execute. The individual(s) executing this Agreement on behalf of the
Contractor is/are duly and fully authorized to execute this Agreement on behalf of
Contractor and to bind the Contractor to each and every term, condition and covenant of
the Contract Documents.
IN WITNESS WHEREOF, this Agreement has been duly executed by the District and
the Contractor as of the date set forth above.
DISTRICT
CONTRACTOR
RIO HONDO COMMUNITY COLLEGE
DISTRICT,
a California Community College District
(Contractor’s License Number)
By:
By:
Vice President, Business
Name:
Title:
(Corporate Seal)
END OF SECTION
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
AGREEMENT
PAGE 2 OF 2
SECTION 00800
SPECIAL CONDITIONS
PART 1
1.01
1.02
Contract Time.
A.
Substantial Completion of the Work. The Work shall be commenced on the date
stated in the Notice to Proceed issued by the District to the Contractor and shall be
completed within 65 consecutive calendar days from and after the date stated in
the Notice to Proceed (Reference Article 7 of the General Conditions).
B.
Interim Milestone Completion Dates. Notwithstanding any provision of the
Contract Documents to the contrary, Contractor shall sequence and coordinate the
work so that portions of the work are completed as required by the Work Segment
Plan in accordance with start and completion dates.
Liquidated Damages.
A.
Delayed Completion of the Work. Pursuant to Article 7 of the General
Conditions, the Contractor shall be subject to the assessment and withholding of
Liquidated Damages for failure to achieve Substantial Completion of the Work
within the Contract Time as indicated in item 1.01.A, above. Liquidated Damages
shall be at the rate of $2,000 per day until Work of Construction Segments IA and
IB as defined on Section 01010 is achieved.
B.
Delayed Final Completion of the Work. Pursuant to Article 7 of the General
Conditions, the Contractor shall be subject to the assessment and withholding of
Liquidated Damages for failure to achieve Final Completion of the Work in
accordance with the Contract Documents. Liquidated Damages shall be at the rate
of $2,000 per day until Final Completion of the Work is achieved.
C.
Delayed Submittals. The per day assessment of Liquidated Damages for
Contractor’s delayed submission of Submittals pursuant to Article 4.8.2.1 of the
General Conditions is $2,000 per day per Submittal until the required Submittal is
submitted.
D.
Other Milestone Delays. Refer to Appendix A for project milestones and
associated liquidated damages
E.
Cumulative Assessment of Liquidated Damages. If the Contractor fails to
timely delivery of the Submittals, fails to achieve Final Completion of the Work
Segments as set forth herein, or fails to achieve Substantial or Final Completion of
the Work, the Contractor shall be subject to assessment and withholding of
Liquidated Damages in the amounts set forth above for each such portion of the
Work which is not timely delivered or completed within the time allocated for each
portion of the Work.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 1 OF 8
1.03
Insurance
Insurance Provided By District.
Not Applicable.
B.
Insurance Provided by Contractors/Subcontractors.
Pursuant to Article 6.12 of the General Conditions, the Contractor, all
Subcontractors and Sub-Subcontractors (except Excluded Parties covered under
Article 6.18) shall provide and maintain the following insurance coverage’s, with
minimum coverage amounts as set forth below:
1.
Workers Compensation Insurance
In accordance with limits established by law.
2.
Employers Liability Insurance
$2,000,000
3.
Commercial General Liability Insurance
Per Occurrence
Aggregate
$1,000,000
$2,000,000
Automobile Liability
Bodily Injury/Property Damage per Occurrence
$1,000,000
Aircraft Liability Insurance (if applicable)
Per Occurrence
Aggregate
$5,000,000
$5,000,000
4.
5.
C.
Insurance Provided by Excluded Parties.
Pursuant to Article 6.18 of the General Conditions, the Excluded Parties shall
provide and maintain the following insurance coverage’s, with minimum coverage
amounts as set forth below:
1.
Workers Compensation Insurance
In accordance with limits established by law.
2.
Employers Liability Insurance
$1,000,000
3.
Commercial General Liability Insurance
Per Occurrence
Aggregate
$1,000,000
$3,000,000
Automobile Liability
Bodily Injury/Property Damage Per Occurrence
$1,000,000
Aircraft Liability Insurance (if applicable)
Per Occurrence
Aggregate
$5,000,000
$5,000,000
4.
5.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 2 OF 8
D.
Pollution Legal Liability Insurance.
Pursuant to Article 6.21 of the General Conditions, the Excluded Parties shall
provide and maintain the following insurance coverage’s, with minimum coverage
amounts as set forth below:
Per Occurrence
Aggregate
1.04
$5,000,000
$5,000,000
Drawings and Specifications.
The number of sets of the Drawings and Specifications which the District will provide to the
Contractor pursuant to Article 2.1.2 of the General Conditions is one (1) set of reproducible
specifications with plans which can be downloaded of the website at
http://www.riohondo.edu/facilities/RFQ/index.htm
Website above is the official record of the bid documents. Contractor is responsible for
downloading all drawings, specifications, addendum etc from the above mentioned
website.
1.05
Mark-ups on Changes to the Work.
A. In the event of Changes to the Work, pursuant to Article 9 of the General Conditions, the
mark-up for all overhead (including home and field office overhead), general conditions
costs and profit, shall not exceed five percent (5%) of the direct actual costs if the General
Contractor performed the work, five percent (5%) if the sub-contractor performed the work,
as determined in accordance with Article 9.4 of the General conditions. Sub-contractor
overhead and profit shall / will not exceed Five percent (5%) for self performed work and
Five percent (5%) for work preformed by others. The foregoing limitation on mark-ups
shall apply regardless of the number of Subcontractors, of any tier, performing any portion
of such Change to the Work. In addition to the foregoing, Contractor may add a bond
premium fee of the actual direct cost of the bond for such Change, not to exceed two
percent (2%), of the actual direct costs for performance of the Change and the maximum
allowable mark-up for overhead, general conditions and profit.
B. Deleted Work: All deductive change order(s) must be prepared pursuant to Contract
Documents. Deductive Change Orders must be at a fair cost value to the district and shall
credit back all mark-ups to the district along with the actual scope of work. General
contractor and all subcontractors shall not be entitled to any profit and overhead on the
deducted work.
1.06
Inclement Weather Days.
Pursuant to Article 7.4.1 of the General Conditions, the number of Rain Days (including
inclement weather) for this Contract is 10-days. Include a critical path activity entitled
“Remaining Inclement Weather Days” on the initial Contract schedule. This activity shall
have an initial duration of seven (7) work days and shall be the last activity in the schedule
prior to the activity entitled “Completion”. All predecessor activities must pass through the
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 3 OF 8
Inclement Weather day’s activity. The Contractor shall request use of the Inclement
Weather Day when a critical path activity has been delayed due to inclement weather. This
request must occur in the same month as the inclement weather delay and must be
approved by a Change Order. Inclement Weather Delays to non-critical activities will not e
considered. If, at completion, there are inclement weather days still remaining, the
Completion date shall not be adjusted. If at or near completion, additional inclement
weather days are required, the completion date shall be adjusted accordingly by
processing a Change Order for a non-compensable time extension.
1.07
District’s Construction Manager.
Del Terra
13181 Crossroads Prkwy, N., Ste 540
City of Industry, CA 91746
PART 2
2.0
Construction operations, phasing, execution and Special Provisions
This Section supersedes other general conditions where applicable.
2.1
Project Limits.
The Contractor will limit its operations to the area included in the Contract Documents. All
contractor lay-down, construction work and operations will be limited to the area as as
directed by the Construction Manager, Approved by Rio Hondo Program Management
Team.
2.2
Hours of Operation
Work will be coordinated with Construction Manager & College for minimum disruption to
College operations and shall be performed during normal business working hours; Monday
to Friday from 6:00 AM to 6:00 PM. All off-hour work or weekend work must be approved
by the College through the Construction Manager at least two days in advance.
2.3
Construction Traffic Route
Contractor to use pre-determined construction traffic routes as approved by the College.
2.4
Progress Schedule; Contractor Responsibility for Construction Schedule
CONTRACTOR shall be responsible for the preparation, submittal and maintenance of
Construction Schedules required by the Contract Documents according but not limited to
Section 01320, CONSTRUCTION PROGRESS DOCUMENTAION as included in Division
01 of the Bid Documents. All pertinent provisions of the General Conditions apply.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 4 OF 8
2.5
Phasing
A
Work will be performed in such a manner as to minimize impact to normal college
operations. Any phase/segment shall be required to be completed according to the
approved Milestones Schedule.
B
Contractor shall submit a “work to complete’ list to the Construction Manager 5 calendar
days before the scheduled end of any phase. The Construction Manager and the
Architect will comment and add items to the list as necessary. The contractor shall
complete the “work to complete” list within 3 days after having received the list from the
Construction Manager. The contractor shall request a punch list walk 5 days prior to the
scheduled end of any phase/segment.
C
During the performance of this contract, the college and facilities operations will be
ongoing and will remain under normal operations. Work will be permitted during school
hours, provided that safe access to and exits from buildings are maintained while facilities
remain in use. Temporary fencing with green windscreen shall be erected by the
contractor to segregate work areas from all other campus areas.
D
Contractor shall commence performance of the Contract upon the date specified in the
Notice to Proceed and shall furnish sufficient labor, equipment, material, extra shifts and
overtime to achieve the required milestones as indicated on Section 01010.
2.6
Allowances
The bidders shall include within the base bid the following allowances. The allowances
shall be identified as separate line items in the Contractor’s schedule of values. The allowances
are to be used at the College’s sole discretion for work not otherwise shown and/or specified in
the construction documents. Work performed under the allowances shall be performed only as
directed in writing by Program Management Team, through the Construction Manager. Any and
all unused allowance amounts shall be credited to the College by change order and reflected in
the Contractor’s final application for payment without any compensation for overhead and profit.
ALLOWANCES
No.
1
Description
Allowance
Unforeseen Conditions
$ 90,000.00
Total
2.7
$90,000.00
Ancillary Project Conditions
Contractor shall provide an itemized scope and work plan to include field notes and shop
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 5 OF 8
drawings to accomplish each of the ancillary projects listed on Exhibit I above. Estimates
of costs must be provided prior to commencement of work. The work will be tracked on a
time and materials basis.
Owner reserves the option to assign work to others with a Not to Exceed amount of 1% of
contract value and at no more than 5% overhead and profit markup on assigned
subcontractor. Any allowances not used can be assigned to other allowances or deleted
in this contract at no penalty to the College.
2.8
Coordination with other Onsite contractors/trades
A. Contractor shall coordinate operations included in various sections of the Contract
Documents to help ensure efficient and orderly completion of the work.
B. Coordinate scheduling and timing of required administrative procedures with other
construction activities to avoid conflicts and help ensure orderly progress of the
work. Such administrative activities include, but are not limited to, the following:
1. Preparation of schedules.
2. Installation, relocation and removal of temporary facilities.
3. Progress meetings.
4. Project coordination activities.
C. Coordinate all work with other onsite contractors.
2.9
Security
Contractor is responsible for Work and Site security from start of construction, date of
NTP, to Substantial Completion, whichever comes later. Contractor’s responsibility
includes assessment of security needs within and around Site Boundaries and
employment of qualified personnel as may be necessary at no additional costs to the
College. In case the security personnel is not used all such costs will be credited back to
the college at prevailing wages.
2.10
Protection of Persons and Property
A. The Contractor shall be responsible for all damages to persons or property that occur as a
result of its fault or negligence in connection with the prosecution of this Contract and shall
take all necessary measures and be responsible for the proper care and protection of all
materials delivered to and from the site and work performed until completion and final
acceptance by the College. All work shall be solely at the Contractor's risk, with the
exception of damage to the work caused by "acts of God" as defined in Public Contract Code
Section 7105(b)(2).
B. Contractor shall take, and require all subcontractors to take, all necessary precautions for the
safety of workers on the site and shall comply with all applicable federal, state, local and
other safety laws, standards, orders, rules, regulations, and building codes to prevent
accidents or injury to persons on, about, or adjacent to premises where Work is being
performed and to provide a safe and healthful place of employment. In addition to meeting all
requirements of OSHA, Cal-OSHA, state, and local codes. Contractor shall furnish, erect and
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 6 OF 8
properly maintain at all times, as directed by the College or Program Manager or required by
conditions and progress of work, all necessary safety devices, safeguards, construction
canopies, signs, audible devices for protection of the blind, safety rails, belts and nets,
barriers, lights, and watchmen for protection of workers and the public, and shall post
danger signs warning against hazards created by such features in the course of construction.
C. The Contractor shall erect and maintain, as required by existing conditions and performance
of the Contract, reasonable safeguards for safety and protection, including posting danger
signs and other warnings against hazards, promulgating safety regulations, and notifying
owners and users of adjacent sites and utilities.
D. Requirements for Existing Sites.
Contractor shall (unless waived by the College in writing):
(a)
When performing construction on existing sites, become informed and take into
specific account the maturity of the students on the site. Contractor shall perform
Work which may interfere with school routine before or after school hours, enclose
working area with a substantial barricade, and arrange Work to cause a minimum
amount of inconvenience and danger to students and faculty in their regular school
activities. The Contractor shall comply with specifications and directives of the
College regarding the timing of certain construction activities in order to avoid
unnecessary interference with school functioning.
(b)
(c)
Provide substantial barricades around any shrubs or trees indicated to be preserved.
Deliver materials to building area over route designated by the College through the
Construction Manager.
Take preventive measures to minimize objectionable dust, noise, or other
disturbances.
Take preventive measures to prevent disturbing or covering any survey markers,
monuments or other devices marking property boundaries or corners. If such
markers are disturbed by accident, they shall be replaced by an approved land
surveyor or civil engineer and all maps and records required therefrom shall be filed
with the County and local authorities, at no cost to the College. All filing and plan
check fees shall be paid by Contractor.
(d)
(e)
(f)
Provide to the College on request, the Contractor's written safety program and
safety plan for each site.
E. Covering and Cleaning: Cover and protect the College's property within the project
limits, as required to prevent soiling or damage by dust, dirt, water, fumes, or
otherwise as deemed necessary by the College or Program Manager.
F. Repair or replace any damage to existing structures, improvements and equipment
caused by Contractor's operations, at Contractor's expense.
G. Repair or replace damaged work with new materials, to restore the damaged areas
and surfaces equal to and matching, the conditions which existed prior to damage, or at
start of the work of this Contract, at no cost to the College.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 7 OF 8
H. Prior to start of work, Contractor, College and Construction Manager shall conduct
an on-site inspection of existing conditions and the Contractor shall clearly document and
report damaged conditions to the College. Items not reported to the College at time of
inspection will be assumed to be result of Contractor's work, whose responsibility it will be to
repair or replace those items. Contractors shall include, along with his report to the College,
digital, dated photographs.
2.11
Landscape Repair and Additional Scope
A. Patch all grass areas damaged by construction vehicles and equipment. Re-sod or hydroseed the area to its previous condition or better under the direction of the Construction
Manager or College Maintenance Department. Do not use grass seeds. Replace any
sprinklers or irrigation material damaged by construction activities. Upon completion of
Work, Contractor shall restore grass areas to its previous conditions before start of
construction operations. Prior to commencement of work, Contractor is to identify
damaged and non-operational irrigation and landscape elements and report to the
Construction Manager.
B. Fire-Hydrant Protection: Contractor shall protect all Fire Hydrants in the site vicinity from
any kind of damage due to construction activity.
C. Contractor shall provide Construction traffic control including flagmen as necessary during
deliveries. Contractor to provide flagmen and other traffic control personnel at any other
location as may be deemed necessary by the construction manager-for safety of all
students, staff and visitors. Contractor will follow pre-determined route for access and exit
to the campus and shall direct/park all haul vehicles as directed by the Rio Hondo
Program Management Team.
END OF SECTION
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER PROJECT
Addendum No.3 05/16/16
SPECIAL CONDITIONS 00800
PAGE 8 OF 8
SECTION 01010
PHASING OF THE WORK
PART 1 - GENERAL
1.01
A.
SECTION INCLUDES
Requirements
a. Comply with the requirements of Section 0800-2.5.
1.02
RELATED SECTIONS
A.
Section 01010: Phasing of Work – APPENDIX A – MILESTONES
B.
Section 01100: Summary of Work
C.
Section 01040: Project Coordination
D.
Section 01330: Submittal Procedures
E.
Section 01320: Construction Progress Documentation
F.
Section 01500: Construction Facilities and Temporary Controls
G.
Section 01770: Closeout Procedures
PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION
3.01
SUBMITTALS
A.
3.02
CONTRACTOR shall submit a Project site logistics plans in accordance with the
requirements of this Section.
LOGISTICS
A.
Prior to the issuance of NTP -1, CONTRACTOR shall prepare and submit
to Construction Manager, a detailed Project site logistic plan, in same
size and scale of Drawings, setting forth CONTRACTOR plan of Work
relative to the following items:
1.
Haul route in accordance with local ordinances to and from Project site:
2.
Identification of any overhead wire restrictions for power, street lighting,
telecommunications or cable;
3.
Local sidewalk access and street closure requirements;
4.
Protection of sidewalk pedestrians and vehicular traffic;
RIO HONDO COMMUNITY COLLEGE
Pico Rivera Educational Center
Addendum No.3 05/16/16
PHASING OF THE WORK
01010-PAGE 1 OF 3
5.
Project site fencing and access gate locations;
6.
Construction parking;
7.
Material staging or delivery areas;
8.
Material storage areas;
9.
Temporary trailer(s) locations;
10.
Temporary service location and proposed routing of all temporary utilities;
11.
Trash removal and location of dumpsters;
12.
Concrete pumping locations;
13
Crane locations;
14.
Location of portable sanitary facilities;
15.
Concrete mixer truck washout locations;
16.
Traffic control signage;
17.
Perimeter and site lighting;
18.
Storm Water Pollution Prevention Plan – SWPPP;
19.
Stockpile or lay down areas;
20.
Security lighting.
B.
Revised Project site logistic plan may be required by Construction Manager for
separately identified phases and segments of Work as set forth in this Section.
C.
CONTRACTOR is responsible for securing and/or obtaining all approvals and
permits from authorities having jurisdiction over the work.
PHASING OF THE WORK – GENERAL
3.03
A.
CONTRACTOR shall prepare Construction Schedule in order to complete Work
and related activities in accordance with phasing plan as established in Appendix
“APPENDIX A – MILESTONES”. CONTRACTOR shall include all costs to
complete all Work within Milestones or Contract Time.
B.
OWNER will be seriously damaged by not having all Work completed within
Milestones or Contract Time. It is mandatory Work be complete within
Milestones or Contract Time.
C.
The major phases/segments of the work are identified below and shall be followed
with the following general guidelines.
Phase 1 – Mobilization and issuance of NTP:
RIO HONDO COMMUNITY COLLEGE
Pico Rivera Educational Center
Addendum No.3 05/16/16
PHASING OF THE WORK
01010-PAGE 2 OF 3
Work to start immediately following issue of initial Notice to Proceed “NTP I”.
See Milestones 1, 2, 3 and 4; and requirements of Section 01500 and other
related Sections. Notice to Proceed “NTP II” shall follow the successful
completion of Phase I requirements.
Phase 2 – Construction to Substantial Completion:
Milestones 5, 6, 7. Construction to start following issuance of NTP Phase 2 is
defined as completion of milestones 5, 6, 7. All work to be substantially complete
as defined by Article 7.2.2 of General Conditions.
Phase 3 - Administrative Closeout:
Work includes substantial completion of the overall project and final completion
of Work in accordance with Articles 7.2.2 and 7.2.4 of the General conditions,
respectively.
PHASING OF THE WORK – SPECIFIC
3.05
A.
B.
CONTRACTOR shall prepare Construction Schedule, and shall the complete
following Milestones as shown in Section 01010 – Appendix A:
1.
Phase 1: Mobilization – (10) calendar days: Milestones 1
2.
Phase 2: Construction – (65) calendar days: Milestones 5, 6, & 7
3.
Phase 3: Administrative Closeout – (14) calendar days: Milestones 8
The Contract Time shall be a total of (79) calendar days from date of
commencement of Contract Time.
END OF SECTION
RIO HONDO COMMUNITY COLLEGE
Pico Rivera Educational Center
Addendum No.3 05/16/16
PHASING OF THE WORK
01010-PAGE 3 OF 3
01010 – PHASING OF THE WORK
APPENDIX A – MILESTONES
CONTRACTOR shall commence performance of the Contract upon the date specified in the Notice to Proceed and shall furnish sufficient forces,
facilities and materials, work such hours, including extra shifts and overtime operations, so as to fully perform the Work in accordance with the
following Milestones.
Milestone
No. 1
Description
Schedule
Phase 1 – Mobilization:
Liquidated
Damages Per
Calendar Day
Start date per
Notice to Proceed– NTP: Is established in accordance with Articles 7.1 and 7.2.2 of the General NTP
Conditions.
No.2
Critical Shop Drawings & Submittals Complete: Is defined as CONTRACTOR prepared Shop
Drawings and Submittals that are either critical or near critical to the overall Substantial
Completion of the Project. Milestones may include, but not be limited to, Baseline Schedule per
Article 7.3, schedule of values per Article 8.2, DSA Deferred Approvals, Steel and Shoring
Drawings, Concrete and Piling Approvals, excavation support system drawings, seismic
calculations if any , shoring system drawings, or any long lead fabrication/procurement item
requiring Shop Drawings.
10 calendar
days after the
effective date
of the NTP
No. 3
Baseline Schedule Submitted: Is defined as baseline schedule in compliance with all the 10 Calendar
requirements outlined in Article 7.3 and in Division 01 Sections 01320 and 01010 is completed days after the
and submitted for CM review and approval.
effective date
of the NTP-I.
No. 4
Completion of Mobilization activities: Is defined as CONTRACTOR mobilization completed, all
submittals approved and lead-time items processed for procurement, logistics plan submitted and
approved (access, gates, parking, trailer locations, signage), site fencing completed if needed,
temporary utilities connections completed (water, electric, phone, sanitation, fire protection),
Project signage completed, submit for and obtain all required permits, implementation of Storm
Water Pollution Prevention measures, submission of CONTRACTOR Safety , submission of
CONTRACTOR Hazard Communication Plan, and obtain approval ACM submittal
10 calendar
days after the
effective date
of the NTP
* Milestone date to be determined by CONTRACTOR during development of the Construction Schedule and submitted to the CM for approval.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER
ADDENDUM NO.3 05/16/16
-PHASING OF THE WORK - APPENDIX A
-
Milestone
Description
Schedule
Liquidated
Damages Per
Calendar Day
No. 5
Phase 2– Construction: Total of 79 Calendar days following Mobilization.
No. 6
Substantial Completion for all Classrooms, Admin. Office, Staff Lounge/ Study Room Contract 55 Calendar
work: Is established in accordance with Article 7.2.2 of the General Conditions.
days after the $2,000.00
effective date
of the NTP-I.
No. 7
No. 8
79 Calendar
days after the
Start of Phase 2 Construction, as defined on Item 3.05.A.2 of this Section, stating Architect and
effective date
CM approved date to start actual demolition and construction activities.
of NTP
Work completion shall be defined as all work is substantially completed including but not limited
to.
Substantial Completion for all Exterior of Buildings, Site utilities, Hardscape and Landscape 65 Calendar $2,000.00
Contract work: Is established in accordance with Article 7.2.2 of the General Conditions.
days after the
effective date
of the NTP-I
Close out and Final Completion: Is established in accordance with Article 7.2.4 of the General 79 Calendar
Conditions.
days after the
effective date
of the NTP.
* Milestone date to be determined by CONTRACTOR during development of the Construction Schedule and submitted to the CM for approval.
RIO HONDO COMMUNITY COLLEGE
PICO RIVERA EDUCATIONAL CENTER
ADDENDUM NO.3 05/16/16
-PHASING OF THE WORK - APPENDIX A
-
EXHIBIT 1
Pico Rivera Audio Visual Equipment List
Audio Visual Equipment
Brand
Hitachi
Hitachi
Chief
Chief
BMS
Extron
Draper
Draper
Shure
Crestron
Crestron
Crestron
Crestron
Crestron
Crestron
Extron
ELMO
Sony
Pakedge
Spectrum Industries
Panel Crafters
Middle Atlantic
Extron
Middle Atlantic
Extron
Extron
Extron
Extron
Middle Atlantic
Model
CP-WX3530WN
Lamp and filter kit
CMA110
CMS018024S
LCDLOCIV
PMK350
Screen
Mount
MX-418D/C
SAROS IC6T-W-TEACH
DMPS3-200-C
DM-TX-200-C-2G-B-T
PW-4818DU
DM-RMC-SCALER-C
MP-B20-B-T
60-1489-01
TT-12i
BDP-S1200
S8PE
Link Lectern
Custom panel
Custom shelf
RSU 129
AUDD2
26-667-03
26-566-02
26-643-06
26-571-03
MIDHSK
Quantity
1
1
1
1
1
1
1
1
1
6
1
1
1
1
1
1
1
1
1
1
1
1
3
1
8
1
1
1
1
Description
1280x800 3700 Lumen projector
Lamp and filter kit
8" Ceiling plate
Adjustable extension column
Projector security mount Key#030
Low profile pole mount kit
Manual 16:10 109" diagonal projection screen
Mounting clips
18" gooseneck mic
Ceiling speakers
3-Series DigitalMedia presentation system
Wall plate DM transmitter
90W power pack for DMPS
DM receiver and room controller w/scaler
Media Presentation Button Panel B20
DSC HD-HD
Document camera
BluRay player
8 port Ethernet switch with PoE
36" Link lectern w/toe kick, overbridge, and document camera shelf
Lectern input panel
Custom shelf for BluRay player
Extron rack shelf kit
2 RU drawer
HDMI Micro Series, MicroDigital™ Ultra-Flexible HDMI Cables
MVGA-A M-M, Male to Male 15-pin HD Micro HR with Audio Cables
AV RCA, RCA Male to Male Composite Video and Stereo Audio Cables
Mini Audio Cables, 3.5 mm Male to Male Stereo Audio Cables
Screws, 100 Piece Security w/Washers
Note : This equipment list is for one classroom. The audio/visual setup needs to be duplicated for all seven classrooms. Contractor is responsible
for ordering equipment, and receivership and installation at seven classrooms.
Addendum No.3 05/16/16
Pico Rivera Audio Visual Equipment List v1_0.xlsx
Rio Hondo College Classroom Audio Visual Standard Specification
The Pico Rivera Education Center will contain 6 classrooms and one computer lab
for a total of 7 rooms with AV systems.
Equipment to be used:
A. Projector: Use Hitachi minimum 3500 ANSI lumen, minimum 1280x800
resolution, HDMI connection, with wired networking.
B. Screen: Draper or equivalent with a 16:10 aspect ratio.Screen height should
be at least 1/6 the distance from the screen to the furthest seat.
C. Audio:
a. Ceiling mounted speakers
b. Appropriate amplifier(s) to power speakers
c. Line level audio to feed an assisted listening system
D. Instructor Station: Lectern with an included 12U rack space in a locking
enclosure, overbridge with a 3 gang and 2 gang cutout for control and input
panels, cable paths, and standard 110 AC outlet.
E. Signal matrixing and routing: Digital and analog video and audio
switcher/scaler with inputs for:
a. Digital PC (HDMI, DisplayPort, etc.)
b. Two additional HDMI ports
c. VGA
d. Composite
F. Control panel: MPC series from Crestron. Control buttons to be labeled and
include functions as required:
a. Projector power toggle
b. Volume control
c. Microphone audio control (separate from program audio) gain
up/down/mute
d. Source selection:
i. Rack PC
ii. DVD/Bluray player
iii. HDMI Laptop
iv. VGA Laptop
v. Aux Video
vi. Projector Image Mute (separate from audio)
G. AV connection panels:
a. Wall input panel with appropriate device connection plates as
required (HDMI, speaker, control)
b. Instructor Station input panel (HDMI, VGA +3.5mm audio, Composite
w/ RCA audio, Female XLR, 3.5mm ALS output)
H. Wired gooseneck microphone
I. Option for future wireless microphone
Addendum No.3 5/16/2016 3:39 PM
RHC PREC Classroom.docx
Page 1 of 2
Rio Hondo College Classroom Audio Visual Standard Specification
Room arrangement
A. Instructor Station at room front
B. Display
a. Projection screen at room front mounted with the bottom of the
screen at least 40-48” from the floor
b. Projector ceiling mounted with a security mount centered to screen
C. Speakers ceiling mounted
D. Media sources and inputs
a. Media sources are located in the equipment rack located in the
Instructor Station
i. Dedicated owner furnished computer located in rack
ii. DVD/Bluray player located in rack
iii. Laptop/Doc cam connections (HDMI, VGA + audio) on input
panel ontop of Instructor Station
iv. Microphone located at Instructor Station
E. ALS output located at input panel on top of Instructor Station
F. Audio and video signal matrixing/routing equipment is located in the
Instructor Station rack
G. Control Systems
a. Push-button control panel with built-in control system will be
mounted on top ofthe Instructor Station
b. Control processingequipment is located in the Instructor Stationrack
Integration Services
A. All equipment, cabling, and accessories required for a fully function
classroom AV system
B. Labor associated with turnkey engineering, installation, programming,
testing, and training
C. Coordination with campus project manager
D. Documentation and engineering package including as-built system CAD
diagrams and manufacturer’s manuals
E. User training on classroom system
F. 1 year warranty
Addendum No.3 5/16/2016 3:39 PM
RHC PREC Classroom.docx
Page 2 of 2
GENERAL NOTES
SYMBOL LIST
(ALL SYMBOLS NOT NECESSARILY USED ON THESE DRAWINGS)
ALL SYMBOL DESCRIPTIONS ARE SUBJECT TO MODIFICATION AS NOTED ON THE DRAWINGS.
VERIFY EXACT LOCATIONS AND HEIGHTS OF OUTLETS WITH ARCHITECTURAL INTERIOR
ELEVATIONS PRIOR TO ROUGH-IN.
A.F.F.
ABOVE FINISH FLOOR
A.F.G.
ABOVE FINISH GRADE
AWG
AMERICAN WIRE GAUGE
AMP, A
AMPERE
AF/AT
AMP FRAME, AMP TRIP
AS/AF
AMP SWITCH, AMP FUSE
AV
AUDIO VISUAL
CIRC., CKT.
CIRCUIT
CB
CIRCUIT BREAKER
C
CONDUIT
DENOTES CONDUIT(S) RISING UP.
C.O.
CONDUIT ONLY
MODULAR BUILDING GROUND ROD. SEE DETAIL 3/E-005.
CONN
CONNECTED
DIA
DIAMETER
EMCS
ENERGY MANAGEMENT CONTROL SYSTEM
EMT
ELECTRICAL METALLIC TUBING
EWC
ELECTRIC WATER COOLER
E-O-L
END-OF-LINE CIRCUIT TERMINATOR
EF
EXHAUST FAN
LIGHTING FIXTURE, SURFACE OR PENDANT MOUNTED, ON FLUSH CEILING MOUNTED OUTLET BOX.
ER
EXISTING EQUIPMENT TO BE REMOVED
LIGHTING FIXTURE, RECESS MOUNTED, WITH OUTLET BOX.
E
EXISTING EQUIPMENT
FT. OR '
FEET
FA
FIRE ALARM
FLA
FULL LOAD AMPS
GFI
GROUND FAULT INTERRUPTER
GRD
GROUND
HVAC
HEATING, VENTILATING AND AIR CONDITIONING
H.,W.,D.,L.
HEIGHT, WIDTH, DEPTH, LENGTH
HP
HORSEPOWER
COMBINATION DATA/POWER/AV FLOOR BOX WITH TWO (2) DATA OUTLETS AND ONE (1) DUPLEX
RECEPTACLES, EQUAL TO FSR #FL-500P SERIES. PROVIDE 1-1/4"CONDUIT WITH TWO (2) DATA CABLES
FROM THE BOX TO THE ACCESSIBLE CEILING SPACE AND ON TO THE RESPECTIVE MDF/IDF.
IDF
INTERMEDIATE DISTRIBUTION FRAME
IN. OR "
INCHES
COMBINATION DATA/POWER/AV FLOOR BOX WITH FOUR (4) DATA OUTLETS AND TWO (2) DUPLEX
RECEPTACLES, EQUAL TO FSR #FL-500P SERIES. PROVIDE 1-1/4"CONDUIT WITH FOUR (4) DATA
CABLES FROM THE BOX TO THE ACCESSIBLE CEILING SPACE AND ON TO THE RESPECTIVE MDF/IDF.
IG
ISOLATED GROUND
J-BOX
JUNCTION BOX
KVA
KILOVOLT AMPERES
KW
KILOWATT
LCL
LONG CONTINUOUS LOAD
L.O.
LUGS ONLY
LTG, LTS
LIGHTING
MCB
MAIN CIRCUIT BREAKER
MDF
MAIN DISTRIBUTION FRAME
MH
METAL HALIDE
MCC
MOTOR CONTROL CENTER
MCM
THOUSAND CIRCULAR MILS
COMPUTER/DATA PROCESSING SYSTEM - 3/4"C., WITH ONE(1) CAT6 CABLE AS SPECIFIED.
D2 - 1"C., WITH TWO(2) CAT6E CABLES AS SPECIFIED.
D3 - 1 1/4"C., WITH THREE(3) CAT6E CABLES AS SPECIFIED.
D4 - 1 1/4"C., WITH FOUR(4) CAT6E CABLES AS SPECIFIED.
MCP
MOTOR CIRCUIT PROTECTOR
MLO
MAIN LUGS ONLY
MTD
MOUNTED
CLOCK OUTLET, ON FLUSH WALL MOUNTED OUTLET BOX, +90" WITH CLOCK. CLOCK SHALL BE WIRELESS GPS
BATTERY OPERATED BY PRIMEX OR EQUAL.
NEC
NATIONAL ELECTRICAL CODE
NC
NORMALLY CLOSED
NO
NORMALLY OPENED
COMPUTER/DATA OUTLET WITH SINGLE DATA OUTLET CONNECTOR, ON FLUSH IN WALL
OUTLET BOX, +18". PROVIDE OUTLET BOX, DATA JACKS, FACE PLATE, ETC. AND 1" CONDUIT
TO THE ACCESSIBLE CEILING SPACE UNLESS NOTED OTHERWISE. PROVIDE CAT 6E DATA
NETWORK CABLE AS SPECIFIED FROM THE OUTLET TO THE RESPECTIVE MDF/IDF.
NIC
NOT IN CONTRACT
NO. OR #
NUMBER
PRIMARY
OVER 600 VOLTS
COMPUTER/DATA OUTLET WITH TWO (2) DATA OUTLET CONNECTORS, ON FLUSH IN WALL
OUTLET BOX, +18". PROVIDE OUTLET BOX, DATA JACKS, FACE PLATE, ETC. AND 1" CONDUIT
TO THE ACCESSIBLE CEILING SPACE UNLESS NOTED OTHERWISE. PROVIDE TWO (2) CAT 6E
DATA NETWORK CABLES AS SPECIFIED FROM THE OUTLET TO THE RESPECTIVE MDF/IDF.
PH. OR
PHASE
PROVIDE
FURNISH, INSTALL AND CONNECT
PA
PUBLIC ADDRESS
COMPUTER/DATA OUTLET WITH SEVEN (7) DATA OUTLET CONNECTORS, ON FLUSH IN WALL
OUTLET BOX, +18". PROVIDE OUTLET BOX, DATA JACKS, FACE PLATE, ETC. AND 1" CONDUIT
TO THE ACCESSIBLE CEILING SPACE UNLESS NOTED OTHERWISE. PROVIDE SEVEN (7) CAT
6E DATA NETWORK CABLES AS SPECIFIED FROM THE OUTLET TO THE RESPECTIVE MDF/IDF.
REC, RECEPT
RECEPTACLE
REF
REFRIGERATOR
RGS
RIGID GALVANIZED STEEL
VOICE/DATA OUTLET WITH TWO (2) DATA OUTLET CONNECTORS AND ONE(1) VOICE
CONNECTOR, ON FLUSH IN WALL OUTLET BOX, +18". PROVIDE OUTLET BOX, DATA JACKS,
FACE PLATE, ETC. AND 1" CONDUIT TO THE ACCESSIBLE CEILING SPACE UNLESS NOTED
OTHERWISE. PROVIDE THREE (3) CAT 6E DATA NETWORK CABLES AS SPECIFIED FROM THE
OUTLET TO THE RESPECTIVE MDF/IDF.
RL
RELOCATED EXISTING EQUIPMENT
SECONDARY
600 VOLTS AND LESS
O
INDICATES DEVICE ON SURFACE WALL
MOUNTED OUTLET BOX.
COMPUTER/DATA OUTLET WITH TWO (2) DATA OUTLET CONNECTORS, ON CEILING MOUNTED
OUTLET BOX, FOR WIRELESS ACCESS POINT. PROVIDE OUTLET BOX, DATA JACK, FACE
PLATE, ETC. PROVIDE TWO (2) CAT 6E DATA NETWORK CABLE AS SPECIFIED FROM THE
OUTLET TO THE RESPECTIVE MDF/IDF.
TV
TELEVISION
TYP
TYPICAL
U.N.O.
UNLESS NOTED OTHERWISE
V
VOLTS
VA
VOLT AMPERES
WP
WEATHERPROOF
W
WIRE
DFCI
DISTRICT FURNISHED CONTRACTOR INSTALLED
DFDI
DISTRICT FURNISHED DISTRICT INSTALLED
BLDG.
BUILDING
IWB
INTERACTIVE WHITE BOARD
AVC
AUDIO/VIDEO CABINET
1P
SINGLE POLE
2P
DOUBLE POLE
3P
TRIPLE POLE
1. PORTIONS OF THESE PLANS HAVE BEEN DERIVED FROM INFORMATION TAKEN
FROM ORIGINAL ELECTRICAL PLANS. THE INTENT OF THESE PLANS IS TO
PROVIDE COMPLETE AND OPERABLE SYSTEMS.
2.
ABBREVIATIONS
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND BECOME
THOROUGHLY FAMILIAR WITH ALL THE FEATURES OF THE BUILDING AND SITE
WHICH WAY AFFECT THE PROPER PERFORMANCE OF THIS WORK.
JUNCTION BOX, FLUSH WALL MOUNTED, +18''.
JUNCTION BOX CONCEALED ABOVE ACCESSIBLE CEILING AREA OR MOUNTED ON ROOF.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REFER TO THE DRAWINGS OF
OTHER TRADES FOR ADDITIONAL DETAILS AND REQUIREMENTS WHICH AFFECT
THE PROPER PERFORMANCE OF THIS WORK.
DUPLEX CONVENIENCE RECEPTACLE VERTICAL ON FLUSH CEILING MOUNTED OUTLET BOX, +18".
P
DUPLEX CONVENIENCE RECEPTACLE VERTICAL ON FLUSH WALL MOUNTED OUTLET BOX, +18".
INDICATES WALL MOUNTED OUTLET BOX, TYPICAL.
INDICATES CONNECTION TO EQUIPMENT AS REQUIRED, TYPICAL.
A
E-1
4. RACEWAY ROUTING, DIMENSIONS, AND EQUIPMENT LOCATIONS ARE
APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
EXACT RACEWAY ROUTING TO CONFORM TO FIELD CONDITIONS.
PANELBOARD, ADJACENT LINE INDICATES PANEL FRONT. ADJACENT BALLOON INDICATES PANEL
DESIGNATION ''A'', SEE DRAWING E-1 FOR PANEL SCHEDULE.
DOUBLE DUPLEX (FOUR-PLEX) CONVENIENCE RECEPTACLE ON ONE FLUSH WALL MOUNTED OUTLET BOX
TERMINAL CABINET. ADJACENT LINE INDICATES CABINET FRONT.
CIRCUIT BREAKER STATIONARY (NON-DRAWOUT) SECONDARY VOLTAGE.
EQUIPMENT CABINET. ADJACENT LINE INDICATES CABINET FRONT.
ELECTRICAL DOWN TIME MUST BE APPROVED BY THE COLLEGE. CONTRACTOR
SHALL MAKE PROVISIONS TO ACCOMPLISH THE WORK OF THIS CONTRACT
WITHOUT UNDUE INTERFERENCE WITH COLLEGE OPERATIONS.
ALL EQUIPMENT DEVICES, CONDUIT FITTINGS, JUNCTION BOXES, AND
CONSTRUCTION LOCATED OUTDOORS SHALL BE WEATHERPROOF.
7.
ALL SIGNAL AND FIRE ALARM SYSTEMS TERMINATIONS MADE IN JUNCTION
BOXES SHALL BE EXECUTED USING TERMINAL BLOCKS.
8.
9.
S
SINGLE POLE TOGGLE SWITCH, ON FLUSH WALL MOUNTED OUTLET BOX, +45". INSTALL MULTIPLE SWITCHES
UNDER COMMON COVER PLATE. SUBSCRIPT OR SUPERSCRIPT AT SWITCH SYMBOL INDICATES THE FOLLOWING:
2 - DOUBLE POLE
4 - FOUR WAY
M - MANUAL MOTOR STARTERS
3 - THREE WAY
P - PILOT LIGHT
K - KEY OPERATED
R - SPDT MOMENTARY CONTACT RELAY SWITCH
V - VAPOR PROOF
a,b,c,d, ETC. - MULTIPLE SWITCHES WITH IDENTIFICATION OF OUTLET CONTROLLED.
2,P
a,b
2
100
1
VISIT THE SITE PRIOR TO BID AND INVESTIGATE THE EXISTING FIRE ALARM, TELEPHONE,
INTRUSION DETECTION, EMS, CLOCK, INTERCOM/PA, TELEVISION AND DATA SYSTEMS
EQUIPMENT ON CAMPUS. COORDINATE WITH THE EXISTING SYSTEMS MANUFACTURERS FOR
ALL REQUIRED EQUIPMENT MODIFICATIONS, CONDUIT, WIRING AND UPGRADING REQUIRED TO
EXTEND THE EXISTING SYSTEMS TO THE NEW MODULAR BUILDINGS. INCLUDE ALL COSTS IN
BID. ALL NEW COMPONENTS SHALL BE COMPATIBLE WITH THE EXISTING SYSTEM.
2. PAINT ALL EXPOSED RACEWAYS TO MATCH SURROUNDING SURFACE COLOR.
3. PROVIDE GROUNDING SYSTEM PER DETAIL 3/E005. WHERE METAL RAMPS OR
RAILWAYS ARE USED PROVIDE 1#2 BONDING ELECTRODE FROM THE RAMPS AND RAILWAYS
TO THE STRUCTURAL STEEL MEMBER OF THE BUILDING.
4. PROVIDE WEATHERPROOF SEALANT AROUND PRECAST CONCRETE PULL BOX COVERS AFTER
WORK IS COMPLETED WITHIN BOX.
B-5,7,9
J
UNDERGROUND CONDUIT STUBOUT, STUB 5'-0'' FROM BUILDING OR WALKWAY, CAP, MARK AND
RECORD.
E
EXISTING CONDUIT.
F
FIRE ALARM SYSTEM - 3/4"C. WITH FIRE ALARM SYSTEM CONDUCTORS AS SPECIFIED.
P
PUBLIC ADDRESS SYSTEM - 3/4"C., WITH CONDUCTORS AS SPECIFIED.
P2 - 3/4"C WITH CONDUCTORS AS SPECIFIED.
TELEVISION SYSTEM - 1"C. WITH CONDUCTORS AS SPECIFIED.
ID
INTRUSION DETECTION SYSTEM - 3/4"C. WITH CONDUCTORS AS SPECIFIED.
AV
S
PUBLIC ADDRESS/CLASS PASSING SPEAKER, HOUSING AND GRILL, FLUSH WALL MOUNTED, +90".
S
PUBLIC ADDRESS/CLASS PASSING SPEAKER, HOUSING & GRILLE, FLUSH CEILING MOUNTED.
S
CLASSROOM AUDIO ENHANCEMENT SPEAKER IN FLUSH CEILING MOUNTED BACKBOX.
AV
D1
INTRUSION DETECTION SYSTEM MOTION SENSOR, ON FLUSH CEILING MOUNTED OUTLET BOX.
ID
1D
2D
1
2D
WAP
COMPUTER/DATA OUTLET WITH ONE (1) DATA OUTLET CONNECTORS, ON CEILING MOUNTED
OUTLET BOX, FOR CEILING MOUNTED PROJECTOR. PROVIDE OUTLET BOX, DATA JACK, FACE
PLATE, ETC. PROVIDE ONE (1) CAT 6E DATA NETWORK CABLE AS SPECIFIED FROM THE
OUTLET TO THE RESPECTIVE MDF/IDF.
P
VC1
AUDIO/VIDEO INPUT WALLPLATE EXTRON PVT SW HDMI RGB D ON FLUSH WALL MOUNTED
2-GANG EXTRA 3 1/2" DEEP AT +18" A.F.F. PROVIDE 1"C. TO ACCESSIBLE CEILING SPACE.
REFER TO SHEET E-0.2 FOR AV SYSTEM REQUIREMENTS.
VC
MEDIALINK CONTROLLER EXTRON MLC 104 IP PLUS ON FLUSH WALL MOUNTED 2-GANG
EXTRA 3 1/2" DEEP AT +48"A.F.F. PROVIDE 1"C. TO ACCESSIBLE CEILING SPACE. REFER TO
SHEET E-0.2 FOR AV SYSTEM REQUIREMENTS.
TELEVISION OUTLET ON FLUSH WALL MOUNTED OUTLET BOX, +18" WITH A DUPLEX
UNIVERSAL OUTLET CONNECTOR AND A TWISTED SHIELDED PAIR RJ CONTROL JACK.
PROVIDE A 1" CONDUIT TO ACCESSIBLE CEILING SPACE.
TV
THE ATTACHMENT OF THE FOLLOWING MECHANICAL AND ELECTRICAL
COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE, BUT NEED
NOT BE DETAILED ON THE PLANS. THE PROJECT INSPECTOR WILL VERIFY THAT
THESE ITEMS HAVE BEEN POSITIVELY ATTACHED. THESE COMPONENTS SHALL
HAVE FLEXIBLE CONNECTIONS PROVIDE BETWEEN THE COMPONENT AND
ASSOCIATED DUCTWORK, PIPING, AND CONDUIT.
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF
MASS
LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT
DIRECTLY SUPPORT THE COMPONENT.
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED
SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF
OR FLOOR OR HUNG FROM A WALL.
FBA Engineering
Consulting Electrical Engineers
150 Paularino Avenue Suite A120
Costa Mesa, CA 92626
949.852.9995 949.852.1657 (fax)
fbaengr.com
FBA Job Number: 223.029
LIGHTING FIXTURE RECESSED MOUNTED WITH OUTLET BOX AND REMOTE MOUNTED JUNCTION BOX CONCEALED
ABOVE ACCESSIBLE CEILING. PROVIDE FLEXIBLE CONDUIT CONNECTION 6 FT. MAXIMUM LENGTH, 1/2" DIAMETER
MINIMUM, FROM JUNCTION BOX TO FIXTURE OUTLET. PROVIDE CONDUCTORS IN CONDUIT, QUANTITY AS
REQUIRED FOR INDICATED CIRCUITS AND SWITCHING CONTROLS, #12 (AWG) MINIMUM.
COMBINATION DATA/POWER/AV FLOOR BOX WITH SIX (6) DATA OUTLETS AND TWO (3) DUPLEX
RECEPTACLES, EQUAL TO FSR #FL-500P SERIES. PROVIDE 1-1/4"CONDUIT WITH FOUR (4) DATA
CABLES FROM THE BOX TO THE ACCESSIBLE CEILING SPACE AND ON TO THE RESPECTIVE MDF/IDF.
05-16-2016 Addendum No.3
SHEET INDEX
TOP OF
BOX
TOP OF
CONTROL
FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE
INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE MECHANICAL/ELECTRICAL
ENGINEER.
24" MAX
34" MAX
48" MAX
FBA Engineering / Plot Date: 5/11/2016 4:57 PM / Plotted by: Jeff Gomez / Drawing Location: I:\223\029\E001_223029.dwg
6D
WEATHERPROOF PUBLIC ADDRESS/CLASS PASSING SPEAKER, HOUSING & GRILLE, FLUSH WALL MOUNTED, +90".
WP S
3. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS
AND HEAVIER THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY
ATTACHEMENTS.
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE
BRACED TO COMPLY THE FORCE AND DISPLACEMENTS PRESCRIBED IN ASCE
7-10 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.8, 13.6.7, 13.6.5.6, AND
2013 CBC, SECTIONS 1616A.1.23,1616A.1.24, 1616A.1.25 AND 1616A.1.26.
AV
1
MEP COMPONENT ANCHORAGE NOTE:
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE
AV
4D
TV
1V
2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED
(E.G. HARD WIRED) TO THE BUILDING SERVICES SUCH AS ELECTRICITY, GAS OR
WATER.
2D
INDICATES CONDUIT SLEEVE(S) THROUGH WALL ABOVE THE CEILING. NUMBER AND SIZE OF CONDUITS
AS NOTED.
2D
1. ALL PERMANENT EQUIPMENT AND COMPONENTS.
LIGHTING FIXTURE WITH LAMPS ON NORMAL AND EMERGENCY LIGHTING CIRCUITS, PROVIDE SEPARATE LAMP
BALLASTS AS REQUIRED.
HOMERUN TO PANEL "B" FOR CIRCUITS 5, 7, 9 WITH COMMON NEUTRAL
7D
ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE
ANCHORED AND INSTALLED PER THE DETAILS ON THE DSA APPROVED
CONTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, THE FOLLOWING
COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND
DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2013 CBC, SECTIONS
1616A.1.18 THROUGH 1616A.1.26 AND ASCE 7-10 CHAPTER 6 TO 30.
OUTLET ON EMERGENCY LIGHTING CIRCUIT.
1775 Hancock St, Suite 120
San Diego, CA 92110
619.542.1188
619.542.1663 Fax
CONDUIT, INSTALLED EXPOSED.
9. PROVIDE NEW TELEPHONE(S), SPEAKERS, DATA OUTLETS, AUDIO/VISUAL SYSTEMS AND
CLOCKS IN MODULAR BUILDINGS WHERE INDICATED ON DRAWINGS.
EQUIPMENT ANCHORAGE NOTES
LIGHTING FIXTURE, SURFACE OR FLUSH MOUNTED AS INDICATED ON FIXTURE SCHEDULE, ON WALL MOUNTED
OUTLET BOX, +90". STEM INDICATES WALL MOUNTED OUTLET BOX, TYPICAL.
CONDUIT, INSTALLED CONCEALED IN OR UNDER FLOOR OR BELOW GRADE, 3/4"C. MINIMUM.
6. PROVIDE CORE DRILLING OF ALL STRUCTURES AS REQUIRED FOR RACEWAY ROUTING AND
DISCOVERED SITE CONDITIONS.
8. WHERE NEW CONDUCTOR(S)/CABLING IS SPECIFIED IN EXISTING CONDUITS CONTAINING
EXISTING WIRING THE CONTRACTOR SHALL REMOVE ENOUGH OF THE EXISTING WIRING TO
PULL IN NEW PLUS REPLACEMENT OF EXISTING REMOVED.
FLUORESCENT LIGHTING FIXTURE, RECESS MOUNTED, WITH OUTLET BOX.
CONDUIT, INSTALLED CONCEALED IN WALL OR IN CEILING SPACE.
1/2" C - 2 #12, 1#12(GRD)
3/4" C - 6 #12, 1#12(GRD)
1/2" C - 3 #12, 1#12(GRD)
1" C - 7 #12, 1#12(GRD)
3/4" C - 4 #12, 1#12(GRD)
1" C - 8 #12, 1#12(GRD)
3/4" C - 5 #12, 1#12(GRD)
1 1/4" C - 9 #12, 1#12(GRD)
5. PROVIDE APPROVED WEATHERPROOF SEALANT AROUND ALL WALL PENETRATIONS. SEAL IN
A MANNER ACCEPTABLE TO THE ARCHITECT.
7. RECONNECT EXISTING CIRCUITS FOR EQUIPMENT THAT IS TO REMAIN IF DISRUPTED BY
WORK PERFORMED UNDER THIS CONTRACT. MAINTAIN CONTINUITY OF ALL FEED THRU
WIRING.
LIGHTING INSTRUCTORS CONTROL STATION ON FLUSH IN WALL OUTLET BOX, +45".
PLAN NOTE CALLOUT. REFER TO CORRESPONDING NOTE ON DRAWING WHERE CALLOUT OCCURS.
13. PROVIDE OZ COMPANY TYPE "DX" EXPANSION/DEFLECTION FITTINGS
WITH BONDING JUMPER ON ALL CONDUITS AT ALL BUILDING
EXPANSION OR SEISMIC JOINT CROSSINGS.
1.
D
DETAIL CALLOUT, "C" INDICATES DETAIL, "E-2" INDICATES DRAWING WHERE DETAIL OCCURS.
11. WHERE POSSIBLE ALL RACEWAYS SHALL BE ROUTED CONCEALED IN WALLS
AND/OR ABOVE ACCESSIBLE CEILING SPACE.
PERFORMANCE NOTES
LIGHTING ENTRANCE CONTROL STATION ON FLUSH IN WALL OUTLET BOX, +45".
FLUORESCENT LIGHTING FIXTURE, SURFACE OR PENDANT MOUNTED ON FLUSH MOUNTED OUTLET BOX.
10. VERIFY THE EXACT LOCATION OF THE RELOCATABLE BUILDING PANELBOARD
WITH THE BUILDING MANUFACTURER PRIOR TO ROUGH-IN.
12. UNLESS SPECIFICALLY SHOWN ON THESE PLANS NO STRUCTURAL
MEMBER SHALL BE CUT NEITHER DRILLED NOR NOTCHED WITHOUT
PRIOR WRITTEN AUTHORIZATION FROM THE STRUCTURAL ENGINEER
AND THE DIVISION OF THE STATE ARCHITECT.
E
FIXTURE SCHEDULE DESIGNATION: "2" INDICATES FIXTURE TYPE, "100" INDICATES FIXTURE TOTAL WATTAGE.
SIGNAL AND/OR FIRE ALARM SYSTEMS SPLICES ARE NOT PERMITTED IN
UNDERGROUND PULLBOXES.
ALL ELECTRICAL EQUIPMENT INCLUDING PANELS, OUTLET BOXES, CONDUITS,
ETC. SHALL BE ANCHORED TO BUILDING STRUCTURE. ANCHORING SHALL BE
DESIGNED FOR 1.0 GRAVITY LATERAL ACCELERATION OF THE EQUIPMENT.
1
FINISHED
FLOOR
APPROACH PARELLEL
APPROACH 44" MAX
PERPENDICULAR
6.
LIGHTING FIXTURE, SURFACE OR FLUSH MOUNTED AS INDICATED ON FIXTURE SCHEDULE, ON WALL MOUNTED
OUTLET BOX, +90". STEM INDICATES WALL MOUNTED OUTLET BOX, TYPICAL.
46" MAX
5.
14471 Chambers Rd, Suite 210
Tustin, CA 92780
714.508.1780
714.508.1780 Fax
E001
SYMBOL LIST, NOTES AND DETAILS
E002
SINGLE LINE DIAGRAM AND DETAILS
E003
LIGHTING FIXTURE SCHEDULE AND DETAILS
E004
LIGHTING CONTROL DIAGRAM
E005
TITLE 24 INDOOR LIGHTING CALCULATIONS
E006
TITLE 24 OUTDOOR LIGHTING CALCULATIONS
E007
DETAILS
E008
PANEL SCHEDULES
E100
DEMOLITION SITE ELECTRICAL PLAN
E101
OVERALL SITE ELECTRICAL PLAN
E102
ENLARGED SITE ELECTRICAL PLAN
E103
SITE LIGHTING CALCULATIONS
E200
DEMOLITION BUILDING ELECTRICAL PLANS
E201
BUILDING LIGHTING PLANS
E202
BUILDING POWER PLANS
E203
BUILDING TELECOMMUNICATIONS PLANS
E301
FIRE ALARM SCHEDULES AND DETAILS
E302
BUILDING FIRE ALARM PLANS
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
OFFICE OF REGULATION SERVICES
AC
FLS
SS
DATE
THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL BE DETAILED ON THE
APPROVED DRAWINGS OR THEY SHALL COMPLY WITH ONE OF THE OSHPD
PRE-APPROVALS (OPM#) AS MODIFIED TO SATISFY ANCHORAGE REQUIREMENTS
OF ACI 318, APPENDIX D.
COPIES OF THE MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE
START OF HANGING AND BRACING OF THE PIPE, DUCTWORK, AND ELECTRICAL
DISTRIBUTION SYSTEMS.
MIN.15" A.F.F.
BOTTOM OF BOX
OUTLET BOX
NOTE:
MAINTAIN 30" X 48" CLEAR PARALLEL
APPROACH FLOOR AREA AND CONTROLS
MOUNTING HEIGHT OVER OBSTRUCTION
SCALE: N.T.S.
1
SYMBOL LIST, NOTES AND
DETAILS
E001
1
14471 Chambers Rd, Suite 210
Tustin, CA 92780
714.508.1780
714.508.1780 Fax
1775 Hancock St, Suite 120
San Diego, CA 92110
619.542.1188
619.542.1663 Fax
FBA Engineering
Consulting Electrical Engineers
150 Paularino Avenue Suite A120
Costa Mesa, CA 92626
949.852.9995 949.852.1657 (fax)
fbaengr.com
FBA Job Number: 223.029
FBA Engineering / Plot Date: 5/11/2016 4:46 PM / Plotted by: Jeff Gomez / Drawing Location: I:\223\029\E008_223029.dwg
05-16-2016 Addendum No.3
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
OFFICE OF REGULATION SERVICES
AC
FLS
SS
DATE
PANEL SCHEDULES
E008
4
A
E007
2
D-17,19
TYPICAL
A-14,16
1
B
-
4
1
PANEL
D-13,15
C
-
PANEL
5
1
15
1
5
D
E007
4
E
-
PANEL
10
4
A-17,19
21
17
17
D-9,11
9 11
13 15
1
16
D-21,23
1
5
14
23
17 19
14
19
19
5
5
22
5
14471 Chambers Rd, Suite 210
Tustin, CA 92780
714.508.1780
714.508.1780 Fax
22
D-22,24
5
19
E-12
17
P
16
5
P
P
24
14
3
16
1775 Hancock St, Suite 120
San Diego, CA 92110
619.542.1188
619.542.1663 Fax
3
12
3
12
12
18
12
14
A-18,20
8
18
8
FBA Engineering
22
Consulting Electrical Engineers
22
9
AV
20
24
9
AV
AV
10
20
150 Paularino Avenue Suite A120
Costa Mesa, CA 92626
949.852.9995 949.852.1657 (fax)
fbaengr.com
11 D-10,12,14,16
9
12 14
16 18
12 D-18,20
20
FBA Job Number: 223.029
18
13
14
BUILDING ELECTRICAL PLAN
SCALE: 1/8" = 1'-0"
2
PLAN NOTES:
1
PANEL SUPPLIED WITH BUILDING. VERIFY EXACT LOCATION WITH MODULAR
RESTROOM BUILDING MANUFACTURER'S DRAWINGS.
2
PROVIDE SPLIT WIRED DUPLEX RECEPTACLE CONTROLLED BY THE RESPECTIVE
ROOMS LIGHTING CONTROLS IN ACCORDANCE WITH 2013 CEC TITLE 24 SECTION
130.1(C). TYPICAL FOR ALL RECEPTACLES IN PRIVATE OFFICES, OPEN OFFICE
AREAS, RECEPTION LOBBY, CONFERENCE ROOMS, KITCHENETTES AND COPY
ROOMS. REFERENCE 2/E003 FOR ADDITIONAL REQUIREMENTS. 1
3
1
ALL EXISTING ELECTRICAL OUTLETS, POWER CONNECTIONS, AND ASSOCIATED
CONDUIT AND WIRING SHALL REMAIN AS IS UNLESS SPECIFICALLY INDICATED
OTHERWISE.
6
1
4
DISCONNECT AND REMOVE THE EXISTING PANEL AND REPLACE WITH NEW
RECESSED 24 CIRCUIT PANELBOARD, 225 AMPERE 120/240V.1PH.3 WIRE WITH 100
AMP 2P MAIN CIRCUIT BREAKER, FLUSH MOUNT. RECONNECT EXISTING CIRCUITS
AND FEEDER TO REMAIN TO THE NEW PANELBOARD. PROVIDE NEW TYPEWRITTEN
CIRCUIT DIRECTORY.
5
CONNECT TO TWO(2) 20 AMP, 1 POLE CIRCUIT BREAKERS IN NEW PANEL WITH
4#12, 1#12 GRD. - 3/4"C.
6
CONNECT TO THE EXISTING FEEDER TAP.
WP
7
3
E006
PANEL
AV
7
CONNECT TO THE PANELBOARD SUPPLIED WITH THE BUILDING.
8
ROUTE CONDUIT BELOW FLOOR, SAWCUT AND PATCH AS REQUIRED.
8
9
P
1
PROVIDE (N) COMBINATION POWER/DATA/AV FLUSH IN FLOOR BOX FOR
CONNECTION TO LECTERN. VERIFY EXACT LOCATION PRIOR TO ROUGH-IN. SEE
SYMBOL LIST AND TELECOM PLANS FOR ADDITIONAL REQUIREMENTS.
10
DISCONNECT AND REMOVE THE EXISTING PANEL AND REPLACE WITH NEW
RECESSED 30 CIRCUIT PANELBOARD, 225 AMPERE 120/240V.1PH.3 WIRE WITH 100
AMP 2P MAIN CIRCUIT BREAKER, FLUSH MOUNT. RECONNECT EXISTING CIRCUITS
AND FEEDER TO REMAIN TO THE NEW PANELBOARD. PROVIDE NEW TYPEWRITTEN
CIRCUIT DIRECTORY.
11
CONNECT TO FOUR(4) 20 AMP, 1 POLE CIRCUIT BREAKERS IN NEW PANEL WITH
8#10, 2#10 GRD. - 1 1/4"C.
4
1
1
9
G
-
3
5
PANEL
AV
H
-
4
8
05-16-2016 Addendum No.3
1
12
CONNECT TO TWO(2) 20 AMP, 1 POLE CIRCUIT BREAKERS IN NEW PANEL WITH
4#10, 2#10 GRD. - 1"C.
9
P
FBA Engineering / Plot Date: 5/11/2016 4:56 PM / Plotted by: Jeff Gomez / Drawing Location: I:\223\029\E202_223029.dwg
1
13
PROVIDE TWO COMPARTMENT SURFACE RACEWAY, FOR POWER AND DATA
OUTLETS, WIRING AND CABLE. SURFACE RACEWAY SHALL BE MOUNTED
HORIZONTAL AT +18". PROVIDE ALL POWER RECEPTACLES AND DATA OUTLETS AS
INDICATED. RACEWAY SHALL BE WIREMOLD 4000 SERIES, STEEL AND IN FINISH AS
SELECTED BY ARCHITECT. PROVIDE ALL BENDS, COVERPLATES, OFF-SETS, ETC.
FOR A COMPLETE INSTALLATION.
14
PROVIDE VERTICAL TWO COMPARTMENT RACEWAY TO ABOVE THE ACCESSIBLE
CEILING.
5
3
PANEL
15
PROVIDE NEW BRANCH FEEDER TAP DUE TO LOAD INCREASE. PROVIDE 3#10, 1#6
GRD. - 2"C. AND CONNECT TO THE EXISTING MAIN FEEDER. INCLUDE ALL COSTS IN
BID.
AV
I
-
4
8
1
9
P
1
5
3
PANEL
AV
J
-
4
8
1
9
P
1
3
5
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
OFFICE OF REGULATION SERVICES
AC
FLS
SS
DATE
BUILDING ELECTRICAL PLANS
BUILDING ELECTRICAL PLAN
SCALE: 1/8" = 1'-0"
1
E202
1
11
12
PROVIDE TWO COMPARTMENT SURFACE RACEWAY, FOR POWER AND DATA
OUTLETS, WIRING AND CABLE. SURFACE RACEWAY SHALL BE MOUNTED
HORIZONTAL AT +18". PROVIDE ALL POWER RECEPTACLES AND DATA OUTLETS AS
INDICATED. RACEWAY SHALL BE WIREMOLD 4000 SERIES, STEEL AND IN FINISH AS
SELECTED BY ARCHITECT. PROVIDE ALL BENDS, COVERPLATES, OFF-SETS, ETC.
FOR A COMPLETE INSTALLATION.
PLAN NOTES:
(E)TELEPHONE BACKBOARD/MPOLE
1
PROVIDE DATA NETWORK OUTLET IN WEATHERPROOF OUTLET BOX, +8'-0", FOR
CONNECTION TO CCTV CAMERA, TYPICAL.
2
PROVIDE NEW OUTLET BOX, FLUSH IN CEILING, FOR INTRUSION DETECTION
SENSOR. RECONNECT TO THE EXISTING INTRUSION DETECTION SYSTEM CONDUIT
AND WIRING.
PROVIDE VERTICAL TWO COMPARTMENT RACEWAY TO ABOVE THE ACCESSIBLE
CEILING.
3
(E)MAIN DISTRIBUTION FRAME "MDF"
5
6
PROVIDE COMPLETE CLASSROOM AUDIO/VISUAL SYSTEM IN ACCORDANCE WITH
CLASSROOM AV WIRING. PROVIDE ALL CONDUIT, CABLING AND DEVICES FOR A
COMPLETE INSTALLATION.
2D
1V
1
PROVIDE TWO(2) 3"C. SLEEVES FOR VOICE AND DATA NETWORK CABLING.
PROVIDE EXPANSION/DEFLECTION FITTINGS AND INSULATED THROAT BUSHINGS
ON CONDUIT ENDS.
2D
1V
1D
131D
13V
1D
1
25D
7V
4
10
81D
9V
4
3
2D
AP
1
34D
8V
4
3
STUB TWO(2) 3"C. CONDUITS FOR VOICE AND DATA NETWORK CABLING INTO THE
ACCESSIBLE CEILING SPACE.
14471 Chambers Rd, Suite 210
Tustin, CA 92780
714.508.1780
714.508.1780 Fax
8
1
1D
1
1775 Hancock St, Suite 120
San Diego, CA 92110
619.542.1188
619.542.1663 Fax
1
4
3
2
2
2D
AP
2D
AP
PROVIDE TWO(2) 3"C. WITH VOICE AND DATA NETWORK CABLING. SAWCUT AND
PATCH PAVING FOR INSTALLATION OF CONDUITS.
1D
2
STUB 1 1/2"C. INTO ACCESSIBLE CEILING SPACE. PROVIDE DATA NETWORK
CABLING TO MDF AS INDICATED.
10
7D
2D
PROVIDE 1 1/2"C. FOR DATA NETWORK AND AV CABLING, SAWCUT AND PATCH
FLOOR.
PROVIDE 18" X 18" X 8" DEEP W.P. GALVANIZED SHEET STEEL PULLBOX, NEMA 3R,
WITH TAMPER RESISTANT SCREWS. PROVIDE LABEL TO READ: "VOICE/DATA".
7D
2D
1V
PROVIDE (N)COMBINATION POWER/DATA/AV FLUSH IN FLOOR BOX FOR
CONNECTION TO LECTERN. VERIFY EXACT LOCATION PRIOR TO ROUGH-IN. SEE
SYMBOL LIST AND POWER PLAN FOR ADDITIONAL REQUIREMENTS.
9
1D
1
15D
5V
1D
2D
1V
2D
1V
6
1D
WP
2D
AP
1D
7
1
2D
AV
8
7D
1
1
7
7D
2D
1V
1
4
9
2D
1V
5
2D
AP
2D
1V
1D
7
1
2D
7
1
2D
5
2D
1V
1D
2D
FBA Engineering
2
2D
5
AV
3D 3D
2D
AV
4D
6
Consulting Electrical Engineers
2D
AP
150 Paularino Avenue Suite A120
Costa Mesa, CA 92626
949.852.9995 949.852.1657 (fax)
fbaengr.com
6
TO MDF
FBA Job Number: 223.029
12D
1D
WP
1D
WP
11
12
1
BUILDING TELECOMMUNICATIONS PLAN
2
SCALE: 1/8" = 1'-0"
PLENUM SPK 18 SPEAKER CABLE (17.5 FT.)
PLENUM SPK 18 SPEAKER CABLE (17.5 FT.)
FF120
42-120-03
FF120
42-120-03
1
39D,4V 10
PVT
PVT SW HDMI RGB D
60-1335-03
HDMI
001
HDMI
[F TYPE A]
A
+18"
PROJECTOR MOUNT TO INCLUDE THE FOLLOWING:
HOUSED INSIDE PVM 220
IR
[2 POLE CS]
002
AUDIO
PROJECTOR
(NOT INCLUDED IN PVS SYSTEM)
RGBHV
[HD15-F]
LOCAL OUT
[HD15-F]
AUDIO
[F 3.5 JACK]
AUDIO
[F 3.5 JACK]
8
7
2D
1V
PCM 340
UPB 25
PVT OUT
[F RJ-45]
AUDIO
[F 3.5 JACK]
RGB
1D
WP
1D
39D
4V
6
1
9
2D
AV
HDMI
2
RS-232
2D
AP
5
3
PVS
PVS 405SA IP
60-1235-01
1D
PLENUM SHIELDED TWISTED PAIR CABLE (50 FT.)
1/2
PLENUM SHIELDED TWISTED PAIR CABLE (50 FT.)
3/4
PVT IN
[F RJ-45]
005
AUDIO
[5 POLE CS]
AUD LINEOUT
[5 POLE CS]
AUX
[3 POLE CS]
HDMI
[F TYPE A]
PLENUM SHIELDED CAT-5 TWISTED PAIR CABLE (15 FT.)
PVT IN
[F RJ-45]
PLENUM RATED MLC IR/RS-232 CABLE (50 FT.)
VOICELIFT Rx
[F RJ-45]
LAN 2
[F RJ-45]
PAGING SENSOR
[3 POLE CS]
LAN 3
[F RJ-45]
IR OVER PVT
[2 POLE CS]
POWER
RS-232
[3 POLE CS]
PLENUM RATED STP 22 CABLE (OPTIONAL)
PLENUM RATED PWR/RS-232/VC POWER CABLE (50 FT.)
05-16-2016 Addendum No.3
2D
AV
1
2
PVT
PVT SW HDMI D
60-1270-03
HDMI
001
HDMI
[F TYPE A]
AUDIO
[F 3.5 JACK]
IR
[2 POLE CS]
HDMI
002
B
(IN FLOOR BOX)
2D
AP
5
PVT OUT
[F RJ-45]
3
ID
HDMI
[F TYPE A]
1D
AUDIO
[F 3.5 JACK]
MLC-01
IDF
Rx
B
Tx
MLS
RS-232
VOICELIFT SYSTEM
DISPLAY
RS-232 / IR
GND
+12V OUT
PART No. 42-139-02
CONT MOD
IR IN
PENDANT AND HANDHELD SYSTEM
SCP COM
E
PART No. 42-139-22
COMM LINK
B
C
D
GND
TWO PENDANTS SYSTEM
1
2
GND
A
2D
AP
5
1
A
PART No. 42-139-01
2D
AV
1D
4
6
Rx
IR OUT
GND
ONE PENDANT SYSTEM
20D
2V
7
1
Tx
PWR
+12V IN
1D
2D
1V
M
+45"
MLC 104 IP PLUS
60-818-03
DIGITAL I/O
ID
A
FBA Engineering / Plot Date: 5/11/2016 4:49 PM / Plotted by: Jeff Gomez / Drawing Location: I:\223\029\E203_223029.dwg
1D
4
6
1
A
29D
3V
7
2D
1V
LAN 1
[F RJ-45]
ID
1D
AMPLIFIED AUD
[4 POLE CS]
3
2
3
GND
1D
1D
ETHERNET
11D
1V
7
CHARGING STATION
2D
1V
6
1
2D
AV
1D
4
1
2
PLENUM RATED STP22 CABLE (NOT INCLUDED IN KIT)
2D
AP
5
3
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
OFFICE OF REGULATION SERVICES
EXTRON
VOICELIFT MIC IR RECEIVER
1D
1D
WP
1D
1D
WP
TYPICAL
1
AC
FLS
SS
DATE
(E)INTERMEDIATE DISTRIBUTION FRAME "IDF"
BUILDING
TELECOMMUNICATION PLANS
CLASSROOM AV WIRING
BUILDING TELECOMMUNICATIONS PLAN
SCALE: 1/8" = 1'-0"
1