NORTH PENN SCHOOL DISTRICT CAPITAL PROJECTS MASTER PLAN SCHOOL ACTIVE PROJECTS: Inglewood Kulp Nash North Wales York Avenue PROJECT NAME Renovations Renovations Renovations Renovations Renovations PROJECTED TOTAL COST PROJECTED 2013-2014 EXPENDITURES PROJECTED 2014-2015 EXPENDITURES 14,838,036 20,024,503 9,802,515 11,947,647 8,148,888 64,761,589 14,838,036 20,024,503 9,802,515 11,947,647 8,148,888 64,761,589 15,545,000 15,545,000 TOTAL APPROVED 15,545,000 TOTAL ACTIVE & APPROVED 80,306,589 TOTAL ACTIVE Paid as of 12/31/13: $63,830,548 APPROVED PROJECTS: Hatfield Renovations and Additions OTHER PENDING PROJECTS: Montgomery Renovations and Additions Cash balance as of 12/31/13: $0 Cash Available (for proposed projects): ($16,476,041) PROJECTED 2015-2016 EXPENDITURES PROJECTED 2016-207 EXPENDITURES PROJECTED 2017-2018 EXPENDITURES 0 0 0 0 15,545,000 0 0 0 0 80,306,589 0 0 0 0 19,680,000 19,390,394 TOTAL OTHER PROPOSED 19,680,000 0 19,390,394 0 0 0 GRAND TOTAL 99,986,589 80,306,589 19,390,394 0 0 0 1/9/2014 Capital Reserve Projects 2013-2014 December 2013 Project School Original Budget Adjusted Budget Encumbrances Expenditures Balance Status Comments Bridle Path Carpet Replacement 28,846.00 28,846.00 0.00 28,846.00 0.00 C 9,000.00 9,000.00 0.00 0.00 9,000.00 Carpet Replacement 26,115.00 26,115.00 0.00 26,115.00 0.00 C Carpet Replacement 16,832.00 16,832.00 0.00 16,832.00 0.00 C Clock System Repairs 37,000.00 18,500.00 0.00 18,500.00 0.00 C 143,370.00 143,370.00 9,102.50 135,253.50 27,141.98 63,900.26 0.00 63,900.26 0.00 C C C Gwyn Nor Instrument Storage Gwynedd Square Knapp Pennbrook Pennfield Hot Water Heater Replacement (986.00) Penndale Carpet Replacement High School Carpet Replacement Sidewalk Repair Terrazzo Repair Band Shell Replacement 83,100.00 15,000.00 10,000.00 26,106.00 58,559.00 19,565.00 10,000.00 26,106.00 0.00 0.00 0.00 0.00 58,559.00 19,565.00 0.00 26,106.00 0.00 0.00 10,000.00 0.00 Wireless Upgrade 66,904.85 66,904.85 81,358.67 41,519.85 (55,973.67) Bus Replacement Transport Radio Tower 690,000.00 32,246.00 690,000.00 32,246.00 183,773.00 15,058.00 484,275.00 0.00 21,952.00 17,188.00 Aspalt Paving Security Upgrade 250,800.00 153,854.17 250,800.00 153,854.17 0.00 2,268.91 101,792.55 103,944.87 149,007.45 47,640.39 $1,616,316.00 $1,614,598.28 $291,561.08 $1,125,209.03 C Technology Transportation Facilities $197,828.17 1/9/2014 North Penn School District Summary of Inglewood Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Architect Fees Reimbursable Expenses Approved Budget Contract/Bid Cost $906,963 $150,000 $906,963 $150,000 General Contractor Change Order #1 $4,997,000 $4,997,000 Site Construction $1,664,642 Electrical Contractor HVAC Contractor Change Order #1 Change Orders Total Cost Amount Paid Vendor Balance $1,056,962.63 $1,026,352.62 Bonnett Assoc. $30,610.01 $5,018,061.75 $4,967,881.13 Lobar Inc. $1,664,642 $1,664,642.00 $1,542,943.10 Out of Site Infrastructure, Inc. $121,698.90 $2,046,197 $2,046,197 $2,046,197.00 $1,914,448.89 Electri-Tech, Inc. $131,748.11 $2,999,609 $2,999,609 $2,948,523.00 $2,765,383.50 B&S Sheet Metal Mechanical $183,139.50 $50,180.62 $21,061.75 ($51,086.00) Plumbing Contractor Change Order #1 $975,920 Fire Protection Contractor Change Order #1 Change Order #2 $273,241 Modular Classrooms $315,739 Furniture/Equip. Audio Visual Equipment $200,000 $975,920 $952,271.00 $927,124.00 Jay R Reynolds, Inc. $25,147.00 $276,639.34 $260,989.44 Guy Cooper, Inc. $15,649.90 $315,739 $315,739.00 $307,837.00 Mobilease $100,000 $150,000 $250,000.00 $227,053.15 ($23,649.00) $273,241 $1,484.73 $1,913.61 $7,902.00 $22,946.85 Page 1 of 2 North Penn School District Summary of Inglewood Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Approved Budget Contract/Bid Cost Change Orders Total Cost Amount Paid Vendor Balance Asbestos Abatement $134,000 $134,000 $134,000.00 $124,780.00 Power Component Systems Miscellaneous Escrow and Fees Bid document fees $50,000 $125,000 $50,000 $125,000 $175,000.00 ($64,685.82) $164,029.88 Towamencin Township/Montgomery County $0.00 $72,206.86 KEM Partners Inc./ECS Mid-Atlantic LLC $3,449.08 $14,838,311 $14,888,311 TOTAL ($50,274.91) $14,838,035.72 $14,304,478.65 $9,220.00 $533,557.07 Page 2 of 2 North Penn School District Summary of Inglewood Elementary School Miscellaneous and Furniture Expenses: December 31, 2013 Category Furniture and Equipment: Approved Budget Amount Paid Vendor $200,000.00 $14,580.00 $7,086.36 $28,391.00 $341.00 $56,826.07 $391.88 $14,384.00 $195.94 $1,423.00 $1,575.00 Eplus Technology Eplus Technology Comm Solutions Office Basics Educational Furniture Solutions Tech Depot Educational Furniture Solutions Tech Depot School Nurse Supply Total Video Products $440.10 Lowes Total Video $84,390.00 Products Educational $6,571.40 Furniture Solutions $698.40 Eplus Technology $8,987.00 Total Video Educational $772.00 Furniture Solutions Subtotal Miscellaneous: Reason Switches VOIP phones Wireless Access Filing Cabinets Main office and classroom furniture Network Interface Main office and classroom furniture Network Interface Health Suite Furniture Smartboard for IMC Refrigerator for Health Suite Audio Visual set for classrooms Main office furniture VOIP phones Video Equip. Gym Desk repair $227,053.15 $50,000.00 $117.78 P-Card J. Strobel George Allen & $280.00 Sons pay for credit rpts on contractors Access key box for Fire Dept. $240.00 P-Card J. Strobel Bux-Mont Awards & Bronze Plaque $2,301.30 Engraving Security System $510.00 Advent Security Subtotal $3,449.08 North Penn School District Summary of Kulp Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Approved Budget Contract/Bid Cost Change Orders Total Cost Amount Paid Vendor Architect Fees Reimbursable Expens $1,213,060 $100,000 $1,213,060 $299,248 $1,512,308.33 General Contractor & Site Manager $9,693,000 $9,693,000 $10,155,563.38 $10,014,735.09 Little Builders Inc. $2,000,717.05 $2,000,717.05 Electri-Tech Inc. $0.00 $3,115,641.94 $3,115,641.94 Myco Mechanical $0.00 $1,390,178.47 $1,390,178.47 Domenic DiDonato $0.00 Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 Change Order #6 Change Order #7 Change Order #8 Change Order #9 Change Order #10 Change Order #11 Change Order #12 $0.00 $140,828.29 $350,000.00 $2,433.98 $4,843.21 $5,990.45 $7,363.45 $12,208.69 $12,667.25 $14,857.75 $16,020.00 $15,006.17 $7,470.86 $13,701.57 Electrical Contractor Change Order #1 Change Order #2 $1,988,000 HVAC Contractor Change Order #1 $3,126,000 Plumbing Change Order #1 Change Order #2 $1,345,000 Food Service Equip $1,512,308.33 Bonnett Assoc. Balance $1,988,000 $10,089.84 $2,627.21 $3,126,000 ($10,358.06) $1,345,000 $43,478.51 $1,699.96 $237,700 $237,700 $237,700.00 $237,700.00 Todd Devin Food Equip $0.00 Page 1 of 2 North Penn School District Summary of Kulp Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Approved Budget Contract/Bid Cost Asbestos Removal Engineer Contractor $143,090 Furniture/Equip. $200,000 $250,000 $50,000 $50,000 Miscellaneous Change Order #1 Change Order #2 Escrow and Fees Insurance Bid document fees Mobilease Total Cost $20,000 $471,827 $506,735 $506,735 $19,094,412 $19,343,660 Vendor Balance ($15,588.22) $21,793.60 Anderson Consulting/Keating Environmental $136,884.62 Delta/BJDS Inc. $250,000.00 $254,323.77 $1,219,304.00 $15,999.00 ($8,900.00) $55,860.48 $33,727.00 $18,861.00 $96,113.67 $487,826.00 ($8,900.00) $60,551.00 $658,521.00 $84,231.00 $18,861.00 $20,000 $471,827 Amount Paid $143,090.00 $30,000 $113,090 Change Order #1 TOTAL Change Orders $680,842.84 $20,024,503.17 $20,026,292.02 ($4,323.77) ($122,705.15) Verizon Pole Relocation Verizon Pole Relocation Hatfield Township PSBA Insurance Trust ($1,788.85) Page 2 of 2 North Penn School District Summary of Kulp Elementary School Miscellaneous and Furniture Expenses: December 31, 2013 Category Furniture and Equipment: Approved Budget Amount Paid Vendor Reason $250,000.00 Cisco Switches $32,384.00 Integra One VOIP Phones $12,503.02 Eplus Technology Educational Furniture Furniture $185,428.06 Solutions Markerboard for Gym $337.43 Hertz Furniture Shelving for Art Room $5,488.83 Office Max Storage Rack for Chairs $618.43 Hertz Furniture Technology Fiber $17,564.00 Sunesys LLC Subtotal Miscellaneous: $254,323.77 $50,000.00 Penn Valley Chemical Dispensers for Mods Grainger Clocks Graybar Coaxel Cable Highsmith Storage Cabinets and Bookcases for Mods $7,933.50 Office Max $243.81 $587.80 $1,477.77 $2,390.91 $2,264.00 E. C. Glover $239.68 Lowe's $1,822.55 Graf Engineering $785.10 Philip Rosenau Gerhart's Engraving $2,088.52 Services $200.00 Peco $466.52 Seton North Penn Water $686.31 Authority $5,317.60 $590.00 $3,565.00 $1,757.00 $7,983.35 $668.36 Power Play C & B Iron E. C. Glover Hartzel's of Chalfont Procurement Card Procurement Card $4,230.00 A H Cornell & Sons $107.32 Procurement Card $182.17 Procurement Card $541.74 Procurement Card Johnson & Towers $1,337.00 Inc $1,381.80 Graybar $184.91 IDN-Hardware Armour & Sons $5,931.00 Electric $500.00 County Electric $78.00 General Supply $318.97 Procurement Card Subtotal $55,860.69 Fence around Mods Entrances Mats for Mods Consulting Fees Hand Santizers for Mods Plaque Signs for School Water Meter Playground equipment Handrail Fence Concrete Remove/Replace concrete sidewalk Roadwork Improvement Penndot-widen road Penndot-Install sewer test on emergency generator Speakers keybox Install flashing signal Cable for overhead page system Removable handle Inspection North Penn School District Summary of Nash Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Architect Fees Reimbursable Expenses Approved Budget Contract/Bid Cost $612,350 $150,000 $612,350 $150,000 General Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 Change Order #6 $3,528,274 $3,528,274 Electrical Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 $1,418,782 HVAC Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 close out adjustment Plumbing Contractor Change Order #1 Change Order #2 $2,334,780 Fire Protection Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 Change Orders Total Cost $762,350.00 Amount Paid Vendor $663,511.41 Bonnett Assoc. Balance $98,838.59 $3,499,644.78 $3,499,644.78 E R Stuebner Inc. $0.00 $1,482,795.51 $1,482,795.51 Lederach Electric $0.00 $2,330,838.46 $2,330,301.70 Myco Mechanical $536.76 $893,692.14 $893,692.14 Dolan Mechanical $0.00 $319,868.08 $319,868.08 Affordable Fire Protection $0.00 ($47,861.76) $6,028.70 $4,929.81 $12,288.50 $16,985.53 ($21,000.00) $1,418,782 $1,403.00 $7,346.13 $10,190.79 $9,429.94 $35,643.65 $2,334,780 $1,303.21 ($28,900.00) $11,150.58 $12,504.67 $874,954 $874,954 $19,588.14 ($850.00) $300,543 $300,543 $7,800.00 $3,271.29 $3,233.00 $7,220.79 ($2,200.00) Page1 of 2 North Penn School District Summary of Nash Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Asbestos Abatement Engineer Contractor Furniture/Equip. Miscellaneous Change Order #1 Escrow and Fees TOTAL Approved Budget Contract/Bid Cost Change Orders $57,500 Total Cost Amount Paid Vendor $57,500.00 $7,500 $50,000 Balance $2,693.90 $26,389.40 KEM Partners Inc. $28,416.70 $250,000 $250,000 $250,000.00 $50,000 $205,826.00 $150,000 $50,000 $5,826 $150,000 $9,727,183 $9,733,009 $69,505.97 $9,802,514.97 $210,416.01 $895.55 $5,826.00 Peco Energy $64,015.00 $9,525,772.28 $39,583.99 $135,089.45 $276,742.69 Page2 of 2 North Penn School District Summary of Nash Elementary School Miscellaneous and Furniture Expenses: December 31, 2013 Category Furniture and Equipment: Approved Budg Amount Paid $24,446.40 $344.19 $667.10 $613.00 $520.00 $664.86 $16,920.00 $54,310.00 $1,996.30 $1,185.68 $2,227.50 Subtotal Educational Furniture Solutions Eplus Technologies Play Power Office Depot Philip Rosenau Henry Schein Inc Visa Educational Furniture Solutions Hertz Furniture Moore Medical Sears Woodwind/Brasswind Office Depot PC Age Total Video Products Bux-Mont Awards Office Basics Kurtz Bros. Library/Classroom/Office Furniture VOIP Phones Playground equipment Bulletin Boards Mats for Café Furniture for Nurse's suite Cables for computers additional library furniture Lobby benches Furniture for Nurse's suite Refrigerator for staff room Music stand storage cart Bulletin Boards Projectors for Classrooms Pole system for projectors Sign for school Bulletin Boards Shelves $210,416.01 $50,000.00 Kistler O'Brien Fire $738.75 Protection $156.80 Visa Subtotal Reason $250,000.00 $59,426.65 $7,068.00 $39,043.00 $382.13 $179.20 $382.56 $39.44 Miscellaneous: Vendor $895.55 Alarm system repair Door closures North Penn School District Summary of North Wales Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Architect Fees Reimbursable Expenses General Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 Change Order #6 Change Order #7 Change Order #8 Change Order #9 Change Order #10 close out adjustment Electrical Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 Change Order #6 Change Order #7 Change Order #8 Change Order #9 Change Order #10 Change Order #11 Change Order #12 HVAC Contractor Change Order #1 Change Order #2 Change Order #3 Approved Budget Contract/Bid Cost $770,888 $100,000 $770,888 $100,000 $3,732,000 $3,732,000 Change Orders Total Cost $870,888.00 Amount Paid Vendor $859,832.28 Bonnett Assoc. Balance $11,055.72 $4,121,099.10 $4,121,099.10 Ernest Bock & Sons $0.00 $1,427,578.80 $1,427,578.80 MJF Electrical Contracting $0.00 $2,488,226.74 $2,488,226.74 Myco Mechanical $0.00 $40,817.00 $1,452.00 $42,121.33 $16,722.58 $33,643.71 $203,764.00 $2,888.00 $6,086.00 $33,461.48 $8,368.00 ($225.00) $1,322,995 $1,322,995 $3,718.75 $15,799.00 $15,049.18 $1,643.50 $28,525.00 $6,757.55 $2,704.61 $2,350.51 $22,950.00 $2,888.00 $2,767.00 ($569.30) $2,478,000 $2,478,000 $3,500.00 $6,415.01 $311.73 Page 1 of 2 North Penn School District Summary of North Wales Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Approved Budget Plumbing Contractor Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 $881,000 Fire Protection Contractor Change Order #1 Change Order #2 Change Order #3 close out adjustment Site Construction Change Order #1 Change Order #2 Change Order #3 Change Order #4 $379,000 $969,000 Amount Paid Vendor Balance $938,342.55 $938,342.55 Worth & Co., Inc. $0.00 $379,000 $366,252.70 $366,252.70 Apex Plumbing & Heating $0.00 $969,000 $1,000,733.07 $1,000,733.07 Bencardino Excavating $0.00 $8,851.90 $10,595.00 $7,339.00 $4,947.17 Furniture/Equip. close out adjustment $200,000 TOTAL $881,000 Total Cost $8,583.50 ($15,250.00) ($6,081.80) $1.00 $149,900 Escrow and Fees Insurance Bid document fees Change Orders $27,380.46 $1,465.26 $9,677.59 $11,453.99 $7,365.25 Asbestos Removal Engineer Contractor Miscellaneous Contract/Bid Cost $149,900.00 $30,000 $119,900 $9,684.80 $34,182.95 JMSI Enviromental Corp. $106,032.25 Sargent Enterprises $200,000 $159,146.35 $159,146.35 $425,480.00 $24,115.41 $6,580.50 Fred's Trailer Rental $115,131.42 Borough of North Wales $295,250.00 PSBA Insurance Trust ($11,900.00) $0.00 ($40,853.65) $50,000 $50,000 $20,000 $287,380 $100,000 $287,380 ($11,900.00) $11,340,163 $11,420,163 $527,484.31 $11,947,647.31 $11,930,604.12 ($3,697.33) $17,043.19 Page 2 of 2 North Penn School District Summary of North Wales Elementary School Miscellaneous and Furniture Expenses: December 31, 2013 Category Furniture and Equipment: Approved Budget Amount Paid Vendor Reason $200,000.00 $5,949.92 Eplus Technology $211.85 Highsmith $79,194.00 Total Video Products Educational Furniture $6,288.00 Solutions $1,666.00 Eplus Technology Educational Furniture $44,271.45 Solutions $1,044.00 Eplus Technology $8,618.00 Thoma Inc. $848.00 Visual Sound VOIP Phones Library Signs Projectors Library Furniture Phones Office Furniture Phones Additional case work for new classrooms Rail kit for LCD projectors Casework for classroom $1,680.00 Reed Associates Educational Furniture Office Furniture $2,320.00 Solutions Nurses' office furniture $382.56 Henry Schein Protective cover for facuets $1,915.00 Youngs Climbing Wall Mats $1,742.96 S & S Worldwide Bullentin Boards $681.51 Office Depot Educational Furniture Office Furniture $1,053.00 Solutions Nurses' office furniture $667.10 Moore Medical Refrigator $613.00 Sears Subtotal Miscellaneous: $159,146.35 $50,000.00 Midatlantic $500.00 Inspections Borough of North $489.00 Wales $170.00 Potty Queen $3,990.00 $910.00 $2,224.81 $3,900.00 $222.00 $4,631.00 Alderfer Glass C & B Iron Gerhart's Engraving A & R Assoc NP Firecompany Procurement Card E C Glover Clayton Services Horizon Sign Hajoca Corp New Hope $158.00 Refrigeration Independent Contract $1,215.00 Flooring $3,227.00 $945.00 $168.00 $1,365.60 Subtotal $24,115.41 Electric Consulting Professional Services Replacement of Damaged Windows Railing Dedication Plaque Roof curbing Install and Repair Fence Repair Oil Tank School Sign Facuet Repair Repair condensing unit Replace carpet in room 114 North Penn School District Summary of York Ave. Elementary School Miscellaneous and Furniture Expenses: December 31, 2013 Category Furniture and Equipment: Approved Budget Amount Paid Vendor $250,000.00 $5,148.00 Hewlett Packard Educational Furniture $113,978.26 Solutions $2,080.00 Eplus Technology $52,459.00 Visual Sound $42,000.00 Powerplay $3,585.25 Creative Hobbies Subtotal Miscellaneous: Furniture Access Points Projectors Playground Equipment Kiln $50,000.00 Amerigas Eplus Technologies Home Depot Gerharts Engraving Travel in Trees Lowe's Cosimo Riccloli and $8,080.00 Sons $456.76 $4,360.72 $83.50 $2,846.65 $2,580.00 $138.27 $37,928.00 Donato Spaventa $700.00 $16,493.74 $2,080.00 $3,725.00 $1,773.00 $950.00 $190.40 $10,542.00 , Computers $219,250.51 Hale Trailer/Fred's $3,636.91 Tailer Rental Subtotal Reason $96,564.95 storage trailers propane for D Schild Access Points Plaque Transplant Trees Curb and Sidewalk Replacement Sidewalk and Ramp Professional Borough of Lansdale Services Non Hazardous PEI Disposal Group disposal Concrete for Hartzel's of Chalfont Playground Superior Turf and Landscaping Sod A H Cornell and Son Firelane Alderfer Glass Replacement glass IDN Hardware Sunesys LLC Fiber installation North Penn School District Summary of York Avenue Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Approved Budget Architect Fees Reimbursable Expenses $577,771 Construction Mgmt. Close out adjustment $190,000 General Contractor & Site Manager Change Order #1 Change Order #2 Change Order #3 Change Order #4 Change Order #5 Chimney Repair Engineer Contractor Close out adjustment Electrical Contractor Change Order #1 Change Order #2 Change Order #3 Close out adjustment Contract/Bid Cost Change Orders $577,771 Total Cost $647,264.63 Amount Paid Vendor $647,264.63 Bonnett Assoc. Balance ($0.00) $69,493.63 $190,000 $0.00 $0.00 $0.00 ($190,000.00) $3,661,600 $3,661,600 $3,697,056.66 $3,599,377.63 Perrotto Builders $97,679.03 $7,276.50 $5,649.68 $7,363.56 $9,779.62 $5,387.30 $26,240 $17,140.20 $1,240 $25,000 $0.00 $17,140.20 Bonnett Associates Inc $0.00 L J Paolella Company ($9,100.00) $978,000 $978,000 $1,016,553.54 $1,016,553.54 Silas Bolef Company $0.00 $1,405,149.91 $1,405,149.91 Five Star Inc. $0.00 $22,033.00 $6,795.79 $9,665.00 $59.75 HVAC Contractor Change Order #1 Change Order #2 $1,385,000 Plumbing Change Order #1 Change Order #2 $819,970 $1,385,000 $14,296.20 $5,853.71 $819,970 $834,526.83 $834,526.83 TMI Commerical $0.00 $9,743.93 $4,812.90 Page 1 of 2 North Penn School District Summary of York Avenue Elementary School Construction Costs As Of: December 31, 2013 Construction Category Description Approved Budget Food Service Equip $146,900 Asbestos Removal Engineer Contractor Change Order #1 $73,125 Contract/Bid Cost $146,900 Total Cost $146,900.00 Amount Paid Vendor $138,842.93 Petco Inc. $75,781.50 $10,000 $63,125 Balance $8,057.07 ($249.60) $10,249.60 Anderson Consulting $65,781.50 Power Component $2,656.50 Furniture/Equip. Close out adjustment $300,000 Miscellaneous $352,730 $300,000 $219,250.51 $219,250.51 $0.00 $89,264.03 $96,564.03 $0.00 ($80,749.49) $352,730 $0 Bid document fees Close out adjustment TOTAL Change Orders ($7,300.00) ($256,165.97) $8,511,336 $8,511,336 ($362,448.39) ($7,300.00) $8,148,887.81 $8,043,401.31 $105,486.50 Page 2 of 2