ARC Requested Information from WGM #1 Information to be provided by Information to ARC Members 1 Host Schools of FI students at St. Gertrude Resource - Planning WGM #2 - January 27 2 Total FI and EF students Resource - Planning WGM #2 - January 27 3 Is there a waiting list for FI and EF? Resource - Program WGM #2 - January 27 4 What are the parameters around top-up funding? Resource - Finance Dept. 5 Where are St. Joseph students coming from? Resource - Planning 6a Marketing strategy of the Board Resource - Communications Dept. WGM #2 Agenda Item - January 27 6b What type of media used by Board to promote Catholic Education Resource - Communications Dept. WGM #2 Agenda Item - January 27 7 Information on Board registration policy Resource - Planning/Communications 8 Walking distance maps for staff proposed options Resource - Transportation/Planning 9 How Transportation Dept. determines potential hazards Resource - Transportation Dept. 10 Update to 5-year facility renewal costs Resource - Construction/ Plant Dept. WGM #3 - February 3 11 Recalculate 5-year facility renewal without RCM Resource -Construction/ Plant Dept. WGM #3 - February 3 12 Consolidated list of SIPs for comparison Resource - Planning WGM #2 - January 27 13 Central Erin Mills Staff PAR Report & ARC Report + Board meeting minutes Resource - Planning WGM #2 - January 27 14 Review modified Option 2 - with other options ARC Working Group & Resource Staff 15 Number of Special Education students at each school Resource - Planning WGM #2 - January 27 16 Link to CPP webpage with information on available space in schools Resource - Planning WGM #2 - January 27 17 Tips for students to guide them through the PAR process Resource - Family of Schools Superintendent 18 How do school closures fit into the Places to Grow Act? Resource - Planning 19 Can documents be translated when English is not the first language? WGM #3 Agenda Item - February 3 WGM #2 - January 27 WGM #2 - January 27 WGM #3 - February 3 WGM #2 - January 27 WGM #3 Agenda Item - February 3 Future WGM Agenda Item WGM #2 Agenda Item - January 27 WGM #2 - January 27 Resource - Family of Schools WGM #2 - January 27 Verbal Update - Reflected in Jan. 27 minutes Superintendent WGM - Refers to Working Group meetings of the Accommodation Review Committee (ARC) What RATIONALE was used to develop these options? Reduce overall capacity by 1400‐1600 pupil places Increase and maximize overall utilization by 20% or higher Retain schools that are central to the catchment area Maintain Catholic presence within the East Credit Review Area Retain newer schools that have lower maintenance costs Increase utilization minimizing need for portables or an addition at receiving school Keeping school communities together when possible Taking into consideration major roads as boundary lines For more information, please visit www.dpcdsb.org, Click on Pupil Accommodation Review ly on Total 81 28 19 12 10 10 9 9 9 8 7 7 6 6 6 5 5 4 4 4 4 3 3 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 279 es GR07 10 4 3 2 0 0 0 1 0 3 0 0 1 0 0 1 0 0 0 0 1 1 1 0 0 0 0 0 1 0 0 1 0 0 0 0 1 0 0 31 os GR06 9 5 2 2 1 3 1 0 3 0 2 0 1 2 2 0 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 39 rp GR05 8 2 4 2 1 4 0 1 2 2 1 2 1 1 0 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 36 pu GR04 9 4 2 2 2 0 2 3 2 2 2 1 1 0 1 1 1 0 1 1 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41 si on GR03 12 4 6 1 1 0 4 1 0 0 0 2 1 0 2 0 1 1 1 1 1 0 0 0 0 1 0 1 0 0 0 0 1 0 1 0 0 0 0 43 us GR02 14 4 0 1 3 2 1 2 0 1 0 1 1 2 1 2 1 2 0 0 2 0 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 43 is c GR01 19 5 2 2 2 1 1 1 2 0 2 1 0 1 0 0 1 0 0 1 0 0 0 0 0 1 2 0 0 0 1 0 0 1 0 0 0 0 0 46 rd Fo Come From FI School St. Gertrude St. Veronica (MV #2) St. Raymond St. Matthew St. Hilary St. Valentine Bishop Scalabrini St. Bernadette St. Gregory St. Dunstan Canadian Martyrs St. Julia Catholic San Lorenzo Ruiz St. Herbert St. Jude Father Daniel Zanon St. Charles Garnier Metropolitan Andrei St. David of Wales St. Joseph, Mississauga St. Thomas More St. Barbara St. Bernard of Clairvaux Catholic ES Mary Fix Catholic St. Catherine of Siena St. Timothy Un-GeoCoded Corpus Christi Pauline Vanier Catholic St. Alfred St. Brigid St. Jean-Marie Vianney St. John of the Cross St. John XXIII St. Kevin St. Mark St. Simon Stock St. Teresa of Avila XXX Bram West 1A Total: GR06 GR07 GR08 Total 42 27 27 0 27 47 20 43 24 54 27 80 47 23 27 0 26 28 24 49 24 48 27 81 43 0 21 25 27 37 26 25 20 43 27 69 46 0 22 28 36 20 23 21 24 48 51 78 178 50 97 53 116 132 93 138 92 193 132 308 es os GR02 is c rd Fo pu rp 46 46 46 44 46 37 46 38 - GR03 si on GR01 46 45 37 42 43 37 43 38 - us French Immersion Enrolments St. Margaret of Scotland (FI) Our Lady of Providence (FI) St. Joachim (FI) St. Angela Merici (FI) St. Ursula (FI) St. Gertrude (FI) *St. Jude (FI) St. Pio of Pietrelcina (FI) Divine Mercy (FI) Our Lady of Mercy (FI) St. Elizabeth Seton (FI) *St. Teresa of Avila (FI) GR05 on Extended French Enrolments St. Christopher (EF) Holy Family (EF) St. Andrew (EF) St. Cornelius (EF) St. Jean Brebeuf (EF) St. Anne (EF) San Lorenzo Ruiz (EF) St. Monica (EF) St. Philip (EF) St. Thomas More (EF) St. Rose of Lima (EF) St. Therese/Jesus (EF) 40 36 36 34 43 16 36 36 - ly Extended French and French Immersion Enrolments Based on October 31, 2015 Enrolment Report GR04 GR05 GR06 GR07 GR08 Total 42 16 34 41 41 15 44 16 - 35 37 28 42 36 15 0 31 9 37 36 28 27 39 0 0 27 0 25 19 21 0 31 0 0 0 0 37 0 25 0 0 0 0 0 0 308 235 255 161 69 279 15 105 169 58 128 9 Wait List data for Extended French and French Immersion Centres As of September 2015 Extended French School # of students on wait Grade 5 Enrolment, Oct list, as of September 31 2015 2015 St Jean Brebeuf 27 7 St Christopher 42 0 St Rose of Lima 27 15 St Thomas More 54 8 San Lorenzo 20 0 St Monica 43 0 St Therese of the CJ 80 5 Holy Family 27 1 St Andrew 27 3 St Anne 47 0 St Philip 24 0 # of students on wait Grade 1 Enrolment, Oct list, as of September French Immersion School 31 2015 2015 St Margaret of Scotland 46 10 St Gertrude 46 15 Our Lady of Providence 46 0 St Joachim 46 1 Divine Mercy 46 9 St Elizabeth Seton 38 5 St Angela Merici 44 0 St Pio of Pietrelcina 37 0 01 Legend s HW Y 4 on ly EAST CREDIT PUPIL ACCOMMODATION REVIEW STATUS QUO 196 ! St. Joseph ! 9 ½ ¹ D BRIS TOL R W 1 ST. GERTRUDE 4 Our Lady of Good Voyage St. Bernadette 2 ! 3 ! St. Dunstan 4 St. Gertrude ! ST. VALENTINE ! 5 ! 6 ! 7 ! 8 ! 9 ! ½ ¹ St. Gregory St. Herbert St. Raymond St. Valentine St. Joseph St. Joseph SS ST. DUNSTAN 6 ! 3 AVE W EGLINTON ST. BERNADETTE St. Joseph Elementary Student Counts 196 146 2 ! r (d ST. HERBERT ! Fo 8 ! 36 ! CREDITVIEW RD ( pu is cu ss ! io n ! 7 MCLAUGHLIN RD ST. RAYMOND 1 ! RD W TERRY FOX WAY BRITANNIA OUR LADY OF GOOD VOYAGE 146 rp o 5 ! MAVIS RD TR EDI IVER CR ST. GREGORY ! ( se Existing Boundaries 40 HW Y 3 36 For more information, visit www.dpcdsb.org click on Pupil Accommodation Review 0 0.35 0.7 Ü Kilometres 1.4 St. Bernadette WALKING WEBS - OPTION 1, 2 & 3 Fo rd is cu ss io n pu rp o se s on ly St Bernadette 1.0 km St. Bernadette WALKING WEBS - OPTION 1, 2 & 3 Fo rd is cu ss io n pu rp o se s on ly St Bernadette 1.6 km St. Bernadette WALKING WEBS - OPTION 1, 2 & 3 Fo rd is cu ss io n pu rp o se s on ly St Bernadette 2.0 km St. Herbert WALKING WEBS - OPTION 1 & 2 Fo rd is cu ss io n pu rp o se s on ly St Herbert 1.0 km St. Herbert WALKING WEBS - OPTION 1 & 2 Fo rd is cu ss io n pu rp o se s on ly St Herbert 1.6 km St. Herbert WALKING WEBS - OPTION 1 & 2 Fo rd is cu ss io n pu rp o se s on ly St Herbert 2.0 km St. Raymond WALKING WEBS - OPTION 1, 2 & 3 Fo rd is cu ss io n pu rp o se s on ly St Raymond 1.0 km St. Raymond WALKING WEBS - OPTION 1, 2 & 3 Fo rd is cu ss io n pu rp o se s on ly St Raymond 1.6 km St. Raymond WALKING WEBS - OPTION 1, 2 & 3 Fo rd is cu ss io n pu rp o se s on ly St Raymond 2.0 km St. Valentine WALKING WEBS - OPTION 1 & 3 Fo rd is cu ss io n pu rp o se s on ly St Valentine 1.0 km St. Valentine WALKING WEBS - OPTION 1 & 3 Fo rd is cu ss io n pu rp o se s on ly St Valentine 1.6 km St. Valentine WALKING WEBS - OPTION 1 & 3 Fo rd is cu ss io n pu rp o se s on ly St Valentine 2.0 km St. Gregory WALKING WEBS - OPTION 2 Fo rd is cu ss io n pu rp o se s on ly St. Gregory 1.0 km St. Gregory WALKING WEBS - OPTION 2 Fo rd is cu ss io n pu rp o se s on ly St. Gregory 1.6 km St. Gregory WALKING WEBS - OPTION 2 Fo rd is cu ss io n pu rp o se s on ly St. Gregory 2.0 km Our Lady of Good Voyage WALKING WEBS - OPTION 3 Fo rd is cu ss io n pu rp o se s on ly Our Lady of Good Voyage 1.0 km Our Lady of Good Voyage WALKING WEBS - OPTION 3 Fo rd is cu ss io n pu rp o se s on ly Our Lady of Good Voyage 1.6 km Our Lady of Good Voyage WALKING WEBS - OPTION 3 Fo rd is cu ss io n pu rp o se s on ly Our Lady of Good Voyage 2.0 km St. Gregory 1075 Swinbourne Drive, Mississauga L5V 1B9 1998 2.79 ha St. Raymond St. Valentine 5610 5735 Heatherleigh Whitehorn Avenue, Avenue, L5V Mississauga L5V 2V7 2A9 2001 2001 2003 - 2 storey 8 classroom addition None 2 2.82 ha 2.7 ha None 2 None 2 2 2.27 ha 2.39 ha 5,388 m2 Yes For safety Yes Yes 4,288 m2 Yes For safety Yes Yes 6,457 m2 Yes For safety Yes Yes 5,214 m2 Yes For safety Yes Yes 5,614 m2 Yes For safety Yes Yes 5,062 m2 Yes For safety Yes Yes 5,041 m2 Yes For safety Yes Yes Yes Residential Low Density II Yes - R4 No Yes Residential Low Density II Yes - R4 No Yes Residential Low Density II Yes - R4-20 No Yes Residential Low Density II Yes - R4-7 No Yes Residential Low Density II Yes - R4 No Yes Residential Low Density II Yes - R4 No Yes Residential Low Density II Yes - R4 No is c Yes - Toddlers Yes - Toddlers Yes - Toddlers & Preschool & Preschool & Preschool Aged Aged No Does the School have a Child CAged Fo St. Herbert 5180 Fallingbrook Drive, Mississauga L5V 2C6 2000 rp os 2 Yes Residential Low Density II Yes - R4 No 2003 - 2 storey 18 classroom addition 2 2.48 ha pu None rd Official Plan or Secondary Plan Land Use Designation Map Available Zoning Map Available Is the School Located 2000 - 1 stoey 12 classroom addition 2 1 2.82 ha si on Date and Description of Subsequent Additions (if any) None Number of Storeys 2.58 ha School Site Size (ha) 2 Building Area - GFA (m ) 4,249 m2 Yes Site Plan Available For safety Floor Plan Available Yes Boundary Map Available Context Map/Aerial Photo AvaYes us Address Date of Construction St. Gertrude 815 5850 River 1060 White 1525 Cuthbert Ceremonial Avenue, Drive, Grove Avenue, Clover Way, Mississauga Mississauga Mississauga Mississauga L5M 4W2 L5M 3R6 L5V 1G7 L5R 3S2 1989 1996 1993 1993 es Our Lady of Good Voyage St. Bernadette St. Dunstan School on ly FACILITY PROFILE Yes - Toddlers Yes - Toddlers & Preschool & Preschool Aged Aged No No St. Gregory St. Herbert St. Raymond St. Valentine on St. Gertrude ly Our Lady of Good Voyage St. Bernadette St. Dunstan School SCHOOL CAPACITY 22 0 0 646 752 106 85.90% 6 0 323 556 233 58.09% 264 533 269 49.53% 447 651 204 68.66% 377 651 274 57.91% os 13 312 484 172 64.46% rp 215 487 272 44.15% pu 192 280 88 68.57% 22 34 25 24 29 29 0 0 0 0 0 0 0 0 0 0 0 0 18 2 2 27 4 3 20 3 2 19 3 2 23 4 2 23 4 2 si on Current Enrolment School Capacity OTG Surplus/Shortage of Pupil Plac Utilization (%) Total Number of Instructional Rooms in Total Number of Portable Units on School Site Total Number of Portapak/RCM Units on es Yes - Extended Yes - Extended Yes - Extended Yes - Extended Yes - Extended Yes - Extended Yes - Extended Yes - Extended Day FDK & Day FDK & Day FDK & Does the School have Before Day FDK & Day FDK & Day FDK & Day FDK & Day FDK & and After School Programs School Aged School Aged School Aged School Aged School Aged School Aged School Aged School Aged INSTRUCTIONAL AND SPECIALIZED CLASSROOM SPACES rd Does the School have Appropriate Existing Space for: Yes Yes • Special Education Yes • Literacy Resource CentreYes Yes • Science and Technology Yes 1 Total Number of Ded No Yes • Computer Lab No No • Arts Facilities Total Number of Ded N/A Fo 18 3 2 us 8 3 2 is c Number of Regular Classroom Number of Purpose Built Kind Number of Special Education Yes Yes Yes 1 Yes Yes Yes 1 Yes No 1 Yes Yes Yes 1 Yes No 1 Yes Yes Yes 1 Yes No 1 Yes No Yes 1 No No 1 Yes Yes Yes 1 No No 1 1 No No 1 1 13,680 m2 is c • FCI is determined by the ratio between the five-year 19.45% 11.92% 54 Fo rd • FCI is determined by Definition of what the FCI Rep the ratio between the five-year 53.08% Facility Condition Index (FCI) o 11.92% Board's Average FCI 46 Total Number of Parking Spac ly St. Herbert No 1 Yes No No No Yes Yes Yes Yes No No os St. Raymond No 1 St. Valentine No 1 1 Yes No No No Yes Yes Yes No No No Yes No No No Yes Yes Yes No No No Yes No No No Yes Yes Yes No No No 11,640 m2 10,335 m2 10,650 m2 15,900 m2 8,700 m2 8,700 m2 3,360 m2 1 - irrigated 4,200 m2 1 - irrigated 3,160 m2 1 - irrigated 2,080 m2 1 - irrigated 2,330 m2 1 - irrigated 4,065 m2 1 - irrigated None None None None None None • FCI is determined by the ratio between the five-year 17.75% 11.92% 51 • FCI is determined by the ratio between the five-year 10.93% 11.92% 46 • FCI is determined by the ratio between the five-year 12.18% 11.92% 48 • FCI is determined by the ratio between the five-year 5.34% 11.92% 59 • FCI is determined by the ratio between the five-year 6.92% 11.92% 64 • FCI is the determined by the ratio between the five-year 7.07% 11.92% 59 us Area of Hard Surfaced Play Ar 3,260 m2 3,220 m2 1 - irragated Total Number of Playfields 1 - irrigated List of Outdoor Facilities (e.g. tracks, basketball court, Track - Needs tennis court, etc.) work None FACILITY CONDITION 1 Yes No No No Yes Yes Yes No No No si on 12,330 m2 St. Gregory No es 1 Yes No No No Yes Yes Yes No No No OUTDOOR PLAY AREA AND GREEN SPACE Area of Green Space (m2) St. Gertrude No on St. Dunstan No rp St. Bernadette No 1 Yes No No No Yes Yes Yes No No No pu Our Lady of Good Voyage School No • Media Room Total Number of Ded N/A Yes • Gymnasium • General Purpose Room No No • Music Room • Assembly/Auditorium No Yes • Library Yes • Staffroom Yes • Stage No • Chapel No • Kitchen No • Cafeteria ly Our Lady of St. Gertrude St. Gregory St. Herbert Good Voyage St. Bernadette St. Dunstan School 1 2 1 2 2 Total Number of Accessible Pa Yes Limited Limited Limited Yes Is there an Adequate Amount Limited St. Raymond on 2 3 Yes No Yes No Yes No Yes Yes Yes Yes Yes No No No Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Total: $1,317,680 Total: $556,400 Total: $866,320 Total: $885,040 pu rp os No Yes si on Do Students have Access to Barrier Free Washrooms Are Student Washrooms Accessible on Each Level of Are the Designated Changerooms Accessible to the Gym 2 Yes es ACCESSIBILITY Is the School Universally Acce No Does the School have an Oper Yes St. Valentine TEN-YEAR HISTORY OF MAJOR FACILITY IMPROVEMENTS Total: $1,856,400 is c FINANCIAL Total: $3,087,760 us PROJECTED FIVE-YEAR FACILITY RENEWAL NEEDS See Attachment 1 for Itemized List Total: $1,786,720 Total: $1,487,886 Fo rd Expenditures on School Staff: Teaching ($) $1,052,528.00 $1,418,047.00 $1,764,675.00 $3,817,466.00 $1,949,137.00 $1,563,347.00 $2,722,962.00 $2,511,323.00 Expenditures on School Staff: Non-Teaching ($) $562,658.00 $734,732.00 $507,070.00 $1,018,693.00 $687,935.00 $708,452.00 $855,872.00 $834,190.00 Expenditures for School Utility Costs ($) $75,858.42 $76,867.20 $67,245.54 $77,632.20 $95,500.56 $106,996.98 $89,808.96 $98,556.48 • Total $17.85 $14.27 $15.68 $12.02 $18.32 $19.06 $17.74 $19.55 • Per square foot us is c rd Fo ly St. Herbert $405.29 Receive benchmark level funding for 1.0 FTE Principal and Secretary. Benchmark Sal & Ben for Loss of grant revenue tied to Square es on St. Gregory $295.67 Receive benchmark level funding for 1.0 FTE Principal and Secretary. Benchmark Sal & Ben for Loss of grant revenue tied to Square os St. Gertrude $120.17 Receive benchmark level funding for 1.0 FTE Principal and Secretary and partial funding for VP. Loss of grant revenue tied to Square rp St. Dunstan $215.53 Receive benchmark level funding for 1.0 FTE Principal and Secretary. Benchmark Sal & Ben for Loss of grant revenue tied to Square si on St. Bernadette $357.52 Receive benchmark level funding for 1.0 FTE Principal and Secretary. Benchmark Sal & Ben for Loss of grant revenue tied to Square pu Our Lady of Good Voyage $395.10 Receive benchmark level funding for 1.0 FTE Principal and Grant Revenues for School Secretary. Administration (Identify any Benchmark Sal & Ben for loss of Revenues) ($) Grant Revenues for School Loss of grant Operations (Identify any loss revenue tied of Revenue) ($) to Square School • Per student St. Raymond $200.91 Receive benchmark level funding for 1.0 FTE Principal and Secretary and partial funding for VP. Loss of grant revenue tied to Square St. Valentine $261.42 Receive benchmark level funding for 1.0 FTE Principal and Secretary and partial funding for VP. Loss of grant revenue tied to Square Our Lady of Good Voyage St. Bernadette St. Dunstan St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine What is the Impact of this Schools Closure on Facility Operating and Capital Budgets Operations and School Renewal funding from the GSN model is reduced by approx. $165,500. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $15,850. Operations and School Renewal funding from the GSN model is reduced by approx. $598,750. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $21,376. Operations and School Renewal funding from the GSN model is reduced by approx. $292,064. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $17,344. Operations and School Renewal funding from the GSN model is reduced by approx. $236,302. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $18,577. Operations and School Renewal funding from the GSN model is reduced by approx. $409,525. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $19,202. Operations and School Renewal funding from the GSN model is reduced by approx. $353,310. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $19,120. us is c rd Fo on es os rp pu Operations and School Renewal funding from the GSN model is reduced by approx. $267,380. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $14,075. si on Operations and School Renewal funding from the GSN model is reduced by approx. $200,195. However, board operating costs are also reduced for custodial salary & benefit and utilities (already included above) and other contractual costs such as Salting&Snow plow of $17,835. ly School St. Gertrude St. Gregory What is the Impact of this School Remaining Open on Facility Operating and Capital Budgets That the costs associated with operating and maintaining the school, exceed the level of funding generated. St. Raymond St. Valentine That the costs associated with operating and maintaining the school, exceed the level of funding generated. That the costs associated with operating and maintaining the school, exceed the level of funding generated. That the costs associated with operating and maintaining the school, exceed the level of funding generated. That the costs associated with operating and maintaining the school, exceed the level of funding generated. That the costs associated with operating and maintaining the school, exceed the level of funding generated. Yes Yes 1.44 km Yes Yes 1.46 km Yes Yes 0.9 km Yes Yes 1.12 km Yes Yes 1.42 km Yes Yes 1.1 km Yes Yes 1.15 km os rp pu si on 199 64% us 7 3% is c 97% 10 min 4 min 7 min 34 5% 36% 16 min 2 min 9 min es That the costs associated with operating and maintaining the school, exceed the level of funding generated. rd Fo St. Herbert That the costs associated with operating and maintaining the school, exceed the level of funding generated. TRANSPORTATION Yes Kiss and Ride Lane Yes Bus Loading Zone Average Distance to School fo 1.39 km 30 Number of Students Bussed to Percentage of Students that 16% Percentage of Students that are not Eligible for Transportation (%) 84% min Longest Bus Ride to School (m15 Shortest Bus Ride to School (m2 min Average Length of Bus Ride to 8.5 min Aggregate Cost to Transport Students to School ($) $13,608.00 Cost per Student Bussed to School ($) $453.60 ly Our Lady of Good Voyage St. Bernadette St. Dunstan on School 32 10% 95% 16 min 5 min 10.5 min 9 3% 90% 13 min 5 min 9 min 30 7% 97% 9 min 3 min 6 min 54 14% 93% 14 min 5 min 9.5 min 86% 16 min 5 min 10.5 min $11,307.00 $63,956.00 $16,329.00 $16,329.00 $13,568.00 $16,329.00 $16,329.00 $1,615.29 $321.39 $480.26 $510.38 $1,507.56 $544.30 $302.39 St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine on INSTRUCTIONAL PROFILE STAFFING - Teaching 13 1.2 16 1.9 14 1.6 11 1.3 19 2.3 16 1.8 0.7 0.8 1.2 1.3 1.3 1 1.7 1.2 0.8 0.2 0.4 1.5 0.4 0.4 1.4 0.2 0.4 3.7 0.7 1 1.5 1 1 1.1 0.2 0.4 1.8 0.8 0.5 1.9 0.8 0.4 2 0 2 5 1 2.5 2 2 2 3 3 3 1 1 1 1 1 1 1 2 2 1 2 2 2 2 2 0 0 1 1 0 0 0 1 1 1.5 1 2 rd is c us STAFFING - Support Staff 1 Yes No N/A Fo rp si on STAFFING - Non-Teaching Number of Designated Early Childhood Educators Number of Education Resourc es 10 1 os 8 0.9 pu Number of Classroom Teache Number of Special Education T Number of Specialized Teachers - French Number of Specialized Teachers - Planning Time Number of ESL Teachers Number of Librarians Number of Custodial Staff Head Custodian Number of Custodial Staff Evening Custodian Number of Custodial Staff Part Time Cleaner Yes Full-Time Head Secretary Assistant Secretary (Full-Time No Total Number of Assistant N/A ly Our Lady of Good Voyage St. Bernadette St. Dunstan School Yes No N/A Yes Yes Yes No 0.5 N/A Yes No N/A Yes No N/A Yes No N/A STAFFING - Itinerate Staff Number of Social Workers 0.2 0.2 0.2 0.2 0.1 0.2 0.3 0.3 es on ly Our Lady of St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine Good Voyage St. Bernadette St. Dunstan School 0.2 0.4 0.2 0.3 0.3 0.3 0.4 0.4 Number of Child and Youth W 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.2 Number of Psychological Asso 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.2 Number of Speech and Langua Yes No N/A No N/A K-8 K-8 SCHOOL ORGANIZATION Grade Configuration K-8 Yes Yes No N/A Yes No 1 N/A No N/A Yes No N/A No N/A Yes No N/A Yes K-8 K-8 K-8 rp Yes No N/A No N/A pu Yes Full-Time Principal No Full-Time Vice Principal Total Number of Full-Time N/A No Half-Time Vice Principal Total Number of Half-TimeN/A os STAFFING - Administrative Staff K-8 Yes No N/A Yes 0.5 0.5 K-8 is c us si on See See See See See See See See Grade Organization (Number Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 9 11 14 30 15 12 20 17 Total Number of Classes 2 3 3 3 6 4 2 5 Total Number of Split Grades 69% 50% 64% 88% 60% 50% 69% 59% Classroom Usage (%) 25 (Does not Number of out of Boundary include FI Students 28 30 52 students) 23 47 28 63 rd PROGRAM OFFERINGS AND SPECIALIZED SERVICES Fo No Arts Program No Extended French No French Immersion International Baccalaureate No Information Technology to Su Yes Guidance Counselling No No No No No Yes No No No No No Yes No No No Yes No Yes No No No No No Yes No No No No No Yes No No No No No No No No No No No Yes No No Yes ly No Yes Yes Yes Yes Yes Yes St. Valentine No Yes Yes Yes Yes Yes No No Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes No No No No on No No Yes Yes Yes Yes Yes Yes St. Raymond es No Yes Yes Yes Yes Yes No St. Herbert os No Yes Yes Yes Yes Yes Yes St. Gregory Yes No No No No No No There has been a schoolwide inquiry on 21st century teaching and learning and creating responsive classroom environments No No Yes Yes No No No Yes Yes No No No Yes No Fo rd Other Specialized Programs (Identify) No Does the School have Remedial Programs Onsite During the Day and After School No Does the School have Access to these Programs in Nearby Facilities Yes is c us si on Career Education Programs (e.g. Co-op Placements) No Yes Early Literacy Resources Culturally Inclusive Programs Yes English-as-a-Second Language Yes Yes Special Education Classes Special Education Resources Yes Programs/Support for StudentYes Lead and/or Specialized Teachers with Specialized Skills No St. Gertrude rp Our Lady of Good Voyage St. Bernadette St. Dunstan pu School St. Gertrude St. Gregory Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes STUDENT ACHIEVEMENT - EQAO us is c Reading Writing Math Grade 3 School/Board 67/71 57/71 71/76 70/76 76/64 52/64 Fo rd Grade 6 School/Board 94/81 86/81 94/82 82/82 75/53 50/53 PREVIOUS FIVE-YEAR ENROLMENT No Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes rp pu Yes Yes Yes Yes Yes Yes Yes Yes St. Valentine si on Yes Yes Yes Yes Yes Yes Yes Yes St. Raymond os EXTRACURRICULAR ACTIVITIES & SPECIAL EVENTS School Plays Dance/Socials Religious Retreats Graduation Celebrations Athletics Clubs Leadership/Student Council Fundraising St. Herbert on Yes ly Our Lady of Good Voyage St. Bernadette St. Dunstan es School Does the School Location Easily Attract Parent/Family/Community Volunteers 84/71 76/76 88/64 82/71 85/76 69/64 86/71 86/76 81/64 68/71 68/76 74/64 86/71 98/76 88/64 63/71 77/76 58/64 92/81 100/82 73/53 85/81 88/82 67/53 84/81 88/82 61/53 73/81 91/82 52/53 78/81 80/82 44/53 85/81 85/82 69/53 es on ly Our Lady of St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine Good Voyage St. Bernadette St. Dunstan 231 353 349 545 455 423 625 446 238 326 302 577 434 372 587 430 215 289 306 611 403 349 550 392 199 253 309 620 380 317 535 400 195 231 284 644 341 285 490 370 192 215 312 646 323 264 447 377 os School 2010-2011 Enrolment 2011-2012 Enrolment 2012-2013 Enrolment 2013-2014 Enrolment 2014-2015 Enrolment Current Enrolment 2015 TEN-YEAR ENROLMENT PROJECTIONS rp See Attachment 3 pu OTHER SCHOOL USE PROFILE Fo rd is c us si on Programs or co-located within School No No No No No No No No N/A N/A N/A N/A N/A N/A N/A N/A Rent Being Collected N/A N/A N/A N/A N/A N/A N/A Operating at Full Cost ReN/A Community Use of the School (Permits) Yes Yes Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A Rent Being Collected N/A N/A N/A N/A N/A N/A N/A Operating at Full Cost ReN/A Before and After School Programs Yes Yes Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A Rent Being Collected N/A N/A N/A N/A N/A N/A N/A Operating at Full Cost ReN/A Yes - Child Yes - Child Yes - Child Yes - Child Yes - Child Care Centre Care Centre Care Centre Care Centre Care Centre Lease Terms at the School No No No N/A N/A N/A N/A N/A N/A N/A N/A Rent Being Collected N/A N/A N/A N/A N/A N/A N/A Operating at Full Cost ReN/A Factors of a Suitable Facility • Facilities utilized at 65% or less for 2 consecutive years and/or have 200 or more projected unused pupil places for at least 5 for Community Planning years from the start of the partnership Partnerships ly Our Lady of St. Gertrude St. Gregory St. Herbert St. Raymond Good Voyage St. Bernadette St. Dunstan Ability to identify and create a distinct and contiguous space within the facility, separate from the students on School St. Valentine Fo rd is c us si on pu rp os es Facility is not located within an area where a Pupil Accommodate Review has been announced, subject to Board Policy 6.51 Space not required for Board programming or other uses Yes Yes No Yes Yes No Yes Does the School meet th No Current Community Planning Yes - Ontario Partnerships Early Years No No No No No No No N/A N/A N/A N/A N/A N/A N/A N/A Rent Being Collected N/A N/A N/A N/A N/A N/A N/A Operating at Full Cost ReN/A on # of Special Education students in self‐ contained classes 6 7 8 7 10 2 10 3 Fo rd is cu ss io n pu rp o se s School Our Lady of Good Voyage St Bernadette St Dunstan St Gertrude St Gregory St Herbert St Raymond St Valentine ly Special Education Enrolment information, based on October 31, 2015 Data Link to the Board’s Community and Planning Partnerships section of the website: http://www.dpcdsb.org/CEC/About+Us/Planning/Community+Partnerships.htm ly Community Planning and Partnerships on On June 16, 2015 the Board of Trustees approved a new Community Planning and Partnership policy to se s reflect amendments to the Ministry of Education guideline on facility partnerships issued in March 2015. The main purpose of the guideline is to encourage school boards to work with community partners to share facilities for the benefit of the boards, students and the community, and to optimize the use of public assets owned by school boards. The operation of these facility partnerships will occur during school hours. is cu ss io n pu rp o Community consultation on Community Partnerships will be held on an annual basis or before the announcement of a Pupil Accommodation Review. This consultation will be an opportunity for the Dufferin‐Peel Catholic District School Board to exchange information with interested facility partners regarding available spaces and/or potential co‐build projects and community needs. A list of potential partnership sites will be also available for discussion at the consultation meeting. For more information on the Community Planning and Partnership framework and principals, please refer to the Community Planning and Partnership Policy. Interested facility partners can fill out an application form and submit to CPPinfo@dpcdsb.org. For further information, please contact us via email at CPPinfo@dpcdsb.org or 905‐890‐0708, ext. 24440. Fo rd ‐ See more at: http://www.dpcdsb.org/CEC/About+Us/Planning/Community+Partnerships.htm Community Partners Distribution List Applewood Centre for Adult Learning Amaranth East Garafraxa Archidiocese of Toronto Ark Children Devt School Autism Ontario Average Joe Sports AYSP BMC Centre Bolton Soccer Club Brampton Volleyball Caledon Cougars Basketball Canadian Bureau for the Advancement of Music Child Development Resource Connection Peel Central West LHIN Community Foundation of Mississauga City of Brampton City of Mississauga Community Living Mississauga Conseil Scolaire Viamonde Conseil Scolaire de district catholique Centre-Sud Dufferin Child and Family Services Disability Access Dixie Bloor Neighbourhood Centre Dixie Soccer Club Dufferin County Eco Source Erin Oak Kids Family Day Family Education Centre Fun School Girl Guides Headwaters Health Care Centre Heritage Mississauga Humber Ismaili Council for Ontario Brampton Caledon Community Living Kerrys Place Kids Pathways Peel LAJQ Chick Lakeview Toastmasters Learning Disabilities Association of Peel Region Local Health Integration Network Learning in our Neighbourhood (LION) Major Move Ministry of Child and Youth Services Melancthon Township Ministry of Health APPENDIX 2 Mississauga Halton LHIN Mississauga Monarchs Basketball Mississauga Parent Child Resource Centres New Steps Child Care Nexus Youth PC Volleyball Peel DSB Peel Health Peel Regional Police PLASP Region of Peel Sheridan College Special Olympics The Dam TopChild Learning Town of Amaranth Town of Caledon Town of Grand Valley Town of Mono Town of Mulmur Town of Orangeville Trillium Health Partners University of Toronto Mississauga Vita Manor Wellington Dufferin Guelph Public Health William Osler Health Centre YMCA Background information regarding the Central Erin Mills Pupil Accommodation Review 1. November 13, 2008 Board Meeting Minutes 2. November 13, 2008 – Report to the Board of Trustees Re: Central Erin Mills Pupil Accommodation Review Follow-Up Report • (ARC Report) Appendix A: Central Erin Mills Report to the Director of Education, June 23, 2008 Re: Central Erin Mills Accommodation Review Committee • (Staff Report) Appendix B: Report to Special Administration and Finance Committee, September 16, 2008 Re: Central Erin Mills Accommodation Review Area