PRESENTATION FOR: BIM VISION,STRATEGY, IMPLEMENTATION, ABU DHABI VDC – A Constructor’s Perspective ATUL KHANZODE, DIRECTOR OF CONSTRUCTION TECHNOLOGIES PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 © 2011 DPR Construction Agenda DPR Construction – Brief Background Virtual Design and Construction at DPR Lessons Learned Implementing VDC / BIM Challenges and Opportunities Vision for the Future PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Who We Are? $2.0 B Revenue 2011 1200 15 Number of offices nationwide Number of professional staff members nationwide 1,200 Number of craft employees nationwide PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 DPR Purpose and Core Values DPR exists to Build Great Things. We conduct all business with the highest standards of honesty and fairness; we can be trusted. We believe work should be fun and intrinsically satisfying; if we are not enjoying ourselves, we are doing something wrong. We must be different from and more progressive than all other construction companies; we stand for something. We believe in continual self-initiated change, improvement, learning and the advancement of standards for their own sake. PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 DPR Scorecard 0.99 33rd Recordable incident rate in 2010, making DPR one of the safest contractors in U.S. Largest General Contractor in U.S. (ENR 2011) 120 Number of projects currently using BIM 22 Rank on FORTUNE’s 100 Best Companies to Work For list 2011 3rd 4th Largest Healthcare Contractor in U.S. (Modern Healthcare) Largest Data Center Builder in U.S. (ENR 2011) 90% Average percentage of annual revenue from repeat customers over the last five years. PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 DPR Core Market Sectors ADVANCED TECHNOLOGY LIFE SCIENCES HIGHER EDUCATION CORPORATE OFFICE HEALTHCARE PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 ADVANCED TECHNOLOGY Apple Autodesk Digital Realty Trust eBay Equinix Facebook Google Intuit Oracle Lucasfilm LSI Logic Motorola PDI/DreamWorks Pixar Animation Studios T-Mobile Vmware White Oak Semiconductor Yahoo! PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 CORPORATE OFFICE American Presidents Line Bank of America Barclays Capital Charles Schwab & Co. Dodge & Cox Jones Lang LaSalle KPMG Pricewaterhouse Coopers U.S. Green Building Council Visa International PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 HIGHER EDUCATION Arizona Board of Regents Arizona State University California Institute of Technology Clemson University Georgia State University Texas A&M University University of California University of Southern California University of Texas University of Virginia PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 HEALTHCARE Banner Health Catholic Healthcare West City of Hope HCA Kaiser Permanente Scott & White Stanford Hospital & Clinics Sutter Health UCSF Medical Center Vanguard Health Systems PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 LIFE SCIENCES Alexandria Real Estate Equities Amgen B. Braun Baxter Pharmaceuticals BioMarin Genentech Novartis Roche Molecular Systems The Scripps Research Institute United Therapeutics PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Complex MEP Systems – 40-60% Contract Value Sutter Medical Center Castro Valley PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Large Drywall Operation as a Self Performed Work DETAILING AND PREFABRICATION = QUALITY EFFICIENCY SAVINGS University of California at San Francisco Mission Bay PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Large Concrete Operation Sutter Medical Center Castro Valley PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 DPR VDC / BIM History DPR Portland Office (Pilot) Bay Street Emeryville (Construction) Banner Good Sam (Logistics) Letterman (Proposal) 1998 2001 Camino Medical (Construction) 2002 2003 2005 0 BIM Engineers PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Key Moments in our History Our first truly successful BIM Project Camino Medical Office Building Project – Fully modeled with amazing results PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Project saved $9M and 6 months Camino MOB saved $9M and 6 months by using the Collaborative Virtual Building process as compared to traditional Design-BidBuild process PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 2006 Strategic Plan for VDC We will INSTITUTIONALIZE VDC in everything we do PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Sustaining our commitment to VDC Number of BIM Projects 120 100 80 60 Number of BIM Projects 40 20 0 Y Y Y Y Y Y Y 2005 2006 2007 2008 2009 2010 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF ABUSERVICES DHABI| DECEMBER 13-14, 2011 DPR BIM / .,VDC Decide why you want to use BIM and value it produces for the Owner Levels of BIM Increased level of Team Engagement 1. Visualization 2. Coordination 3. Constructability 4. Fabrication & Installation PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 LESSONS LEARNED FROM IMPLEMENTING BIM ON MULTIPLE PROJECTS PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 What it looks like recently* – photo superimposed on model Photo elements are grey, model elements are in color. Sutter Medical Center Castro Valley, CA, USA – $320 Million PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Process Metrics Design Assist Process Virtual Company Target Costing Virtual Building Tools Collaborative Planning Design the “Big Room” Big Room PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Team organized to work Together with BIM PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Very Detailed Process Mapping – Every 2 weeks PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Everything above 1.0 cm was modeled PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Electrical underground L00 slab on grade to model PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Schedule compared to baseline set in April 2008 6 weeks Ahead Was Jan. 1, 2013, Is Nov. 15, 2012 PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Contract Financial Health $4.0 M under Budget PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Productivity Up 6% - 28% Baseline Mechanical: Plumbing: Electrical: Framing: Planned Actual Projected 100% 105% 116% 120% 100% 100% 104% 106% 100% 114% 110% 114% 100% 122% 125% 128% Baseline: Normal experience on acute care facility in CA PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Rework Down 50% – 95% Baseline Actual Mechanical: 7% 0.5% Plumbing: 10% 0.5% Electrical: 10% 5.0% Framing: 5% 0.5% PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATIONBaseline: CONF., ABU DHABI| experience DECEMBER 13-14, 2011 Normal on acute care facility in CA Metrics prove that VDC Works Mechanical prefab (%) Electrical prefab (%) 90% 100% 80% 80% 70% 60% 60% 40% Mechanical prefab (%) 20% Linear (Mechanical prefab (%)) 50% Electrical prefab (%) 40% 30% Linear (Electrical prefab (%)) 20% 0% 0% 50% 100% y = 1.3101x - 0.2056 R² = 0.4827 IVL Score 10% y = 0.4688x - 0.067 R² = 0.1947 0% 0% 50% 100% IVL Score 90% 80% 70% 60% 50% Plumbing prefab (%) 40% 30% Plumbing prefab (%) 20% Linear (Plumbing prefab (%)) 10% y = 0.8902x - 0.1943 R² = 0.4572 0% 0% 50% 100% IVL Score PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Less Change Orders and RFIs % of RFIs due to field conflicts % of COs due to field conflicts 90% 100% 80% 90% 70% 80% 70% 60% 60% 50% 50% 40% % of RFIs due to field conflicts % of COs due to field conflicts 40% 30% Linear (% of RFIs due to field conflicts) Linear (% of COs due to field conflicts) 30% 20% y = -0.6282x + 0.4644 R² = 0.3055 10% 20% y = -0.3787x + 0.347 R² = 0.0898 10% 0% 0% 0% 50% IVL Score 100% 0% 20% 40% 60% 80% 100% IVL Score PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Lessons Learned • Owner Leadership is a MUST • Integration requires a shared commitment to owner’s goals • Early involvement of builders in the design process • Co-location of project team • Keep the responsibility for Virtual and Real building aligned on projects PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Lessons Learned Integrated Process Works More anxiety producing but have a better handle on projects Virtual Building is like Real Building and only way to check Design Completeness Creating new roles on projects – Process Facilitators, BIM Integrators Creating new opportunities in our industry PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 What future holds for us? Digital Prefabrication offsite PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Prefabricated - Multi-Trade Racks for MEP Systems PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Collaboration via Knowledge Sharing PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Lets make sure we PAUSE to change the wheels…. PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011 Quest ions & Answers PRESENTATION FOR: BIM VISION, STRATEGY AND IMPLEMENTATION CONF., ABU DHABI| DECEMBER 13-14, 2011