HARTNELL COLLEGE Construction Update Prepared by Joseph Reyes, Director, Maintenance Presented to the Board: February 4, 2014 CURRENT PROJECTS 1. Building-S Science Building (813026)- 2013 56,690 sq. ft. Building, State of the Art Classrooms, Labs, and Technology. State of the Art Planetarium. October 11, 2013 December10, 2013 January 14, 2014 (FRP) Request for Proposal Project out to rebid Rebid Opening 2. Building-D Elevator (840104) – 2013 An elevator will be installed on CAB north side of the building. Currently, the elevator in CAB south is not reliable and often breaks down. The new elevator will tie into the CAB ADA compliance work and make it easier for students coming from the main entrance, 411 Central Avenue, to get to the second and third floors of CAB. 3. Building-D ADA Compliance (840103)- 2013 The area on the west side of CAB will get a complete ADA upgrade to all of the pathways. In addition, the moat, which is between the Student Center and CAB, will be filled allowing better access between two buildings. OCCUPIED PROJECTS IN FINAL STAGES OF COMPLETION Alisal Building-D Technical Training Building Alisal Campus Center for Applied Technology Building-A (in DSA close out process) Student Services Building B (in DSA close out process) COMPLETED PROJECTS* Date Closed Out October 2004 November 2005 June 2006 December 2008 February 2009 September 2010 September 2010 December 2010 June 2010 January 2011 Project Name Campus Infrastructure Phase I Parking Structure Learning Resource Center (LRC) Building-D&E Classrooms Refresh #1 Building- D&E Classrooms Refresh #2 Lighting Phase II Building-D&E Classrooms Refresh #3 U- Pool Renovation NE Landscape Project Building-D&E Classrooms Refresh #4 Page 1 of 2 April 2011 August 2011 September 2011 September 2011 December 2011 December 2011 January 2012 January 2013 January 2013 April 2013 June 2013 June 2013 June 2013 June 2013 July 2013 Alisal Landscape Project City Sidewalk Replacement City Sidewalk Phase II Alisal Campus Sign Alisal Campus Bus Turnaround Building-D & E B Boiler/Chiller and Roof Replacement Campus Infrastructure II Alisal Campus Additional Parking Student Center Building- S Annex Demolition Campus Safety & Security Improvements Campus Maps & Directional Signage Building-P PE Field House Solar Canopy Structures, Alisal Campus Building-D First Floor/ North Remodel *Completed means that all of the claims and paperwork have been submitted and no further action/claims on this project will be forthcoming from the District. Future Projects Building-E 1ST Floor /South Building-N Remodel Keyless Entry Safety Cameras Project 1) Building-S Science Building 2) Building-D Elevator Budget % Completed Funding Source $28,065,000 0% Measure H $491,500 0% Measure H $541,500 0% Measure H 3) Building-D ADA Page 2 of 2