Technical Training Building (813028) – 2010 – Hartnell issued a request for qualifications (RFQ) for
architectural services related to the design of the Technical Training Building on the Alisal Campus. A
total of eight firms submitted a RFQ. A group of faculty and staff (the users of the building) met and
shortlisted a total of 5 firms for interviews. The users then interviewed the firms and they selected NTD
based off of previous similar project experience and cost.
May 2010
Approved NTD architect firm of Salinas.
January 2012
Plans submitted to (DSA) Division of State Architects.
August 23, 2012
Project out for rebid.
October 2, 2012
Board awarded contract to Dilbeck and Sons of Salinas, CA
PE Field House (865003) – 2011 - Locker rooms, restrooms, a classroom, a training room, and concessions
area. Matching funds raised by the Hartnell College Foundation.
April 2011
Board awarded contract to Belli Architectural Group Firm of Salinas
December 2011
Plans submitted to (DSA) Division of State Architects.
July 25, 2012
Board awarded contract to Tombleson Inc of Salinas, CA
August 13, 2012
.
Construction started.
Measure H ($1,604.000) & Foundation ($700K) Raised to date $820,000
3.
CAB Building First Floor/North Remodel ( 814001) – Accommodate the following Programs, Human
Resources, Vice President Academic Affairs, Deans, Trio program, and Supporting Staff.
4.
CAB Elevator (814001) – will be installed on CAB north side of the building. There is currently an
elevator in CAB south but it is not reliable and often breaks down. The new elevator will tie into the CAB
ADA compliance work and make it easier for students coming from the main entrance, 411 Central, of the
campus to get to the second and third floor of CAB.
Page 1 of 3
5.
CAB ADA Compliance (814001) - The area on the west side of CAB will get a complete ADA upgrade to
all of the pathways. In addition the mote, which is between the Student Center and CAB will be filled
which will allow for better access between two buildings.
6.
Campus Signage (843003) - The campus maps for all three campuses will be updated and labeled. Once
that map is completed all the building, both inside and outside, will get signage which matches maps.
7.
Annex Demolition (813026)-In accordance with Facilities Master Plan, it is proposed that the existing
Library/Annex
7
be demolished to provide space for a future Science Building.
7
7
.
8.
Science Building (813026), 56,690 SF Building, State of the Art Classrooms, Labs, and Technology. State
of the Art Planetarium.
Page 2 of 3
OCCUPIED PROJECTS IN FINAL STAGES OF COMPLETION
Alisal Campus Additional Parking
Alisal Campus Center for Applied Technology(In DSA close out process)
Student Center ( In DSA close out process)
CALL Building (In DSA close out process)
COMPLETED PROJECTS*
Date Closed Out
October 2004
November 2005
June 2006
December 2008
February 2009
September 2010
September 2010
December 2010
June 2010
January 2011
April 2011
August 2011
September 2011
September 2011
December 2011
December 2011
January 2012
Project Name
Campus Infrastructure Phase I
Parking Structure
Learning Resource Center (LRC)
CAB Refresh #1
CAB Refresh #2
Lighting Phase II
CAB Refresh #3
Pool Renovation
NE Landscape Project
CAB Refresh #4
Alisal Landscape Project
City Sidewalk Replacement
City Sidewalk Phase II
Alisal Campus Sign
Alisal Campus Bus Turnaround
CAB Boiler/Chiller and Roof Replasement
Campus Infrastructure II
*Completed means that all of the claims and paperwork have been submitted and no further action/claims on this
project will be forthcoming from the District.
FUTURE PROJECTS
CAB Building First Floor/South
Merrill Hall Remodel
Keyless Entry