Supplier APQP Gated Review 1- Plan & Define the Program APQP Phases: Gated Reviews: RFQ review & submission 2 - Product and Process Design & Development Job Award PPAP - I Readiness PPAP - II Readiness 3- Product & Process Validation PPAP Completion readiness 4- Feedback, Assessment & C/A Launch and follow-up Review Date: General Guidelines 1.) Supplier will read the Tower Automotive Supplier APQP Process standard NA-ST-054, to get full understanding of the tasks for each element listed under each gate review. 2.) Review dates are set by the supplier based off of the original program timing. The dates to be entered for each gate review are listed in the procedure after the gate name. The original dates can only be adjusted if the customer has changed their dates. These dates are internal review dates and do not reflect the date that Tower Automotive will audit the supplier progress. RFQ package review Program Risk Evaluation (NA-ST-054B) Team feasibility commitment (NA-ST-054C) Open Issues Log (NA-ST-054J) Open Issues Log (NA-ST-054J) Open Issues Log (NA-ST-054J) Open Issues Log (NA-ST-054J) Open Issues Log (NA-ST-054J) Preliminary Process Flow Chart Program Timing Program Timing Program Timing Program Timing Tower Requirements review Die Design Buyoff Die buyoff Control Plan Control Plan Pre-Production control plan Gage Design buyoff Gage Buyoff TGR/TGW Post launch audit PFMEA Assembly equipment design buyoff Design for Mfg. & Assy (NA-ST-054D) Design for Mfg. & Assy (NA-ST-054D) TGR/TGW Design for Mfg. & Assy (NA-ST-054D) TAPAS review and planning Release BOM review Design for Mfg. & Assy (NA-ST-054D) TGR/TGW Die and gage progress Containment procedure & plan review Program Timing Die and gage progress Assembly equipment buyoff New Facilities Checklist (NA-ST-054E) Packaging design review Review Prior TGR/TGW Open Issues Log (NA-ST-054J) Program team contact list 3.) At a minimum the supplier launch team should begin to review the next gate tasks one week prior to the inprocess gate review date. Floor plan layout Resource list 4.) Tower Automotive will audit the elements in each gate two weeks prior or after the internal supplier gate review date. Team Feasibility Commitment (NA-ST-054C) Process Readiness Checklist (NA-ST-054F) Packaging tests Status of Tasks Release BOM review Program not advanced to this step Task Completed / In-Process - No Risk Team Feasibility Commitment (NA-ST-054C) Some risk - action plan in place Major issues to be resolved PPAP Readiness Checklist (NA-ST-054G) Quality System Review (NA-ST-054H) TAPAS review and planning Launch Control Readiness Checklist (NA-ST-054I) Team Feasibility Commitment (NA-ST-054C) Not Applicable Program: Project Leader: Effective 10/29/04 NA-ST-054A Supplier Quality Assurance