IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed to keep vents clear at all times. Record locations here: 2. Ground Level Outdoor Inspection (weather permitting) a. Univent air intakes are free of obstructions. If false, record locations here: b. Filters i. Medium efficiency filters are installed in all univents. If false, list locations and create work orders to initiate corrective action. ii. High efficiency filters are installed in the air handling units. If false, list locations and create work orders to initiate correction action. iii. Filters are being changed every six months and the installed date is written on the outer filter casing. If filter is older than 6 months, list locations and create work orders to initiate corrective action. c. Insects, bird nests, or droppings are not evident near outdoor air intakes. If false, indicate locations here: d. Trash dumpsters are located away from doors, windows, and outdoor air intakes. e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) f. Trucks and buses are not allowed to keep their engines idling near the building. Page 1 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A g. No evidence of drainage problems exist. Water drains away from the building including roof downspouts. h. Sprinklers do not spray directly toward the building or into outdoor air intakes. i. j. Grass clippings from mowers are directed away from the building air intakes. The landscaper has been intructed to blow clippings away from the building. This is being monitored weekly. Clean walk-off mats are present at exterior entrances. 3. Roof (Inspections conducted weather permitting) a. Roofing consultant has not found any issues requiring immediate repair. Most recent roofing inspection date/company: 5-year roofing plan completed 5/25/2010 with C. E. Crowley & Associates. b. There is no evidence of water ponding on the roof. This is a rock ballasted roof but no evidence of ponding was visible. c. Intake ventilation units are operating properly and free of debris. d. All exhaust fans are operating properly and free of debris. e. Air intake dampers are set to allow air flow even at minimum setting. f. Insects, birds, animal nests or droppings are not evident near outdoor air intakes. g. Plumbing stacks and exhaust vents are located away from air intakes. 4. Attic a. There is no evidence of roof or plumbing leaks. There is no attic. Page 2 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A b. There is no evidence in attic of insects, birds, animals, or nests. No Attic. 5. General Considerations a. Classrooms, offices and/or common areas appear recently cleaned. If examples of poor housekeeping are found, record locations below: First floor gave evidence of not being vacuumed in the hallways. This was addressed with GCA supervisors. b. Only vacuums with HEPA filters are being used. c. All supply and exhaust ventilation units are working properly. The re-commissioning of the Building automation system is on-going which means that some fan units may be off for brief periods of time as we confirm connections. d. Occupied space temperatures and relative humidity levels are within the standards listed below. i. Temperature range: Winter temperatures 70-73 degrees. Summer temperatures 74-80 in air-conditioned spaces and 74-85 in non-air-conditioned spaces. Outdoor air temperature: 32.5 degrees. Highest temperature – Location: A206; Reading of 74.3 degrees. Lowest temperature – Location: B126, B210; Reading of 69.7 degrees. ii. Relative humidity range is 30% to 60%. Non-air-conditioned spaces may be higher on rainy or humid summer humid days. All spaces may be less than 30% when the out-door air temperature is less than 32 degrees. Outdoor relative humidity: 51% Highest relative humidity – Location: A109; Reading of 28.3% Lowest relative humidity – Location: Main Office;Reading of 23.1% Page 3 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A Readings not within acceptable standards will result in the creation of a work order, requesting maintenance to address. (Readings are noted on the attached test data sheet) e. Occupied space readings of carbon monoxide (CO) levels are less than 9.0 PPM. Outdoor Air CO Reading: .5 Highest CO Location: A200, A202, B208, B213 Reading: 0.2 Lowest CO Location: Numerous Rooms Reading: 0 If the CO level is greater than 9.0 PPM in any space as measured with a handheld device or “leave-in” monitor, the space must be cleared of all occupants and steps taken to correct the problem. The issue will be immediately addressed by maintenance and the Fire Department. (Readings are noted on the attached test data sheet) f. CO2 levels in any occupied space are below threshold limits. i. Perform CO2 check with Gray Wolf or other portable device. Measure four times yearly or more often if needed. Measure only in fully occupied rooms. Reading should be less than 700 PPM plus outside air CO2 PPM. 700 PPM + 350 PPM = 1050 PPM Assume outside CO2 is 350 if temperature is below 41 degrees and air is not stagnant with no- wind. Record all occupied space CO2 levels on forms provided. Provide the outdoor CO2 level as well as the high and low CO2 extremes below: Outdoor reading: 410 PPM Highest CO2 reading – Location: B204; Reading of 956 PPM Lowest CO2 reading – Location: B118; Reading of 518 PPM 2 hour occupancy requirement met. There is a need to confirm room numbers and locations to sync rawings with actual building layout. Page 4 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A ii. If reading is above threshold, check univent and air handling dampers to ensure a value is set to provide at least 15 cfm of fresh air intake per student based on average space occupancies. If reading is consistently elevated, then use data logging to monitor CO2 concentrations over time and look for other sources of problems. iii. CO2 levels were checked three months ago. g. h. i. j. iv. CO2 levels on “leave-in” devices, where present, where checked. No Leave In devices Offensive odors are not apparent. If false, list problem areas: Offensive gas smell has been reported. Corrective action has been identified and is in process. Water damage is not evident. Check for roof leaks, pipe leaks, spills, stained ceiling tiles, etc, visually and with moisture meter. Look for the source of any water leaks and schedule repairs. Discard porous items such as ceiling tiles if wet for more than 24 hours. For carpeting, if less than 9 square feet of wet area, shampoo with germicide and fan dry. For areas greater than 9 square feet, replace carpet with tile in reasonable timeframe. If carpet is over ACM tile, replace during next unoccupied break time (winter break, spring break, summer). If false, record findings and locations here: Stained ceiling tile in stairwell by door 21, Prep Room by B206. Also water is penetrating through the window in Todd's office. Mold or mildew growth is not evident. If false, record findings and locations here: All pest management issues are being handled by Integrated Pest Management. k. No other unresolved concerns or complaints by building personnel are known. If false, list any pending issues not previously mentioned in this report here: l. There are no incomplete HVAC preventative maintenance (PM) work requests. If false, list any incomplete HVAC work request here: Page 5 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A 6. Bathrooms and General Plumbing a. All locker or restroom exhaust fans are working. Inoperable or malfunctioning fans are listed as follows: Location: Problem: b. All of the following drain-trap maintenance procedures are being conducted according to the frequency indicated. If false, indicate all deviations and locations: i. Water is poured into floor drains once per week (approximately 1 quart of water) or water and a teaspoon of cooking oil poured into the drain once a month. Drafting a PM procedure to confirm that all floor drains are consistantly checked and that a record of this data is maintained. ii. Water is poured into sinks at least once per week (about 2 cups of water). iii. Toilets are flushed at least once per week. 7. Lab Chemicals & Maintenance Supplies a. Lab chemicals are used with exhaust fans turned on. Just for reference, the science exhaust hoods will be inspected, balanced and certified over the summer. b. Lab chemical storage areas have been inspected yearly by ROE and Fire Department. Record last inspection dates below: ROE: 10/10 LZFD: 10/10 c. Flammables are not stored with igniters. d. All chemicals that may react or produce toxic or explosive by-products are separated and maintained in Page 6 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A approved containers stored in approved storage. (e.g. lockable, with appropriate ventilation). e. Chemical disposal records for all lab chemicals are available for review. f. All cleaning products used in building contain no/low VOC. List any exceptions: g. Increased ventilation is considered when installing new carpets, cleaning upholstered furniture, shampooing carpets, etc. h. Exhaust ventilation systems in chemical and trash storage areas are turned on and functioning properly. i. Portable fuel containers are properly closed. j. Power equipment, like snow blowers and lawn mowers, have been serviced and maintained according to manufacturers’ guidelines. k. Oil based paints are stored in approved storage cabinets. No oil based paints allowed in the district. l. Green Cleaning products and processes are used in this building. 8. Combustion Appliances a. Combustion analysis is performed at the start of the heating season on all boilers. Adjustments are made to the burners to correct any abnormalities and improve efficiency. b. In rooms that contain combustion appliances, there is no evidence of combustion gas or fuel odors. If false, record locations here: c. No leaks, disconnections, and/or deterioration were found on exhaust hoods. Page 7 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A d. Flue components are clean and free of soot. e. All combustion appliances have flues or exhaust hoods and vent NO2. i. If false, inspect cooking hoods, chemical hoods. Assure that cooking stoves and appliances are correctly installed, used, and maintained according to manufacturers’ specifications. ii. If not vented, ensure that “leave-in” CO monitors are placed in room. Record locations here: iii. CO levels in rooms with combustion appliances are measured and recorded with an IAQ monitor. CO readings outside of normal CO range will result in an immediate response by maintenance to reduce CO level or vacating the room/building, if necessary. Record locations here: 9. Other a. Paint No peeling and/or flaking paint found. If planned building renovation will damage paint or if peeling paint is discovered, lead testing may be necessary. If peeling paint is found, send email to the building Principal and the Facilities Director alerting them of the problem. Staff and teachers need to pick up any flakes of paint to prevent children from being exposed. The Facilities Director will advise the Facilities Coordinator (a Certified Lead Paint Renovator) to test the paint for lead. Lead paint was discontinued in 1978. Buildings built after 1978 are exempt from lead paint testing. If lead is present, required repairs should be done immediately using lead-safe methods and, if necessary, a licensed lead contractor. Location(s) of known peeling paint in building: b. The following preventive measures are being taken to reduce lead exposure. i. Play areas and toys are cleaned nightly. Page 8 of 9 Revised 3/21/2011 AMJ Created 11/2010 IAQ Check List Building: Lake Zurich Middle School North Date: May 14, 2011 ii. IAQ Check List Building Inspection Performed by: Skip Lubenow, Denys Armashov, Lyle Report Compiled by: Lyle Erstad Check List True False N/A Floors are mopped nightly. iii. Dust at least weekly. c. Radon testing is recommended by IEMA every 5 years. Last testing date listed below: Date: ; Reading of d. The IAQ testing equipment used for this inspection was calibrated and is in good working order. Equipment Used: Gray Wolf Last date of calibration: 2/4/11 Page 9 of 9 Revised 3/21/2011 AMJ Created 11/2010 Middle School North 95 Hubbard Ln. Spring 2011 IAQ Readings Site Location Date/Time Temperature °F Relative Carbon Monoxide Carbon Dioxide Occupants Humidity %RH ppm ppm Middle School North Outdoor Air 20-Apr-11 11:03:34 AM 32.5 51.0 0.5 410 Middle School North A104 20-Apr-11 12:53:52 PM 70.9 27.1 0.0 686 22 Middle School North A109 20-Apr-11 12:55:31 PM 71.6 28.3 0.0 817 29 Middle School North A110 20-Apr-11 12:57:29 PM 72.2 26.9 0.1 613 3 Middle School North A112 20-Apr-11 01:00:28 PM 73.7 26.4 0.0 579 12 Middle School North A200 20-Apr-11 01:29:37 PM 73.3 27.6 0.2 916 29 Middle School North A202 20-Apr-11 01:27:57 PM 73.4 27.0 0.2 873 27 Middle School North A204 20-Apr-11 01:24:49 PM 74.0 26.3 0.1 861 25 Middle School North A205 20-Apr-11 01:23:02 PM 74.2 24.9 0.1 700 7 Middle School North A206 20-Apr-11 01:26:23 PM 74.3 25.6 0.0 736 11 Middle School North A207 20-Apr-11 01:21:30 PM 73.8 24.2 0.1 556 3 Middle School North A208 20-Apr-11 01:15:17 PM 72.7 25.3 0.0 677 20 Middle School North A209 20-Apr-11 01:13:40 PM 72.8 24.5 0.1 593 9 Middle School North A210 20-Apr-11 01:09:13 PM 73.5 27.9 0.0 695 14 Middle School North A211 20-Apr-11 01:12:03 PM 73.6 27.1 0.1 843 12 Middle School North A212 20-Apr-11 01:07:08 PM 72.3 26.3 0.1 720 16 Middle School North A213 20-Apr-11 01:03:42 PM 72.7 26.1 0.0 703 20 Middle School North A214 20-Apr-11 01:05:37 PM 72.5 26.5 0.1 774 22 Middle School North A215 20-Apr-11 01:02:24 PM 72.4 26.6 0.1 788 22 Middle School North B102 20-Apr-11 12:32:40 PM 72.6 27.2 0.0 812 24 Middle School North B104 20-Apr-11 12:34:42 PM 72.1 25.8 0.0 630 29 Middle School North B106 4/20/2011 12:39 72.4 26.8 0.0 741 28 Middle School North B110 20-Apr-11 12:36:34 PM 71.9 25.7 0.1 629 9 Middle School North B112 20-Apr-11 12:41:21 PM 72.5 26.7 0.0 696 17 Middle School North B114 20-Apr-11 12:44:30 PM 70.1 25.2 0.0 477 3 Middle School North B118 20-Apr-11 12:46:13 PM 70.2 25.6 0.0 518 5 Middle School North B126 20-Apr-11 12:48:20 PM 69.7 25.9 0.0 556 5 Middle School North B202 20-Apr-11 01:33:30 PM 73.3 24.5 0.0 651 11 Middle School North B203 20-Apr-11 01:31:46 PM 73.2 24.6 0.0 599 8 Middle School North B204 20-Apr-11 01:35:02 PM 73.0 25.4 0.1 770 19 Middle School North B206 20-Apr-11 01:36:53 PM 73.2 27.3 0.0 956 23 Middle School North B207 20-Apr-11 01:38:47 PM 73.3 25.8 0.1 699 19 Middle School North B208 20-Apr-11 01:45:29 PM 72.4 25.7 0.2 759 22 Middle School North B209 20-Apr-11 01:40:21 PM 73.4 26.4 0.1 822 29 Middle School North B210 20-Apr-11 01:48:52 PM 69.7 24.8 0.1 560 23 Middle School North B211 20-Apr-11 01:47:03 PM 71.9 26.1 0.1 842 13 Middle School North B212 20-Apr-11 01:50:17 PM 72.0 27.4 0.0 880 17 Middle School North B213 20-Apr-11 01:51:43 PM 71.8 26.3 0.2 762 16 Middle School North Main office 20-Apr-11 01:54:04 PM 71.5 23.1 0.0 529 5 Middle School North A102 20-Apr-11 12:51:38 PM 70.9 27.4 0.0 670 9 Taken by Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Taken with Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Middle School North Outdoor Air 11-May-11 12:44:13 PM 86.1 66.1 0.3 368 Middle School North A103 11-May-11 12:04:19 PM 74.2 51.7 0.1 755 2 Middle School North A105 11-May-11 12:09:49 PM 74.8 51.9 0.1 811 4 Middle School North A106 11-May-11 12:06:52 PM 75.1 53.2 0.1 1120 29 Middle School North A107 11-May-11 12:11:37 PM 74.8 52.5 0.1 906 12 Middle School North A108 11-May-11 12:13:31 PM 74.9 52.8 0.1 844 19 Middle School North A111 11-May-11 12:15:36 PM 74.4 53.1 0.1 Middle School North A113 11-May-11 12:17:24 PM 74.7 53.6 0.1 1057 2 Middle School North A114 11-May-11 12:22:03 PM 74.9 53.5 0.1 1127 2 Middle School North A115 11-May-11 12:19:18 PM 74.7 53.1 0.1 993 2 Middle School North A203 11-May-11 12:26:31 PM 75.2 52.2 0.1 816 2 Middle School North B104 11-May-11 12:40:34 PM 74.5 54.6 0.0 876 28 Middle School North B116 11-May-11 12:37:54 PM 74.8 52.9 0.1 829 2 Middle School North B200 11-May-11 12:32:36 PM 75.3 52.3 0.1 847 5 Middle School North B201 11-May-11 12:30:50 PM 75.0 52.6 0.1 773 3 Middle School North B205 11-May-11 12:34:40 PM 74.9 52.6 0.2 832 10 Middle School North A100 11-May-11 12:02:07 PM 74.6 54.9 0.1 885 26 988 19 Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Denys Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf Gray Wolf