INSTITUTIONAL AND COMMUNITY PLANNING 2003-2004 AREA EFFECTIVENESS PLAN SELF-ASSESSMENT Total Number District Plans Submitted (Duplicated if for more than 1 goal 384 Total Number of Assessed Plans Met: 150 44% President Associate Vice President, Employee Relations Plan Budget No. Acct No. Area 20 11000-11107 AVP Employee Relations & Development Plan Name Projected Cost. 0 Sick Leave Pool Program Refinement of Implementation Objective Measure To refine the processing The facilitation of and communication duringcommunication between the application, approval, all parties, with the and benefit award betweenEmployee Relations the employee, the Department taking the supervisor, the Employee lead role. Benefits Office, the Payroll Office, and the Employee Relations Department, coordinated by the Employee Relations OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard 93 27% 99 29% Total Number of Non-withdrawn Plans Assessed 342 96% Total Number of Non-withdrawn Plans Not Assessed 15 4% Total Number of Plans Withdrawn 27 7% Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 100% Strategies 1. Draft procedures to assure More effective communication and the inter-departmental facilitation of the benefit coordination between offices and between the Employee award. Relations Department and supervisors. 2. Coordinate with Personnel Services to identify employees eligible for the program. 3. Provide information and promote the benefit through rptAssessmentResultsDetailLinedWithProg Total Number of Assessed Plans Not Met: Total Number of Assessed Plans In Progress Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results 1. In Progress 0% Expected Objective's Completion Date Status Use of Results Ongoing, coordinated process to ensure eligible employees are aware of the program and given the opportunity to apply. Met 2. Personnel Services provides information and forms when notified of an eligible employee. Employee Relations refers employees to A more detailed explanation Personnel Services when of the process and eligibility contacted about eligibility. requirement is being incorporated into the 3. Met with representatives of procedure. Wednesday, April 18, 2007 Page 1 of 157 President Associate Vice President, Employee Relations Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Department. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 100% Strategies employee associations. 4. Work with employees to determine eligibility and assist in the process. rptAssessmentResultsDetailLinedWithProg Total Number of Non-withdrawn Plans Not Assessed 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Employee Associations to explain the process, request On-going input. Misunderstandings of the process and eligibility were identified. Wednesday, April 18, 2007 Page 2 of 157 President Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Associate Vice President. Marketing and External Affairs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard 2 11000-14001 AVP Marketing Desktop Publishing Specialist 0 To bring the Internal To implement timely College Directory up to changes of employee's date and integrate photos status and location in the to keep employees online internal photo informed of where directory. employees are located and what they are doing. 6 11000-14001 AVP Marketing Marketing and External Affairs 0 Contribute to the District'sIncrease the proportion of Percentage of increase. the target audience that is efforts to increase aware of EPCC and enrollment. understands the strengths and benefits of attending EPCC. New Special Events 0 Coordinator To refine the process for Frequency of returning renting space and services businesses to use our OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 6 86% Strategies 14% Number of Non-withdrawn Plans Assessed 7 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Expected Objective's Completion Date Status Assessment Results Use of Results By facilitating the ongoing process of reporting an employee's entrance into the College or move within the College and directing the employee to have a picture taken, the information in the directory will be current and accurate. A photo directory was compiled and published on the College website. The directory, while successful, would be better had more employees opted to have their photos taken. With the move of the Webmaster out of Marketing, the photo directory is now in the hands of IT. The directory is an online tool to locate and identify people, their faces, phone numbers and other information. Support promoting the campuses individually and particularly the struggling occupational programs so EPCC may remain competitive with other career and occupational learning institutions. The college enjoys high image in the community which is evidenced by enrollment results and community participation. Promoted each of the campuses in their areas through billboards and cinema. . EPCC has 8 billboards across the county all year round and expanded cinema coverage to all theaters. Created college jingle and listed the college in Texas State directory. Results are used in In community and state reports Progress as well as maintaining a competitive position in higher education. . Higher enrollment and better awareness of the college offerings and position as a Higher Education Institution in the community. Ongoing Many college staff are scheduling events up to one Accessing the requests of the In users to better provide for Progress Ongoing Implement a much more aggressive promotional and marketing campaign through advertising, radio, TV, print, electronic media, web page development, billboards, and creating relations with media entities and community organizations. 14 11000-14001 AVP Marketing Total Number of Non-withdrawn Plans Not Assessed The College Procedure, Learn more about time lines Section: V. Facilities, for set-ups, media needs and rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Met Page 3 of 157 President Associate Vice President. Marketing and External Affairs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 6 86% Strategies Number of Non-withdrawn Plans Assessed 7 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status to the community for the facilities, based on Conference Center at the Conference Center Administrative Service Facilities Request Forms. Center in order to serve as a resource for the community and a community relations person from the College, always striving to create a strong, positive image. Board Policy: 5.02.01 Use of Conference Centers at Administrative Services Center. their needs in the future. whatever is necessary to better year in advance. A new fee structure is being implemented Continually refining the identify the needs of the January 2005. This fiscal year process for the Conference requestor, and provide a new budget and a plan for Center events. Continue information to the requestor learning about set-ups, regarding what is available and reimbursement for overtime media requirements and how the necessary charges to best went into effect. I have received positive feedback to best serve the requestors. serve the District and regarding the facility, the community. services provided, and the staff assisting them. Several groups are returning for their events. The requests are growing in number. Online hits per month. By creating and establishing new online services will help the students, community and employees by giving them access to online programs, information and classes. 18 11000-14001 AVP Marketing Webmaster 0 Create a new interactive Increase external web Web site to attract and aid traffic. the community, new students, current students, staff and faculty to El Paso Community College programs and services. 19 11000-14001 AVP Marketing Webmaster 0 Create an informational Increase our Intranet web Online hits per month. traffic. portal that can only be accessed through the EPCC Network to establish an online community for EPCC employees. An example of the Intranet online feature will be the online employee picture directory. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 14% This objective has been implemented under the direction of IT. The Webmaster position doesn't report to AVP Marketing any longer. Better internal communication. In Progress Ongoing The development of the new This objective has been Intranet will help in the growth implemented under the and information distribution direction of IT. The Webmaster position doesn't for all employees of El Paso report to AVP Marketing any Community College. longer. Better internal communication. In Progress Ongoing rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 4 of 157 President Associate Vice President. Marketing and External Affairs Plan Budget No. Acct No. Area 21 11000-14001 AVP Marketing Plan Name Projected Cost. Coordinator, Marketing & External Affairs 0 Objective Measure Increase significantly the Monitor the local media exposure of our programs including radio, TV and and achievements in the newspapers to check local media including results. radio, TV and newspapers. Standard not-applicable Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Marketing & External Affairs 0 Create a strong, positive Increase the proportion of Surveys the community that feels market image as the college in the community. favorably about EPCC. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 0% 7 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 6 86% I will work closer with CSA, PSA. Faculty Assoc. and department deans to remind them about the importance of letting us know about their events at least three weeks before they happen. The media needs our press releases in their newsroom two weeks in advance. rptAssessmentResultsDetailLinedWithProg 0% 0 Total Number of Assessed Plans Met: Strategies Promote the successes of students, faculty and staff through all means of media. 0 Total Number of Plans Withdrawn Total Number Plans Submitted (Duplicated if for more than 1 goal) I also need to re-establish my contacts, which I have been doing, with the assignment editors at all five local TV stations. They are changed often and I need to address my future press releases directly to them. I also need to work closer with the El Paso Times since they also change education reporters and editors often. 51 11000-14001 AVP Marketing Total Number of Non-withdrawn Plans Not Assessed 14% Number of Non-withdrawn Plans Assessed 7 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results While not scientifically I will keep trying to improve In measured, the exposure our the coverage our programs Progress programs got in the media this get in the media, especially year compared to 2003 in the Times and the El increased on radio and TV Diario. considerably. I will work harder to increase coverage in the El Paso Times. CSA, PSA and faculty were a lot better in sending their information to get media coverage for their events. Ongoing EPCC holds a very Attracting wider range of competitive position among students to start at EPCC higher education institutions in first. the region as a result of aggressive marketing campaign Ongoing Wednesday, April 18, 2007 In Progress Page 5 of 157 President Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Director, Foundation and Diversity Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard 0% 0 0% 3 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 3 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies 11000-52500 Diversity Programs Diversity Program 0 To continue to provide workshops/training by which college students, employees and the community can interact and become aware of the many facets of diversity. 4 11000-52500 Diversity Programs Diversity Program 0 Increase the number of To provide a vehicle of Identification of the participants by 100. understanding, interaction number of past and a greater awareness of participants, attendees, speakers, vendors etc. as diversity through workshops/training for compared to previous year. EPCC students, employees and the community. Identification of students and other participants for the training/other cultural activities through faculty staff/community referrals. Development of working committees (such as Hispanic Heritage Committee). 5 11000-11103 Foundation Campaign 500 0 To increase the awareness Continuation of identifying The standard will be potential donors, the and visibility of the El comparison of the Paso Community College number of donors listings, the amounts Foundation to the College contacted, and the amount raised in the previous raised by the end of the and the El Paso years. fiscal year. community by raising donations for scholarships. Donors lists will be contacted, new donors listings will be developed and alumni listings will continue to be developed and contacted via software system. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 0 Total Number of Plans Withdrawn Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Identification of listings of Increase participation by community contacts, 5% more than last year. college employees, and students that attend or participate in the activities/training. Total Number of Non-withdrawn Plans Not Assessed Assessment Results Use of Results Expected Objective's Completion Date Status Identification of students for the Diversity Leadership training sessions through faculty/staff referrals. Hispanic Heritage Month (support of others). rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 6 of 157 President Director, Human Resources Development Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 6 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% Strategies Number of Non-withdrawn Plans Assessed 6 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results 7 11000-52149 Human Resources 360-Degree Development Performance Appraisal Training 0 Development and implementation of a 360degree measurement and performance appraisal system for all full-time administrative, professional, and classified staff. 8 11000-52149 Human Resources "Who Moved Development My Cheese" 0 Administer program 62 EPCC employees. Facilitation of "Who Moved My Cheese" at the evaluation survey to staff participants to obtain Annual Staff Retreat. feedback to determine if program objectives were met. Successfully, conducted the 1. Coordination and collaboration with staff retreat 10th annual staff retreat in Albuquerque, New Mexico. facilitation team. 2. Finalize staff retreat agenda. The post program evaluation showed that 97.3 percent of 3. Meet with staff retreat the program participants were facilitation team to develop satisfied with the learnings and interactive program plan. results of the program. 4. Meet with staff retreat facilitation team to select participants. 5. Meet with staff retreat participants to orient and answer questions concerning retreat. The training program has been instrumental in helping employees to better cope with change. Met 9 11000-52149 Human Resources EPCC Development Centralized Training Tracking 0 Identification of the One Centralized Development and tracking systems currently Training Tracking implementation of a used by various System. centralized training tracking system for EPCC.departments. 1. Create a centralized training tracking team composed of key department heads to brainstorm on how to Department heads can generate reports to find out what types of training their employees have, date, and Met Target population: Train 100% of staff. 100% of staff in the process by August 31, 2003. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 1. Coordination and input from the 360-degree performance appraisal team. 2. Coordination and interface with Information Technology department. 3. Conduct "trains-the-trainer" workshops. Three trainers assist in the implementation. 4. Development and announcement of rollout training schedule. rptAssessmentResultsDetailLinedWithProg 67% Developed and implemented a 360-degree performance measurement training and rolled it out to 731 employees. Trained over 95 percent of employees in process of the 360-degree performance measurement. Complete. A new centralized data training tracking system tied to Banner is now in place. Users have been trained by IT Employees now have a Met better understanding of how a 360-performance measurement works, and employees will be able to sit with their supervisors in March 2005 and have input into the development of their work goals and objectives. Wednesday, April 18, 2007 Page 7 of 157 President Director, Human Resources Development Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 6 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% Strategies Number of Non-withdrawn Plans Assessed 6 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results best create and implement this in the system and training data is being fed into the system for tracking system. analytical use. 2. Coordinate with Information Technology department to develop or utilize Banner to track campuswide training. 3. Have department heads input training data into the system on a monthly basis. System 10 11000-52149 Human Resources "Connections" Development and "Advanced Connections" Training 0 "Connections" and Identify the number of 100% of full-time staff- -Prepare training schedule of "Advanced Connections": staff who attended the first Classified, Professional, employees who did not attend Implementation and part of Connections. and Administrative Staff. first part of Connections. training sessions for the -Send out announcements and balance of staff personnel invitations to promote and who have not attended the register staff personnel. initial presentations. -Conduct the three, two-hour Invite participants who training sessions. have attended the first part -Prepare training schedule for to attend the "Advanced Advanced Connections. Connections" version. -Send out announcements and invitations to promote and register staff personnel. -Conduct the three, two-hour sessions. 11 11000-52149 Human Resources New Hire Development Employee Orientation 0 New Hire - quarterly orientation. Identification of May and Expected new hires by August 2003 new hires. Aug. 2003 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Coordinate with orientation presenters. -Develop schedule and program. -Invite and send out notices to new hires of new hire rptAssessmentResultsDetailLinedWithProg 67% Expected Objective's Completion Date Status Use of Results duration of the training. Employees have access to their own training data. The information can be used for many purposes, performance evaluations, training needs, career growth and development etc. Staff who had not previously attended "Connections", were invited to participate. Trained 114 employees in "Connections." 40 more are scheduled to participate in the program November 30, and December 9, 2004. "Advanced Connections," has not been rolled out. Employees who have gone In through "Connections" have Progress a better understanding of what Quality Customer Service is and how to deliver it. New employee orientation was held February 20, 2004, June 24, 2004, and October 21, 2004, for a total of 54 new hires. New hires are better equipped to find needed information and blend in with EPCC. Wednesday, April 18, 2007 Met Page 8 of 157 Ongoing President Director, Human Resources Development Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 6 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% 67% Number of Non-withdrawn Plans Assessed 6 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status orientation. 12 11000-52149 Human Resources EPCC Development Toastmaster International Club 0 Create and organize an (3 x 50 = 150) 150 EPCC Toastmasters Club speaking and leadership that will develop and growcontributions from club the public speaking participants by August, potential of faculty, staff 2004. and employees. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 30 EPCC Employees -Meet with local Toastmasters Not started. Leadership to obtain program information on how to start a club. -Develop and present mini workshops to interested employees on the benefits of professional public speaking, platform, and presentation skills. -Register and submit club members to Toastmaster International. -Meet weekly to develop club members. rptAssessmentResultsDetailLinedWithProg In Progress Wednesday, April 18, 2007 Page 9 of 157 Dec. 2005 President Director, International Education Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 2 67% Total Number of Assessed Plans Not Met: 1 33% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status 15 11000-42801 International Programs Marketing of 0 CASS Program Disseminate the quality of Number of presentations CASS Programs to other during the year. (5) institutions. Standard will be Contact other institutions determined by the within the U.S. and outside the number of presentations U.S. set during the year. 2 Presentations in San Elizario, Provided cultural learning Met 2 Presentations in Hanks High experiences for local high School, 1 Presentation in school students and senior EPCC, and 1 Presentation in centers and public Clinic Bien Vivir. That was a recognition for the CASS total of 6 Presentations. and International Program at EPCC. 16 11000-42801 International Programs Increase Enrollment 0 Number of students Increase enrollment of International Students by enrolled. 10%. Will be set by the number of new participants. The increase of 25% of enrollment. 17 11000-42801 International Programs International Education Program 0 Purchase 6 computers in Increase availability of 85% order to do the following: access to information in -To enhance the services rural health area through offered by EPCC to the technology. Percentage of CASS program in order to students using the new provide opportunities for technology. the CASS students to learn to research using the internet and be able to communicate with their home countries while they are at EPCC. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase marketing with funding source. As far as the students are concerned - more impact in their home communities (incountry) and more grant funding for EPCC. Purchase of six computers for Goal was not met due to lack of funding. The CASS grant the CASS Program. does not allow the purchase of equipment and our institutional budget was not increased to cover this expense. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Met Not Met Page 10 of 157 President Director, Public Relations Plan Budget No. Acct No. Area 13 11000-11101 Public Relations Plan Name Media Projected Cost. 0 Objective Measure To enhance college image Attendees survey. with media & college employee conference/workshop. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Increase understanding of working media/college employee comprehension. Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 1 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Conduct workshop/conference with news directors/college administration and staff/students. rptAssessmentResultsDetailLinedWithProg Expected Objective's Completion Date Status Withdra wn Wednesday, April 18, 2007 Page 11 of 157 President President Plan Budget No. Acct No. 1 Area Plan Name Projected Cost. 11000-11000 President's Office EPCC "Salutes the Arts" Project 0 Objective Measure Standard Continue the EPCC Plan and organize Number of donations "Salutes the Arts" Project events/activities, increase received and to garner internal and scholarship fund scholarships awarded. external support and bring donations, and award in contributions to make scholarships to students as scholarships available to part of the EPCC "Salutes students interested in the Arts" Project. pursuing a career in the arts. Promote awareness of the many different pathways to success and excellence available through higher education by motivating our students and local youth in our community to participate in different Collegesponsored arts events/activities. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) 22 Total Number of Assessed Plans Met: 7 32% Total Number of Assessed Plans Not Met: 6 27% Total Number of Assessed Plans In Progress 9 41% Total Number of Non-withdrawn Plans Assessed 22 100% Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 0 0% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 1 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status Meet with external community leaders/VIPs to promote the College and the arts project, garner support, and bring in donations. Meet with educational leaders from area school districts to garner their support and their student's participation in various art project activities throughout the fiscal year. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 12 of 157 Research and Development Director, Grants Management Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% 97% 1 3% Total Number of Plans Withdrawn 1 3% 5 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 75% Strategies All externally funded Currently, some grants projects of one year or provide the requested more should use the EPCCEffectiveness Planning Effectiveness Planning document and some do Process. not, at least not timely. 100% of Carl Perkins projects first; then all other externally funded projects will develop EPCC Effectiveness Plans on the same timeline as institutional budget heads. Externally funded Budget Heads will be included in the training workshops provided to other budget heads. At least one "special" workshop for externally funded budget heads will be conducted by the Office of Planning in coordination with the Office of Grants Management. In addition, one-on-one information and advisement will be provided by the Office of Grants Management. 259 11000-32200 Supported Programs Management Grants Management Planned Growth Increase external funding Increase external funding. Annual aggregate total awards and renewals to of awards and renewals EPCC. will be increased by 10% by August 31, 2004. -Grants management will increase staff time spent on researching potential funding sources, with a resultant increase in the number of grant alerts issues, with a special emphasis on potential corporate and private foundation sources. -On a bi-weekly basis, provide the College President, VicePresidents, and Deans a listing of summaries of potential funding sources available, and request these recipients to return this listing indicating whether any should be pursued and the faculty or staff rptAssessmentResultsDetailLinedWithProg 35 Total Number of Assessed Plans Met: 0 Carl Perkins AdministrationGeneral OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number of Non-withdrawn Plans Assessed Total Number of Non-withdrawn Plans Not Assessed Total Number Plans Submitted (Duplicated if for more than 1 goal) 258 24301-73251 Carl Perkins AdministrationGeneral 0 60% 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 0 0% Assessment Results El Paso Community College Grant Awards Received 2002 $10,925,422 - ( 1.7) 2003 - $ 9,690,9730 - (11.3) 2004 - $ 9,158,309 - ( 5.5) Use of Results Expected Objective's Completion Date Status In FY 2002, available In dollars began to decline. Progress Although this was due in some part to changing budget priorities by the new national administration, the events of September 11th and the subsequent war in Iraq resulted in a diversion of substantial federal funds to homeland security and the defense budget. Another major factor causing these diminished revenues was a significant cut back in the Texas state budget. GMO will continue to submit proposals to gain additional Wednesday, April 18, 2007 Page 13 of 157 08/31/2005 Research and Development Director, Grants Management Plan Budget No. Acct No. Area 260 11000-32200 Supported Programs Management Plan Name Projected Cost. Grants Management Planned Growth 0 Objective Measure Standard Develop a comprehensive A priority plan for the Grant awards received EPCC external funding development of external by EPCC in 2003-2004 priority plan. funding will be established.will be more in line with an established external funding priorities plan which is consistent with the College's mission and vision for current and future development; and which plan is approved by the President and the Vice Presidents (awards are OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 75% Strategies 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status assigned to work with Grants Management on application development. -Provide four 2-hour grants workshops during the year, which will be directed at EPCC faculty and staff; and which will promote interest in grants and generally cover availability of external funding the EPCC policies and procedures governing the grants process, and the role and availability services of EPCC's Office of Grants Management. (This is an increase of two over the present level of these workshops). funding for EPCC. President reorganized the -Based on identification of meetings. The office of Grants funding needs priorities Management no longer is established by the College President, Vice-Presidents, and included in the attendance of Deans, by December 31, 2003, the VP meetings. the Office of Grants Management will develop an "EPCC External Funding Priorities Plan" for approval of the President and the Vice Presidents; which plan will then be used to better focus efforts to identify and apply for Office of Grants In Management will develop a Progress new strategy for meeting with key administrators of EPCC. rptAssessmentResultsDetailLinedWithProg 60% Wednesday, April 18, 2007 Page 14 of 157 08/31/04 Research and Development Director, Grants Management Plan Budget No. Acct No. Area 261 11000-32200 Supported Programs Management Plan Name Projected Cost. Grants Management Planned Growth 0 Objective Measure Increase the number of Increase in the number of EPCC offices, staff, and offices/disciplines faculty across all involved in grant disciplines and services development and funding. who are involved in the grants process, and significantly increase their capabilities to locate appropriate funding sources and acquire grant funding. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 75% Strategies presently too opportunistic, rather than as a result of planning). external funding. -Upon approval of the plan, the Office of Grants Management will focus its efforts according to the priorities established within the plan. -The Office of Grants Management will submit to the President and Administrative Team members quarterly reports describing the degree to which efforts and results have achieved the plan's goals during the reporting period (year-to-date). The number of EPCC offices/disciplines receiving external funding support will have increased by 25% by August 31, 2004. -The Office of Grants Management will conduct a minimum of two intensive grantsmanship courses (1 to 2 full days) for EPCC faculty and staff: which courses will cover funding sources, application/proposal development (needs, objectives, methodologies, budget development, and evaluation systems), general grant standards (EPCC, OMB, state, and local), management of grant programs (personnel, accounting, facilities, and rptAssessmentResultsDetailLinedWithProg 60% 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status All strategies on this objective These strategies have been Met continuing. The office of completed for the year. They Grants Management has need to be met on an annual provided grants 6 courses to continuing basis. Increasing faculty and staff: 4 the number of persons Introduction to grants training involved with grant writing workshops and 3 Grants process and funding sources Management workshops for all will have a positive long persons currently directing, term effect. coordinating or administering EPCC's grants. Grants Management Newsletter have been published and distributed. Wednesday, April 18, 2007 Page 15 of 157 Research and Development Director, Grants Management Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 75% Strategies rptAssessmentResultsDetailLinedWithProg 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status property management), and reporting. -The Office of Grants Management will refine its funding search and grants alert system to: a) reach a greater number of faculty and staff, b) acquire greater input from EPCC faculty and staff on areas of funding needs, and c) focus funding searches and application efforts on identified EPCC priorities. -The Office of Grants Management will research and develop a grant-specific "fact book" that will include current general and specific data and information that can be readily used by EPCC staff and faculty in development of grants (needs statements, goals and objectives, methodologies selections, and baselines for grant evaluation components. -To make the grants process generally more visible, the Office of Grants Management will publish a quarterly newspaper that will cover EPCC grant activities (awards, renewals, notable accomplishments, etc.) potential funding opportunities, OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 60% Wednesday, April 18, 2007 Page 16 of 157 Research and Development Director, Grants Management Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% 60% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 75% Strategies 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status and information useful to staff and faculty involved in the grant process (internal management procedures and changes, training and workshop agenda and schedules, and other matters of interest.) 262 11000-32200 Supported Programs Management Grants Management Planned Growth 0 Increase accuracy and Standards for review and Accounting and budget reduce the time required toturnaround of grant actions needed to complete administrative expenditure and budget support EPCC's active actions required to supportactions will be established. grants will be completed management of active more timely and grants. corrective actions will be significantly reduced. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Banner policies, procedures, and delegations will be jointly reviewed by the Office of Grants Management and Budget/Accounting to ascertain the most efficient processing system that will permit faster Banner entries and fewer incidents of errors, while remaining consistent with the established system of checks and balances. -As required, staff of Grants Management will receive formal Banner training needed to implement an enhanced grant processing system in Banner. rptAssessmentResultsDetailLinedWithProg Banner policies, procedures, and delegations have not been reviewed in a formal nature to ascertain the most efficient processing system that will permit faster Banner entries and fewer incidents of errors. -As required, staff of Grants Management has received formal Banner training needed to implement an enhanced grant processing system in Banner. Wednesday, April 18, 2007 In Progress Page 17 of 157 08/31/2005 Research and Development Director, Institutional and Community Planning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% 100% Strategies Number of Non-withdrawn Plans Assessed 6 0 0% Number of Plans Withdrawn: 1 14% Assessment Results Use of Results Expected Objective's Completion Date Status Facilitate Effectiveness Planning Process 0 Facilitate College-wide Annual planning process operational planning for in February/March of continuous improvement fiscal year for coming via Effectiveness Planningfiscal year completed Process. successfully. Completion of Effectiveness plans by all College areas as part of annual planning process, with measurable objectives, standards, and viable strategies for each Area. -Meet with each College Area prior to formal planning period to discuss process, deadlines and concerns. -Provide an updated planning guide for fiscal year to each budget head and planning forms with clear instructions. -Develop examples of specific potential objectives, measures and standards that can be used by Areas. -Provide extensive training in operational planning and objective writing to a core group of planning facilitators that can assist in each Area during planning period. Annual operational planning process was successfully conducted, with technical assistance provided to each Vice Presidential area, as well as assistance to each budget head. Area Effectiveness plans were received from each budget head in instructional and administrative support areas. For the first time, program review was incorporated into operational planning, and individual databases were developed and sent to each instructional dean to respond to program review indicators. Met Planning process will be conducted similarly for FY '05-'06, with a separate cycle for Program Review Response plans to be implemented. Planning guide for FY '05'-06 will reflect operational planning (Area Effectiveness Plans) as well as Program Review Response planning. 252 11000-33010 Institutional & Community Planning Operational Planning Training & Support, District Wide 0 Train College budget Number of training heads and administrators sessions held with College in the El Paso Community Areas and Budget Heads. College District in operational planning techniques to facilitate continuous improvement (Effectiveness Plans). Meet with 100% of all College Areas and at least 95% of all College budget heads to hold Planning training sessions. This is a 10 percent increase in direct assistance to individual budget heads from last fiscal year. -Vice Presidential areas, the President's area, and budget heads assigned to these administrators to be visited by Planning Director and staff. -Individual meetings with budget heads in each Areas to provide technical assistance in writing objectives, measures and standards will be held. -Develop extensive Objective Writing and Assessment training Syllabi. -Train a core group of Met with All College areas regarding operational planning (Area Effectiveness Plans) and provided technical assistance and training to budget heads and instructional coordinators in disciplines. Individual meetings were held with budget heads at each campus College-wide and their staffs to conduct work on annual operational plans. System will continue District- Met wide for FY 2005-2006 operational planning cycle, working with each Vice Presidential Area and budget heads within each Vice Presidential area. rptAssessmentResultsDetailLinedWithProg 67% Number of Non-withdrawn Plans Not Assessed 251 11000-33010 Institutional & Community Planning OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 60% Wednesday, April 18, 2007 Page 18 of 157 Research and Development Director, Institutional and Community Planning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% 60% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% 100% Strategies 67% Number of Non-withdrawn Plans Assessed 6 Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 1 14% Assessment Results Use of Results Expected Objective's Completion Date Status Planning Facilitators in each College Area to serve as contact points for Effectiveness Planning. Work on extensive skills development in writing objectives, measuring outcomes, and reporting Use of Results. -Hold Effectiveness Planning meetings with each Instructional Dean and Instructional Coordinators reporting to each Dean. 253 11000-33010 Institutional & Community Planning Strategic Plan UpdateStreamline Process 0 Formalize and streamline Review and revision, as annual review of District- necessary, of District-wide wide strategic planning strategic goals by College goals and update of administrators. College's Strategic Plan in cooperation with the Vice President of Research and Development and the President's office. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Formal annual process in place for strategic plan review/revisions. -Completed/Updated Strategic Plan in place, with any necessary additional strategic goals adopted by College administration and inserted into strategic plan by end of fiscal year. -Better understanding of Strategic Plan and its use by College administrators. -Initiate annual review of District-wide Strategic Goals by College administrators, in cooperation with the President's office. -Meet the President and Cabinet to review current Strategic, District-wide goals. -Train & Facilitate all College administrators in use of strategic goals/importance of strategic plan at a work session hosted by President and Cabinet. -Coordinate discussion and adoption of strategic goals by the President and Cabinet. -Revise strategic plan goals rptAssessmentResultsDetailLinedWithProg Session was held in November 2003, but will be held later for this fiscal year. This is due to a desire to utilize both NoelLevitz student survey data, Noel-Levitz Institutional Priority survey data, as well as information gained from the Achieving the Dream project data analysis to conduct a comprehensive Strategic planning session. Session to be conducted in In Spring 2005 Spring 2005, as directed by Progress Vice President of Research and Development to include most recent data valuable for strategic planning. Wednesday, April 18, 2007 Page 19 of 157 Research and Development Director, Institutional and Community Planning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% 100% Strategies Number of Non-withdrawn Plans Assessed 6 0 0% Number of Plans Withdrawn: 1 14% Assessment Results 254 11000-33010 Institutional & Community Planning Site 0 Improvement Planning Assessment/Us e of Results Report Prepare a Site Improvement Plan Assessment/Use of Results Report to exemplify accountability and effective use of College funds. Submission of Site Improvement Plans Assessment/Use of Results report for prior fiscal years to College upper administration. 100% of Site Improvement Plans (formerly Unit Improvement Plans) accounted for in report, with use of outcomes and benefits to College reported. -Identify all plans previously Due to budget constraints based upon a statewide budget funded under Unit Improvement Planning Process shortfall, Site Improvement and under newly named Site Plans (formerly Unit Improvement Plans) were Improvement Process. -Identify all types of purchases cancelled for this fiscal year. Funds were not made available made with College funds. during this fiscal year for this -Provide Assessment competitive planning process. instrument to all who have received funds under this process. -Prepare Assessment/Use of Results report for College upper administration for accountability and identification of recurring College needs. 255 11000-33010 Institutional & Community Planning Community Planning Initiatives Provide quality community/strategic planning sessions and training in support of EPCC's mission with: College constituency groups, other educational Sessions held with positive feedback and evaluations from participants with tangible outcomes as a result of sessions. At least 3 community planning sessions per fiscal year, with written report/outcomes provided. -Work with educational organizations and community groups to provide technical assistance and support for planning initiatives. -Train others in facilitation techniques and planning OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 67% Number of Non-withdrawn Plans Not Assessed Use of Results Expected Objective's Completion Date Status and make available via print, Website, planning guide, posters, etc. for College-wide awareness and operational planning action by budget heads. - 0 60% A number of community and College planning sessions were conducted during the fiscal year. The Mission Valley Summit was coordinated and conducted in cooperation with multiple Work on this project may Withdra still be done in the coming wn fiscal year, particularly if these types of plans are reinstated. In the interim, the project was put on hold based on other College priorities. Similar sessions will be Met conducted in FY 2004-2005, to include finalization of the Mission Valley recommendations, as well as sessions with EPCC areas working on their long-range Wednesday, April 18, 2007 Page 20 of 157 Research and Development Director, Institutional and Community Planning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard organizations, communitybased groups to broaden student and support organization base of College. 256 11000-33010 Institutional & Community Planning Assessment of College Operational Objectives 0 Provide annual Assessment reporting of College-wide operational planning objectives (Effectiveness Plans) in cooperation with all College budget heads to facilitate accountability and decision-making efforts. Assessment Report prepared and distributed to all College administrators and budget heads. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% 60% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% 100% 67% Number of Non-withdrawn Plans Assessed 6 Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 1 14% Assessment Results Expected Objective's Completion Date Status Use of Results community-based groups and and operational planning. strategies. -Promote EPCC programs in Senator Eliot Shapleigh. In addition, planning sessions support of community were conducted with the initiatives. EPCC Information Technology -Train and involve College personnel where appropriate to Department, EPCC Senior showcase expertise and talent Adult Program, and The EPCC of EPCC staff. Workforce Development area. -Draft reports and provide College personnel were assistance in strategic planning identified and trained prior to efforts. each of the sessions on session -Provide technical assistance process and content, and and facilitation support for the reports on each of the session development of a strategic plan outcomes were prepared by for the Lower Valley (Mission the Office of Institutional and Valley in cooperation with Community Planning. Mission Train Association & Senator Shapleigh's office. Self-assessments and Use of Results prepared by at least 100% of all District-wide administrators and budget heads. -Actively facilitate Assessment An Assessment Report is In While the Assessment In Early spring Progress at the time of this process for use by College process is working well, Progress 2005 evaluation. Each College decision-makers. streamlining of the databases budget-head has received an will be helpful for next fiscal -Continue training and individualized database of their year. Currently there are 55 technical assistance to Area Effectiveness Plans for individual databases that will administrators and budget be reviewed and meshed into heads in Assessment reporting. FY 2003-2004, and is being one to produce the provided with database -Provide use of specific Assessment Report for FY examples and information tools assistance to complete evaluations. It was agreed in 2003-2004. as needed to assist in both Instructional and Student Assessment process. -Prepare Assessment Report Services areas that the timeline and disseminate to all College for Assessment would change from Spring to Fall for this decision-makers. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 21 of 157 Research and Development Director, Institutional and Community Planning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 7 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 33% 100% Strategies Instructional Administrator Training on Data Needs/Usage 0 Provide training for College Instructional Administrators on types and uses of data for Planning to assist in decision-making and assessment. Completed training session on types of data needed for effective planning and measurable objectives. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Meet with 100% of all College Instructional Deans to hold training session and follow-up survey in cooperation with Vice President for Research and Development and Director of Research. -Work with Vice President of Research & Development and Research Director, as well as Institutional Effectiveness Director to plan Data Needs and Use Training for all Instructional Deans. -Prepare to discuss content and data analysis issues. -Identify most commonly needed data sets. -Identify longitudinal data needed. -Identify areas where comparative data will be needed on ongoing basis. -Follow-up with survey to finalize data needs and achieve concensus. rptAssessmentResultsDetailLinedWithProg 67% Number of Non-withdrawn Plans Assessed 6 Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 1 14% Assessment Results Use of Results Expected Objective's Completion Date Status fiscal year. Subsequently, plans were sent-out on October 1 to each budget head with frequent follow-up conducted. 257 11000-33010 Institutional & Community Planning 60% This type of training was Work will be ongoing, with Met incorporated throughout continued emphasis on institutional projects, as well Planning Data Profiles, as via work with instructional produced by the Institutional deans and instructional Research Office, for coordinators, both at Dean's instructional Deans. An leadership team meetings, and additional session on in instructional division and planning and program discipline meetings. The review is scheduled for primary focus of this faculty development in information occurred during Spring 2005. Emphasis on Area Effectiveness planning, data for use in planning will as well as planning in response continue in the College's to Program Review. These annual strategic planning two major planning focuses session, to be held in Spring warranted the development of 2005, as well as via materials (sample plans) as Achieving the Dream project. well as a training session hosted by the Institutional Effectiveness Director and Institutional & Community Planning Director at Faculty Development training sessions. Wednesday, April 18, 2007 Page 22 of 157 Research and Development Director, Institutional Effectiveness Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% 60% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 4 80% Strategies 20% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status 263 11000-34000 Institutional Effectiveness Administrative 0 Review Develop and implement anPreparation of an Administrative Review Administrative Review Process. Report. Annually by February 1. Develop a College procedure for the process. The Office of Institutional Effectiveness is in the process of gathering and analyzing existing College surveys, such as the Noel-Levitz surveys, to create a profile of the administrative areas that serve students and the College community. Institutional Effectiveness is In in the process of developing Progress a procedure that utilizes existing College surveys to create a profile of administrative areas. 264 11000-34000 Institutional Effectiveness Tracking 0 Standing Committee Recommendati ons Develop and implement a Submission of reports. mechanism for regularly informing the President of the recommendations of College committees. At least one report Periodically contact during each Fall, Spring committees chairs for and Summer semester. information to be placed into a database. The chairs of the standing committees submitted committee reports on their committees' activities for Fall 2003 and Spring 2004 to the IE Office to familiarize committee chairs with the College procedure on committees. The chairs' reports on committee activities for Fall 2003 and Spring 2004 have been input into the standing committee database so that the College President can receive automated reports. The 2004-2005 standing committee chairs have been informed that they will submit future reports electronically via a database created for that purpose. 265 11000-34000 Institutional Effectiveness Evaluating the Quality of Instructional Services Develop and implement a Preparation of a report. process for evaluating Instructional Services. Annually by March 1. As the office of Associate Vice The IE Office will create a In March 2005 President of Instructional pilot report that will annuallyProgress Services was abolished, and profile the effectiveness of some of its duties devolved the College's instructional upon the office of the Vice services. President of Instruction, the IE Office must now work with the Vice President to outline a 0 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Work with the Associate Vice President of Instructional Services to develop a process for evaluating the services. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Met February 2005 January 2005 Page 23 of 157 Research and Development Director, Institutional Effectiveness Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% 60% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 4 80% Strategies 20% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status means of using existing College surveys, such as the Noel-Levitz surveys, to evaluate services such as tutoring centers and the libraries. 266 11000-34000 Institutional Effectiveness Evaluating the Quality of Student Services 0 Develop and implement a Preparation of a report. process for evaluating Student Services. Annually by March 1. Work with the Vice President of Student Services to develop a process for evaluating the services. The Office of Institutional Effectiveness is in the process of gathering and analyzing existing College surveys, such as the Noel-Levitz surveys, to create a profile of the administrative areas under Student Services that affect students. Institutional Effectiveness is In March 2005 in the process of developing Progress a procedure that utilizes existing College surveys to create a profile of the administrative areas under Student Services that affect students. 267 11000-34000 Institutional Effectiveness Evaluating the Quality of Auxiliary Services 0 Develop and implement a Preparation of a report. process for evaluating Auxiliary Services. Annually by March 1. Work with the Associate Vice The Office of Institutional President of Auxiliary Services Effectiveness is in the process of gathering and analyzing to develop a process for existing College surveys, such evaluating the services. as the Noel-Levitz surveys, to create a profile of the administrative areas under Auxiliary Services. Institutional Effectiveness is In March 2005 in the process of developing Progress a procedure that utilizes existing College surveys to create a profile of the administrative areas under Auxiliary Services OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 24 of 157 Research and Development Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Director, Institutional Research Plan Budget No. Acct No. Area 409 11000-34002 Institutional Research Plan Name Projected Cost. Complete Testing of CBM Reports 0 Objective Measure Complete Testing of CBMAll reports run from the Reports including Reports Menu. modifications to meet new legislative requirements. Standard Accurate reports delivered on time. Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 17 Total Number of Assessed Plans Met: 13 Total Number of Assessed Plans Not Met: 1 6% Number of Assessed Plans In Progress: 3 18% Strategies Coordinate with SCT, Texas Connection and College offices. Number of Non-withdrawn Plans Assessed 17 100% 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results Work is progressing at a Meet Texas state reporting In March 2005 steady rate. TSI requirements requirement Progress not completely incorporated yet. Validate the CBM reports. Prepare Reports to Federal/State Agencies 0 Coordinate, organize and Prepare reports. prepare reports to Federal and State agencies. Reports prepared on Identify data sources, extract All IPEDS, LBB, SACS, etc. schedule and with 100% information, and generate reports delivered on time. accuracy. reports after verifying accuracy. Meet federal and state reporting requirements Met Prepared IPEDS reports. Prepared LBB reports. 411 11000-34002 Institutional Research Ensure Faculty 0 Evaluations are Conducted Ensure Faculty Faculty Evaluations Evaluations are conducted Reports. and create on-line process for on-line courses. Reports prepared before Coordinate process with credit Requires constant update the end of each long and non credit administrators. semester. Provide faculty evaluations to Deans Met 412 11000-34002 Institutional Research Coordinate with all Counseling Departments 0 Obtain results of Produce data. counseling performance. Analysis conducted each Coordinate with all counseling Many changes made in the semester. procedure this past year. departments. Provide counselor evaluations to supervisor Met Coordinate with 0 413 11000-34002 Institutional Research Produce, conduct, analyze new student orientation, counselor performance and career planning surveys. Facilitate CB116 collection of student CB116 data provided to THECB. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Accurate data provided Coordinate with instructional on time annually. deans. rptAssessmentResultsDetailLinedWithProg 76% Number of Non-withdrawn Plans Not Assessed Test the CBM report generation process. 410 11000-34002 Institutional Research 60% Worked out details of cooperative partnership with Provide data to state of Texas Met Wednesday, April 18, 2007 Page 25 of 157 Research and Development Director, Institutional Research Plan Budget No. Acct No. Area Plan Name Projected Cost. Instructional Deans Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 17 Total Number of Assessed Plans Met: 13 Total Number of Assessed Plans Not Met: 1 6% Number of Assessed Plans In Progress: 3 18% Strategies outcome data. Coordinate with Grants Management Office 415 11000-34002 Institutional Research Report 0 Information on Program Review 0 416 11000-34002 Institutional Research Promote the Effectiveness of College Units 417 11000-34002 Institutional Research Disseminate 0 Information to the Community Number of Non-withdrawn Plans Assessed 17 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results Job Placement 0 Provide data required to Data is available. facilitate grant proposals. Organize and report information on program review. Implement program review for continuing education programs. Program Review Information. Data produced as needed on time. Coordinate with Grants Management Office. Provide all data requested Update data annually. Coordinate with Institutional CE process needs work Effectiveness committees and Institutional Effectiveness Office. Develop grant proposals and monitor grants Evaluate College instructional programs Met In March 2005 Progress Develop data reports. Promote the effectiveness Provide data for unit of all College Units - Unit review. Review. Update data annually. Provide performance data to Have received no No results. the Office of Institutional specifications so project could Effectiveness and Institutional not begin. Effectiveness committees. Disseminate Information Update Fact Book/EPCC to the community. Today. Update annually. Revise the College Fact Book Completed, May 2004 and publish it in print and electronically. Not Met Provide data to College community and outside agencies Met Meet state reporting requirements Met Revise, print and disseminate Pocket Stats. Provide Population Data for CBM 76% Coordinate with Office of Coop Education and Job Placement. 414 11000-34002 Institutional Research 418 11000-34002 Institutional Research 60% 0 Provide special populationProduce Data. data for CBM reports and College community. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Collect data from 70% of students each semester. Coordinate with instructional disciplines. rptAssessmentResultsDetailLinedWithProg Completed a new internal process Wednesday, April 18, 2007 Page 26 of 157 Research and Development Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Director, Institutional Research Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Reports 60% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 17 Total Number of Assessed Plans Met: 13 Total Number of Assessed Plans Not Met: 1 6% Number of Assessed Plans In Progress: 3 18% Strategies 76% Number of Non-withdrawn Plans Assessed 17 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results Conduct and analyze Student Survey. 419 11000-34002 Institutional Research Coordinate with College Offices 0 Develop and analyze Produce survey results. surveys for College community, and integrate data into college databases. 420 11000-34002 Institutional Research Disseminate Enrollment Information 0 Disseminate Enrollment College enrollment trends Update data each Develop, revise and update Information. and projections posted on semester after each 12th reports on the College's College website. class day of long term. website. Produce results on time. Coordinate with College offices. Completed reports on all surveys conducted Provide information to College community and outside agencies Met Hope to add additional data next year Provide data to College community and outside agencies Met Completed all requested projects Provides data to College community Met Update enrollment by the 12th class and present as unofficial; at the end of each semester replace with official numbers. 421 11000-34002 Institutional Research Develop Adhoc Data Reports for the College Community 0 Reports developed. Develop ad-hoc data reports for the college community and external businesses/schools/agencie s. 422 11000-34002 Institutional Research Create Program Extracts from Banner 0 Create program extracts from Banner for student tracking. Build current semester file. Update each term. Process Drop, Graduate and Leavers 0 Process Drop, Graduate and Leavers surveys. Conduct and analyze survey. 423 11000-34002 Institutional Research Accurate reports delivered on time. Update active cohort files. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Conduct Drop survey each semester. Coordinate with Information Coordinating Council. Coordinate with LONESTAR Completed critical portions of Provide data to College Group. this project community and outside agencies Coordinate with Information Technology. Coordinate with college offices Completed required reports Provide information to College community In Progress Met Analyze results. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 27 of 157 On-going Research and Development Director, Institutional Research Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Surveys 424 11000-34002 Institutional Research 425 11000-34002 Institutional Research Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 17 Total Number of Assessed Plans Met: 13 Total Number of Assessed Plans Not Met: 1 6% Number of Assessed Plans In Progress: 3 18% 0 Coordinate with College Departments 0 Process employee surveys.Conduct and analyze survey. Conduct surveys annually. Distribute survey forms to employees. Number of Non-withdrawn Plans Assessed 17 100% 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results Completed analysis and report Provide information to college community Met Completed requested applications Met Analyze results. Coordinate with College Develop applications for Develop the applications. Applications run correctly and developed departments. College departments for on time. data collection relating to Institutional Research functions. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 76% Number of Non-withdrawn Plans Not Assessed Conduct Graduate and Leavers survey annually. Process Employee Evaluation Surveys 60% Facilitate data collections Wednesday, April 18, 2007 Page 28 of 157 Research and Development Total Number Plans Submitted (Duplicated if for more than 1 goal) 37 Total Number of Assessed Plans Met: 21 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 13 37% Vice President, Research and Development Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number of Non-withdrawn Plans Assessed 35 97% Total Number of Non-withdrawn Plans Not Assessed 1 3% Total Number of Plans Withdrawn 1 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 33% Number of Non-withdrawn Plans Assessed 3 100% 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results Administrative 0 Office Effectiveness Review Implement and report on Preparation of Report on Administrative Office Administration Office Effectiveness Review. Effectiveness. By February 1, 2004. Coordinate the design and Report not completed, in composition of the planning phase Administrative Office Review Process. 249 11000-12004 VP Research & Development SACS 0 Recommendati ons Facilitate the preparation Preparation and and submission of EPCC submission of response Response to SACS document. recommendations. Within 5 (five) months of the visit. Coordinate with all College areas. Documents completed, SACS All documentation on file reaccredits EPCC with EPCC SACS Library, EPCC reaccredited Met 250 11000-12004 VP Research & Development Staff Development Activities Staff will attend approved Attendance at staff development development activity. activities. One per year. Staff/supervisor will identify training needs. Both Administrative Assistants Both are better prepared to have attended at least one and handle duties, e.g. power possibly three professional point design, web page development activities. upkeep. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 67% Number of Non-withdrawn Plans Not Assessed 248 11000-12004 VP Research & Development 0 60% not completed Wednesday, April 18, 2007 In Progress Page 29 of 157 may, 2005 Workforce Development and Lifelong Learning Associate Vice President, Workforce Development and Lifelong Learning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 10 Total Number of Assessed Plans Met: 1 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 9 90% Assessment Results Use of Results Expected Objective's Completion Date Status 366 11000-12005 VP Workforce Dev & Lifelong Learning Expenses in the Workforce Development Division 0 Reduce operational Reduce budget expenses expenses in the Workforceby 10%. Measure 2003and Lifelong Learning 04 expenditures to 2002Division. 03 expenditures. Savings of 10% in the 2003-04 budget expenditures. Reduce expenses such as equipment, supplies, personnel, travel, etc. 367 22608-73217 Helen of Troy Training to Helen of Troy 0 To deliver 39,982 hours ofNumber of people trained training to Helen of Troy, and receiving salary at a cost of $179,000 in a increases at the 12 month period. This completion of the grant. training is designed to raise the salary level of those individuals trained. Expect to train 492 employees with the 179,000 in tuition based on the base line. Cooperation between, Helen of Troy, EPCC contract instructors and customized training coordinators. Withdra wn 0 Establish a Center for The effectiveness of the Technology and Worker proposed Center will be Learning that will provide measured by the number a number of workplace of students enrolled and related classes to assist their completion rates. incumbent workers improve their skills to become more competitive (e.g. Technology, English for Specific Purposes, Leadership, Study Skills, Spanish Literacy, etc.) 75% of the students complete their prescribed course of study. That standard will be revised after the first year of operation. -Perform a needs assessment with employers and workers to determine/confirm classes to be offered at the Center -Develop marketing materials based on findings -Hire a coordinator -Market the Center Withdra wn 387 11000-42471 Center for Quality 0 Technology and Instruction for Worker Learning Motivation, Education, and Training (MET) Number of site visits per Monitor instructional year. activities and perform classroom observations at least three times per year to ensure that instructional goals are being met for the Minimum of three -Obtain instructional goals. classroom observations -Observe classroom instruction. per year. -Provide feedback to instructors. -Follow-up on recommendations. 386 11000-42471 Center for Center for Technology and Technology Worker Learning and Worker Learning OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 63% Met Withdra wn Wednesday, April 18, 2007 Page 30 of 157 Workforce Development and Lifelong Learning Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Associate Vice President, Workforce Development and Lifelong Learning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 10 Total Number of Assessed Plans Met: 1 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 9 90% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status MET program. 388 11000-43201 Small Business Center CBS Programs 0 Structure at least three (3) Number of WECM training events under CBS courses taught under CBS Programs that qualify for departments. State Reimbursement through WECM. Increase to three (3) training events/year that qualify for State reimbursement. Attend WECM workshops and develop process by which CBS programs fit into the WECM. Withdra wn 389 11000-43201 Small Business Center Project Impact Reviews by SBDC Business Specialists 0 To have at least fifty (50) Fifty (50) completed completed Project Impact Project Impact Reviews (PIR's) for Fiscal year Reviews by SBDC Business Specialists that (October 1 - September reflect client satisfaction 30). and result in $8.0 million in economic investment (loans obtained and equity investments in businesses) for the community. Increase by 100% over last year's accomplishments. Business Specialists need to focus on assisting clients on follow-up basis that will result in tangible outcomes and produce increased economic investment in El Paso County. Withdra wn 390 11000-41001 Contract Oper Ctr Contract PTAC Matching Opportunities Center 0 Increase the effectiveness of To assist existing small Obtain $6.0 million in new Increase by 50% over prior year's performance. Procurement Specialists by businesses penetrate the government contract focusing on those small government contracting awards this Fiscal Year. business clients that are in a market and obtain $6.0 position to bid for new million in new awards this government contracts. More Fiscal Year. professional development training needed. 394 11000-43000 AVP Workforce Development 0 Create a One Stop Training Center for the Apprenticeship Training Program. One Stop Training Center The opening of the Apprenticeship Training Center at the Viscount Location. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -To begin classes within a year to have complete build-out in 5 years -To house a minimum of 60% of the Withdra wn Continued collaboration between the Apprenticeship trainers, Johnny Kilgore, Business & Industry and EPCC. rptAssessmentResultsDetailLinedWithProg 63% Withdra wn Wednesday, April 18, 2007 Page 31 of 157 Workforce Development and Lifelong Learning Associate Vice President, Workforce Development and Lifelong Learning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 10 Total Number of Assessed Plans Met: 1 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 9 90% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status apprenticeship programs at Viscount. 395 11000-43000 AVP Workforce Development Correctional Facilities Training 0 Develop a training Compared to recidivism Recidivism rate below program at the Avalon rates established at other 20%, 90 days after Correctional Facility and Windom Educational sites release. the Sanchez prison that in the state. partners with the Windom School District to deliver specialized training to inmates with GED or High School diplomas. The existing training program and the number of contact hours per day to accomplish the training delivered during the course of study have established the standard. Withdra wn Work through the Workforce Development Board and the Colleges office of Grant Management. Withdra wn Supported by the Youthful offender program. 396 11000-41003 Customized Training Alternate Funding Sources 0 Any new funding Develop alternate funding The new number of sources outside the Skills funding sources identified sources. as compared to previous Development and Self Sufficiency state funds. year. Sources that can be used to provide training to specialized populations. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Page 32 of 157 Workforce Development and Lifelong Learning Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Director, CE Business Programs & Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 399 11000-42601 N/C Business Business Programs Services Programs and Services 0 Make 35 hour office clerk Increase of 5 hours per position into a full-time week to clerk's position. position due to increase in workload after having the Office Technology department delegated to my area in June, 2002. 400 11000-42204 CE-Office Technology Office Technology Program 0 Market the Office Technology Program so that we can increase enrollments. 401 12195-73243 CE Computer Programs Computer Programs 0 Improve/replace Purchase 13 computers computers and software in and upgrade software. Office Technology Program. 402 12195-73243 CE Computer Programs Computer Programs 403 12170-73243 Customs Customs Brokers/Purchase Brokers 40 hour full-time clerk position. 5% increase in number of Increase in number of student attending students by end of 2003/2004. Summer 2004. 3,420 Continue to implement Purchase new removal technology upgrades in hard drives for 36 classrooms 106 ATC and machines. 150A-TM. 0 Standard Check all materials, Monitor and update Customs Brokers offeringsupdate where necessary. Seek input on changing based on Emergency laws within the Federal Federal Laws. System. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 13 new computers installed with appropriate software. Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 3 60% Total Number of Assessed Plans Not Met: 1 20% Number of Assessed Plans In Progress: 1 20% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results -Seek VP approval. Not attained. Hiring freeze -Extra work for part-time clerk. effect so unable to upgrade position to full-time. Expected Objective's Completion Date Status Not Met -Mail out flyers. -Market program via radio and TV and advertising in El Paso, Inc. Increase in students. Flyers were done and mailed out. Advertising in El Paso Inc. was completed. *Radio and TV advertising were not done. Met -VP approval -Purchase of computers -Installation of computers and software 8 new computers were purchased and installed in classroom. Other computers were upgraded. All software upgraded. 5 more computers will be installed during Spring 2005. Met 36 machines upgraded. -Identify most cost effective hard drives. -Obtain VP approval. -Purchase hard drives. Hard drives purchased and all machines upgraded. All materials updated to -Seek input from Customs reflect current Federal Brokers instructors. Laws. -Seek information from U.S. Customs Department relating to new rules and regulations. New Harmonized Tariff Books purchased. All courses reviewed for relevance and updated where necessary. rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 In Spring, 2005 Progress Met Page 33 of 157 Workforce Development and Lifelong Learning Director, CE Business Programs & Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies rptAssessmentResultsDetailLinedWithProg Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% 63% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 3 60% Total Number of Assessed Plans Not Met: 1 20% Number of Assessed Plans In Progress: 1 20% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Wednesday, April 18, 2007 Expected Objective's Completion Date Status Page 34 of 157 Workforce Development and Lifelong Learning Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Director, CE Health Plan Budget No. Acct No. Area 368 11000-42313 CE EMT Plan Name Projected Cost. CE EMT 0 Objective Measure With the shortage of Increase enrollment in healthcare workers, CE/EMT courses. hospitals are turning to EPCC for much of their training. Currently, EPCC provides all CPR, ACLS, and PALS training for Las Palmas Medical Center. Thomason has also turned over all ACLS and PALS training to EPCC, and other hospitals are following suite. In addition to the WBAMC contract, they have requested CPR and ACLS training courses because their educators have been deployed. In order to meet the increased demand for courses, additional monies are needed to hire part-time faculty and provide American Heart Association training materials. Standard Strategies Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 5 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Enrollment will increase 1. Identify qualified faculty by 10 percent. 2. Advertise classes 3. Ensure there is sufficient enrollment to cover cost of instruction 4. Offer classes Number has been increased and additional students served. However, budget was not increased to reflect increase, resulting in budget deficit for 2003-2004. Requested additional funds to support additional course offerings. However, additional funds were not awarded in 2005-2005 fiscal year. Will continue to request additional funds in order to balance the budget. Met 100% renewal of all All programs are accredited. Accreditation will continue Met Increase number of sections and enrollment in CE/EMT courses. 369 11000-42301 CE-Health CE/Health 0 Maintain current Accreditation standards OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 1. Identify qualified faculty rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Page 35 of 157 Workforce Development and Lifelong Learning Director, CE Health Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard accreditation standards formonitored while preparing accredited programs. nursing assistant, message for site visits. therapy, and medication aide courses. 370 12153-73243 Workshops/Conf. CE/Workshops 0 Misc.. & Conferences With the realignment of continuing education courses this year, CE/Health inherited OSHA and Fitness courses. No additional funds were allocated to support these offerings. Increase 2003-2004 enrollment in OSHA and Fitness by 20 percent as compared to 2002-2003 enrollment. Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 5 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results 2. Prepare files 3. Review curriculum Increase enrollment by -Find qualified faculty 20 percent in OSHA and -Advertise classes Fitness by August 2004. -Ensure there is sufficient enrollment to cover cost of instruction -Offer classes Expected Objective's Completion Date Status Use of Results so students can sit for state exams. Fitness course offering have increase. However, OSHA courses were transferred to Kathy Lopez. Will continue to offer courses requested by the public. Met Increase enrollment in OSHA and Fitness course offerings. 371 12164-73243 CE Nursing CE/Nursing 372 12114-73243 Continuing Massage Education/Messag Therapy e Therapy 0 All reasonable requests Maintain level of course Ensure the community met. offerings to meet the needsrequests are met with sufficient course offerings. of the health care community. -Hire qualified faculty -Advertise classes -Ensure there is sufficient enrollment to cover cost of instruction -Offer classes Courses have been offered as a Will continue to offer result of community requests. courses requested by the The Introduction to Basic community. Critical Care is one example. Met 0 With the opening of the Two additional 300-hour massage therapy courses new Health Sciences Building at the Rio Grandewill be offered. campus, Massage Therapy will finally have a classroom. In order to meet the demand for the 300 hour state-approved -Identify qualified faculty -Advertise classes -Ensure that revenue covers courses costs -Offer classes Massage enrollment has increased and additional massage offerings have been offered. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT A total of four 300-hour massage therapy classes will be offered by summer, 2004. rptAssessmentResultsDetailLinedWithProg 63% Continue to offer massage courses to meet CE requirements of registered massage therapists. Wednesday, April 18, 2007 Page 36 of 157 Workforce Development and Lifelong Learning Director, CE Health Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 5 Total Number of Assessed Plans Met: 5 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 5 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status course, two additional courses will be offered each year. Increase enrollment in massage therapy courses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Page 37 of 157 Workforce Development and Lifelong Learning Director, CE Personal Enrichment Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 50% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results Restructuring 0 381 11000-42203 Material Handling/WarehouMaterial se Ops Handling/Ware house Operations To restructure the The development of an To increase enrollment MH/WO (Material evening section will by an additional 20 Handling Warehouse increase enrollment and students per semester. Operations) to more fit themeet the needs of business needs of the workforce in and industry. business and industry. -Classes will be developed for N/A an evening section. -A marketing plan will be developed by the instructor. -An assessment will be developed to determine the need for this course. -Identify an institution to work on student loans. Program was closed in Spring 2002. 382 12168-73243 Enrichment Seminars The budget will increase To develop a budget that A new budget will be by 50 percent. reflects all the training thatdeveloped to meet the increase in enrollment for is being offered in this CEU training. area. -Enrollment History will be reviewed for 2 years. -A revised budget will be submitted. -Revenue projection will be compiled for justification. I am able to plan more effectively and be more realistic when planning and developing this area. Met Enrichment Seminars 0 This is a (self-supporting) budget account. 383 11000-42202 CE-Technology Programs Heating 5,000 To develop a course Ventilation training plan for HVAC and Air (Heating Ventilation and Conditioning Air Conditioning). 384 11000-42102 CE-Personal Enrichment Courses that 1,000 Relate to Environmental Preservation To develop new courses that relate to environmental preservation. Met objectives. Withdra wn The development of these new courses will meet the demand from the Workforce community and increase enrollment. New HVAC certificate program will increase enrollment in this area by approximately 30 students per semester. -A certificate course plan will Met objectives. be developed by the faculty. -A marketing plan will be developed by the faculty. -An Advisory Committee will be set up. 22 CE students registered for this in Fall of 2004. Met The development of these new courses will meet the demand from the community and increase enrollment. New course additions will increase enrollment in the C/E Personal Enrichment area by approximately 60 students. 1. Course will be developed in:Met objectives. -Irrigation -Landscaping -Gardening 2. Courses will be developed with expert advise from Texas A&M extension program. New Irrigation Management and Horticulture classes were added to the Summer 2004 CE schedule. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Page 38 of 157 Workforce Development and Lifelong Learning Director, CE Personal Enrichment Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective 385 11000-42111 Young People's College Young People's College 391 11000-42403 ATC Advanced 32,000 ATC Coordinator. Technology Center Coordinator Measure 1,000 To develop and offer moreThe development of these Science related courses to new courses will meet the the children of the demand from the community. community and increase enrollment. Standard Increase enrollment for CE Young People's College area by an additional 60 students. Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 50% Assessment Results 1. Courses to be offered: Met objective. Science Fair Project Workshop/Red Rover Program. 2. Consult with educators in the field of Science and Technology. 3. Work in conjunction with a representative from LEGO and NASA. 4. Courses would be marketed throughout the community. Use of Results rptAssessmentResultsDetailLinedWithProg Expected Objective's Completion Date Status A LEGO Science Fair was Met set up for the Independent School District in May 2004. -Currently, we track our -National recognition for -Becoming ISO 9001 2000 I can not assess due to my graduates for a 6-month short 8 week tenure (Oct. 1 ISO Certification. Certification. period, or as a provider Nov. 30, 2004) -Regional recognition -Review current programs contract stipulates. The for being a Premier implement new strategies and current method fragmented Advanced Technology procedures. with the results not Center. -Bring real-world technology providing enough to the classroom by recruiting information to gage additional experts (folks who strategic planning. have 10+ years in experience -ATC Coordinator manage and/or considered an expert by program activities, industry standards) to teach including job placement, part-time and/or facilitate student recruitment, seminars/workshops. develop & facilities -Create and implement advisory committee computerized system to track meetings. students using the following -Manage day to day values: students enrolled, challenges with faculty, students who complete staff, and students relating programs/courses, students to all courses offered at from business/industry the ATC. partners, students who drop OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 63% Wednesday, April 18, 2007 Withdra wn Page 39 of 157 Workforce Development and Lifelong Learning Director, CE Personal Enrichment Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard -Secures all supplies, equipment & materials. -Coordinate course offerings for all programs. -Hire Substitutes and Parttime staff. -Assist with the process of ATC ISO 9001-2000 Certification. -Develop 5-yr/10-yr. strategic plan for the ATC including goal of becoming a "National Center of Excellence" via National Science Foundation Grants. -Increased number of grants pursued and awarded. -Directly impact on increasing student enrollment and enhancement of College's image. 392 11000-42403 ATC Advancing the30,000 Advanced Technology Center Marketing Advanced Campaign. Technology Center Currently, ATC has 6 technical brochures each one has different program focus. Update our current brochures to include the following: -Associates Program in 4 disciplines and Continuing OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 50% Assessment Results Use of Results Expected Objective's Completion Date Status courses/programs, 5 year period, various reporting devices. -Increase in number of industry partners. -Increase activity with ISD partners. -Increase number of partners that tour ATC facility. I can not assess due to my -Create a Task Team to short 8 week tenure (Oct. 1 include personnel from all 6 Nov. 30, 2004) programs, partners (UTEP/NMSU), ex & current students, other EPCC personnel (i.e. Marketing Dept.) and High School personnel to oversee ATC rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Withdra wn Page 40 of 157 Workforce Development and Lifelong Learning Director, CE Personal Enrichment Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Education in 6 disciplines. -Testimonial statements from partners: IE: exstudents, industry partners, UTEP professors, exUTEP students; -Highlight recent professional accomplishments for faculty in all 6 disciplines; -Highlight that the ATC is Nationally Recognized as being a "Certified Rockwell Programmable Logic Controller (PLC) Training Facility" as of 1/2003; -Highlight Industry Advisory Committees & Partners; -Highlight articulation programs with UTEP & Independent School Districts; -Highlight Professional Memberships (i.e. NCATC, SME, PMA). 393 11000-42403 ATC Advanced Technology Center 0 Achieve International Organization for Standardization (ISO) 9001-2000 Certification. Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 50% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status Marketing Campaign; -Decide on market target audience and type of marketing materials to be produced; -Gather testimonial statements from partners; -Quotes from vendors; -Use contacts with local economic development partners (i.e. Chambers, City) to review and critic brochures before publication. -Implement the identified -Clear goal for internal The following activities will I can not assess due to my activities (under strategies) quality development short 8 week tenure (Oct. 1 need to be completed for and track progress to Nov. 30, 2004) (motivation). certification: schedule, -National recognition for All ATC committee members -Reduce costs and being ISO Certified. completed 12 hours of OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Withdra wn Page 41 of 157 Workforce Development and Lifelong Learning Director, CE Personal Enrichment Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard liabilities, -Establish a -Be more efficient and management system that profitable, provides confidence in -Increase customer the conformance of a satisfaction, recognized requirement. -Increase market share, -Improve communications and morale in the ATC, -Increase confidence of students and faculty within the learning system. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 50% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status professional development "Understanding ISO Eight Quality Management System Standards". -Recruit 12 representatives to serve as Audit and Documentation Committee members. -Documentation Specialist - 2 people maximum. -Committee members complete additional professional development hours relating to specific committee. Draft & complete 2 required manuals for ISO Certification: -Quality Manual - Plan of action for response to quality system. -Quality Management Systems - lesson plans, course catalog, etc. rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Page 42 of 157 Workforce Development and Lifelong Learning Director, CE Safety and Security Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 373 12198-73243 Law Enforcement Law Academy-In Enforcement Service In-Service Firearms 0 Increase student enrollment by 10% per semester. 374 11000-42501 Security/Sp Officer Basic Peace Officer Program 0 Compare the number of Increase student students beginning Phase I enrollment by 5% per class to a maximum class of each starting class. of 30 students per class. 375 11000-42501 Security/Sp Officer Basic Peace Officer Program 0 Develop a Professional Emergency Response Driving Program. 376 11000-42501 Security/Sp Officer Basic Peace Officer Program 0 Improve passing rates for Compare rates for each graduating class and the State Licensing assess instructional Examination. performance (3 times per year). Compare the number of enrolled students at the beginning of each semester. Develop an Emergency Response Driving Program to serve the needs of local Law Enforcement, Fire and EMS personnel. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% 63% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 4 50% Strategies 50% Number of Non-withdrawn Plans Assessed 8 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results Increase enrollment by 10% each semester. A recruitment improvement Successful. Activity will plan that will include: continue in this area. -Use of local media opportunities -Partnerships with local law enforcement agencies -Recruitment opportunities at local public events Results used for future strategic planning in this area. Met Increase each class enrollment by 5% until 30 students are enrolled in Phase I of each new class. This goal is to be reached by the end of FY 2004. Successful. Activity will A recruitment improvement continue in this area. plan that will include: -Use of local media opportunities -Partnerships with local law enforcement agencies. -Recruitment opportunities at local public events Results used for future strategic planning in this area. Met Design and construct a driving pad that may be used for Professional Emergency Driving. Develop partnership agreements with local emergency response agencies to assist in the development of the driving pad. This project requires the development of a local support base from the area law enforcement agencies and technical information for construction projections. In August 2005 Progress Increase the passing rate for the state examination to 80% by the end of FY 2004. Instructional improvement plan This goal can only be evaluated with each graduating that will include: class. We anticipate -Continuous revision of examinations to bring in line improvement with each class until an 80% passing rate is with course objectives -Organizing class study groups achieved. -Availability of instructors as In August 2005 Progress rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 43 of 157 Workforce Development and Lifelong Learning Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Director, CE Safety and Security Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies 63% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 4 50% 50% Number of Non-withdrawn Plans Assessed 8 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results study group leaders -Continuous assessment of student's knowledge and mastery of the course objectives 377 11000-42511 Drivers Education Drivers Education 36,000 Replace three (3) Drivers Equipment replacement Acquire three new Education Vehicles. for safety and instructional training vehicles. Vehicles with high effectiveness. mileage need replacement. Standard periodic equipment replacement. 378 11000-42201 La Tuna Building Trades - La Tuna FCI 0 Develop new program. Develop a "Building Trades" Program for La Tuna Federal Correctional Facility. New program in Program Development: operation for 2003-2004. -Needs assessment -Development of objectives -Budget development -Implementation 379 12206-73243 Concealed Handgun 2 Concealed Handgun 0 Compare the number of Increase student enrollment by 10% course,enrolled students beginning course, each per semester. semester. Increase enrollment by 10% per course, each semester. 380 12107-73243 Truck Driving Truck Driving Expansion 0 To expand our Truck Driving Program to all areas of El Paso, to provide convenient Would increase enrollment Within a year the Truck by at least 25%. Driving Program would double it's capacity in enrollment, revenues, OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Two of the vehicles have been replaced and four others are pending replacement. Budgeting has been approved. We are awaiting acquisition of the vehicles to complete the objective. In Progress December 2004 We are pending the completion of the instructor interview and the qualifying list for final selection. In Progress February 2005 A recruitment improvement Successful. Activity will plan that will include: continue in this area. -Use of local media opportunities -Partnerships with local law enforcement agencies -Recruitment opportunities at local public events Truck Driving has 2 options: Option 1: We would start a new classroom and training activities at NW Campus. rptAssessmentResultsDetailLinedWithProg Results used for future planning. Successful Met Met Wednesday, April 18, 2007 Page 44 of 157 Workforce Development and Lifelong Learning Director, CE Safety and Security Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure locations to better serve our student population on the West side and Northeast side of El Paso. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard and contact hours. Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 4 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 4 50% Strategies 50% Number of Non-withdrawn Plans Assessed 8 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Option 2: We would register students at NW Campus and bus the students to MdP Campus everyday. rptAssessmentResultsDetailLinedWithProg 63% Wednesday, April 18, 2007 Page 45 of 157 Workforce Development and Lifelong Learning Director, Senior Adult Program Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 404 11000-42701 Senior Adult Program Senior Adult Program Improve Office and Marketing Operations 0 Develop an Operations Each staff member Manual and How to responsible for the project Project Guide for each of or area will submit the the Senior Adult draft Guide Book to the Programs, Grants, ProjectsDirector for review and and Events. approval. Every two 1. Senior Adult Program months a Guide will be A. S.A.P. Office completed approved by Operations the Director and submitted B. Caregiver Education to the Vice President of Grant Workforce Development C. Elderhostel Program and Lifelong Learning. D. Mature Living TV We will enhance the Show image of the college as we E. Seniors Love collaborate with Conference community organizations, F. Seniors Arts Festival agencies through G. Seniors Kermes ATW networking and Grant partnerships to make these H. Homenaje a la Mujer services and events Awards possible. I. Posada Navidena Christmas Show J. Travel Learn 405 11000-42701 Senior Adult Program Senior Adult Program Instructional Improvement 0 Develop an Instructional Computer Course Workbook for each of the following computer courses designed to each older adult students. 1. Senior Adult Program A. Introduction to A Computer Workbook will be developed each semester starting with Introduction to Computers. The workbook will be tested, with input from the students and OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% 63% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 0 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 100% Strategies 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Each month a staff meeting will be scheduled to discuss the progress of each area on the development of the manual or guide. A part-time Clerk III and a PT Faculty on a non-instructional assignment will be responsible to gather information and materials from the Senior Adult Program. Director, Administrative Assistant, Grant Program and Project Coordinators and compile the Senior Adult Program Operations Manual or Project Guide Books. This is a continuing process. We are still collecting information for the SAP Operations Manual and requires continuous update. May require additional staff to get it done. Will seek Office Technology student interns to assist with the project. In September 2004 we've added a new event, Celebrating Grandparents Day. The SAP Office Manual and In the How to Project Guide forProgress each of the Grants, Projects and Events will assist in recruitment of volunteers to coordinate and execute the events. 8/31/05 Currently, each Computer Instructor is using his/her own Computer Book and Instructor Manual. This is the first attempt to standardize the class curriculum design A PT Faculty on a noninstructional assignment is assigned to develop the curriculum and workbooks. Meeting with all computer faculty to finalize a workbooks for each of these courses Intro to Computers, Windows, and Internet. Recommendation from faculty was made to offer MS Word, Excel, Access and Powerpoint as separate course The new computer course In offerings will provide Progress students with the opportunity to continue learning the computer programs, and expand their knowledge of the many uses of PC computers in their daily 8/31/05 rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 46 of 157 Workforce Development and Lifelong Learning Director, Senior Adult Program Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Computers B. Introduction to Windows C. Surfing the Internet D. Microsoft Office 406 11000-42701 Senior Adult Program Senior Adult Program Seniors Institute for Lifelong Learning 0 Measure improvements will be made each semester. This long-term objective Schedule quarterly involves researching and meetings to collaborate exploring the feasibility ofwith and develop support establishing a Third Age from community Institute to provide a one- organizations, agencies stop facility for seniors to through networking and take educational classes, partnerships for establish a Wisdom Think establishing a Seniors Tank for successful aging Institute. Assess progress and provide volunteer of commitments in an opportunities and for job annual report. training and placement. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% 30 0 0% Total Number of Plans Withdrawn 13 30% 3 Total Number of Assessed Plans Met: 0 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 3 100% Strategies 1. Present the vision to local leaders, business, volunteers, and potential contributors at the meetings. 2. Research and identify potential of the project. 3. Compile information on similar institutes or projects. 4. Identify the pros and cons of the project and make a decision to pursue further or end the project. 5. Develop a report of findings. rptAssessmentResultsDetailLinedWithProg Total Number of Non-withdrawn Plans Assessed Total Number of Non-withdrawn Plans Not Assessed Total Number Plans Submitted (Duplicated if for more than 1 goal) specifically for older adults. Hold at least three meeting per year and recruit four firm commitments from businesses, other educational institutions and individuals in the community. 63% 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status offerings and eliminate the Microsoft Office course. lives. The development of the workbooks will assist in determining a tuition fee for the computer courses to be implemented in 2004-05. A facility has been identified and assigned to the Senior Adult Program pending some building requirements, inspections and review and approval of remodeling cost estimates. The expansion project of the In Senior Adult Program will Progress allow for growth and enable implementation some of the strategies for successful aging identified by senior citizens and community participants who attended the August 2004 Visions for Successful Aging Planning Session. Wednesday, April 18, 2007 Page 47 of 157 8/31/2005 Workforce Development and Lifelong Learning Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Director, Workforce Development Plan Budget No. Acct No. Area 397 11000-43101 Workforce Development Plan Name WFD Projected Cost. 0 Objective To train all WFD staff in the new TWC Electronic contract processing to fulfill the Master Enrollment Agreement between EPCC and TWC/TAA. Measure Standard All support staff will be Compliance with TAA knowledgeable and able to and Master Enrollment generate electronic Agreement guidelines. contracts as of March, 2003. Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 4 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 50% Strategies MEA will be signed by TWC and Dr. Richard Rhodes. Number of Non-withdrawn Plans Assessed 4 100% 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results All designated staff was trained and able to generate electronic contracts. Electronic contracts are no longer used. Currently, ITA's (Individual Training Accounts) are used for all students. Met All designated staff was trained and able to generate electronic contracts. Electronic contracts are no longer used. Currently, ITA's (Individual Training Accounts) are used for all students. Met Director will establish an email address to be shared by all EPCC departments that work with TWC/TAA students. Director and WFD staff will monitor electronic contract processing to ensure compliance and timely processing of students for WFD training. Director and WFD staff will assist in monitoring other departments such as CE, ATC and others to ensure that each area handles its own contracts. WFD 0 To train all WFD staff in the new TWC Electronic contract processing to fulfill the Master Enrollment Agreement between EPCC and All support staff will be Compliance with TAA knowledgeable and able to and Master Enrollment generate electronic Agreement guidelines. contracts as of March, 2003. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT MEA will be signed by TWC and Dr. Richard Rhodes. Director will establish an email address to be shared by all EPCC departments that work rptAssessmentResultsDetailLinedWithProg 50% Number of Non-withdrawn Plans Not Assessed Director will bring together local TWC staff, other appropriate department staff and WFD staff to discuss particulars of system. 398 12103-73243 Workforce Development 63% Wednesday, April 18, 2007 Page 48 of 157 Workforce Development and Lifelong Learning Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Director, Workforce Development Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard TWC/TAA. 63% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 4 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 50% Strategies 50% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results with TWC/TAA students. Director will bring together local TWC staff, other appropriate department staff and WFD staff to discuss particulars of system. Director and WFD staff will monitor electronic contract processing to ensure compliance and timely processing of students for WFD training. Director and WFD staff will assist in monitoring other departments such as CE, ATC and others to ensure that each area handles its own contracts. 407 11000-43101 Workforce Development CTC/WFD 0 To equip Career Training All lab computers will be Center computer labs with upgraded and fully upgraded hardware and operational by Spring, software for vocational 2004. training offerings. Upgrade will meet college standards and requirements as well as individual vocational training offerings standards. Director will work with instructors, lab assistants and Interim Associate Vice President to determine specific upgrades needed. Partial Upgrade done. Still in process to finish upgrading the lab at the Career Training Center. Computer classroom upgraded with new computers at the Career Training Center. In August, 2005 Progress Director will work with purchasing, and other departments as appropriate to obtain estimates, bids, and other vendor information for budget projections. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 49 of 157 Workforce Development and Lifelong Learning Director, Workforce Development Plan Budget No. Acct No. Area 408 12103-73243 Workforce Development Plan Name CTC/WFD Projected Cost. 0 Objective Measure To equip Career Training All lab computers will be Center computer labs with upgraded and fully upgraded hardware and operational by Spring, software for vocational 2004. training offerings. Standard Upgrade will meet college standards and requirements as well as individual vocational training offerings standards. Total Number Plans Submitted (Duplicated if for more than 1 goal) 43 Total Number of Assessed Plans Met: 19 Total Number of Assessed Plans Not Met: 1 3% Total Number of Assessed Plans In Progress 10 33% 100% Total Number of Non-withdrawn Plans Assessed 30 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 13 30% Total Number Plans Submitted (Duplicated if for more than 1 goal) 4 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 50% Strategies Director will work with instructors, lab assistants and Interim Associate Vice President to determine specific upgrades needed. rptAssessmentResultsDetailLinedWithProg 50% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Partial Upgrade done. Still in process to finish upgrading the lab at the Career Training Center. Expected Objective's Completion Date Status Use of Results Computer classroom upgraded with new computers at the Career Training Center. In August, 2005 Progress Director will work with purchasing, and other departments as appropriate to obtain estimates, bids, and other vendor information for budget projections. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 63% Wednesday, April 18, 2007 Page 50 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name Projected Cost. 108 11000-13001 Dean-ALP, BASK, Comm., & PA Dean, Am. Lang., BASK, Comm. & Prfm. Arts VV 109 11000-55320 Americana Language Program Americana Language Programs Clerk II Objective Develop and retain a quality workforce. 0 Measure Ensure that all division classified staff have the opportunity to attend inservice training. Standard Strategies Increase attendance for Each classified staff member staff to continue inattend a minimum of two service training. workshops on work skills or personal enrichment. To ensure that ALP office Reduction in students' time More timely service, offer more placement is fully staffed. ALP has spent waiting in line for classes Monday-Friday information, testing, etc. testing dates, more efficient department from 7:45 am - 9:45 pm; coverage. Saturday from 8 am - 5:30 pm; Sunday from 8 am 1:30 pm. Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Two staff members (Dean's Office) attended the Banner Navigation and Banner Requisition workshops. Use of Results Expected Objective's Completion Date Status Staff have Banner access to generate purchase requisitions as well as student services screens to assist students during registration. Met Hire one full-time Clerk II who Funding for a full-time Clerk Funding was not available to Not Met would work a flex schedule to was not available. However, hire a full-time clerk. ALP will continue to request a ensure that office is fully clerk each year. staffed during peak hours, which include evenings and Saturdays. Department needs at least one full-time clerk to handle placement testing, registration, mid-terms and finals, and routine office duties, and to deal with the public. It is extremely difficult to cover hours of operation with only part-time staff. 110 12132-73243 ALP Tech Fee Americana Language Programs Tech Fee Account 0 Continue providing most Quality and quantity of up-to-date computer lab equipment. equipment as possible. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Maintain current standard. Continue to update lab equipment. rptAssessmentResultsDetailLinedWithProg In Fall 2004, IT Committee funded eight ALP "Smart" classrooms with up to date equipment. Equipment has been Met received. Equipment is being installed and will be in use by Spring 2005. Wednesday, April 18, 2007 Page 51 of 157 Instruction Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 111 11000-52128 Com. Ed. Program (CEP)VV Community Education Program Community Deaf Services 0 To provide educational support services for low literacy deaf adults who are unable to access other college programs or other educational programs in the community. 112 11000-52128 Com. Ed. Program (CEP)VV Community Education Programs Community Service Enhancement 0 This effort will result in anIncrease CEP's funding to serve an additional 100 increase in external economically and funding for CEP to provide adult education academically services for educationally disadvantaged students who live in colonias and and economically disadvantaged adults that other poor areas. the community requests and the college is unable to provide. 25 deaf adults will receive educational and support services that will enhance their literacy skills and their employability. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status 25 deaf adults will be Hire a Popular Educator Lead recruited and will Facilitator at $24,000.00 to acquire sufficient conduct outreach and literacy skills to recruitment and to provide transition into the Center educational services for the for Students with deaf. Disabilities transitional educational program. CEP has lost over $220,000 in Carl Perkins monies and has lost its ability to provide any services for the deaf and there are essentially no other programs that provide educational services for low literacy deaf adults. Withdra wn CEP's budget will increase by a minimum of $100,000 that will provide services to an additional 100 annually. Withdra wn Hire a program assistant at $24,000 to assist program manager in preparing grant reports, develop databases, database grant information, input information into database, etc. CEP existing programs are funded almost in their entirety by grants. Grant research, procurement and reporting is done by the program manager. Manager is understaffed and unable to procure additional funds with existing staff. CEP has lost $220,000 in Carl rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 52 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status Perkins funds in the past few years. Dance 114 11000-55185 English-VV Developmental 0 Education Train part-time BASK Writing and Reading Instructors to be more effective. 115 11000-55195 Drama-VV Drama 0 To enhance the Drama Drama courses will be Additionally, sections To offer theater in Spanish and Program by focusing on compared by the number will be offered in Spring. Teatro Chicano courses in the Bilingual Theatre of performances and Spring 2004. options. Giving the number of participants in students an opportunity to the performance with the act and perform in both addition of other Spanish and English languages from Spring productions. 2003 to Spring 2004. 0 The equipment will allow Adding the needed the MACO lab to gear up equipment will increase for the expected growth our technological arising from the state capability and enrollments mandated creation of the will improve as we Journalism Field of Study. publicize the state mandate. 116 11000-52119 El Conquistador- El VV Conquistador 0 Increase enrollment for theNumber of students Increase enrollment for Develop and carry out Dance Program. enrolling for Dance the Dance program. recruitment procedures in local courses to increase at least high schools. 10. 113 11000-55205 Dance-VV All instructors attend workshops on teaching and share material. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase the number of training workshops for the discipline. Once Field of Study has been implementedenrollments will be compared. Discuss techniques for better teaching and how Reading and Writing disciplines can be linked. Dell 8200 series (customized) $3,450 Microtek 9600XL Scanner $1,050 Sony MVC-FD95 DMavica $ 800 Sony VPL-CX2 LCD Projector $2,500 Satellite Pro 4500/1000Mhz $2,500 Epson Stylus 3000- rptAssessmentResultsDetailLinedWithProg In Fall 2004, El Conquistador Equipment is in place and in received equipment through IT use. Committee to build the MACO Lab. As technology continues to change, the MACO Lab will continue to require state of the art equipment. IT requests will be submitted each year to ensure that the MACO Lab needs are met. Wednesday, April 18, 2007 Met Page 53 of 157 Instruction Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Standard Assessment Results Expected Objective's Completion Date Status Use of Results C203011B $ 995 Total 117 11000-55185 English-VV English - VV 118 11000-52143 Faculty Travel-VV Faculty Travel - VV $11,295.00 0 Providing DSL hookups and cable set up for instructors who teach online courses will allow faculty to access information and students from their homes, thus enhancing quality of teaching and making it possible for instructors to communicate with their students more frequently and effectively. Perhaps more faculty will become interested in teaching online courses if we make it more practical and accessible to them. By having more faculty teaching on-line/hybrid courses, we would have more classroom space available and could have more students enroll at EPCC with more course offerings. 0 Upon the return from such as Travel funds will be used The total travel funds used To ensure all faculty during 2003-2004 have the opportunity to trip, the faculty member will for faculty attending Compare number of instructors presently teaching on-line courses with the number of new instructors teaching online courses at the end of the new fiscal year. Also, look at the number of faculty being trained to teach on-line courses and completing the training. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase the number of -Make WEB CT on-line courses, both in training/teaching on-line writing and literature, by training more accessible to at least 20% in the instructors. Perhaps have English discipline, and more offerings (times, days, have at least one fourth locations, and length of of our faculty teaching training) for instructors. on-line or hybrid Possibly have training sessions courses. Have all in lieu of division/discipline English faculty trained meetings, or offer other on teaching on-line. incentives. -Offering a faculty development workshop on online teaching. Current English instructors who teach on-line could present and persuade the rest of the faculty, thus if we make it more accessible for instructors, with DSL hookups and cable set up, more faculty will be persuaded. rptAssessmentResultsDetailLinedWithProg Faculty who were able to travel to a conference Conferences attended by faculty shared conference Wednesday, April 18, 2007 Met Page 54 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name 119 11000-55190 Foreign Language Foreign VV Language Projected Cost. 0 Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies and/or presenting at academic year will be conferences directly reviewed to assure the related to their discipline. funds were utilized in related instructional conventions. attend conferences related to their field. Increase retention within Number of students retained and increase by the German discipline. one percent. Compare enrollments at Identify at-risk students and the end of 2005. provide tutoring and teacher mentoring. be required to make a presentation at a division meeting on the conference he/she attended. Assessment Results presented at Division meetings and shared conference materials with other disciplines. Expected Objective's Completion Date Status Use of Results information at Division meetings as well as presented at Faculty Development. Develop a series of faculty workshops related to instruction. 120 11000-52122 Forensic Travel - Forensic TM (Speech) 0 To continue the EPCC Intercollegiate Forensics Program to provide academic competition for the students. Increase enrollment Enrollment will be through active competition increased due to the and hosting of competitions. tournaments. Identify student compositions to travel for competition. Eight students x eight tournaments for 2003-2004. Increase travel pool to an additional $10,000.00 for airfare since driving to tournaments is no longer approved. Increase supply pool to an additional $3,000.00 for when EPCC hosts tournaments. 121 12223-73243 Instituto Mexico Instituto Mexico 0 Higher enrollment and Increase enrollment in Instituto Mexico courses more course offerings. in Juarez. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 10% increase annually. Publicize in Juarez newspapers and other marketing venues. rptAssessmentResultsDetailLinedWithProg Ads were placed in Juarez newspapers and enrollment is healthy. Wednesday, April 18, 2007 Met Page 55 of 157 Instruction Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Name Projected Cost. Language Camps 0 Increase delivery of Higher enrollment and specialized English and more course offerings. Foreign Language courses within the community. 123 11000-55255 Language Lab Language (VV/ B building) Lab - VV 0 To purchase two LaserJet The quality of printing Language lab will 1200N Network Printers service offered to students improve once the 2 for the language Lab. At who use the language lab printers are purchased. present, there are 9 will greatly be improved computers for one printer with new network printers. which is approximately 7 years old and 3 computers that are not hooked-up to any printer. Plan Budget No. Acct No. Area 122 12177-73243 ALP Language Campus 124 11000-55170 Mass Communication VV Mass 0 Communicatio n Objective Attract high school graduates to communication program, to fully prepare EPCC students regardless of major, for transfer to 4 year schools, and take advantage of local media internship opportunities. Measure Standard 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 10% increase annually. Marketing, billboards, PTA presentations. Increase number of Enrollments will students who enroll. We increase as the will compare 2002/2003 recruitment continues in and 2003/2004 numbers to the 5 year span. the average number of students in these classes over the previous five year. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) To purchase printers through EPCC vendors: Amherst quote: 2 printers @ $600 each = $1,200.00. In Fall 2004, IT Committee approved funds to purchase network printers and an additional 10 computers for Language Lab. Equipment has been received and in use. Met Mackie 1604 VLZ Channel stereo mixer $1,800 Denon DN M-200R Microdisk Studio Recorder $ 800 3 Portable Microdisk Recorders (Sony or Denon) $4,500 3 Electro Voice Professional Unidirectional Mics $3,600 Syntrillium Digital Editing Software $1,000 Mac G4 with 23" Cinema screen $4,000 Strategies have been met. Equipment was approved by Dr. Brown's Equipment needs this Fall 2004. Measure was evaluated and an increase in enrollment was made. Comparison of Fall 2002 and Fall 2003 enrollment was made. There was an increase of 7 students. Met rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 56 of 157 Instruction Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Standard Assessment Results Expected Objective's Completion Date Status Use of Results $15,700.00 125 11000-55422 Media Production - VV 126 11000-55200 Music - VV Media Production Music 0 0 To purchase equipment Enrollments are expected that will allow the Media to expand considerably Production labs to becomeonce the equipment is in "state of the art." place. Therefore, making the Media Production program more appealing for recruitment purposes. It is estimated that we could increase enrollment substantially by purchasing needed equipment. To replace obsolete equipment that is approximately 10 years old and install needed software in the Advanced MIDI Lab. Actual replacement and installation of new equipment/software for MIDI Lab. With an expanded lab 3 ea. JVC portable DV we will also objectively cameras $ 12,000.00 expand the technological 2 ea. Audio work stations capabilities. (Computers) $ 8,000.00 2 ea. Teleprompters $10,000.00 In Fall 2004, IT Committee Equipment has been and Carl Perkins provided received and in use. funds to purchase equipment for Media Production Lab. As technology changes, Media Production will continue to require state of the art equipment. Met Total: $30,000.00 MIDI Lab will be improved until the obsolete equipment is updated. Acquire needed materials from In Fall 2004, objective has In Fall 2004, equipment has been met. IT Committee qualified vendors: been received and is in use. approved funds to update Music Lab. As technology EMU Proteus 2000 Sound Module (18 @ $510 = $9180) changes, Music Lab will continue to require state of the Digital Edge Soundforge 6.0 art equipment. Software (2 @ $1815 = $3630) Met Maudio Reason Software (2 @ $1300.00 = $2600.00) 127 73243-12219 ALP Prepa Chamizal Prepa Chamizal 0 Higher enrollment and Increase enrollment in Prepa Chamizal courses inmore course offerings. Juarez. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 10% increase annually. Publicize in Juarez newspapers and other marketing venues. rptAssessmentResultsDetailLinedWithProg Ads were placed in Juarez newspapers and enrollment is healthy. Wednesday, April 18, 2007 Met Page 57 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area 128 11000-55265 Speech - VV Plan Name Projected Cost. Speech - VV 0 Objective Measure Standard To improve the quality of Comparisons to prior 2% improvement in speech instruction by presentations can be student evaluation providing students with made. Comparisons to (grades). the type of presentation previous semester equipment they will be enrollments to indicate using in everyday increase in enrollment and speaking situations as welluse of evaluation would be as providing means to made. fulfill the highest level of the cognitive domain which is selfassessment/evaluation. Enhanced enrollment would also be achieved because classes would be scheduled all day long in the room dedicated for the equipment. Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Presentation equipment: TV/VCR 600.00 Camcorder Tripod 80.00 Camcorder 700.00 LCD/Infocus machine (mounted) $3,500.00 70 X 70 Screen 300.00 Lap-top with PowerPoint $2,900.00 Storage Cabinet(s) for securing equipment $1,500.00 Assessment Results $ $ $ Use of Results In Fall 2004, IT Committee Equipment has been approved funds to purchase received and is in use. equipment for the Speech Lab. As technology changes, the Speech Lab will continue to require state of the art equipment. Expected Objective's Completion Date Status Met $ Total Cost: $9,580.00 129 11000-52129 Special Projects Special for Perf Arts-VV Projects Performing Arts 0 The EPCC Spring Arts Compare number of attendees at the Spring Festival showcases the Arts Festival 2002 (all many artistic talents of EPCC students, faculty, activities added together) and staff through a variety to the number of attendees in 2003. of activities including music recitals, film presentations, literary readings, drama productions, and art exhibits. Along with this, accomplished artists, OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase attendance at the Spring Arts Festival from 14,000 (attendees in the Spring Arts Festival 2002) to 15,000 in 2003. Focus on two specific areas: a. Work to acquire talented performers that our students can relate to and are interested in. Continue to invite topquality artists and performers who can present "cutting-edge voices that appeal to students." b. Advertise the Festival in greater quantity and quality to insure that students and the rptAssessmentResultsDetailLinedWithProg The comparison of attendance for Arts Festival 2002 (14,000) to Arts Festival 2003 (15,000) was not a realistic figure when Area Plan was submitted. Comparison of Final ReportsNot Met to City of El Paso, attendance was compared: Spring 2002: 11,166; and Spring 2003: 6,896. The difference in attendance may be attributable to event evaluations. Not all evaluations were submitted in Spring 2003 to obtain an accurate count. Wednesday, April 18, 2007 Page 58 of 157 Instruction Americana Language Program, Basic Skills, Communications, & Performing Arts Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard musicians and writers are invited to share their work with our community. This festival, already in its 18th year, has provided EPCC with a wonderful opportunity to showcase the many talents of its faculty and students, thus helping to establish EPCC as a strong representative of the El Paso Art Community. 130 12208-73243 Americana Testing Testing Fee 0 Continue with ACT placement testing on computers. Update test annually. Do away with pencil/paper test. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 23 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results community are aware of the events. Send press releases to all major news outlets in the city as well as schedule interviews with television and radio stations. Use computer testing only. Determine cut scores for each ESL level; test the scores, implement computer testing. rptAssessmentResultsDetailLinedWithProg Cut scores have been determined for each ESL level and ACT placement testing is used. Wednesday, April 18, 2007 Met Page 59 of 157 Instruction Architecture, Arts, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Incorporate technology Increase use of technology into Geology classes by in all Geology classes. purchasing equipment used in computer presentations and internet class projects. 93 11000-55300 Sociology -VV Development 0 of a Pool for PT Instructors 94 11000-55180 Art - VV Art/Computers,6,000 Incorporate state-of-the- Increase in classroom art technology in technology in Art Projectors classroom instruction for Appreciation classes. Art Appreciation classes. 95 11000-55180 Art - VV Art/Skeleton 96 11000-55430 Kinesiology-VV Kinesiology/Eq3,500 Purchase state-of-the-art uipment for training equipment to be Gym used in conditioning and weight training classes. 97 11000-55430 Kinesiology-VV Kinesiology 400 0 Replace skeleton for drawing classes. Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 6 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 8 57% Strategies Number of Non-withdrawn Plans Assessed 14 93% Number of Non-withdrawn Plans Not Assessed 1 7% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results All Geology classes at Purchase projector, monitor, VV will use state-of-the- computer cart, and necessary art technology by Spring software; train all instructors. 2004. 100% of all Art Appreciation classes will be using state-ofthe-art technology during 2003-2004. Three projectors and three laptops computers will be purchased by the discipline, and all art teachers who teach Art Appreciation will be trained to use powerpoint presentations. One Projector and lap-top was purchased during 2003-2004, and another set was purchased during 2004-2005. Equipment will be used to In Spring 2006 incorporate technology in Progress classroom instruction for Art Appreciation classes. Study of anatomy requires Life drawing classes knowledge of human need skeleton to draw skeletal system. from as well as one drawing I courses. New Skeleton was purchased. Skeleton was needed for To buy a new skeleton (real not plastic) to replace ours that Life Drawing classes. was stolen. Met Increase technology and equipment in both classes so that all students have access at some time. Purchase at least 30 new pieces of equipment during 2003-2004 school year, for example elliptical trainers, stationary bicycles. Met All students (100%) in conditioning and weight training classes will use state-of-the-art equipment simultaneously. New pieces of equipment were State-of-the-Art Equipment purchased during 2003-2004. will be used for Conditioning and Weight Training Classes. Provide opportunities for Four full-time faculty Provide travel/training money Money was not available Provide money for two faculty to travel each would be trained during for 2003-2004. during 2003-2004. travel/training for semester for training. 2003-2004 year. Kinesiology faculty in areas of Stability training, Spinning, Tae-Bo. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 43% rptAssessmentResultsDetailLinedWithProg N/A Wednesday, April 18, 2007 In Spring 2006 Progress Page 60 of 157 Instruction Architecture, Arts, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 6 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 8 57% 43% Number of Non-withdrawn Plans Assessed 14 93% Number of Non-withdrawn Plans Not Assessed 1 7% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results 98 11000-55325 Architecture VV Architecture/C 1,200 Incorporate state-of-the- Improve instructor's art technology by preparation ability for omputers improving and developing classroom presentations. presentations for Assisting and assessing classroom instruction in allstudent ideas and offering aspects of curriculum design revisions. Increase preparation, student in student retention, evaluations, and utilizationincrease student of one line internet admissions and improved services of the web and preparation comparable to EPCC. state of Texas 4 or 6 year professional architecture universities. One new high speed computer Equipment not purchased 100% of all during 2003-2004. (CPU) with CD rom, CD Architectural Curriculum will be using burner, DVD burner, latest version of Windows, intelliEye state-of-the-art architecture technology Microsoft mouse, natural by all instructors. Better keyboard pro by Microsoft, assisting architecture and a 17" flat screen monitor. students who are skilled Connection to the internet for in the usage of the office A1718. AutoCAD. Currently, the instructors are not able to view student project work during reviews because of anticipated CPU, slow speed, memory and too small of a monitor. N/A In Progress 99 11000-55325 Architecture VV Architecture/Pr3,000 Incorporate state-of-the- Increase in classroom instruction and graphic art technology in ojectors classroom instruction for projection technology in the Architectural Architectural History, Architectural Technology, Curriculum. Increase in Architectural Aesthetics Student Retention and and our Introduction to increased Student Admissions, and Architecture classes. enrollment. Equipment not purchased 100% of all 2 projectors and 2 laptop Architectural computers, and a new screen during 2003-2004. Curriculum will be using in classroom A1518 will be state-of-the-art purchased by the discipline, technology, and by all of and all Architecture instructors our instructors. who teach in the entire discipline will be trained and/or upgraded in the use of PowerPoint presentations. N/A In Spring 2005 Progress 100 11000-55330 Biology-VV Increase the availability of Cardiovascular slides, Biology/Cardio1,600 To improve the vascular cardiovascular laboratory materials and equipment in pipettes and electronic the laboratory setting. balances are necessary Laboratory unit. for a "hands on" OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Equipment was purchased Purchase one FX Series during 2003-2004. electronic balance = $795 Purchase four pipettes = $175 x 4 = $700 rptAssessmentResultsDetailLinedWithProg Equipment will be used for Biology Classes. Wednesday, April 18, 2007 Met Page 61 of 157 Fall 2004 Instruction Architecture, Arts, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Increase the number of state-of-the-art microscopes in the laboratory. Measure Increase the number of microscopes available to students in the laboratory setting. 101 11000-55330 Biology-VV Biology/Micro 0 scopes 102 11000-55330 Biology-VV Increase the number of Biology/Skelet2,217 To replace broken and worn out skeletons, skulls skeletons, skulls and on and bones. bones that students can work with in the laboratory. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 6 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 8 57% Strategies Number of Non-withdrawn Plans Assessed 14 93% Number of Non-withdrawn Plans Not Assessed 1 7% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status functional cardiovascular laboratory for the 20032004 academic year. Purchase iron Deficiency Anemia slides $48.40 Purchase Lymphocytic Leukemia slides = $60 Purchase Eosinophilia = $65.60 A minimum of two students per microscope in class of 32 students requires a total of 16 microscopes during the 2003-2004 academic year. Four Microscopes were Purchase six new Olympus microscopes with micrometer purchased. disc and eyepiece pointer for a total of 16 Olympus microscopes. Two students per 16 Olympus microscopes = 16 x 2 = 32. Therefore, 32 students will have access to state-of-the-art microscopes in one lab setting. Microscopes will be used in the Biology Lab Classes. Met Students will have access to new skeletons, skulls and bones to work with in the laboratory for the 20032004 academic year. Purchase one human skeleton Half of the skulls and skeletons These items will be used for were purchased. (real bone) at $3,500 Biology Lab Classes. Purchase one human skeleton (plastic) = $794 Purchase two human skulls (real bone) = $925 x 2 = $1,850 Purchase three human skulls (white, plastic) = $154 x 3 = $462 Purchase three human skulls (colors, plastic) = $274 x 3 = $822 Purchase two fetal skulls (real bone) 400 x 2 = $800 Purchase one disarticulated Met rptAssessmentResultsDetailLinedWithProg 43% Wednesday, April 18, 2007 Page 62 of 157 Instruction Architecture, Arts, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 6 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 8 57% Strategies 43% Number of Non-withdrawn Plans Assessed 14 93% Number of Non-withdrawn Plans Not Assessed 1 7% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results skeleton (plastic) = $737 Purchase flexible shoulder ligament model = $258 Improve student retention Increase in number of Number of students in all Physics classes by students successfully currently enrolled in allowing each student completing Physics classes.Physics classes at VV. access to a graphing calculator. 103 11000-55350 Physics-VV Physics/Graphi 100 ng Calculators Purchase of graphing calculators for check-out to students enrolled in Physics classes who do not have one. (TI-89 specifically) Batteries were purchased to fix Calculators will be used in Graphing Calculators that the Physics classes. department already had. 104 11000-55335 Chemistry-VV Chemistry/Co 2,000 To upgrade the technologyIncrease in Chemistry in the Chemistry students' retention due to mputers, department, and to provideincrease in classroom Projectors students with the tools for technology, provide a better understanding of students with hands-on Chemistry concepts. experience with molecular Also, improve the lab models and safer science safety equipment. These facilities. two objectives will make us comply with area mission. The discipline would purchase 3 lap-tops, 3 LCD projectors, cart for laptop, 32 molecular model sets, and an eye wash station (installation included). Molecular Model Sets, Equipment is being used in In Spring 2005 Laptop, and Eye Wash Station Chemistry Labs. Progress were purchased; LCD Projector will be purchased Spring 2005. 105 11000-55365 Advertising Graphics-VV Advertising 0 Graphics & Design/Comput ers Increase student enrollment in computer generated Art Classes. Acquire a bigger lab to Open enrollment to any Acquire 10 more Mac's & a accommodate 20 students. student that would want Lab twice the present square to audit these classes. footage of a generic classroom. In Spring 2006 Progress 106 11000-55345 Math-VV Math/Compute 0 r, Projector Implementing technology Comparison of student learning success rate and in the regular math classrooms and math lab. retention rate between 2002- 2003 and 20032004 in math classes. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 100% of all Chemistry classes would use technology in the classroom. Student success rate (passing for the next level rate) and retention rate will increase by 10% in 2003-2004 for math classes. A faculty mentoring system will be implemented Fall 2003 that will focus on implementing technology in mathematics teaching; also, a workshop of using technology rptAssessmentResultsDetailLinedWithProg Met In Spring 2006 Progress Wednesday, April 18, 2007 Page 63 of 157 Instruction Architecture, Arts, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 6 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 8 57% Strategies 43% Number of Non-withdrawn Plans Assessed 14 93% Number of Non-withdrawn Plans Not Assessed 1 7% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status in the classroom for math faculty will be scheduled during 2003-2004. 107 11000-55340 Geology-VV Geology/Comp 0 uters, Training Incorporate technology Increase use of technology into Geology classes by in all Geology classes. purchasing equipment used in computer presentations and internet class projects. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT All Geology classes at Purchase projector, monitor, VV will use state-of-the- computer cart, and necessary art technology by Spring software; train all instructors. 2004. rptAssessmentResultsDetailLinedWithProg In Spring 2006 Progress Wednesday, April 18, 2007 Page 64 of 157 Instruction Arts, Basic Skills, Communication and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 15 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 15 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Standard Assessment Results Expected Objective's Completion Date Status Use of Results 168 11000-13005 Dean, Arts, Attend a BASK, Comm & Workshop or SS Training Session 0 Each of th three full-time Nothing has been required One workshop per year. Attend a workshop. employees in the Division for continuous office will attend at least improvement and no one workshop or training workshops have been session to improve some required. skill. 169 11000-55206 Dance-TM Dance 0 Improve Student Retentionnone 170 11000-55306 Economics-TM On-line Course in Philosophy 0 To offer an on-line course The offered course set-up The course appearing in Working on a proposal to achieve course offering of this in Philosophy, namely, theand installed in Distance on-line schedule of courses. on-line course. course Introduction to Phillearning program. 1301. 171 11000-55196 Drama-TM Drama 0 Purchase a Obtain a storage room for none dressing/storage room to productions and students be place behind the stage use. to be used for productions. none In Progress 172 11000-55186 English-TM Obtain a Classroom for English Students 0 To designate a classroom just for English composition classes (ENGL 1301/1302) with 30 personal computers in the room. Obtain a classroom none specifically for English students and have 30 PCs for students. 30 PCs X 1,300=39,000 Withdra wn 173 11000-55201 Music-TM Music 0 Increase Enrollment. Discipline is working on this. Actively recruit in public schools. 0 Increase completion rates Of all students on certified To be determined after 174 11000-55296 Political Science - Increase OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Thirty students. Recruit in the Public Schools. Withdra wn Classes are at maximum enrollment. Continue doing an outstanding teaching job. Met Select new text, Revise rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 65 of 157 Instruction Arts, Basic Skills, Communication and Social Sciences Plan Budget No. Acct No. Area TM Plan Name Projected Cost. Objective Measure in all government classes. roster, there will be an increase of 2% who receive passing grades (A,B,C, or D) and an equivalent who receive a non-passing grade (F, W). Completion Rates Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 15 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 15 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status the final processing of curriculum, Enhance incomplete grades and instructor/student discounting students communication skills, who are administratively Review/revise delivery of withdrawn and who instruction. never attended. 175 11000-55281 Psychology-TM Psychology Courses Plan 0 The number of sections of Fall 6 on-line courses, 1 to offer a variety of Psychology which are on- video conference courses in a variety of delivery modes to students.line and distance learning. (Psycholog, Human Relation & Human Sexuality) 176 11000-55301 Sociology TM Increase Enrollment 0 Increase enrollment. 177 11000-55275 ESAL-TM Increasing ESOL Student Retention Rates 0 Increase by 3% from To increase retention rate The students will be of students from ESAL tracked to determine how previous three-year average. Level 1 to ESAL Level 2. many are retained. Work on increasing the number of sections offered to students ina variety of delivery modes. Offered a variety of Increase enrollment by Enhance introductory students Sociology classes at 5% each class period. communication skills, times/periods conducive to Eventual goal is 90% fill revise/update curriculum and different student rate in each class. syllabi, provide relevant populations. information. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Identify students who, at midsemester, have a class average of 79% or below in ESAL 0301. Set up a conference with those students, and develop a plan of action to include the following: tutoring in the ESAL and Language Labs, CAI, faculty mentoring, formation of student study groups, and referral to CSD for tutoring if appropriate. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 66 of 157 Instruction Arts, Basic Skills, Communication and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 15 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 15 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Standard 178 11000-55271 ESL-TM Increasing ESOL Student Retention Rates 0 To increase retention rate The students will be Increase by 3% from of students from ESOL tracked to determine how previous three year Level 1 to ESOL Level 2. many are retained. average. Identify students who, at midsemester, have a class average of 79% or below in any of the following courses: ESOL 0301 and ESOL 0302. Set up a conference with those students, and develop a plan of action to include the following: tutoring in the ESOL and Tutoring Labs, CAI, Faculty mentoring, formation of student study groups, and referral to CSD for tutoring if appropriate. 179 11000-55261 Reading-TM Incorporating Technology Assignments into READ/RESL Classes 0 To assess students' attitudes about using the Internet before and after the assignment. Students' attitudes about using the Internet to access information will improve significantly based on a pre-and postquestionnaire. An attitudinal questionnaire will be developed for each level of RESL and READ courses. Also, Internet assignments will be developed for all classes and shared with part-time instructors. 181 11000-55291 History-TM History 0 To move the humanities none offerings from their current location in room 1131 to the expanded site in room 1517. This site none none A pre- and postquestionnaire will be deveoped to determine if the assignments had an impact on students' attitudes about using computers. Also, students' increase in knowledge of the Internet will be measured by the assignments that they turn in. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Assessment Results Use of Results Expected Objective's Completion Date Status Withdra wn Wednesday, April 18, 2007 Page 67 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Arts, Basic Skills, Communication and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 15 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 15 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 15 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results would allow for additional seating and enhanced and varied programming. 182 11000-55191 Foreign Language-Language Lab TM 183 11000-55181 Art - TM Art 0 Improve student retention Acquire more computer by increasing student software as well as audio resources in the Language visual material. Lab . 2,000 Improve Student Retention.Acquire a CD projector. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT More material by the Visit web sites and contact beginning of Fall 2003. publishing companies about material available. Attendance increased In 2004 Continue to improve attendance up to week 13, was conditions in the lab to 4346. maintain lab attendance. Met A small increase in retention. Classes have achieved maximum enrollment. Met Recruit in the public schools. rptAssessmentResultsDetailLinedWithProg Continue to do an excellent teaching job. Wednesday, April 18, 2007 Page 68 of 157 Instruction Arts, Basic Skills, Communications, Occupational Education and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 19 Total Number of Assessed Plans Met: 5 26% Total Number of Assessed Plans Not Met: 4 21% Number of Assessed Plans In Progress: 10 53% Number of Non-withdrawn Plans Assessed 19 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results 72 11000-13007 Dean Arts, BASK, Occ Ed, & SS Staff Development Opportunities 0 Increase the number of staff development opportunities. 73 11000-55317 Developmental Education-RG Retention Survey of Successful BASK Students in Future Remedial Classes 0 Use a survey instrument to To determine whether successful BASK students address this issue. are continuing their college careers and determine how many students in the next level of remediation completed a BASK course along with percentages to enrollment in those courses. 74 11000-55317 Developmental Education-RG BASK Passing 0 Standards Number of students 80% completion with To maintain good Referrals to tutoring when retention and passing ratesenrolled at census date and either grade of CR or warranted. Adequate in the BASK course taughtthe corresponding grade at NC (These are the communication between students who finish the students, instructors, and at the Rio Grande Campus.the end of the semester. semester.) 70% passing tutors. Using the PLATO of the students software to its fullest potential. completing the semester. 75 11000-55317 Developmental Education-RG Full-Time Lab Assistant for CAI Lab 0 To provide a full-time lab Hiring of new full-time lab One full-time Academic Advertisement and hiring of a No funding is available. Resource Specialist and full-time lab assistant. assistant to work in the assistant. one full-time lab CAI/PLATO Lab at Rio assistant. Grande. 76 11000-55217 Computer Increase 0 Increase student Number of staff Increase the number of development opportunities staff development increases from 2 to 3. opportunities by one. Number of students OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 50% of successful BASK students continuing college career. 30% of student in ENGL 0310, Math 0300, and READ 0308 completed the corresponding BASK course. Increase by 10% from Allow staff time during the work day to attend staff development opportunities in the college. Half of the staff attends in Fall, other half attends in Spring. Expected Objective's Completion Date Status Use of Results Number of Staff Development Objective was successfully Met Opportunities was increased met and can be repeated next year. Develop a survey instrument This requires participation from other disciplines. No that would be completed by the students at the beginning of interest expressed as of yet. each semester after census date and see if the standard is met. Collecting data from each semester about grade distributions for BASK discipline. Identify and interview students Statistics have to be rptAssessmentResultsDetailLinedWithProg Not Met The results will be used to determine rates are met. In Spring 2005 Progress Not Met Report criteria for THECB. Wednesday, April 18, 2007 In Page 69 of 157 Fall 2005 Instruction Arts, Basic Skills, Communications, Occupational Education and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard graduation rate for the CISgraduating and/or attaining previous FY Year. Program. a certificate. Information - RG Graduates Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 19 Total Number of Assessed Plans Met: 5 26% Total Number of Assessed Plans Not Met: 4 21% Number of Assessed Plans In Progress: 10 53% Number of Non-withdrawn Plans Assessed 19 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results consolidated for all EPCC who lack 12 hours for graduation. Identify students Campuses. These figures who need less than six hours to commit focus on one campus, successfully attain certification. will discuss at future Discipline meetings. Progress To increase enrollment forIncrease in number of the POCT discipline. students enrolling. Increase all courses to a Speak to area high school Lack of Personnel precludes us To support the objectives of Not Met maximum of 14 from the classes and to ESL classes on from meeting our objectives. increasing POCT enrollment. current number of 7-10. campus. Distribute flyers when speaking and place in new student orientation packets. To Incorporate 0 ESOL Writing and Computer Technology Information To write 5 modules which To make the ESOL computer technology incorporate computer technology with ESOL materials available to all ESOL instructors teaching 0309 or 0311 (Writing in the ESOL computer Focus V and VI). classroom. To increase the number of instructors These modules will be sample lessons that ESOL using the materials and the instructors can use as a number of students utilizing the classroom by model or for actual 20%. classroom instruction when using the ESOL computer classroom. Instructors will be able to see a sample of appropriate materials that incorporate ESOL writing and computer technology information. Modules will be ready for use and distribution by March 31, 2003. A sign-in sheet will be placed in the classroom to track the number of students and instructors using the classroom. Instructors are correlating -Modules will be written by language structures with Rogelio Chavira. -Modules will be distributed to regular course objectives. all instructors. -Sign-up sheets will be distributed. -During the staff development week, further discussion will be held. -Full-time instructors will meet for future planning needs. Increase Student Enrollment Increase enrollment in Increase student enrollment for the programeach of the semesters over the next 2 fiscal years.during the next 2 fiscal years. Enroll 10 additional students over the next fiscal year. Increase recruitment outreach Lack of Personnel precludes us To support the objectives of Not Met by attending at least 6 job fairs from meeting our objectives. increasing POCT enrollment. and/or speaking in classrooms at the high school level and ESL classrooms at the college 77 11000-55248 Office Information Systems - RG Increase Enrollment 78 11000-55272 ESL -RG 79 11000-55426 POCT 0 0 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Materials will be stored at ESOL Lab for instructors' future use. Wednesday, April 18, 2007 Met Page 70 of 157 Instruction Arts, Basic Skills, Communications, Occupational Education and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 19 Total Number of Assessed Plans Met: 5 26% Total Number of Assessed Plans Not Met: 4 21% Number of Assessed Plans In Progress: 10 53% Number of Non-withdrawn Plans Assessed 19 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Standard Assessment Results Use of Results Expected Objective's Completion Date Status level. 80 11000-55262 Reading-RG Exit Exam 0 Accountability Access exit exam accountability. 81 11000-55187 English-RG Adding a Part- 0 Time Tutor to the Writing Center at Rio Grande Add one part-time tutor to Add one tutor. the Writing Center to bring the number of tutors to 4. We will have a new space and increased usage once we have higher enrollment. Current three tutors are maxed out. Reach a total of 4 tutors Advertise, interview, and hire next Fall to work 41 new tutor for next year. weeks a year for 19 hours a week. New tutors are serving on increasing demand. Tutors service EPCC from all campuses, including a few UTEP students. Students continue to utilize Writing Center. Doug Perry part-time Lab Assistant is keeping statistics which he relays to coordinator. 82 11000-55187 English-RG Literary Community We will develop and then A literary community that offer Creative Writing I will have a visible (ENGL 2307) during the presence at the RG Fall Semester and Creativecampus that will enhance Writing II (ENGL 2308) student life beyond the classroom, and that will during the Spring Semester. We intend to attract more students to the RG campus. build a creative community centered at Rio Grande campus in part by adding these classes and in our further efforts to improve the Chrysalis Literary Magazine. We will also undertake other Finish developing and offer the two new creative writing classes. Set up two campus readings, two area high school readings. Expand the membership of the Nonprofit Literary Society by 5-10 and offer writing workshops. Increase the membership of the Sage Literary Alliance by 5-10 and increase its viability citywide with Ysella Fulton-Slavin and other full-time and part-time instructors continue to design literary activities for EPCC students and community. Ysella has implemented new Met office as headquarters for "Papagayo." Ysella utilizes students and service learning students. 0 The number of students completing exit level at each level will be compared with the previous semester and with the appropriate level. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT The standard will be the percentage of students successfully completing the exit level at each level. The Reading Discipline will This is in progress because this The results will be used to In is an ongoing activity. assess if enough students are Progress discuss and decide what is a positive and realistic goal to acquiring the objectives. achieve in terms of numbers of students exiting reading levels successfully. Publicity, promotional activities and presentations, announcements in classes and at meetings, distribution of the new issue of the Chrysalis literary magazine. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Met Page 71 of 157 Summer 2005 Instruction Arts, Basic Skills, Communications, Occupational Education and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard related activities, such as utilizing local writing talent to visit these classes and do readings for the campus as a whole and for area high schools, offering other support activities such as writer's workshops, and sponsoring the RG chapter of the Nonprofit Literary Society as well as the citywide Sage Literary Alliance. publicity and activities. Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 19 Total Number of Assessed Plans Met: 5 26% Total Number of Assessed Plans Not Met: 4 21% Number of Assessed Plans In Progress: 10 53% Number of Non-withdrawn Plans Assessed 19 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status Increasing Student Retention 0 Increase Student Retention.Measure number of students completing courses in the discipline. Increase of 3% of Use of appropriate students completing teaching/mentoring methods. courses in the discipline based on the previous five semesters' average. I need the latest data and am requesting it from IR. In Progress Summer 2005 84 11000-55297 Political Science - Increasing RG Student Retention 0 Increase Student Retention.Measure number of students completing courses in the discipline. Increase of 2% of Use of appropriate students completing teaching/mentoring methods. courses in the discipline based on the previous five semesters' average. I need the latest data and am requesting it from IR. In Progress Summer 2005 85 11000-55292 History-RG 0 Increase Student Retention.Measure number of students completing courses in the discipline. Increase of 2% of Use of appropriate students completing teaching/mentoring methods. courses in the discipline based on the previous five semesters' average. I need the latest data and am requesting it from IR. In Progress Summer 2005 83 11000-55307 Economics-RG Increasing Student Retention OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 72 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Arts, Basic Skills, Communications, Occupational Education and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 19 Total Number of Assessed Plans Met: 5 26% Total Number of Assessed Plans Not Met: 4 21% Number of Assessed Plans In Progress: 10 53% Number of Non-withdrawn Plans Assessed 19 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 86 11000-55287 Philosophy-RG Increasing Student Retention 0 Increase Student Retention.Measure number of students completing courses in the discipline. Increase of 2% of Use of appropriate students completing teaching/mentoring methods. courses in the discipline based on the previous five semesters' average. I need the latest data and am requesting it from IR. In Progress Summer 2005 87 11000-55282 Psychology-RG Increasing Student Retention 0 Increase Student Retention.Measure number of students completing courses in the discipline. Increase of 4% of Use of appropriate students completing teaching/mentoring methods. courses in the discipline based on the previous five semesters' average. I need the latest data and am requesting it from IR. In Progress Summer 2005 88 11000-55302 Sociology -RG Increasing Student Retention 0 Increase Student Retention.Measure number of students completing courses in the discipline. Increase of 3% of Use of appropriate students completing teaching/mentoring methods. courses in the discipline based on the previous five semesters' average. I need the latest data and am requesting it from IR. In Progress Summer 2005 89 11000-55276 ESAL -RG Creating 0 Language Modules for ESAL Students Number of language Increase number of language modules for ESLmodules. students using ESAL computers. Seven language modules The coordinator, along with Students are using modules will be created and instructors and work-study installed on ESAL students, will create and install computers for ESL five language modules on students. ESALcomputers. 90 11000-55267 Speech-RG Use of Power Point in Speech Courses Continue to implement thePowerPoint capability has 75% of instructors will use PowerPoint in the use of PowerPoint in the just been received. classroom. Public Speaking courses. 0 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT FT instructor will mentor PT instructors. rptAssessmentResultsDetailLinedWithProg Students have used PowerPoint in a variety of ways. Met Mentoring will increase. Wednesday, April 18, 2007 In Spring 2005 Progress Page 73 of 157 Instruction Associate Vice President, Instructional Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 3 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 0 Increase instructional Increase instructional services for faculty, staff services. and students of EPCC district. 5% increase. -Technology training sessions for faculty and staff -Distance Education Programs -ACS Lab Services -TV Production Services 240 11000-51005 Faculty Resource Technology Center Resource Center 0 Each staff member will be Each workshop taught by each staff member. able to teach every workshop offered by the Faculty Resource Center. Each staff member will conduct at least one section of every developed workshop on the Faculty Resource Center Course Inventory during the Fall 2002 and Spring 2003 semesters. The number of training Each staff member will use currently available resources to sessions has increased by develop the skills necessary to approximately 5%. Training sessions are now being lead the workshops. delivered online. The Technology Resource Center has 3 full-time staff and 2 parttime lab assistants developing training modules. 242 11000-52101 Academic Computing Services 0 Improve user satisfaction. User satisfaction. Lab assistants will complete Lab Assistants have attended Improve user satisfaction. 5% increase in user satisfaction after training.MS Office XP training courses. workshops in Windows 2003 and Customer Service sessions. ACS is also developing a website for users. 231 11000-52100 AVP, Instructional Services AVP, Instructional Resources & Technology Academic Computing Services OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Instructional services increased Continued refinement of by 5%. A new distance processes and new education training program has developments been developed, several new TV shows are being produced, better ACS coordination. Met Results will continue to help Met in the further development of "on-demand" training sessions. Wednesday, April 18, 2007 Met Page 74 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area 22 24318-73251 CP Special PopWIT/Equity & Opp. Plan Name Women in Technology Projected Cost. 0 Objective Measure Standard Increase the number of Total enrollment for 2001- 1% increase. female students enrolling 2002 fiscal year. in nontraditional technical/vocational fields of study. Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Assessment Results Expected Objective's Completion Date Status Use of Results Establish annual WIT Program closed. Recruitment fairs focusing on transitioning students directly into academic/occupational education. Withdra wn Develop referral directory to assist WIT Recruitment. Recruit Area High School Senior females directly into program with admission application workshops. 23 11000-55246 POCT Power Pack Courses 24 11000-55246 POCT Evaluation of 0 Students in Co- 0 Offer Power Pack or minimester courses. Number of students enrolled in courses. Starting Fall 2003. Course offered in blocks and Identify potential students, minimester at VV and TM staff, outside agencies for skills upgrade while earning campuses. In Fall 2005 POFI certificate or associate's degree. 2301 will be available online with POFI 2340 to follow ITSW 1310 Presentation subsequent semester. Also, Media Software and IMED IMED 1316 will be placed 1325 Web Page Design I online as a blended class designated Power Pack. POFI 2301 Word Processing during same time frame. and POFI 1341 Computer Applications II minim esterblock scheduled. POFT 1127 Keyboarding and POFT 2203 Speed and Accuracy block-scheduled. On-going evaluation of Evaluation of students enrolled POCT 2380 Evaluate students while in Number of employers in the co-op course would be Students/Employers is an the co-op course (POCT responding to evaluation. student's progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Understand needs of students will determine best methods to serve diverse student populations and schedule classes. Used to place students in community. Wednesday, April 18, 2007 Met In Progress Page 75 of 157 May 2005 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. op Course Objective Measure 2380). Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies whenever class offered. evaluated through Training (Spring offering) Plan, Mid Term, and Final Reports. Technical skills and soft skills will be evaluated. Assessment Results Advertisement 0 Prepare and distribute Number of students Target EPCC Identify target group flyers for advertisement. enrolled in POCT courses Population. population: English, History, and other prospective Fall 2003 & Spring 2004 Political Science, etc. Flyers students already on distributed by instructors/lab campus. staff. Place ad in school paper and in official publication. 26 11000-55246 POCT Recruiting Former Students 0 Meet Classified Staff to Identify staff members who are Identify former students at Recruit former students Determine number of employed full-and part-time at EPCC during administrative from El Paso Community returning students who are set up meetings for EPCC employees. prospective classes. professionals week during EPCC. College (EPCC) staff. Fall 2003 & Spring 2004 Host an event inviting all April. support staff to upgrade their skills and earn their certificate/AAS degree. Evaluate credits and mentor until graduation. Event could take place during Administrative Professionals Week. Support from the administrative team will be required. 27 11000-55246 POCT Marketing Strategies 0 Prepare marketing strategies based on campus location. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Flyers prepared and distributed To help EPCC former In by faculty and lab staff to students earn their Progress students other populations and certificate/AAS Degree in counselors. this Office/Computer field and become more Proficient. To help EPCC former In students earn their Progress certificate/AAS degree in the Office/Computer field and become more proficient. Visit High Schools in Identify high schools and the VV area. businesses in the Valle Verde Fall 2003 & Spring 2004 area. Prepare flyers for distribution. rptAssessmentResultsDetailLinedWithProg Expected Objective's Completion Date Status ongoing process. Note: Will begin again with Spring 2005 enrollments (23 registered 11/15/04) 25 11000-55246 POCT Number of potential students by high school locations and businesses. Use of Results Withdra wn Wednesday, April 18, 2007 Page 76 of 157 April 2005 April 2005 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies 28 11000-55246 POCT Increase MOUS Certification for Students 0 MOUS Certification for students. 29 11000-55246 POCT Increase MOUS Certification for Faculty 0 Increase MOUS Number of faculty passing Increase MOUS Certification for faculty. MOUS Certification. Certification by one faculty in Fall 2003 and by one in Spring 2004. 30 11000-55246 POCT Increase Community Awareness 0 Increase community awareness. Place ads in newspaper Dependent on budget Advertise in the El Paso Times and identify the number of place at least one AD in on "Re-inventing your Skills. businesses responding. El Paso Times newspaper. 31 11000-55246 POCT Increase Student Graduation Rate 0 Increase student graduation rate for the Professional Office Computer Technology (POCT) discipline. Number of students Co-op student graduating in the information and other certificate's) and POCT classes. associate's degree program in the fall and spring semesters. 0 Develop off-campus sites Enroll students at off-site Pilot Spring 2003 for implementation in Fall to provide courses for in- locations to increase educational levels of 2003. service officers. officers in the field. 32 11000-55380 Criminal Justice - Development VV of OffCampus Sites Number of students passing MOUS Certification. Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Gather student Identify students upon Courses are designed around information. completing POFI 1341 (Word, Certification Skills using Fall 2003 & Spring 2004 Expert); POFI 1349 (Excel, specific textbook for exam. Core); POFI 2301 (Word, Core); POFTS 1319 (Access, Core); ITSW 1310 (Presentation Software Graphics) MOUS Certifications. Expected Objective's Completion Date Status Use of Results Students are prepared to go In June 1, 2005 to testing sites locally and Progress take timed hands- on exam. Faculty must be committed to Summer 2004 5 faculty Project MOS Certified In attending workshops and attended MOS Certification faculty as discipline strents Progress taking the MOUS Certification Training & will test Fall 2004. and currency. Exams for Microsoft Suite. Identify students who are 12 hours or less away from graduation. This process should take place at the beginning of the spring semester. Withdra wn Students contacted in POCT 2380 classes and others to determine those 12 hours or less away from graduation every Spring Semester. Able to determine employed In and non-employed students Progress and provide contacts for possible employment through co-op and placement office and other outside possibilities. Enroll students at Rogelio Two classes are being offered On going with classes as Sanchez, Sheriff's Office, and at the Sheriffs Dept. Spring needed. El Paso Police Department to 2004, Summer 2004. facilitate education in field. rptAssessmentResultsDetailLinedWithProg Dec. 31, 2004 Wednesday, April 18, 2007 Met Page 77 of 157 May 2005 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies 33 11000-55380 Criminal Justice - Development VV of Field of Study 0 Develop field of study. 34 11000-55380 Criminal Justice - Develop VV Guidelines for Competition 0 Promote program through Faculty to develop skills' Competition realized competition to promote Spring 2004. local area independent school districts (ISD) and Criminal Justice programs with local ISDs. student competition to strengthen articulation agreements. 35 11000-55380 Criminal Justice - Promotion of VV Field of Study and Articulation Agreements 0 Promote field of study andCriminal Justice discipline Completion realized Fall Meet with UTEP officials to co-develop field of articulation 2003. (Dean of Liberal Arts, study and articulation agreements/programs Criminal Justice faculty to agreements/programs with between the Sheriff's develop guidelines for Academy (SO), El Paso UTEP and the various law accomplishing field of study enforcement agencies. Community College and articulation agreements (EPCC), and the between the educational and University of Texas at El law enforcement agencies. Paso (UTEP). Will entail several meetings to Note: In addition to the establish guidelines. SO, other agencies will be added as agreements are Review syllabi in Criminal made. Justice (EPCC & UTEP). Establish educational requirements of current and future faculty for teaching in the field of study and WECM. FOS begins Fall 2003. Review educational levels of current and future faculty to meet field of study requirements. Assessment Results We have two type of credentials, one for WECM Courses and for Field of Study. Expected Objective's Completion Date Status Use of Results Moving toward all faculty Withdra being credentialed for field wn of study. Hosted Skills USA Spring Meet with local ISD Currently working on Dual Met 2004 and will again in Spring Credit programs with EPISD. instructors and develop guidelines for competition with 2005. articulated high schools and Criminal Justice program. We have advanced standing with all public academies in state and one with FBI National Academy. We have articulation with NMSU, Hanks High School and University of Phoenix. Currently working with UTEP and Sul Ross. Met Increase of 4,514 students in EDUC 1300. Increase of 2,303 students in TECA. Maintain enrollment forecast trend. Met Determine cohort groups. 36 11000-55435 Education -VV Increase Enrollment in Education 0 Increase enrollment in the Number of Education EDUC 1300 and TECA 1300 students and Education Majors. courses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase enrollment of students from onset of program. Recruit high school students, employees at the ISD's in the El Paso County area. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 78 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 37 11000-55435 Education -VV Increase 0 Retention Rate of Students Increase retention rate of Retention rate of EDUC Maintain retention rate Provide discipline advising to students in Education. students over previous of Education majors and Education majors. since inception of program. increase enrollment of students over a 3-year period from Baseline year. Completers for Ed 1300 dropped proportionally. Completers for TECA increased proportionally. Survey; both completer and In August, 2006 students that drop or fail. Progress Maintain retention. 38 11000-55435 Education -VV Increase 0 Retention Rate in Education Increase retention rate of Measure retention rate over a three-year period, students in Education. from baseline year. Maintain retention rate Provide discipline advising to of Education majors and Education majors. increase enrollment by students over a 3-year period from Baseline year. Completers for EDUC. 1300 dropped proportionally. Completers for TECA increased proportionally. Survey students that drop In August, 2006 and fail. Maintain retention. Progress 39 11000-55435 Education -VV Hire One FT Faculty Member 0 At least one full-time faculty member to this discipline by Fall 2003. Hire one FT qualified faculty member. Yes, full-time instructor Open the position internally was hired. and externally for qualified faculty to apply. Two new faculty were hired. Maintain faculty and forecast enrollment trend. 40 11000-55210 Accounting - VV Recruit Students in Accounting 0 Start a student organization in which accounting students can better understand the business world and principles of free enterprise while design outreach programs that help individuals in the community. Currently, there is no student business organization. After this plan, there should be one. Start the SIFE (Students Recruit students and work with SIFE started currently, it has in Free Enterprise) 50 members, won "Rookie of the SIFE organization. student program here at the year" award in the nation the community college. wide competition. Include writing of charter and recruitment of initial members. Plan to increase enrollment from previous years. 41 11000-55417 Social Work Program-VV 0 Increase student graduation rate for the Social Work Program. Number of Social Work students graduating. Increase enrollment from previous 3-year average. Increase Student Graduation OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT New student organization Met motivates students to go into business degrees. Implement student mentoring Mentoring system Continue with mentoring system, i.e., assign faculty implemented. The number of system in order to improve mentor to each student in the social work students student retention. rptAssessmentResultsDetailLinedWithProg Met Wednesday, April 18, 2007 Met Page 79 of 157 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Rate for the Social Work Program Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies program. 42 11000-52123 Library - VV Closed Circuit Television Security System for the Valle Verde Library 43 11000-52123 Library - VV VV Library 0 Five Year Plan 0 Ensure the safety and Installation and use of the Completion date: security of the Valle Closed Circuit Television October 2003. Verde Library patrons, Security System to staff and dwindling libraryprovide a safer and more resources and materials. secure library The total cost of installing environment. Reduction the Closed Circuit in the number of Television Security complaints and police System is $13,990. If a reports generated by the student, patron and staff library and library patrons member is assaulted, then due to theft of personal EPCC's total cost could beproperty, theft of library ten times that or more thanmaterials, harrassment of the initial cost of the patrons by other patrons, system. Our patrons verbal abuse of staff, include little children, inappropriate behavior teenagers, young adults, (making out on the floor), adults and if one is ever beer bottles, needles, abducted, molested or pornographic drawings on sexually assaulted, EPCC furniture, semen on could be liable for furniture, etc. damages. Purchase and install the Closed Circuit Television Security System. Projected Cost: $13,9990.00 Installation of the following components: 16 color cameras 16 low profile camera mounts, 1 camera power supply, 1 16-channel digital recorder (120 images per second & 120 gig hard-drive), and lot wire Create a V.V. Library FiveCreation of the V.V. Library Five Year Plan. Year Plan. Create a V.V. Library Fivwe Year Plan that will document the goals and priorities for 2003-2008. It will be a strategic and operational plan. This document will be an ever- OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Completion date: December, 2003. rptAssessmentResultsDetailLinedWithProg Assessment Results Use of Results Expected Objective's Completion Date Status graduating has increased. Wednesday, April 18, 2007 Page 80 of 157 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status changing and action-oriented plan that will serve as the resource that will communicate and guide the direction of library over the next five years. 44 11000-52123 Library - VV Weeding of the Valle Verde Library Collection 0 Weed the Valle Verde Library circulating collection. 45 11000-55390 Draft/Design Tech - VV Increase Student Enrollment in Drafting & Design Technology 0 Increase student Increase of students in enrollment in the Drafting each regular semester and & Design Technology summer session. program over the next two years. Reduce material that is Completion date: older than 10 years to December 2003. approximately 77%. Run a report based on same criteria used for 10/18/02 "Age of EPCC Campus Library Collections." OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT During the Summer and Fall of 2003, primary responsibility for weeding the collection is held by the Division Liaison librarians with the involvement of relevant Division faculty in the specific subject areas. The following general criteria are considered when discarding materials: obsolescence, superdeded editions with no historical value, poor physical condition, insufficient use or basic value, changing curricular needs. An increase of students Improve communication with There has been moderate We track all drafting In increase in enrollment, summer majors. A faculty member Progress over the base by the end local high schools. '03 over summer '04. We of Spring, 2004. An will meet with assigned expect an additional slight increase of students over Target specific high schools students at least once per the 2003-2004 numbers for recruitment presentations. increase for the spring of '04 semester to advise them on over spring of '05 numbers. by the end of Spring, required courses for With this current trend we also completion of their 2005. Provide a scholarship opportunity to the winter of the expect a slight increase in the program. This advising last year, 2004-2005, of this process assists students and annual VICA-SKILLS USA two year plan. allows us to identify required drafting contest winner. sections in advance for rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 81 of 157 April 2005 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Use of Results Conduct a periodic open house, at least once per semester, and showcase our facilities and program to local high schools. scheduling purposes. Expected Objective's Completion Date Status 46 11000-55405 Fire Technology Accreditation of Fire Technology A.A.S. Degree 0 Obtain accreditation for Obtain accreditation from IFSAC accreditation the Fire Technology IFSAC. standards. A.A.S. degree from the International Fire Service Accreditation Congress. The current status of the Fire -Attend an IFSAC Technology discipline with the accreditation workshop -Apply for IFSAC membership International Fire Service -Complete a program self-study Accreditation Congress -Host a site-visit for IFSAC (IFSAC) accreditation is in accreditation evaluators progress, pending approval for the funds, $1250.00 per year. In This process will accredit our degree program. The Progress accreditation is industry specific and it is recognized nationally. The process to obtain accreditation is a selfstudy, site evaluation and Congress approval. 47 11000-41009 Fire Recruit Training -VV Facilities for Firefighter Certification Training 0 Build (1) a storage Facilities to conduct building and parking Firefighter Certification garage to house Fire training. Technology's fire equipment and two fire apparatus and (2) a classroom capable of seating 32 students that would be utilized for Firefighter Certification training. The parking garage could be located in the west parking lot (Hawkins side) of the ATC and the classroom and storage buildings in the area between buildings 1 and 2. Develop plans with the Maintenance Department and the director of the Apprenticeship Program. The Fire Recruit progress needs are fix facility to store equipment, apparatus and specialized hazardous material (HAZMAT) equipment that is used in the program. We now use a 40-foot trailer that has exceeded the amount to store. Some alternative to procuring another trailer or storage area is considering the construction program possibly building a portable or fix facility in the future. Not Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Texas Commission on Fire Protection Standards. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 82 of 157 2008 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Assessment Results Use of Results Expected Objective's Completion Date Status Students in the apprenticeship program can build the buildings if the materials are provided. 48 11000-55424 Sign SLNG Lab Lang/Interpreter- Maintenance VV 0 6.1 Stabilize the SLNG Dept. lab facility, equipment and staff to support the instructional needs of the existing courses and student requests. 49 11000-55424 Sign SLNG High Lang/Interpreter- School VV Articulation Plan 0 none 2.1 Increase seat count/enrollment by articulating credit with high school programs offering ASL course work. All equipment replaced, 6 VCR station, 1 video relay station, list of missing tapes ordered, lab assistant scheduled for day, night and weekend schedules. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT SLNG Lab equipment in place for Spring, 2004 semester. Student survey of satisfaction Spring, 2004. -Pursue all avenues to repair All avenues were pursued with and replace as appropriate any all relevant departments IT/Media to repair and the existing equipment that is existing SLNG Lab broken. -Replace non-repairable and equipment. Two computers were determined to be nonoutdated VCR/Camera functional and were taken out equipment. -Purchase and install the ability of service. Funding was secured for (1) computer with to utilize CD Rom based CD Rom capacity. It was materials. supposed to be on order since -Replace missing/damaged last Spring 2003 semester but videotapes. -Provide for 6 working VCR has not arrived. practice stations. -Provide for computer relay interpreting calls to be demonstrated. -Provide SLNG Lab Assistant for access for Day, Night, and Weekend students. During the time of this plan In August, 2005 2 TV/VCR combo units Progress were "broken" and non repairable. We received 2 new TV/VCR units. The total number of SNLG media viewing stations is still at 4. Two new cassette recorders were received. The two video cameras need to be repaired. We have been unable to secure their repair. We are requesting that one item of funding from the Carl Perkins. Number of plans in effect. 2 -Strategic planning with dean Strategic planning with Dean and Advisory Board was held to identify potential courses during Fall, 2004 meeting. and programs. -Identify personnel involved at Personnel was identified at Burgess H.S.; Eastwood H.S. Eastwood; Burgess. Margo -Revisit the Eastwood plan and Portillo Endlich is revisiting The articulation plan has In been drafted with Burgess Progress H.S. and will be signed and completed by the end of Fall, 2004 semester. A student recruitment brochure rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 83 of 157 May, 2005 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results the Eastwood plan. It does not update as needed. need to be updated at this time. -Develop and information piece for high school students who are junior/seniors. -Complete articulation plans with Burgess High School if appropriate. 50 11000-55424 Sign SLNG Fill Lang/Interpreter- Rate VV Management 0 2.1 Maximize enrollment Completed survey student Increase fill rate for Fall by increasing sections to by Spring, 2004, classes 2004 and 2005. 85% fill rate average. offered off cycle for Fall 2004 and Spring 2005. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Strategic planning with dean to develop most efficient scheduling. -Offer 3 to 1 ratio of beginning to advanced classes. -Survey students to determine future scheduling needs. -Recruit new students to fill entry level classes. -Offer entry level courses off cycle; and or at other campuses as feeder courses to develop second year program as appropriate based on need/interest. -Complete articulation plans with Burgess High School. rptAssessmentResultsDetailLinedWithProg Use of Results Expected Objective's Completion Date Status is in the final draft states with Gloria Estrada. This brochure can be used to recruit junior/senior students of articulated programs. A letter will be drafted that can explain the articulation/transfer process and provided to the high school programs. Our counselor Arvis Jones is the designated contact person. The statistics for Fall, 2003; 17 Fall 10 courses with overall Met sections with 186 seat count. average of 83.7% fill rate. The statistics for Fall, 2004; 15 The SLNG Intro to Deaf sections with 210 seat count. Community Class rate was This should improve the ratio. 109.38% and SLNG ASL (I noticed on section 11750 Beginning I was overall was not deleted from the 85.% fill rate. The 3:1 ratio schedule and the 0% fill rate is in progress to have second incorrectly brings the Fill Rate year courses stabilized. The to 64.29% instead of the actual program is in a position 128.57%) where sections are closed and the extra section that is "building" the program is the course that brings down the total average. We are pilot testing a off campus; off cycle course to recruit students from Hillside faculty and staff by offering a "Signed English" course Wednesday, April 18, 2007 Page 84 of 157 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results Spring, 2005. Articulation plans with Burgess and Eastwood are being completed. 52 11000-55215 Comp Implement Information - VV SAM & TOM Testing Services 0 To provide access for The number of instructors students to Web-based and students who will be applications that train, test,utilizing the new system. and evaluate their skills in the Microsoft Office Suite of products. There is a sufficient way to measure future usage. We expect a large number of faculty and students to utilize the new system once it is implemented. SAM software was installed Software will be installed throughout the district. Faculty throughout EPCC in the CISC will be trained to implement classrooms and ACS labs. and utilize the system for a SAM training for faculty was variety of services. conducted the last 3 semesters. Textbook orders are now being utilized extensively throughout our Microsoft Office offerings including our online sections by both full-time and part-time instructors. 53 11000-55370 Automotive Tech - VV 0 Provide night classes for second year students. Students in the 2 year degree plan need 12 automotive classes to graduate. Night students will graduate with an AAS Degree in Automotive Technology. The second year of the Automotive Technology degree plan lists three automotive classes in the Fall and three in the Spring semesters. Only one second year automotive class will be offered at night each semester. The student will be required to attend three consecutive years to complete the second year courses at night. Provide Night Classes Needed by Students Completing their Degree Plan Second year night classes have not been offered for the past 4 years. Students will register for night classes when they are scheduled. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Met Acquire feedback from student and faculty related to its benefit/disadvantages. Use SAM reporting to determine why some faculty are not utilizing the utility. Use feedback to determine the best practices. This plan began in Spring 2003 Continue to offer two 2nd with the offering of one 2nd year night classes until year night class. Fall 2003 enrollment begins to drop. also had one 2nd year night Students can complete 2nd class. Enrollment was year night classes in two increasing and two 2nd year consecutive years. night classes were offered for Spring 2004. One at night and one on Saturday. Enrollment was sufficient in both classes. Two 2nd year night classes were again offered in Fall 2004, night and Saturday. Sufficient enrollment. Wednesday, April 18, 2007 Met Page 85 of 157 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 54 11000-55370 Automotive Tech - VV Provide Night Classes Needed by Students Completing their Degree Plan 0 Revise courses to more Courses have not been accurately provide trainingupdated for 5 years. A in the current and future DACUM will be technology. conducted during Spring 2003. 55 11000-55370 Automotive Tech - VV Provide Night Classes Needed by Students Completing their Degree Plan 0 Develop a Video Tape High School Marketing is Video will be developed The script will be written and showcasing the not sufficient. The Video by Spring 2004. the Video will be developed. automotive program, to be could be used by the used for marketing. Recruitment office while visiting High School Students. Digital Video was recorded We will not be making an Withdra on two occasions along with individual program video for wn other occupational programs. Automotive Technology. The video will be used to make Occupational Programs video CD. 56 11000-55215 Comp Create CISC Information - VV District-Wide Mission Statement 0 To create a district-wide The completed document. uniform CISC mission statement to continue our commitment for a consistent quality program. One comprehensive mission statement for the entire CISC discipline. During CISC discipline meetings, ideas will be requested by a sub-committee to begin the development of the document. In subsequent meetings, changes and revisions will be made until a comprehensive document is created. During CISC discipline We will revisit the Mission meetings, we gathered the Statement from time-to-time variety of mission statements to ensure its relevance as that were out there. It well as its support of the appeared each campus had College mission. one. We massaged those into one coherent mission statement for the entire discipline. 57 11000-55215 Comp CISCO Information - VV Networking Training 0 Increase CIS enrollment Increase CIS graduates by increasing the number from previous 3 year of Local Academies under average. the EPCC CISCO Training Umbrella, thus ensuring course articulation and dual credit CISCO Certificate of Completion and AAS Microcomputer ApplicationsTelecommunications and Networking. Open communications with High Schools in the Lower Valley and private schools. Increase CIS enrollment by Local Academies are not in increasing the number of Local place in the EPISD, Socorro, Academies under the EPCC & YISD. Instructors are CISCO Training Umbrella, being identified for Dual thus ensuring course credit offerings in the articulation and dual credit schools. with the local academies into OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Advisory Committee The results of the DACUM will approve courses by will be used to analyze and Spring 2004. revise current courses. rptAssessmentResultsDetailLinedWithProg Dacum was conducted in May Courses were revised and 2003. Advisory Committee updated. approved changes to courses on October 21, 2003. Wednesday, April 18, 2007 Met Met Page 86 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies with the local academies into the EPCC CIS Degree Programs. Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Assessment Results Use of Results Expected Objective's Completion Date Status the EPCC Degree Programs. 58 11000-55375 Child Development VV Increase Enrollment in Child Development Program 0 Increase enrollment in the Number of Child Child Development Development majors. Program. 59 11000-55375 Child Development VV Improve Retention, Graduation, and Completion Rates 0 Improve retention, graduation, and completion rates. Retention rate of Child Maintain retention rate Development students of Child Development over previous three years. students and increase rate. Faculty will continue academic Number of graduates has advising of Child Development increased. students. Continue to pre advice and Met monitor students in retention efforts. 60 11000-55230 Business AdministrationVV Advertisement for Business Management 0 Increase community awareness. Number of businesses responding to ad. Summer of 2004: requested Advertise in the El Paso Times, and Twin Plant News. advertisement in the El Paso Continue to update faculty web Times. Request was processed through proper pages regarding program channels and again the information. Marketing Department did not publish. This department continues their non-support in this program. Previous requested have been made to no avail. This mission of this area does not support the instructional programs. Their mission and vision needs to be reevaluated. Through the requested Not Met advertisement, we had expected an increase in enrollment in the NEW course. Due to no support from the Marketing Department, the enrollment for the new course were very low. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase enrollment from previous 3-year average. Number of advertisements. Recruit high school students and employees of early childhood facilities. rptAssessmentResultsDetailLinedWithProg Enrollment numbers have gone Continue to recruit in In through temporal fluctuations schools and day care centers.Progress increasing and decreasing slightly. Wednesday, April 18, 2007 Page 87 of 157 2007 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 61 11000-55230 Business AdministrationVV CE Courses 0 Identify courses and offer Number of students courses as concurrent enrolled in concurrent courses. courses. Compare student CE Courses: Courses are Contact CE coordinator and enrollment by semester. provide information for identified and advertised as courses to be advertised in the concurrent courses. CE schedule. 62 11000-55230 Business AdministrationVV Course Offerings 0 Offer Power Pack, mini- Number of students mester or on-line courses. enrolled in courses. Number of courses offered by semester. Continue to evaluate and identify courses that may attract students to enrolling in them. Courses are reviewed ever semester. The E-Commerce and E-Business Management courses were identified as needed to be put on-line. Additional courses are being reviewed. We are in the process of review mini-mester course. Course will be developed 2005. Advised Advisory Committee of adding additional on-line courses. They agreed and also agreed to offering other NEW Courses related to ECommerce. Met 63 11000-55230 Business AdministrationVV Evaluation by Employers 0 Evaluations are used to Students enrolled in the work Evaluate students while in Number of employers responding to evaluation. ensure we are meeting experience course would be the work experience the standards of evaluated. course. business and industry. Evaluation By Employers: Fall 2004 and Spring 2004 Coop courses were evaluated and sent to Job Placement. Results from these evaluations are used to improve the program, and network with employers. Met 64 11000-55230 Business AdministrationVV Partnerships 0 Partner with businesses Number of students and offer courses on-site. enrolled in Business/Management courses. Partnership: Partnerships with The results will be available In August, 2005 business: A mini-grant was within a year. Progress written by Linda E. Silva-Gras was approved. The mini-grant funds are being utilized to identify potential businesses. This process began Fall 2004 and will continue to Spring 2005. Working with Sister Helen in writing a curriculum for small businesses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Number of committed partnerships. Identify organizations who may be interested in offering courses on-site. rptAssessmentResultsDetailLinedWithProg We were able to attract new Met students through this process. Wednesday, April 18, 2007 Page 88 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Number of businesses responding to ad. Standard 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 65 11000-55251 International Trade and Business-VV Advertisement for International Trade 0 Increase community awareness. 66 11000-55251 International Trade and Business-VV CE Courses 0 Identify courses and offer Number of students enrolled in concurrent courses as concurrent courses. courses. Compare student Contact CE coordinator and CE Courses are identified and We were able to attract new Met enrollment by semester. provide information for advertised as concurrent students through this process. courses to be advertised in the courses. CE schedule. 67 11000-55251 International Trade and Business-VV Course Offerings 0 Offer Power Pack, mini- Number of students mester or on-line courses. enrolled in courses. Number of courses offered by semester. 68 11000-55251 International Trade and Business-VV Evaluation by Employers 0 Evaluations are used to Students enrolled in the work Evaluate students while in Number of employers responding to evaluation. ensure we are meeting experience course would be the work experience the standards of evaluated. course. business and industry. 69 11000-55251 International Trade and Business-VV Graduates 0 Increase student graduation rate for International Trade Number of students graduating in the certificate & Associate OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Number of advertisements. Total Number Plans Submitted (Duplicated if for more than 1 goal) Monitoring growth of graduates. Advertise in the El Paso Time, Increase community awareness. Through the requested Not Met advertisement, we had and Twin Plan News. expected an increase in Continue to update faculty web enrollment in the NEW pages regarding program course. Due to no support information. from the Marketing Department, the enrollment for the new course were very low. Continue to evaluate and identify courses that may attract students to enrolling in them. Identify students who are 12 hours or less away from graduation. This process rptAssessmentResultsDetailLinedWithProg Courses are reviewed every Courses are offered in the semester and shared with the traditional way and online. Advisory Committee. The International Trade Program was recommended for closure and the programs was restructured with a new Associate Degree and Certificate. Met Evaluation by Employer: Fall 2004 and Spring 2004 Coop courses were evaluated and sent to Job Placement. Met Results from these evaluations are used to improve the programs, and network with employers. Graduates: Need to identify students who are 12 hours away from graduation. Wednesday, April 18, 2007 Not Met Page 89 of 157 Instruction Dean, Education and Occupational Programs Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective program. Measure Standard Degree program in the Fall & Spring semesters. 0 Partner with businesses Number of students and offer courses on-site. enrolled in Business/Management courses. 71 11000-55421 Legal Assistance Enrollment 0 Increase enrollment in the Number of Legal Assistant Increase enrollment from previous 3 years Legal Assistant Program. majors at EPCC. average. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 49 Total Number of Assessed Plans Met: 21 49% Total Number of Assessed Plans Not Met: 7 16% Number of Assessed Plans In Progress: 15 35% Number of Non-withdrawn Plans Assessed 43 98% Number of Non-withdrawn Plans Not Assessed 1 2% Number of Plans Withdrawn: 5 10% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results should take place at the beginning of the Fall semester. Partnership 70 11000-55251 International Trade and Business-VV Total Number Plans Submitted (Duplicated if for more than 1 goal) Number of committed partnership. International Businesses who may be interested in offering courses on-site. Partnerships with business: A The results will be available In mini-grant was written by within a year. Progress Linda Silva - grant was approved. The mini-grant funds are being utilized to identify potential businesses. This process began Fall 2004 and continue through Spring 2005. Working with EPISD and Bowie High School to identify articulated and dual courses. Actively recruit high school Developing a CD explaining students and employees in the the program. Legal profession without degrees. rptAssessmentResultsDetailLinedWithProg Pass CD on Paralegal Program to high school graduates and career counselors. Wednesday, April 18, 2007 Met Page 90 of 157 Dec. 2005 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Director, Center for Instructional Telecommunications Plan Budget No. Acct No. Area 243 11000-52115 Instructional Media Centers Plan Name Projected Cost. CIT-Ceiling Air Conditioning System for the TM Lecture Forum Master Control Room 0 Objective Measure To install an air Reduce equipment conditioning ceiling unit indowntime to zero. the Transmountain Lecture Forum control room. The equipment in the control room is estimated at over $200,000. The intensive heat generated by the equipment is in danger of damaging the equipment beyond repair. Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 2 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 50% Number of Non-withdrawn Plans Assessed 2 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Eliminate equipment Solicit institutional funds in malfunction due to order to comply with equipment overheating. manufacturers operational equipment specifications, in order to continue to comply with Lecture Forum usage requests. Not completed--waiting for funds. Eliminate equipment Solicit institutional funds in malfunction due to order to comply with equipment overheating. manufacturers operational equipment specifications, in order to continue the production of professional video programs. The purchase and installation of the Air Conditioning and Ceiling Unit was completed last August, 2004. Use of Results Expected Objective's Completion Date Status In Progress Equipment replacement would turn into an astronomical cost for the College-district. 244 11000-52136 Cablecast CIT- Ceiling Air Conditioning System for the Master Control Room at the TV Studio 0 Reduce equipment To install an air conditioning ceiling unit indowntime to zero. the TV studio located at VV C401. The equipment in the TV studio is estimated at over $300,000. The intensive heat is in danger of damaging the production equipment. Met Equipment replacement due to overheating would turn into an astronomical OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 50% Wednesday, April 18, 2007 Page 91 of 157 August 31, 2005 Instruction Director, Center for Instructional Telecommunications Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 2 Total Number of Assessed Plans Met: 1 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 50% Number of Non-withdrawn Plans Assessed 2 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status cost to the College-district. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 50% Wednesday, April 18, 2007 Page 92 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Director, Distance Learning Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 33% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Expected Objective's Completion Date Status Assessment Results Use of Results Regularly scheduled information; planning and objective(s) setting meetings with all supported areas improved communication. Continue weekly meetings 238 11000-52112 Instructional Instructional Support Services Support Services 0 Improve communications Weekly meetings are between the ISS staff and regularly held. supported staff members. 239 11000-52135 Instructional TV 0 Improve communication Improved communication. 5% increase from with faculty and students. baseline at the end of the reporting period. Provide information one week Published information letters, Continue to publish and mail Met orientation schedules, review information to students and prior to educational events. sessions notifications to faculty one week before students and faculty one week scheduled activities and before each event or activity. events. Communication was improved. Increase student satisfaction in Distance Education programs. Improve faculty training and provide enhanced student services. Instructional Television 241 11000-52113 Distance Distance 0 Education / Online Education/Onli ne Increase student satisfaction in distance education classes. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 85% of scheduled Regularly schedule meetings held during the information; planning and year. objective(s) setting meetings with all supported areas. 5% increase in student satisfaction from previous semester. rptAssessmentResultsDetailLinedWithProg 67% Online course training & mentoring programs for EPCC faculty teaching distance education delivered courses were taught by the Technology Resource Center each month at online faculty meetings. This training is designed to improve faculty skills in teaching distance education delivered courses. The Distance Education Network office has revised internal student support procedures to offer enhanced service to students. Met Continue to work with In faculty to improve student Progress satisfaction in distance education programs and improve services to students. Wednesday, April 18, 2007 Page 93 of 157 Ongoing Instruction Director, Library Technical Services Plan Budget No. Acct No. Area Plan Name 235 11000-52144 Library Technical Library Services Technical Services Projected Cost. 0 Objective Measure Standard Restore user services to Users call LTS within 30 Two hour problem libraries and Library minutes of any database or resolution. Technical Services (LTS) PC problem. promptly when problems arise. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 1 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Implementation strategy: Withdrawn -Write and distribute procedure -Train staff to better diagnose problems -Publish lessons learned rptAssessmentResultsDetailLinedWithProg Use of Results Expected Objective's Completion Date Status This function was Withdra transferred to IT as a result wn of College reorganization. Wednesday, April 18, 2007 Page 94 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% ESL, Reading and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 9 Total Number of Assessed Plans Met: 0 #Num! Total Number of Assessed Plans Not Met: 0 #Num! Number of Assessed Plans In Progress: 0 #Num! Number of Non-withdrawn Plans Assessed 0 0% Number of Non-withdrawn Plans Not Assessed 9 100% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status 184 11000-55277 ESAL Speech-VV VV ESL Recruiter 0 A faculty in Reading couldTo base ourselves on be given release time to number of students (ESL). work in conjunction with the office of Recruitment to recruit High School ESL students. 185 11000-55290 History-VV Increase Effectiveness in Teaching 0 Increase Effectiveness in Existence of U.S. History none maps in classrooms. Teaching U.S. History Courses. 186 11000-55300 Sociology -VV A Pool for Part-time Instructors 0 Develop a pool of parttime instructors to ensure all class sections offered by the college have an available and prepared instructor. Number of applicants to Personnel and/or to Coordinator's e-mail address book. Stronger pool of Recruit new instructors via qualified PT instructors. electronic flyers and/or presentations to graduate student groups at UTEP and NMSU. Recruitment flyers sent to Dr. Ted Curry at UTEP for distribution to graduate students. Visits made to Dr. Ted Curry's UTEP class of graduate students and to NMSU's student graduate club to make a pitch on teaching sociology at El Paso Community College. Met 187 11000-55300 Sociology -VV Develop a Pool for PartTime Instructors 0 Develop a pool of parttime instructors that reflects the social and cultural diversity of the community we serve. Percentage of minority Stronger pool of Identify and use advocacy instructors in the part-time qualified PT instructors. groups to recruit new faculty faculty pool. members. Out of 17 active members in the adjunct faculty e-mail file: 10 are female; 7 are male; and 6 are non-hispanic whites. Our pool of adjunct faculty more closely mirrors the characteristics of our student body. Met 188 11000-55280 Psychology-VV Mind Psi Club- 0 Then, to see how many more students are enrolled after the recruiters role/presentation. Budget for the position was -Identify population. not approved. -Set up appointments for presentations. -Go with office of Recruitment to give these presentations at the local high schools. Withdra wn Purchase of 1 set of U.S. History maps approximately $800.00. Withdra wn Is renew student, faculty, Interest will continue and To have elected officials Recruiting via flyers and word Club is still defunct. Student OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Keep open to students Wednesday, April 18, 2007 In Page 95 of 157 End of Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% ESL, Reading and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. ESL Literary Competition Measure and staff interest in Mind perhaps grow, and club Psi (Valle Verde will maintain minimum Psychology Club). Club qualifications for EPCC had been officially student club recognition. recognized, but lost EPCC recognition. However, initial efforts suggest that there is much interest in reviving the club, and in having its members make a positive contribution to EPCC and VV Campus. Renewal 189 11000-55270 ESOL-VV Objective Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 9 Total Number of Assessed Plans Met: 0 #Num! Total Number of Assessed Plans Not Met: 0 #Num! Number of Assessed Plans In Progress: 0 #Num! Number of Non-withdrawn Plans Assessed 0 0% Number of Non-withdrawn Plans Not Assessed 9 100% Number of Plans Withdrawn: 0 0% Strategies Assessment Results and new/revised club interest has not been strong of mouth, soliciting student constitution by end of input as to how to define Mind enough to maintain a feasible Summer '03, and to organization. Psi (e.g., activities, fund continue to recruit and raising) and work with retain interested students students to brainstorm (on-going) beginning effective recreating, retention, Spring 03 and working ensure club success. through Fall 03 and beyond each semester. Use of Results Expected Objective's Completion Date Status organizing and re-establish Progress club. Academic Year In Progress End of Academic Year To add an ESL category toStudents will enter essays Students will be for competition. motivated. the English Literary Contest. To be called the ESL literary Competition. We will cooperate with the English Discipline and get together for the awards ceremony to award prizes of $100, $60, and $30. 190 11000-55277 ESAL Speech-VV VV ESAL 0 Library/Resour ce Center for Part-Time Faculty Create a library/resource # of part-time ESAL center for part-time ESAL instructors checking out instructors at Valle Verde. books or duplicating material from library/resource center. 70% of part-time ESAL instructors will check out books or duplicate materials from library/resource center during academic year. Books and teaching materials Library completed; only 30% will be set up in Room #B226; of PT faculty have checked out materials. it will be available to instructors beginning Fall 2003; instructors will have access during the hours that the ESAL Lab is open. In Progress End of Academic Year 191 11000-55305 Economics-VV Recruit and retain a high Increase the number of quality part-time teaching part-time Economics Instructors from the faculty. present number of 7 to at least in classroom skills. 10 Instructors in one year. Recruit from Business, Government, and Universities. In Progress End of Academic Year Recruit High Quality P-T Teaching Faculty 0 0 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg To be continued. Wednesday, April 18, 2007 Page 96 of 157 Instruction ESL, Reading and Social Sciences Plan Budget No. Acct No. Area Plan Name Projected Cost. 192 11000-55295 Political Science - Recruit High VV Quality P-T Teaching Faculty 0 Objective Measure Standard Recruit and retain a high Increase the number of 10 Instructors in one quality part-time teaching part-time Government year. faculty. Instructors from the present number to at least in classroom skills. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 9 Total Number of Assessed Plans Met: 0 #Num! Total Number of Assessed Plans Not Met: 0 #Num! Number of Assessed Plans In Progress: 0 #Num! Number of Non-withdrawn Plans Assessed 0 0% Number of Non-withdrawn Plans Not Assessed 9 100% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Employed 2 new FT Recruit from Business, Government, and Universities. Government Instructors. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Expected Objective's Completion Date Status In Progress Page 97 of 157 End of Academic Year Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective 91 11000-52125 Library - RG Update Library Collection 0 Provide adequate budget to upgrade Rio Grande Library Collection holdings. 92 11000-52125 Library - RG Online Databases 0 131 11000-55148 Respiratory Care- Purchase a RG Sink of Respiratory Care Laboratory 132 11000-55132 Emergency Increase Medical Services- Enrollment RG Measure Current collection records indicate 82% of collection publication dates are over 10 years. Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Increase purchase of new materials to reach ultimate goal of 75% of collection with publication dates no more than 6 years. Weed out of date materials. Purchase appropriate materials to update collection. At an average cost of $82.25/item library could purchase 573 new items for the library collection. Maintain online database Number of databases service at current level. available to all students, both on and off campus. TexShare funding could be eliminated or reduced by state legislature beginning 1 July 2003. EPCC libraries would need to increase spending to provide current level of instructional support. Increase funding to provide same level of academic support through online database availability. 0 Sink is installed. To provide effective teaching of infection control practices in the Respiratory Care laboratory, RG B301, a sink is required in the lab to evaluate psychomotor skills. Sink is installed in lab by January 2004. Incorporate additional lab work in RSPT 1429, Fundamentals I, during unit on infection control. Submit request for installation of sink. 0 To increase enrollment in Increase enrollment. advanced program. Increase 5% enrollment Attend orientation sessions for in credit program by paramedics seeking A.A.S., January 2004. Nursing, and fire technology options. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Assessment Results Use of Results Wednesday, April 18, 2007 Expected Objective's Completion Date Status Page 98 of 157 Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Complete and have Expected to start Fall approved an affiliation 2003. form with Light House for the Blind, El Paso in order to provide eyeglass services for their parents. Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies 133 11000-55144 Ophthalmic Tech- OPTS Public RG Service Augmentation 0 OPTS Public Service Augmentation. 134 11000-55130 Diagnostic Med. Laptop with Sonography-RG Media Projector 0 Provide instructors with Purchase of new multimedia equipment. state of the art instructional equipment. Computer projection Purchase labtop and computer and computers available projector. in DMSO lab by January 2004. 135 11000-55130 Diagnostic Med. Ultrasound Sonography-RG Machine with Doppler Capability 0 An ultrasound machine Purchase of new with doppler capabilities ultrasound machine. will be use to instruct students with up to date equipment in the EPCC lab. New equipment is in place by September 2003. 136 11000-55130 Diagnostic Med. Hire One FullSonography-RG Time Faculty 0 Hire an additional full- Hire a full-time faculty by There are two full-time Request funding and approval January 2004. faculty in the DMSO of position. Recruit time DMSO faculty program. applicants. Hire. member on tenure track. 137 11000-55130 Diagnostic Med. Linear Sonography-RG Ultrasound Transducer 0 Purchase of transducer. A linear ultrasound transducer in the EPCC ultrasound lab will introduce students to small parts as well as black and white vascular studies. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Use of Results Expected Objective's Completion Date Status Director for LHB contacted Jose M. Baca to request possibility of affiliation. LHB director is working on a grant which will provide funding for the project. No projected expenses for EPCC/OPTS. Monies accepted will allow OPTS to procure more supplies. Purchase new ultrasound machine with doppler capabilities. Conduct in service by provider for faculty and students. Transducer is used in Submit budget request for classroom for instruction approval. and patient assignment by January 2004. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 99 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies 138 11000-55140 Pharmacy TechRG Maintain High Quality of Student Graduates 0 Maintain high quality of Pass rate on certification student graduates. exam. 139 11000-55140 Pharmacy TechRG Increase Enrollment 0 Increase enrollment in the Enrollment in core PHRA 50% increase each Fall. -Begin online courses in courses each Fall. PHRA 1170, 1209, 1301 Pharmacy Technology -Begin open enrollment Fall Program. 2002 -Withdraw from Specialized Admissions (ie. HOBET) 140 11000-55005 Nursing-RG Increase Student Success on NCLEX-RN Exam. 0 Increase student success Number of students passing NCLEX-RN on on NCLEX-RN exam. first attempt. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) Assessment Results Use of Results Expected Objective's Completion Date Status 90% or better pass rate -Identify student weaknesses on National Certification -Define critical objectives that Exam. are required to be mastered by students prior to clinical rotation (PHRA 1261, 2260) -Revise syllabi to include critical objectives and successful completions for areas of high priority -Add typing component to PHRA 1301 Annual pass rate of 85% -Review exams for or better. incorporation of NCLEX-test plan and make revisions as necessary. -Revise tests using item analysis (each theory course). -Administer ERI assessment tests to students at the end of each course. -Review student performance on ERI assessment tests and make revisions to course packets/instruction as rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 100 of 157 Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status necessary. -Provide students with information regarding NCLEX review at the completion of the nursing program. 141 11000-55005 Nursing-RG Ensure Retention in AND Nursing Students 0 Ensure that the course to course retention rate of students enrolled in core AND nursing courses meets the following measure and standard. 142 11000-55005 Nursing-RG Maintain Student Success on NCLEX-LVN Exam 0 Annual pass rate of 95% -Review exams for Maintain student success Number of students incorporation of NCLEX-test on NCLEX-LVN exam. passing NCLEX-LVN on or better. first attempt. plan and make revisions as necessary. -Revise tests using item analysis (each theory course). -Administer ERI assessment tests to students at the end of each course. % of students enrolled in a 80% retention by May course that progress to the 2004. subsequent course on the degree plan in the next semester/min-mester. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Establish and implement a plan for faculty follow-up on students who fail exams. -Implement CE course on Overview of Dosage Calculations for Fundamental students prior to the start of Fundamentals. -Implement CE course on Testing for Fundamental students prior to the start of Fundamentals. -Continue mentoring program for new faculty. -Review course/packet evaluations and make revisions as necessary. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 101 of 157 Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status -Review student performance on ERI assessment tests and make revisions to couse packets/instruction as necessary. -Provide students with information regarding NCLEX review at the completion of the nursing program. 143 11000-55005 Nursing-RG Maintain High Quality of Student Graduates 0 Ensure that the course to % of students enrolled in 80% retention. course retention rate of acourse that progress to students enrolled in core the subsequent course on VN nursing courses meets the degree plan in the next the following measure andsemester/mini-mester. standard. 144 11000-55002 Dietetic Technology-RG Increase Enrollment 0 Increase Dietetic Technology program enrollment. Increase the number of students enrolled in the program (2). Present career information to elementary, middle and OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Establish and implement a plan for faculty follow-up on students who fail exams. -Implement CE course on Overview of Dosage Calculations for Fundamental students prior to the start of fundamentals level courses. -Implement CE course on Testing for Fundamental students prior to the start of fundamentals level courses. -Continue mentoring program for new faculty. -Review course/packet evaluations and make revisions as necessary. Increase enrollment by -Market program benefits 5% from previous three within the College, the year average. community, and health and food related organizations. Offer CEU programs for Diet rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 102 of 157 Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies high school students. Tech's and/or RD's-Visit public schools and/or participate in career day activities in order to expose the children to an alternate health profession. Participate in health fairs. -Contact local health and food related organizations about encouraging employees to pursue an associate degree and receive credit fo their work experience. See articulation with NMSU and UTEP in order to sell the program as a step beyond the associate degree. Enrollment each semester. Increase of 10% in comparing enrollment from Fall to Fall. -Develop a innovative and effective system for recruitment of students. -Increase advertising via media presentations, flyers, career fairs, and Internet. -Increase awareness at the Academy of Science and Technology and develop further articulation agreements. 145 11000-55125 Dental Assisting- Increase RG Enrollment 0 Increase enrollment. 146 11000-55141 Dental HygieneRG 0 Enhance Dental Hygiene Survey of dental community and students. programs image in the community. Enhance the College's Image in the Community Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Satisfaction of 80% or higher. Assessment Results Use of Results Expected Objective's Completion Date Status -Increase individual instruction. -Utilize counselors to present motivational and time management seminars. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 103 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status -Provide academic reviews in a timely manner. 147 11000-55150 Community Laptop and 0 Health Advocacy LCD Projector RG To familiarize class with Number of student making computer presentations using generated presentations in computer technology. class to allow students to make powerpoint presentations in the classroom. Each CHA student will make at least one Powerpoint presentation in the classroom each semester. 148 11000-55150 Community Place Health Advocacy Graduate in RG Employment 0 Evaluate student employerSurveys are completed and demand to determine the results tallied. need for program expansion. Survey is distributed to Survey students, survey students and to employers, evaluate results, employers by end of Fall costs-postage, printing. semester. 149 11000-55143 Health Information Technology Provide Adequate Resources for Health Information Students 0 Provide adequate resoucesNumber of computers in for student learning Health Information activities; seek continuing Technology lab with accreditation via specialized software; CAAHEP and AHIMA. apply for continuing accreditation. Provide specialized Purchase additional specialized software to students to Health Information enhance their learning Technology software (3500 experiences and to meet approved for software. Fee accreditation agency from accreditation agency for expectations; meet analysis of "Report of Current requirements for Status"/Self-Study is $1,500. continuing accreditation. 150 21092-73219 HCOP Recruitment of 0 50 Middle School Students into an HCOP Summer Camp To recruit 50 middle school students into an HCOP summer camp. Attendance at HCOP Summer camp. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 50 students accept admission with a 90% or higher completion rate. To allow students to become more familiar with a laptop computer for class and community presentations for health education. -Through brochures, flyers, posters, folders, meetings with counselors and networking, health programs at EPCC are marketed. -50 students are given an 8wekk seminar in English, Math, Med Term, Science, and rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 104 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status field trips to receive stipends and college preparation. -50 middle school students will receive stipends. -Recruitment is through high school presentation on paper ads, TV, videos, health fairs, career fairs, and HCOP application. 151 21092-73219 HCOP Improve Graduation in HCOP 0 To improve the graduationGraduation and transfer and transfer rate of rates by demographic disadvantaged students status. from the college's health occupations programs. 152 21092-73219 HCOP Identify and Increase 0 To identify and enroll a minimum of 70% of 5% increase in -Through statistics, the rate of graduation; 1% increase minorities in health professions in transfer rate. is low, hence, HCOP is promoting the health care professions to attract minorities. -HCOP sends out special forms to teachers to check on the progress of HCOP students who need tutoring are asked to come in for free tutoring. -Every year, in May, prospective students are given financial aid seminars, and helped to fill out scholarships at the HCOP office. -HCOP students are encouraged to attend EPCC. HCOP students are taken to Galveston to tour UTMB and its services. Percent of HCOP studens 70% of HCOP students -Recruitment is through H.S. entering health programs enroll at EPCC in health presentation, paper ads, TV OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 105 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Enrollment in HCOP 153 21092-73219 HCOP Promotion of Minorities, Especially Objective HCOP students in the 2 year health occupations programs. 0 Measure at EPCC. Standard programs for 2003-05. Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status ads, videos, health fairs, career fairs, and fill in the HCOP application. -Through statistics, the rate of minorities in health professions is low, hence, HCOP is promoting the health care professions to attract minorities. -Through brochures, flyers, posters, folders, meetings with counselors and networking, health programs at EPCC are marked. -HCOP sends out special forms to teachers to check on the progress of HCOP students who need tutoring are asked to come in for free tutoring. -50 students are given an 8wekk seminar in English, Math, Med Term, Science, and field trips to receive stipends and college preparation. -HCOP students are encouraged to attend EPCC HCOP students are taken to Galveston to tour UTMB and its services. -Create a focus group Through these activities, Invitation to form the focus To promote minority students into nursing and from prospective nursing exposure to nursing and groups. Marketing materials and hiring recruiters. allied health, especially and allied health students, allied health to male OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 106 of 157 Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Men, in Nursing Objective Measure Standard men. community members, and students is achieved. health facilities to assess the needs for a male labor workforce, identify barriers, and design interventions to meet the goal of increasing male workforce in nursing. Kick off a mjoar campaign of marketing and exposure of nursing and allied Health for the community and workforce in general. Visit all schools to promote male nursing and allied health positions. Provide a list of pros and cons (if they exist) for this goal. Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies 154 11000-13008 CD/Health/Math/S Computer cience Laboratory for Health and Science 0 Operate the new Health and Science Computer Laboratory in the completion of the new Health and Science Laboratory Building. Number of students utilizing the new laboratory. Computer lab is operational during Fall 2003. Hire staff and develop operational schedule. 155 11000-13008 CD/Health/Math/S Border Health cience Clinic 0 Implement a multidisciplinary patient care clinic with the completion of the new Health and Science Laboratory Building. Number of patients seen by students/faculty in the clinics. Number of disciplines participating in the clinic activities. Clinic is operational during Fall 2003. At least two additional disciplines have scheduled clinics during the Spring semester Determine specialty clinics to be conducted, develop flyers, order supplies, recruit patients from students, staff, and area residents, and hire staff. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Assessment Results Use of Results Wednesday, April 18, 2007 Expected Objective's Completion Date Status Page 107 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results 2004. At least four disciplines have scheduled clinics during the Spring semester 2004. 162 11000-55145 Physical Therapist Assistant-RG Coordinators of PTAP will travel to CAPTE 0 Coordinators of PTAP willSelf study preparation will Self study report will be travel to CAPTE start during Summer 2004 due sometime in 2005. sponsored re-accreditation continuing in FY 2004training at CSM (Feb 2005. 2004) or National conference (June 2004) in FY 2003-2004. Attendance at 3 day course prior to CSM or National and continued attendance at CSM or National. The Accreditation date was Moved to next year's area moved back a year by CAPTE, plan. thus travel was postponed a year. 163 11000-55145 Physical Therapist Assistant-RG Assist Faculty in Updating their Skills 0 Assist faculty in updating Faculty will adjust the their instructional, clinical content of their assigned and administrative skills. courses bases on current "state of clinical practice", or "teaching" and the Normative Model of PTA Education." Attendance at state, local or national workshops that address the specific area of need of the faculty. Most courses have been Annual report, Accreditation In reviewed against the normative report. Progress model except for Pathology and Neuromanagement. Debbie attended Texas State PT conference, and forwarded information to appropriate faculty. 164 11000-55145 Physical Therapist Assistant-RG Purchase Equipment for New Lab 0 Purchase equipment for new lab space that we need for teaching. Purchase of equipment Use in lab/new PT clinic Submit Banner requisition. (see attached critical needs linked to specific PTHA list). courses. Carl Perkins equipment request for cervical traction unit to go with previously purchased traction table, and stairs submitted, but not funded. 165 11000-55145 Physical Therapist Assistant-RG Establish a PT Clinic within the College 0 Establish a PT clinic within the college that provides PT services to Establish a PT clinic at the Appointment based PT Develop marketing tools to RG Campus in the new services will be offered inform the potential client. RG building. to students, faculty, Purchase patient information Pilot clinic began in Spring Annual report, accreditation 2004, and Fall 2004. One report, grant report. clinic offered through the "PT OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT On-going revisions of courses are done each semester, based on the "Normative Model of PTA Education". rptAssessmentResultsDetailLinedWithProg Annual report, and accreditation report. Resubmit next year. Wednesday, April 18, 2007 In Progress Not Met Met Page 108 of 157 Instruction Health Occupations, Math and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard faculty, staff, students and the local neighborhood. staff, and physical/therapist referrals. Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 33 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 33 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 33 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Expected Objective's Completion Date Status Use of Results clinic services" is the Falls brochures on common diagnosis's which PT services. Risk reduction clinic. This clinic is now externally funded for FY 2005. A personnel ad was placed to find a PT for the clinic, but there have been no applicants. However, there is community interest for the clinic. 166 11000-55145 Physical Therapist Assistant-RG Master Students in Specific Clinical Skills 0 Each student will Increase competency of demonstrate mastery of students clinical skills specific clinical skills priorthrough mentoring to enrollment in a clinical sessions. course. 90% of mastery on skills Hire additional part time check off sheets. faculty for mentoring and clincial skills check-off days. 167 11000-55145 Physical Therapist Assistant-RG Improve State Licensing Exam 0 Improve state licensing State reported first time exam first time pass rate. pass rates. 90% OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Additional part-time faculty State report, annual report, were hired to assist with accreditation report, mentoring classes. Grad class advisory committee report. of 2004 had a 100% first time pass rate. Hire additional full time Part time faculty were hired, instructors and part-time Grad class of 2004 had a first instructors. Continue to offer time 100% pass rate. mentoring in courses which have a laboratory component, by part-time faculty. Hire additional full time faculty member to improve the continuity of curriculum flow from one semester to the next. rptAssessmentResultsDetailLinedWithProg Annual report, accreditation report, advisory committee report. Wednesday, April 18, 2007 Met Met Page 109 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Instructional Programs: Mission Del Paso Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard 193 11000-13010 CD/Dean Inst Prog - MdP Provide Funding to MDP disciplines 0 Additional increase in funding is needed. 194 11000-55319 Developmental Education-MdP BASK 0 Assign students enrolled in Success will be To increase retention BASK reading to PLATO measured by an increase students enrolled in in the number of Reading, English, & Math instructional program. students who pass the class - should have access Reading section of to the PLATO TASP. instructional system. Provide financial support to any discipline at MDP to ensure success in meeting its goals if current funding is inadequate. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) 2 Total Number of Assessed Plans Met: 2 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 2 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results During the year when Funds will be used from this the supply budget is account to address needs. depleted the Dean's office will assist with funds to meet discipline goals. Met Students who complete PLATO will be tracked to determine if reading section in TASP was passed. rptAssessmentResultsDetailLinedWithProg Expected Objective's Completion Date Status Met Wednesday, April 18, 2007 Page 110 of 157 Instruction Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Expected Objective's Completion Date Status Standard Strategies Assessment Results Increase by 3% from previous year's enrollment. Meet with appropriate personnel to identify partnership possibilities. This is a continuous project. In Progress On going Use of Results Program Enhancement 0 To create partnerships Number of partnerships. with the Canutillo Independent School District and the City of El Paso to better serve the citizens of this region. 207 11000-55213 Accounting - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 208 11000-55184 Art - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 209 11000-55333 Biology - NW Program 0 Continue to increase Use Enrollment Figures Campus personnel will In On going 206 11000-13009 CD/Dean Inst Prog - NW OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase by 5% from rptAssessmentResultsDetailLinedWithProg This is a continuous project. Wednesday, April 18, 2007 Page 111 of 157 Instruction Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Enhancement 210 11000-55800 Borderlands Program Enhancement 0 Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 Strategies 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status enrollment in this discipline. for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. Progress To continue to enhance student publication. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports FY 2003enrollment. 2004 and compare those figures to the previous year. College personnel will work This is a continuous project. with the students in producing this publication. College support will be sought to continue the publication on 40# vellum paper. In Progress On going Increase by 5% from previous year's enrollment. Enhance technology to support Ordered 5 Elan Mira Writer the Occupational Programs. (Steno Writers) Met 8/31/04 Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those Campus personnel will This is a continuous project. participate in recruitment activities such as Career Days, High School visits and serve as In Progress On going The student publication printed materials will continue to be enhanced using 40# vellum paper. 211 24324-73251 Carl Perkins Program Enhancement 0 To maintain technology in To maintain the level of technology needed in classrooms at the Occupational Programs. Northwest Campus needed to support the programs being offered. 212 11000-55218 Computer Program Information - NW Enhancement 0 Continue to increase enrollment in this discipline. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 112 of 157 Instruction Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 Strategies figures to the previous year. speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status 213 11000-55222 Court Reporting - Program NW Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 214 11000-55318 Developmental Education - NW 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 0 Continue to increase Use Enrollment Figures Campus personnel will In On going Program Enhancement 215 11000-55308 Economics - NW Program OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase by 5% from rptAssessmentResultsDetailLinedWithProg This is a continuous project. Wednesday, April 18, 2007 Page 113 of 157 Instruction Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Enhancement Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 Strategies 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status enrollment in this discipline. for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. Progress 216 11000-55438 Education -NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 217 11000-55188 English - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in In Progress On going OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 114 of 157 Instruction Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status this program. Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 219 11000-55298 Political Science - Program NW Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 220 11000-55293 History - NW 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within In Progress On going 218 11000-55274 ESL - NW Program Enhancement OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 115 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status this discipline will advise students in their classes in order to improve retention in this program. 221 11000-55348 MATH - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2002- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 222 11000-55204 Music - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% previous for this discipline from the year's enrollment. State Reports for FY 20032004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 223 11000-52126 Library - NW Program Enhancement 0 Inventory all items in To implement a new library facility providing objectives and strategies to ensure compliance. quality services and resources to the NW Met 8/31/03 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase by 5% from previous year's enrollment. Facilities: work closely with all departments involved (architect construction, vendors, etc.) rptAssessmentResultsDetailLinedWithProg Facility completed Spring 2003 and will continue to seek equity in funding. Wednesday, April 18, 2007 Page 116 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard students and community in order to establish an attractive and conducive environment for research and study at NW campus. Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 Strategies 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Collections: input from faculty Staffing/Budgeting: seek parity and equity in funding. Moving/Installation: procedures/training in place. 224 11000-55288 Philosophy - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 225 11000-55283 Psychology - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 117 of 157 Instruction Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 9% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status 226 11000-55263 Reading - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 227 11000-55303 Sociology -NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in order to improve retention in this program. In Progress On going 228 11000-55268 Speech - NW Program Enhancement 0 Continue to increase enrollment in this discipline. Use Enrollment Figures Increase by 5% from for this discipline from the previous year's State Reports for FY 2003- enrollment. 2004 and compare those figures to the previous year. This is a continuous project. Campus personnel will participate in recruitment activities such as Career Days, High School visits and serve as speakers for classes to promote college offerings in this discipline. Faculty within this discipline will advise students in their classes in In Progress On going OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 118 of 157 Instruction Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Instructional Programs: Northwest Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 23 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 21 91% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status order to improve retention in this program. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 9% Wednesday, April 18, 2007 Page 119 of 157 Instruction Math, Occupational Education and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 195 11000-51006 Ft Bliss Faculty Travel 0 Provide resources for faculty development and skills enhancement for division faculty. 196 11000-55436 Education -TM Equipment 0 Laptop & LCD Projector None for PowerPoint Presentations for all students. 197 11000-55396 Electronics-TM Increase Enrollment 0 Increase Enrollment. 198 11000-55341 Geology-TM Transmountain 0 Geology Computer Lab Standard Provide faculty Five or more faculty development and training development activities opportunities for at least funded. five faculty. None Increase in the number of 6 students. new students. To increase quality of Student surveys. Geology instruction and student interest by upgrading existing Geology computer facilities. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Current survey results. Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 11 Total Number of Assessed Plans Met: 7 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 22% 100% Number of Non-withdrawn Plans Assessed 9 Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 2 18% Assessment Results A total of 7 faculty members -Solicit interest have been allowed to travel for -Identify needs -Provide administrative support training or to participate in faculty development activities outside of the college. NOTE: This plan is showing under the wrong account. It should be listed under 11000-13012 (Faculty Travel) Use of Results Expected Objective's Completion Date Status Met Faculty members who have attended these activities have brought back their expertise and shared what they've learned with their colleagues and students. For PowerPoint presentation Equipment has been acquired Instructors and students have Met by students otherwise must and is in place. used of the equipment for send students to computer lab instructional purposes. to complete project. Objective in EDUC classes: Students must make a PowerPoint presentation. Advertising Recruit Employers Minimal Release Time This program is being closed. This program is being closed.Withdra wn Purchase 4 new basic iMac New machines were acquired computers to replace 20 year via the IT committee. old Macs. iMacs are necessary to run unique software already owned that is only compatible with the Mac OS. New computers will replace machines that have reached the end of their useful lifetimes as well as allow the rptAssessmentResultsDetailLinedWithProg 78% Students and faculty are Met currently using these systems. Wednesday, April 18, 2007 Page 120 of 157 Instruction Math, Occupational Education and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 11 Total Number of Assessed Plans Met: 7 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 22% 100% Strategies 78% Number of Non-withdrawn Plans Assessed 9 Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 2 18% Assessment Results Use of Results Expected Objective's Completion Date Status addition of tutorial films and the running of new software that will not work on the older machines. The computers required (iMac 600/SN/256/40/CD/LL) cost approximately $850 each (shipping included). The Maconly software currently owned includes a Geologic history of El Paso as well as tutorials on minerals, rocks, fossils, earthquakes, glaciers, and many more. 199 11000-55416 Heat/Vent/ACTM Develop a Quality Workforce 0 Attract develop and retain To aid students in 7:1 Ratio per student a quality workforce. troubleshooting and wiring per equipment. special circuits and to give more students time on trainers. The trainer has been acquired Students and faculty are able Met 1. Heat Pump Trainer Supplier: Broadhead & Garret and is fully functional. to use the system for Part#: 12574636 instructional purposes. 2. Control Board Trainer Part#: CAT12590384 Part#: 9215A Contact: Jan Karchella, Customer Representative 1800-529-7351 Ext. 1473 200 11000-55331 Biology-TM Store Flammable Chemicals 850 Provide safe storage space Safe storage of flammable Storage in flammables cabinet. for flammable chemicals. chemicals. Installation of a vented flammables cabinet. The cabinet has been purchased, however, the venting has not been completed. Funds will need to be In acquired to install Progress appropriate venting in the area. Completion date will be dependent upon the availability of funds. 201 11000-55346 Math-TM Improve Improve student results in This will be difficult to Possibly start some pre-and Some faculty development See Assessment. 0 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Students will have a rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Withdra Page 121 of 157 08/31/05 Instruction Math, Occupational Education and Science Plan Budget No. Acct No. Area Plan Name Projected Cost. TM Library Strategic Plan 203 11000-55414 Culinary Arts-TM Recipe Database Measure developmental math measure, since students courses. Since the are allowed to transfer developmental math from campus to campus. courses are often a If possible, I would like to stumbling block for the try some pre and post student-and some students testing of students-which drop out of college could be expanded to because they are not other campuses if successful-a better successful. understanding of the material being taught should help with the EPCC retention effort. Developmental Math Courses 202 11000-52124 Library - TM Objective 0 100 To develop TM Library strategic plan to identify needs and priorities for 1Staff training, and 2Collection development. Compare number of Library staff attending workshops. Compare collection against ACRL standard with college's of similar size. Standard 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 11 Total Number of Assessed Plans Met: 7 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 22% 100% Strategies Number of Non-withdrawn Plans Assessed 9 0 0% Number of Plans Withdrawn: 2 18% Assessment Results Use of Results Expected Objective's Completion Date Status post testing. Definitely start screening students to see if they are placed in the correct classes. (Hopefully Banner will be doing this soon). Look at the placement testing, and try to decide if it corresponds to the proper course levels. And finally, have a faculty workshop to expose the math faculty at TM to methods of critical thinking, and how to get the students to think critically. It would also be nice to have some training for the math tutors-but, that costs money. activities have occurred in this area. While this remains a priority, there did not appear to be a reliable measure of this plan by campus. The department will work with the Title V project to continue these efforts. There will need to be a district-wide focus for this plan. Each TM Library employee will attend at least one workshop. Collection will be at the ACRL minimum level. Convene TM Library employees during Spring 2003 and develop strategic plan that identifies staff training needs and collection weaknesses. Each library employee has each attended at least one workshop. This includes nonfaculty employees. Collection weaknesses have been examined and are being addressed. While these will be ongoing Met efforts, this plan has been completed successfully. Training will continue to be a priority. Increased collections are now available for use by library patrons. Collection strengths/weaknesses will be evaluated continually. Purchase a culinary software set to enter, store and standardize the presentation of the recipes. This has been completed and has greatly eased the process of researching and acquiring recipes for the students. The database is available and online for student use. It will continue to expand as recipes are added. rptAssessmentResultsDetailLinedWithProg 78% Number of Non-withdrawn Plans Not Assessed better understanding of the material (and instructors will have a better understanding of how to teach the material)-This cannot be done overnight, nor at just one campus, but it can be started. To be completed by Student recipes need to be Complete, indexed indexed, organized and database of student recipes. November 2003. formatted. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) wn Wednesday, April 18, 2007 Met Page 122 of 157 Instruction Math, Occupational Education and Science Plan Budget No. Acct No. Area 204 12205-73243 Culinary Arts Plan Name Cookbook 205 11000-55400 Fashion Tech-TM Design Competition Projected Cost. 500 0 Objective Measure Produce a well written andFinished text. useful cookbook that the students will test, train and use as a fundraiser. Standard 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 11 Total Number of Assessed Plans Met: 7 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 22% 100% Strategies Book should be finished Use of digital camera as well by May at 2004. as current computer equipment will be used, along with PDA's to help develop the book. Keep enrollment to at Enrollment was very high How many students participate in competition least 80% of capacity. this year, nearing capacity. We will work to and how many high school keep enrollment strong. enroll in the Fashion Technology program. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number Plans Submitted (Duplicated if for more than 1 goal) In order to keep enrollment high, the Fashion Technology program will work with area high schools, especially the Fashion Design program at EPISD Center for Career and Technology Education. The EPCC Fashion Technology program will develop and sponsor an apparel design competition which allows high school students to participate. We will also meet with high school students several times throughout the year, inviting students to join our design competition and working with high school teachers to encourage participation. rptAssessmentResultsDetailLinedWithProg 78% Number of Non-withdrawn Plans Assessed 9 Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 2 18% Assessment Results Use of Results The recipes are cataloged and In progress indexed. Two student clubs have been formed and are working on the cookbook. Work is ongoing. Enrollment is at its highest point in many years. The recruitment efforts have been very successful. Expected Objective's Completion Date Status In Progress Strategies will continue to be Met used to ensure sufficient enrollment in the future. Wednesday, April 18, 2007 Page 123 of 157 8-31-05 Instruction Publications Plan Budget No. Acct No. Area 236 11000-51010 Publications Plan Name Publications Projected Cost. 0 Objective Measure To become the central Will compare last year's point of printing (will printing versus new year's allow us to make sure printing using the publications standards are commodity report and our followed and will give printing logs. District best pricing). OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Would like to capture 70-85% of in-house printing; with the rest of printing being completed in-house, i.e., ISC's individual departmental copiers. Total Number Plans Submitted (Duplicated if for more than 1 goal) 209 Total Number of Assessed Plans Met: 50 26% Total Number of Assessed Plans Not Met: 83 43% Total Number of Assessed Plans In Progress 58 30% Total Number of Non-withdrawn Plans Assessed 191 95% Total Number of Non-withdrawn Plans Not Assessed 11 5% Total Number of Plans Withdrawn 7 3% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 0% Total Number of Assessed Plans Not Met: 1 100% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Provide more information District-wide about our services through workshops, emails and brochures. Careful record-keeping of our orders and cross-referencing them to the records kept by Purchasing. Departmental, area, a nod constituency meeting presentations. More effective customer service thorugh the addition of an additional staff member to handle customer service inquiries and better tracking of orders. rptAssessmentResultsDetailLinedWithProg Assessment Results In process. We will provide faculty development workshops in the Spring (we're in the schedule). We have developed brochures and promotional copy to assist in informing the College community about our services. We e-mail announcements abour our newsletter and new services. Ongoing. We keep spreadsheets and back-up invoices on all our vendors. In process. Along with the faculty development workshops, staff have given presentations and we have talked to constituency presidents. Completed. We hired a part-timer to help with customer service and tracking orders. Expected Objective's Completion Date Status Use of Results To create awareness of department, to enhance customer service and for fiscal responsibility. Wednesday, April 18, 2007 In Progress Page 124 of 157 Ongoing Student Services Director, Admissions Plan Budget No. Acct No. Area 344 24309-73251 Admissions Plan Name Projected Cost. Guidance/Voca 0 tional Intake Objective Measure Standard Increase quality intake andFund one FT classified 20% of student service guidance service staff or hours increased. occupational/technical guidance/vocational intake. students. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 100% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Hire one full-time classified Administrative decision to Will request institutional In staff employee for project year. continue funding position with funds for September 1, 2005.Progress Carl Perkins. rptAssessmentResultsDetailLinedWithProg 0% Wednesday, April 18, 2007 September, 2005 Page 125 of 157 Student Services Director, Center for Students with Disabilities Plan Budget No. Acct No. Area 352 11000-64001 Center for Students with Disabilities Plan Name CSD Projected Cost. 0 Objective Measure To standardized services 1. Provide equal to disabled students. accessibility to adaptive equipment and services at each CSD office. 2. Have personnel available at CSD labs. 3. Acquire space for CSD labs. 4. Develop an interoffice policy and procedure manual. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard -Purchase 6 computers, adaptive equipment and software. -Hire 5 additional Lab Aides. -Acquire 2 additional lab spaces. -Complete 1 interoffice policy and procedure manual and distribute to 5 CSD offices. Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 0 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 100% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results 1. Purchased & installed 10 new computers for (CSD labs) (2 per campus lab) purchased & installed Jaw II Licenses district sites (each Hire Lab Aides campus lab) - Purchased & Request for additional space at installed Dragon Naturally Speaking software (each TM, RG campus lab) - Combined 2 Meet with CSD staff to receive part-time (35 hr) positions into input on present intake, service 1 full-time Assistive Technology Specialist. 2. providing system, etc. and Withdrawn 3. Withdrawn 4. write a review manual. Has changed to Departmental Guidelines Manual is nearing the final draft stage. Have completed, needs to have final review and approval. Evaluate present equipment inventory and purchase computers, software. rptAssessmentResultsDetailLinedWithProg 0% Use of Results Expected Objective's Completion Date Status 1. Disabled students will In have accessibility to more Progress updated computers & software at each campus. A fulltime person with adaptive technology expertise is available 5 additional hours a week to work with all campuses. 2. Withdrawn 3. Withdrawn 4. Will ensure that all students are provided with consistent information and services at all CSD offices. Will eliminate confusion to both student and staff. Wednesday, April 18, 2007 Page 126 of 157 Student Services Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Director, Co-op Education & Job Placement Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 2 Total Number of Assessed Plans Met: 2 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 2 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status 345 11000-64002 Cooperative Educ/Job Placement Equitable Services Available throughout EPCC 0 Assure that all EPCC One person campus office Plan will be campus one person staff will have the same implemented in May of Job Placement and Co-op information available 2003. Education Offices have which are posted at the available the same job central VV Office. vacancies, co-op/intern opportunities and summer job announcements as are available at the central VV Office. One person office staff will review the information available in the central office when they deliver their monthly timesheets. The director will monitor the progress. All EPCC campuses, including one person staff, have same accessibility to job vacancies, Co-op Education postings, and other job vacancy announcements. A centralized job order taking staff person, assigned to EPCC Valle Verde campus, ensures that all job postings, vacancies, and announcements are distributed to each office. A documentation tracking system is in place that ensures accessibility at this time. A computerized systems will be in place in January 2005 that will automatically post, track, and purge job orders effectively. 346 11000-64002 Cooperative Educ/Job Placement Become Visible on EPCC's Website 0 Become visible on EPCC'sJob Placement and Co-op Be tested by September Education services, special 15 and available by website. events, special October 1, 2003. announcements (job vacancies and co-op education positions) will be available on EPCC's website. One staff member will be trained to announce services and to delete/update site. A back-up staff will also be available. Office of Co-operative Education & Job Placement does have a segment in the EPCC official website. Information regarding both inhouse programs are available and accessible to students. The addition of this Met department on the EPCC website has lead to an increased exposure to EPCC students requesting information regarding our services. There has been a significant increase of various services that this department provides students as documented with in-house statistics. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Met Page 127 of 157 October 2003 Student Services Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Director, Police Department Plan Budget No. Acct No. Area 326 11000-72008 Safety Office 327 11000-72008 Safety Office Plan Name Fire Warden Program Fire Warden Program Projected Cost. 0 0 Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 6 Total Number of Assessed Plans Met: 2 50% Total Number of Assessed Plans Not Met: 1 25% Number of Assessed Plans In Progress: 1 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 1 17% Strategies Assessment Results To expand and maintain Increase the number of 25% increase in number an effective Fire Warden existing Fire Wardens by of Fire Wardens at each Program, District Wide. 25%. campus and College sites in the first six months. Recruitment campaign at each In progress at this time, goal of 25% increase has not been campus to obtain volunteers for the Fire Warden Program. met, currently at 15%. Maintain attendance roster of number of volunteers enrolled in the designed training program. To develop training materials Training has been provided for all existing Fire Wardens to for Fire Warden training date. program, including course objectives. To train Fire Warden volunteers to effectively and efficiency carry out their duties and responsibilities. 100% of new Fire Wardens trained and exhibiting knowledge and ability to carry out duties and responsibilities. Use of Results Expected Objective's Completion Date Status In Progress Maintain a master roster of active Fire Wardens in reference to their location, equipment, transfers, tenure, and training. Met To train volunteers District Wide in their roles and the use of portable fire extinguishers. To provide each volunteer with certificate of achievement and necessary equipment, including space diagrams of their assigned areas, to carry out their duties. 328 11000-72008 Safety Office Safety Literature 0 Compare previous To provide and worker's compensation disseminate Safety claims and reported materials to College employees and students in accidents in the previous order to maintain a Districtyear to the present time. Wide safe environment. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Periodic review at six month interval. Reduction in accidents and claims over this period. Conduct training sessions and emphasize safety in the workplace through making training aids, posting safety information, or materials to instill positive safety attitudes rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 128 of 157 4/1/05 Student Services Director, Police Department Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Distribute and post emergency guidelines in case of disasters. Strategies 0 To fund hazardous Amount varies as number Uncontrolled amounts of Amount of hazardous waste chemical waste collection, of courses in waste are generated. generated is uncontrollable. removal, and disposal. Chemistry/Biology are Hazardous materials are added or deleted. picked up two to three times per year. City licenses to allow chemicals to be on the different College sites. 342 11000-61001 Police Department Classroom Emergency Awareness Training 0 Increase formal ClassroomTwo additional presentations. Emergency Awareness presentations to staff and faculty by 25%. 10 presentations. Add one additional officer Addition of two officers to Increase staffing to a to the staffing tables at staffing. total of six officers at both the Northwest and both Campuses. Mission del Paso Campuses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 6 Total Number of Assessed Plans Met: 2 50% Total Number of Assessed Plans Not Met: 1 25% Number of Assessed Plans In Progress: 1 25% Number of Non-withdrawn Plans Assessed 4 80% Number of Non-withdrawn Plans Not Assessed 1 20% Number of Plans Withdrawn: 1 17% Assessment Results Use of Results Expected Objective's Completion Date Status for College employees and students, District Wide. 329 11000-72009 Hazardous Waste Hazardous Disposal Waste Disposal 343 11000-61001 Police Department Increase 0 Police Staffing at MDP and Northwest Campuses Total Number Plans Submitted (Duplicated if for more than 1 goal) Hazardous waste collection was transferred to the Physical Plant under Gloria Martinez in November, 2003. Our safety office is no longer involved with this program. Proactive advertisement of We did a total of 12 program to the faculty by presentations. GroupWise, faculty newsletter, and any other means available. Funding is not available at this Demonstrate need for time for any additional additional staffing based on increased enrollment at both personnel. campuses and emphasize safety concerns for both the students and our officers with current situation. rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Withdra wn Met Not Met Page 129 of 157 Student Services Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Director, Testing Services Plan Budget No. Acct No. Area 426 11000-63001 Testing Services Plan Name Projected Cost. Testing Services/NCT A Guidelines 0 Objective Measure Conduct a comprehensive Test center operations will self assessment of testing be in compliance with center operations district professional testing wide. standards as outlined in the National College Testing Association (NCTA) Guidelines for Professional Standards. Standard That test center operations will be in compliance with suggested standards. Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 3 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Review NCTA Professional Standards publications and compare test center operations to standards. Prepare evaluation criteria and rating sheets. Conduct site visits to all campus test centers district wide. Prepare formal report of findings to include action plans for improvement where appropriate/necessary. Take necessary actions to insure compliance. Assessment Results Expected Objective's Completion Date Status Use of Results The review of Test Center Met operations (against the guidelines recommended by the National College Testing Association) was conducted as planned. EPCC test centers are operating well within the standards. One new and significant improvement made was increase proctor security for those who have access to test passwords (i.e. ACCUPLACER, CLEP and VUE testing). Individual passwords are now issued only after sign proctor agreements. (response by Kay Lambert, 12/02/04) 427 11000-63003 Alternative/AccuplTesting acer Testing Services 0 Increase the number of Decrease reliance on paper/pencil format tests tests administered and the used for alternative and number of students testing on a computerized test. placement testing by increasing the volume of computerized testing administered district wide. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase by 20% (minimum) the number of computerized tests administered in FY 2003-04. Promote advantages of computerized testing to both students and college administration. Increase number computerized testing sessions available throughout the district. rptAssessmentResultsDetailLinedWithProg We have far exceeded our goal in the area of computerized placement testing for students (excluding ESL which has only paper/pencil tests available). Wednesday, April 18, 2007 Met Page 130 of 157 Student Services Director, Testing Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure This will benefit students by providing faster scoring of written essays and a more student friendly, self paced test process than available with paper/pencil format tests. Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 3 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Continue to increase capability to administer computerized testing NWC, RG, TM campuses (which currently have only 2, 8 and 9 stations respectively) within limits of current budget. This will benefit EPCC by using a more cost effective/efficient testing process and reducing test security/storage concerns currently present with paper/pencil tests. 428 11000-63004 GED Testing Testing Services 0 Increase college and community awareness of GED testing program, policies and test procedures. Assessment Results Expected Objective's Completion Date Status Use of Results During the 2003-04 year: 46,918 - ACCE Computer tests 0 - Paper/pencil placement tests Compared with 2002-03 year: 29,973 - ACCU Computer tests 23,955 - Paper/pencil (MAPS Tests) (response by Kay Lambert, 12/2/04) Whether the GED web Web page information Design and publicize a web page is created and developed and put on page devoted to GED testing operational on EPCC main the EPCC web site. process, schedules, links to web page. other resources. Participation in a Participation in minimum of five (5) Set up electronic job/training fairs. local agency/job training communications to provide fairs in FY 03-04. GED preparation agencies with emailed updates on GED testing center policies/schedules. Actively participate in local agency/job training fairs. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg A GED webpage has been Met created and is operational on the EPCC official website since February, 2003. The page is updated monthly with current test schedules and contains links to GEDTS and TX GED Agency. Agencies receive monthly email updates. GED Testing staff participated in eight (8) GED information sessions with various local GED Wednesday, April 18, 2007 Page 131 of 157 Student Services Director, Testing Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 3 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status preparation agencies and job fairs. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg Wednesday, April 18, 2007 Page 132 of 157 Student Services Registrar Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective WEB Payment. Measure Long lines Standard 338 11000-62000 Registrar WEB Payment 0 339 11000-62000 Registrar Record 36,527 Record Verification. Verification 340 11000-62000 Registrar Customer Service Training for Registrar's Office Staff 0 Customer Service Training0% now. 75% training in 100% by 2005. for Registrar's Office Staff.customer service and telephone etiquette by 2004. 341 11000-62000 Registrar WEB Add/Drop 0 Implementation of Add/Drop on WEB. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 4 Total Number of Assessed Plans Met: 3 75% Total Number of Assessed Plans Not Met: 1 25% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 4 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Complete use of WEB Publicizing the convenience of Project complete. Payment for all nonpaying on the WEB. financial aid students by Fall, 2005. 30% complete, August 31, 75% completed by 2003. August 31, 2004. Long lines. Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) Daily count completed. Use of Results Reduced lines. Completion, 75% of record verification. Send staff to customer service Continuous training needed. training sessions. Complete use of WEB Bring 5.6 module up for for all students by Fall, Add/Drop. 2004. rptAssessmentResultsDetailLinedWithProg Until tuition rates are equal, project cannot be completed. Wednesday, April 18, 2007 Expected Objective's Completion Date Status Met Met Met Not Met Page 133 of 157 Student Services Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Vice President, Student Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 5 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 17% Strategies 337 11000-12003 VP Student Services Provide Training to Student Services Employees 0 Provide training to StudentNumber of employees Services employees on who receive training. customer service. 347 11000-65000 Counseling - PT Summer New Student Orientation 0 Continue to enhance New Number of student served Number of students Counseling will use Student Orientation. by NSO will increase by serve will be 5% above Administrative Service Center 5% over the last year. baseline. to pilot Valle Verde New Student Orientation. All Student Services Work with the Human employees receive Resource Development training on customer Department on in house service on a yearly basis. training. NSO student workbook and PowerPoint presentation will be created. 348 11000-65000 Counseling - PT Summer Dual Credit 0 349 24305-73251 Counseling/Career Counseling/Car 0 eer Center Center - RG RG Counseling will support a This will result in a Counselor assigned will To provide support to minimum of 10% more continue to work with Dual Dual enrollment program. minimum of 80% of requested activities. activities above baseline. Credit Team. Provide New Student Orientation for Dual Credit students. Provide advising and registration assistance. Liaison with parents and school administration. To provide quality career 1) A minimum of 15 in- 5% increase. assessment & exploration class presentations will be made to Developmental services to students. Education classes each semester. 2) Transfer center services OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 1) Increase student retention by being aware of Career Center Services for interest assessment, career exploration and college planning. Number of Non-withdrawn Plans Assessed 6 75% Number of Non-withdrawn Plans Not Assessed 2 25% Number of Plans Withdrawn: 0 0% Assessment Results Expected Objective's Completion Date Status Use of Results On-going basis. An effort of all the Student Services areas. In Progress Valle Verde and MdP has fully NSO's are held twice a week integrated the NSO at the at the ASC. ASC. Academic Advisors are planning implementing and presenting NSO's with counselors. Met Service Presentations 56 Test Dual NSO's are held at High Interpretations 1,851 Schools. Enrollment 1,134 Student Counseling Services 502. Met 1) 847 assessments were provided. Met 1) To help students on making a wise career choice. 2) 502 attended a career exploration services. 2) Staff can provice accurate services to students. 2) Improve student educational 3) Dr. Pyle was contacted by rptAssessmentResultsDetailLinedWithProg 83% 3) To increase students Wednesday, April 18, 2007 Page 134 of 157 Student Services Vice President, Student Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard 3) Consultant training from the Discover Corporation will be provided for Career Center staff to better utilize and assist student use of career exploration with discover software. 4) A career presentation will be made at 80% of all New Student Orientations provided. 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 5 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 17% Strategies 1) A minimum of 15 in- none class presentations will be made to Developmental Education classes each semester. 1) Increase student retention by being aware of Career Center Services for interest assessment, career exploration and college planning. 2) Student referrals and direct service contacts will increase by 10% over last year's district career center contact. 2) Improve student educational planning through assistance of positive and productive career exploration services. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Number of Non-withdrawn Plans Assessed 6 75% 2 25% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status 1) 3478 assessments were provided. Met 1) To help students on making a wise career choice. 2) 5620 students attended a career exploration services. 2) To help students on making a wise career choice. 3) Dr. Pyle was contacted by 3) Staff can provide accurate telephone for training for services to students. career training staff exploration with Discover program. 4) To increase students awareness of career decision 3) Provide Career Center staff 4) 10% of presentations were making. rptAssessmentResultsDetailLinedWithProg 83% Number of Non-withdrawn Plans Not Assessed 5) Promote and provide district student contact with area professionals for career information and employment opportunities. 5) One district-wide career fair will be planned and conducted annually. Provide quality student services. 25 Total Number of Assessed Plans Met: planning through assistance of phone for training for career awareness of career decision positive and productive career training staff exploration with making. discover. exploration services. 4) To provide updated career information. 3) Provide Career Center staff 4) 7087 presentations were made District-Wide. development for use of the update Discover Software. 5) INS and Austin Police Department, Dallas Police 4) Student retention will be improved by increasing student Department provided career awareness of career decision- and employment information. making as foundation of educational planning. will be integrated with district career centers. 350 24307-73251 Counseling/Career Counseling/Car 0 eer Center Center Total Number Plans Submitted (Duplicated if for more than 1 goal) Wednesday, April 18, 2007 Page 135 of 157 Student Services Vice President, Student Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 5 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 17% Strategies 3) Consultant training from the Discover Corporation will be provided for Career Center staff to better utilize and assist student use of career exploration with Discover software. development for use of the update Discover Software. 4) A Career presentation will be made to 80% of all New Orientations provided. 5) Promote and provide district student contact with area professionals or career information and employment opportunities. Number of Non-withdrawn Plans Assessed 6 75% Number of Non-withdrawn Plans Not Assessed 2 25% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status made due to lack of personnel. Lecture is provided 5) To provide updated for all NSO's. career information. 4) Student retention will be improved by increasing student 5) INS and Austin Police awareness of career decision- Department, Dallas Police Department provided career making as foundation of and employment information. educational planning. 5) One district-wide career fair will be planned and conducted annually. 351 24308-73251 Guidance/Military Transfer Transaction Center 0 Provide quality student services. 1) A minimum of 15 in- none class will be made to Developmental Education classes each semester. 2) Student referrals and direct service contracts will increase by 10% over last year's district career center contact. 3) Consultant training from the Discover Corporation will be provided for Career OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 1) Increase student retention by being aware of Career Center Services for interest assessment, career exploration and college planning. 1) 3478 assessments were provided. 1) To help students on Met making a wise career choice. 2) 5620 students attended a career exploration services. 2) Staff can provide accurate services to students. 3) Dr. Pyle was contacted by 3) To increase students telephone for training for awareness of career decision career training staff exploration making. with Discover program. 4) To provide updated 3) Provide Career Center staff 4) 10% of presentations were career information. made due to lack of development for use of the personnel. Lecture is provided update Discover Software. for all NSO's. 2) Improve student educational planning through assistance of positive and productive career exploration services. rptAssessmentResultsDetailLinedWithProg 83% Wednesday, April 18, 2007 Page 136 of 157 Student Services Vice President, Student Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Center staff to better utilize and assist student use of career exploration with Discover software. 0 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 5 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 17% Strategies To increase the number of Percent of CSD students Increase by 5% from students with disabilities with technical/vocational previous three-year degree codes registered average. going into through the department. technical/vocational programs. Number of Non-withdrawn Plans Assessed 6 75% 2 25% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status Counselor review student career goals during advisement and based upon discussion, make degree plan changes. Students completing GED tutoring program will review technical/vocational programs with counselor and Director. Presentations at CSD to students and staff by technical/vocational educational instructors. 354 24313-73251 CSD Center for Students with Disabilities 0 To increase the number of Percent of CSD, students Increase by 5% from students with disabilities with technical/vocational previous three-year degree codes registered average. going into through the department. technical/vocational OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Counselor review student career goals during advisement and based upon discussion, make degree plan changes. rptAssessmentResultsDetailLinedWithProg 83% Number of Non-withdrawn Plans Not Assessed 5) Promote and provide district student contact with area professionals for career information and employment opportunities. 5) One district-wide career fair will be planned and conducted annually. Center for Students with Disabilities 25 Total Number of Assessed Plans Met: 4) Student retention will be improved by increasing student 5) INS and Austin Police awareness of career decision- Department, Dallas Police Department provided career making as foundation of and employment information. educational planning. 4) A Career presentation will be made to 80% of all New Student Orientations provided. 353 24313-73251 CSD Total Number Plans Submitted (Duplicated if for more than 1 goal) Wednesday, April 18, 2007 Page 137 of 157 Student Services Vice President, Student Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 25 Total Number of Assessed Plans Met: 15 71% Total Number of Assessed Plans Not Met: 2 10% Total Number of Assessed Plans In Progress 4 19% Total Number of Non-withdrawn Plans Assessed 21 88% Total Number of Non-withdrawn Plans Not Assessed 3 13% Total Number of Plans Withdrawn 1 4% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 5 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 17% Strategies Number of Non-withdrawn Plans Assessed 6 75% Number of Non-withdrawn Plans Not Assessed 2 25% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status programs. Students completing GED tutoring program will review technical/vocational programs with counselor and Director. Presentations at CSD to students and staff by technical/vocational educational instructors. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 83% Wednesday, April 18, 2007 Page 138 of 157 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Plan Name Projected Cost. 276 32003-73246 Intercollegiate AthleticsAdministrative Electronic Message Centers 277 32003-73246 Intercollegiate AthleticsAdministrative Placement of Student Athletes into Four (4) Year Academic Institutions Objective 150,000 Raise $150,000 from external sources for the purchase of three (3) electronic message board centers for the total institutions use (not strictly for Athletics). 0 Measure Standard By the Spring 2004 Purchase and use of semester are three (3) three (3) electronic electronic message centers message centers. are to be in place and operating at TM, NWC, and VV. Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results $150,000 will be raised from external sources and electronic message center purchased. Approach and secure finding from local vendors-Major League Baseball. Director of Athletics, all Achieve a minimum of At the end of our student- 75% placement of 75% placement of student-athletes' eligibility period student athletes into four coaches and staff will continue to stress, implement and place athletes into four (4) year rosters of each sport will (4) year institution. as our top priority, continued academic institution upon be evaluated to determine the percentages. eligibility and placement of our their departure or student-athletes. graduation from EPCC. In January 2005 Progress 66% (18/27) of all second Met year athletes went on to fouryear schools. Coaches and staff meet with student-athlete monthly. Offer them computer services at the Athletic Office. Offer tutoring when requested. 278 32003-73246 Intercollegiate AthleticsAdministrative Athletics Advisory Committee 0 Development, organization and recommend an Athletics Advisory Committee. Presently no such Completion, final committee exists but needs approval, and operation to be completed to satisfy of the Committee by all SAC's requirements. December 31, 2003. 279 32003-73246 Intercollegiate Athletics- Higher Graduation 0 Insure that EPCC Athletics continue to At the end of each EPCC academic year (Sept. 1 - OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Director of Athletics will develop and identify membersrecommend Athletics Advisory Committee through the chain of command-final approval by the EPCC President. EPCC Athletics expects Continue to place top priority a minimum of 5.0%. upon continued eligibility, rptAssessmentResultsDetailLinedWithProg 88% Met SACS requirements and Met improved Athletic programs. 48% - 12 of 28 graduated. This has to exceed the Wednesday, April 18, 2007 Met Page 139 of 157 Resource Management Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Administrative Plan Name Projected Cost. Objective Measure Standard achieve and maintain a Aug. 31) rosters of each higher graduation rate thansport will be evaluated in the general, full time cooperation with the student body. EPCC office of Institutional Research to determine these figures. Rate Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Strategies Assessment Results Expected Objective's Completion Date Status Use of Results meaningful academic progress and, if applicable, graduation. EPCC student body rate. Obtain average graduation rate of general student body and EPCC student-athletes. The EPCC overall graduation rate is not known. However, studentathletes are most likely the only students required to graduate. This is an NCAA requirement if they are not "qualifiers" out of high school. Presently no such Completion and final positions as Faculty approval by December Association 31, 2003. Representative exists. Appointment of two (2) Faculty Association Representatives, one for the male athletes and one for the female athletes. Athletic Representative to represent the Athletic Department. 280 32003-73246 Intercollegiate AthleticsAdministrative Men's and 0 Women's Faculty Athletic Representative s (FAR's) Establishment of Men's and Women's Faculty Association Representative for the Athletic Department. 281 32003-73246 Intercollegiate AthleticsAdministrative Athletics Policy and Procedures Manual Presently no such manual Completion and final Development, exists but needs to be approval by December organization and 31, 2003. completion of an Athleticscompleted to satisfy all Policies and Procedures SACS requirements. Manual. 0 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Director of Athletics will recommend a Men's and Women's Faculty Association Representative through the appropriate chain of commandFinal approval by the EPCC President. Met SACS requirements and Met improved Athletic programs. Director of Athletics and staff will develop and ensure that this Policy and Procedure Manual will be completed to meet SACS guidelines. Met SACS requirements and Met improved Athletic programs. rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 140 of 157 Resource Management Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area 282 32003-73246 Intercollegiate AthleticsAdministrative 283 32006-73246 Baseball 284 32007-73246 Softball Plan Name EPCC Athletics Budget Reduction EPCC Athletics Budget Reduction EPCC Athletics Budget Reduction Projected Cost. 0 0 0 Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Strategies Continue to remain within The Annual Budget will be 5% the EPCC Athletic evaluated and audited at reduction/dependence Department annual year's end to determine if on Auxiliary Fund. approved budget and the Department of continue to reduce the Athletics remained within impact on the EPCC its annual budget and by Auxiliary Services Budget how much the impact has by a minimum of 5% each been reduced on the year. Auxiliary Fund. Monitor all income, expenditure and purchases throughout the academic year to insure fiscal responsibility. Year end figures/audit will give us our bottom line and our level of success. Continue to remain within The Annual Budget will be 5% evaluated and audited at reduction/dependence the EPCC Athletic year's end to determine if on Auxiliary Fund. Department annual the Department of approved budget and Athletics remained within continue to reduce the its annual budget and by impact on the EPCC Auxiliary Services Budget how much the impact has by a minimum of 5% each been reduced on the Auxiliary Fund. year. Monitor all income, expenditure and purchases throughout the academic year to insure fiscal responsibility. Year end figures/audit will give us our bottom line and our level of success. Continue to remain within The Annual Budget will be 5% evaluated and audited at reduction/dependence the EPCC Athletic year's end to determine if on Auxiliary Fund. Department annual the Department of approved budget and Athletics remained within continue to reduce the its annual budget and by impact on the EPCC Auxiliary Services Budget how much the impact has by a minimum of 5% each been reduced on the Auxiliary Fund. year. Monitor all income, expenditure and purchases throughout the academic year to insure fiscal responsibility. Year end figures/audit will give us our bottom line and our level of success. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Expected Objective's Completion Date Status Use of Results Eliminated the position of Director of Athletics. Met Receiving athletic support through vendor donations. Withdra wn Receiving athletic support through vendor donations. Withdra wn Receiving athletic support through vendor donations. rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 141 of 157 Resource Management Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area 285 32011-73246 Cross Country 286 32018-73246 Kikks Plan Name EPCC Athletics Budget Reduction EPCC Athletics Budget Reduction Projected Cost. 0 0 Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Strategies Continue to remain within The Annual Budget will be 5% the EPCC Athletic evaluated and audited at reduction/dependence Department annual year's end to determine if on Auxiliary Fund. approved budget and the Department of continue to reduce the Athletics remained within impact on the EPCC its annual budget and by Auxiliary Services Budget how much the impact has by a minimum of 5% each been reduced on the year. Auxiliary Fund. Monitor all income, expenditure and purchases throughout the academic year to insure fiscal responsibility. Year end figures/audit will give us our bottom line and our level of success. Continue to remain within The Annual Budget will be 5% evaluated and audited at reduction/dependence the EPCC Athletic year's end to determine if on Auxiliary Fund. Department annual the Department of approved budget and Athletics remained within continue to reduce the its annual budget and by impact on the EPCC Auxiliary Services Budget how much the impact has by a minimum of 5% each been reduced on the Auxiliary Fund. year. Monitor all income, expenditure and purchases throughout the academic year to insure fiscal responsibility. Year end figures/audit will give us our bottom line and our level of success. Assessment Results Expected Objective's Completion Date Status Use of Results Withdra wn Receiving athletic support through vendor donations. This program was eliminated Fall 2003. Met Receiving athletic support through vendor donations. 287 32003-73246 Intercollegiate AthleticsAdministrative StudentAthlete Academic Standards 0 With regards to studentathletes, maintain higher academic standards than that required by the NJCAA and achieve a level of minimum of 85% success rate according to EPCC's "Athlete's Scholarship Policy". At the end of each semester GPA's of our student-athletes will be evaluated to determine these figures. 85% success rate according to EPCC's "Athletes Scholarship Policy". Enforcement of the EPCC Department of Athletics to monitor student-athletes in the Fall and Spring and enforce the "Athlete Scholarship Policy". 90% success rate. Continue to identify the possible at risk students and encourage them to take tutoring and study hall. Met 288 32003-73246 Intercollegiate Student- 0 Recruit quality, student- Opening day Rosters of 70% local (as defined Director of Athletics will Overall percentage was Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 142 of 157 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area AthleticsAdministrative Plan Name Projected Cost. Objective athletes and assure that a minimum of 70% of our student-athletes come from the El Paso County Community College District (local area as defined by EPCC). Athlete Recruitment Measure each sport will be evaluated to determine local verses out-of-state percentages. Standard by EPCC) studentathletes. Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Strategies insure that EPCC coaches are recruiting and signing local student-athletes. Assessment Results Expected Objective's Completion Date Status Use of Results 63%. Each coach continues to recruit the top athletes from the graduating class from the local defined area. Some factors involve the quality of the athletes in the graduating class and the desire to stay in El Paso versus attending another college. 289 32004-73246 Baseball Camps Camp Accounts 0 Coaches set dates for Stage sport camps to attract area youth to our camp. Camp flyers are campus and expose local mailed at least two (2) youth to EPCC and EPCC weeks prior to camps. Athletics. Increase enrollment as Flyers will be developed and follows: distributed locally to attract Baseball Camps - 10% youth to the various camps. Softball Camps - 10% Cross Country Camps 10 attendees KIKKS Camps - 10 attendees Held twice a year, during Winter break and Summer. Met 290 32005-73246 Softball Camps Camp Accounts 0 Coaches set dates for Stage sport camps to attract area youth to our camp. Camp flyers are campus and expose local mailed at least two (2) youth to EPCC and EPCC weeks prior to camps. Athletics. Increase enrollment as Flyers will be developed and follows: distributed locally to attract Baseball Camps - 10% youth to the various camps. Softball Camps - 10% Cross Country Camps 10 attendees KIKKS Camps - 10 attendees Held twice a year, during Winter break and Summer. Met 291 32016-73246 Cross Country Camps Camp Accounts 0 Coaches set dates for Stage sport camps to attract area youth to our camps. Camp flyers are campus and expose local mailed at least two (2) youth to EPCC and EPCC weeks prior to camps. Increase enrollment as follows: Baseball Camps - 10% Softball Camps - 10% Cross Country has never had Withdra a camp. wn OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Flyers will be developed and distributed locally to attract youth to the various camps. rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 143 of 157 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Measure Standard Cross Country Camps 10 attendees KIKKS Camps - 10 attendees Stage sport camps to Coaches set dates for attract area youth to our camp. Camp flyers are campus and expose local mailed at least two (2) youth to EPCC and EPCC weeks prior to camps. athletics. Increase enrollment as Flyers will be developed and follows: distributed locally to attract Baseball Camps - 10% youth to the various camps. Softball Camps - 10% Cross Country Camps 10 attendees KIKKS Camps - 10 attendees Camp Accounts 293 32006-73246 Baseball Lights at At present no lighting Completion, placement 150,000 Secure funding Baseball and (approximately $150,000) exists at both the Baseball and operation of lights Softball Fields by February 1, 2004. from external sources for and Softball field. the purchase and placement of lights at both the Baseball and Softball fields. 0 All Fundraising Accounts Increase outside will be audited at the end fundraising dollars to of the fiscal year to augment the Annual rollover Athletic Budgets. determined the amount of funds raised under each account. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase annual fundraising in 20032004 are as follows: Athletic Fundraising 10% Baseball Fundraising 10% Softball Fundraising 10% Cross Country Fundraising - 10% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Strategies Athletics. 292 32017-73246 Kikks Camps 294 32008-73246 Athletic MarketingFundraising Accounts 0 Objective Assessment Results Expected Objective's Completion Date Status Use of Results This program was eliminated Fall 2003. Met Director of Athletics will spearhead the effort to secure the required $150,000 from external sources and possibly from Major League Baseball. Involvement with local individuals, vendors, and businesses to increase Fundraising dollars in each specified area. rptAssessmentResultsDetailLinedWithProg 88% In Progress Annual commitments met with annual vendor contributions. Wednesday, April 18, 2007 Met Page 144 of 157 Dec 2005 Resource Management Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Assessment Results Use of Results Expected Objective's Completion Date Status KIKKS Fundraising 10% 295 32019-73246 Baseball Fundraising Fundraising Accounts 0 Increase outside All Fundraising Accounts fundraising dollars to will be audited at the end augment the Annual of the fiscal year to rollover Athletic Budgets. determined the amount of funds raided under each account. Increase annual fundraising in 20032004 are as follows: Athletic Fundraising 10% Baseball Fundraising 10% Softball Fundraising 10% Cross Country Fundraising - 10% KIKKS Fundraising 10% Involvement with local individuals, vendors, and businesses to increase Fundraising dollars in each specified area. This is an on-going process during the year. Met 296 32013-73246 Softball Fundraising Fundraising Accounts 0 All Fundraising Accounts Increase outside will be audited at the end fundraising dollars to of the fiscal year to augment the Annual rollover Athletic Budgets. determined the amount of funds raised under each account. Increase annual fundraising in 20032004 are as follows: Athletic Fundraising 10% Baseball Fundraising 10% Softball Fundraising 10% Cross Country Fundraising - 10% KIKKS Fundraising 10% Involvement with local individuals, vendors, and businesses to increase Fundraising dollars in each specified area. This is an on-going process during the year. Met 297 32014-73246 Cross Country Fundraising Fundraising Accounts 0 Increase outside fundraising dollars to Involvement with local individuals, vendors, and This is an on-going process during the year. Met All Fundraising Accounts Increase annual will be audited at the end fundraising in 2003- OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 145 of 157 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Plan Name 298 32015-73246 Kikks Fundraising Fundraising Accounts 306 11000-72002 Property Control Operation District Warehouse Storage Projected Cost. 0 Objective Measure Standard Strategies Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Assessment Results Use of Results Expected Objective's Completion Date Status augment the Annual of the fiscal year to rollover Athletic Budgets. determined the amount of funds raised under each account. 2004 are as follows: Athletic Fundraising 10% Baseball Fundraising 10% Softball Fundraising 10% Cross Country Fundraising - 10% KIKKS Fundraising 10% businesses to increase Fundraising dollars in each specified area. Increase outside All Fundraising Accounts fundraising dollars to will be audited at the end augment the Annual of the fiscal year to rollover Athletic Budgets. determine the amount of funds raised under each account. Increase annual fundraising in 20032004 are as follows: Athletic Fundraising 10% Baseball Fundraising 10% Softball Fundraising 10% Cross Country Fundraising - 10% KIKKS Fundraising 10% Involvement with local individuals, vendors, and businesses to increase Fundraising dollars in each specified area. This program was eliminated Fall 2003. Provide state of the art warehousing storage capabilities by FY 200304. Obtain financial resources to procure and set up district industrial warehousing capabilities to serve the College district needs. District Warehouse Met industrial racking equipment improved safety, accuracy, efficiency and effectiveness for EPCC warehousing storage. Space utilization has been maximized by 35% 13,500 Obtain an Industrial Warehouse Racking System. Provide Accessibility, safety, accuracy, efficiency and effectiveness on College District warehousing storage. Provide District low-cost- OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Met Page 146 of 157 Resource Management Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Complete District grant 307 11000-72002 Property Control Physical 5,720 Implementation and completion of District funded inventory/Fall Inventory of physical inventory of grant2003. Grant Funded funded equipment Equipment Compliance Circular A110 OMB. 308 11000-72002 Property Control Post0 implementation of GASB 3435 Standard Audit compliance (OMB) Circular A-110 Property Management Standards for Assistance Agreements. Complete implementation Audit compliance and Postreport generation. Implementation/assessmentof Depreciationand completion of GASB accounting of real and 34-35 into the fixed asset personal property into the fixed asset accounting accounting reporting module. requirements. 0 Develop a standard Auxiliary Services operations evaluation survey. Survey is distributed and completed by students/staff, and evaluated to improve OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Assessment Results Expected Objective's Completion Date Status Use of Results and accessibility to furniture and equipment has been improved. Develop plan of action, deadlines and procurement of financial resources to capture record and account for District Grant Funded Equipment. Implement physical inventory and update Master File Database. District Grant Funded Equipment physical inventory has been conducted and update in EPCC Property Master File Data Base. Met Develop plan of action and deadlines to capture and record all depreciation data related to infrastructure, buildings, furniture and equipment. Complete implementation of Depreciation accounting of real and personal property has been successfully accomplished. Financial recording and reporting for Fix Asset Accounting has complied with GAAP and GASB requirements. Met Audit compliance has been successfully recorded and reported. Completion of survey by -Utilize existing survey Spring 2004. instruments and consolidate into one uniform document. -Distribute to staff and rptAssessmentResultsDetailLinedWithProg 88% Total Number of Non-withdrawn Plans Not Assessed savings warehouse state of the art storage facility. Improve financial reporting. Auxiliary Services Survey 48 Total Number of Assessed Plans Met: Strategies Data assessment and report generating from fixed asset module. 333 11000-72000 AVP Auxiliary Services Total Number Plans Submitted (Duplicated if for more than 1 goal) Survey results will identify areas that need improvement as well as areas that are meeting expectations. The Wednesday, April 18, 2007 Met Page 147 of 157 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Associate Vice President, Auxiliary Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Auxiliary Services operations. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies students for completion. -Compile responses per department. -Meet with each department head to discuss results of surveys. rptAssessmentResultsDetailLinedWithProg 88% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 27 Total Number of Assessed Plans Met: 21 91% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 9% Number of Non-withdrawn Plans Assessed 23 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 4 15% Assessment Results Use of Results Expected Objective's Completion Date Status "Auxiliary Services Survey: Employees" is done annually. Wednesday, April 18, 2007 Page 148 of 157 Resource Management Associate Vice President, Budget and Financial Services Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard 334 11000-73000 AVP Budget & Finance Completion of Banner Operational Procedures 0 To ensure that all Procedures are completed. BANNER Procedures are completed for all facets of the BANNER Finance Module. 335 11000-73214 Non-Mandatory Transfer - Plant Transfer to Unexpended Plant Fund 0 Reinstate Prior Year Budget for Plant Maintenance and Renovation of Projects. 336 11000-73215 Non-Mandatory Tran - Ren Rep Transfer to Renewal and Replacement Fund 0 Budget is reinstated to its Renewal and Reinstate Prior Year replacement of facilities Budget for Plant Renewal prior year level. continue at the prior & Replacement. year level. Each operation is able to refer to a procedure manual for information and training by August 30, 2004. Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% 0 0% Total Number of Plans Withdrawn 5 10% 3 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 1 33% Banner Finance Functional Area Team members will review the compiled procedures, suggest any changes and submit the finalized procedures to the respective area. rptAssessmentResultsDetailLinedWithProg 43 Total Number of Assessed Plans Met: Budget is reinstated to its Maintenance and Renovation projects are prior year level. Renovation of facilities identified and prioritized to will continue. provide a better and safer environment for students and staff. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Total Number of Non-withdrawn Plans Assessed Total Number of Non-withdrawn Plans Not Assessed Total Number Plans Submitted (Duplicated if for more than 1 goal) Strategies Renewal and Replacement projects are identified to provide updated and safer facilities. 88% 67% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Banner Procedures were completed for the following areas: Property Control Budget - Purchasing Accounts Payable/Data Control - Payroll Procedures are in progress for: General Accounting - Tuition Cashiering - Accounts Receivable. Use of Results Expected Objective's Completion Date Status Each operation is able to In refer to a procedure manual. Progress $512,311 was added to the Funding is adequate for 03/04 Budget, thereby maintenance and renovation reinstating the original Budget of facilities. of $700,000. Met $110,000 was added to the Identified projects are 03/04 budget to fund Renewal funded. & Replacement Projects. Met Wednesday, April 18, 2007 Page 149 of 157 8/31/05 Resource Management Comptroller Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 3 Total Number of Assessed Plans Met: 3 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 3 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Increase is related to The budget has been postage for mailing IRS increased to cover Form 1098T, envelopes to additional costs incurred mail 45,000 Form by Accounting Services. 1098T's, and toner cartridges and paper for District Wide printers primarily supporting student registration. The Accounting Services supplies budget is increased to cover actual costs. Bank 0 Reconciliation Banner Feature Implement the Banner Bank Reconciliation System. Met objective. After implementation, Test reconciliation module, the system will generate load prior checks outstanding, a list of checks coordinate with bank for feed outstanding to facilitate of checks cleared and begin the reconciliation testing. process by January 2004. Banking Services User Manual Develop Banking ServicesConsolidate in one manual all the banking process to User Manual. review, transfer, direct deposit funds of the college. Banking Services manual is completed. 309 11000-73206 Accounting Services Accounting Service New Money Request 310 11000-73206 Accounting Services 311 11000-73200 Comptroller 0 0 Bank reconciliation will identify the checks outstanding as opposed to performing this review manually. The Banner feature of automated reconciliation system is implemented. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Produce a single manual that describes, instructs, and explains the various steps to support the banking functions by August 31, 2004. An increase in the budget is The budget was increased. the only alternative to cover costs passed on as a result of an IRS reporting requirement. Identify various banking processes. Document and organize information into a single manual. rptAssessmentResultsDetailLinedWithProg 88% Objective met. Expected Objective's Completion Date Status Use of Results Supplies were purchased to support the 1098T process. Met Bank accounts are reconciled using the Banner system. Met The banking services are documented for reference. Met Wednesday, April 18, 2007 Page 150 of 157 Resource Management Director, Budget Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure 312 11000-73100 Budget Office Hire Full-Time23,362 Hire a full-time employee Full-time employee is to help prepare various hired and trained. Employee budget and expenditure reports and provide research and analysis. 313 11000-73100 Budget Office Implementation 0 of Position Control Module none Implementation of Position Control Module: Position Control is a component of Budget Development that allows you to define position classifications and apply them to your budget. This component is fully integrated with the Banner2000 Finance System. It enhances budgeting capabilities and ensures consistency by supporting the full range of functions necessary for position administration, including: -budget preparation and monitoring -position control and OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 4 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 50% Number of Non-withdrawn Plans Assessed 4 100% 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Budget Office and Personnel Test have been done. We are still meeting trying to resolve Services will establish objectives, tasks and timelines some issues. to implement the Position Control Module. rptAssessmentResultsDetailLinedWithProg 50% Number of Non-withdrawn Plans Not Assessed Use of Results After the employee Interview qualified candidates No decision has been made on We are waiting for a completes the initial the hiring status of this position decision. and provide proper training. training and hands-on experience, we anticipate a faster turnaround in generating various labor-intensive reports and budget processes during fiscal year 2003-04. Fully implemented in two years. 88% Expected Objective's Completion Date Status In Progress We have discussed the Pros In and Cons of Position ControlProgress Module. Once we resolve some issues, we will be in a better position to determine how best to implement this module. Wednesday, April 18, 2007 Page 151 of 157 12/04 9/01/05 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Director, Budget Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Strategies Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 4 Total Number of Assessed Plans Met: 2 Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 2 50% Increase in 3,000 Increase in supply budget Current supply budget is We will attain this goal Utilize supplies more is necessary to Supply Budget not adequate from current by the end of the fiscal efficiently. We will e-mail accommodate high volumeneeds. year. more reports when possible. of printing, duplicating the Budget Books externally, and increase in cost of general supplies. 315 11000-73100 Budget Office Increase in Overtime Budget 500 Need increase in overtime Current overtime is not due to volume of work andadequate from current shorter deadlines. needs. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Number of Non-withdrawn Plans Assessed 4 100% 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status The budget was increased to The increase will allow us to Met cover additional supply needs. pay for needed supplies. We will attain this goal Eliminate some reports and The budget was increased for by the end of the fiscal reduce the frequency of some overtime. year. reports. rptAssessmentResultsDetailLinedWithProg 50% Number of Non-withdrawn Plans Not Assessed staffing -position classification -account distribution 314 11000-73100 Budget Office 88% The increase will be used to support the budget process. Wednesday, April 18, 2007 Met Page 152 of 157 Resource Management Director, Personnel Services Plan Budget No. Acct No. Area Plan Name Projected Cost. 332 11000-74000 Personnel Services Employment Verification Reporting 0 Objective To reduce the response time in providing nontelephonic verification of employment on current and prior employees. Measure By August 31, 2004, time from receipt to dispatch of employment verifications will be reduced by 10%. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard By August 31, 2004, non-telephonic employment verifications will be completed in 50.4 hours of the receipt of the request. Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 1 Total Number of Assessed Plans Met: 1 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 1 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Workflow will be assessed within Systems and Records and where appropriate and deemed effective, workload will be processed either in a different flow process or work will be divided among existing employees in a more efficient and effective manner. rptAssessmentResultsDetailLinedWithProg 88% Assessment Results Use of Results Expected Objective's Completion Date Status The average time to complete The workflow process used non-telephonic employment in this study will be applied verifications has been 56 hours to other functions in the from time of receipt to time of Systems and Records area to dispatch. The goal was to improve customer service reduce the required time for related processes. Where completion by 10% resulting in applicable, the same a 50.4-hour turn-around time. processing strategy may be In sampling the current state of applied to other processes in this process, we find that the the department. average time from receipt to dispatch reduced to 6.3 hours. This represents a 90% improvement over the baseline as opposed to the 10% goal. Wednesday, April 18, 2007 Met completed August 31, 2004 Page 153 of 157 Resource Management Director, Purchasing Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 2 Total Number of Assessed Plans Met: 2 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 2 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status 330 11000-77000 Purchasing/Contra District Wide ct Mgmnt Purchases 0 To maximize cost savings Meet and exceed current on all district wide fiscal year YTD cost purchases. savings. Increase of 7% in cost savings amount for current fiscal year. 1. Review of all commodities to determine target areas for cost savings. 2. Process competitive solicitations and pursue better pricing on high dollar commodities. 3. Seek additional cost savings through additional negotiations with purchasing cooperatives. 4. Work with Buyers and staff and maximize focus on cost savings initiatives. The Purchasing department realized cost savings in the amount of $763,091 for fiscal year '03-'04, this amount represents a 59% increase over the prior year cost savings amount of $313,843. This was made possible through increased use of contract vendors, combining requirements for better discounts and requesting more value added services of vendors. The cost savings for Met individual purchases have translated into opportunities for departments to purchase additional goods and better meet their needs, an example of this is the purchase of computers for faculty where more computers were purchased from cost savings. The College has also benefited from increased leverage by utilizing combined quantities for major purchases, this translates into better discounts from vendors. Overall cost savings provide college wide departments with additional funding to purchase more goods and services for increased service levels to the community. 331 11000-77002 Insurance Property 0 Maintain levels for To ensure adequate coverage for college wide automobiles, property, student medical property and casualty malpractice, educators through an increase in budget allocation of 35%, liability and general this increase is the result liability insurance of increases in premiums coverage college-wide. and deductibles attributed 100% coverage of property/casualty. -Conduct annual bid of insurance and seek rate guarantees through multi-year contract awards. -Utilize purchasing resources to seek the best available plans in the market, to include insurance expert assistance. The College issued a solicitation for insurance that was awarded in February of 2003. The terrorist attack of 911 created substantial increases in insurance premiums nationwide. By negotiating with the insurance Improved efficiency in the Met manner in which the College manages its insurance policies, minimizing insurance claims and future risk, thus, paying lower insurance premiums. The College can maintain its Increase in College Property Values OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 154 of 157 Resource Management Director, Purchasing Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure to a nationwide crisis of the insurance industry, initiated by the events of 9/11 and an increases to College property values of 30 million dollars incurred in the past three years. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 2 Total Number of Assessed Plans Met: 2 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 2 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 0 0% Assessment Results Use of Results Expected Objective's Completion Date Status carrier and renewing existing current position and continue -With upper management policies, the College was able to pay lower insurance assistance, develop a to realize cost savings from '02-premiums, in comparison procedure to seek proactive '03 premiums by 3.5%. Other with other political improvements in the area of subdivisions in Texas, in risk management and minimize initiatives have also been implemented, such as spite of increased property losses of college property. values. -Work closely with insurance maintaining communication with the insurance agent and agent to conduct review and the insurance underwriter, to manage insurance coverage areas eligible for claims cost continuously address areas that may pose a risk to the containment. College. Even though the College increased property values by adding buildings and square footage, the College has maintained insurance costs lower than most political subdivisions throughout Texas, e.g., the current property insurance rate of $ .88 is one of the lowest in the state. rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 155 of 157 Resource Management Vice President, Resource Management Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Measure Standard Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 7 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 7 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 1 13% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status Orion Project 0 Work with UTEP and EPISD on the Orion Project to continue to pursue the high speed bandwidth connectivity. 269 11000-71002 Memberships/Due Renewal of s Institutional Memberships 0 none Renew and subscribe to Faculty, administration, institutional memberships staff, and board members that help the college keep are able to take advantage abreast of information on of lower conference and seminar rates because of trends, changes, and opportunities in education.institutional memberships. Monitor cost/benefit of institutional memberships. "Not Mine" 270 11000-11105 AIMS Project SAN (Storage Area Network) Project 0 Numbers of meetings held. 80% of milestone met. Ensure that Banner functional area teams are meeting regularly and progressing. Attend and facilitate team meetings. Objective was met Efficiency for College Operations Met 271 11000-75000 AVP Info SAN (Storage Technology & Sys Area Network) Project 0 Improve services of the Train current staff in the Train two employees in Select two employees for Objective was met Information Technology effective utilization of the SQL and ProCobol. training so they can train other Department staff. current software tools. Information Technology employees. Efficiency for College Operations Met 272 11000-75002 Information Center 0 Improve services of the Information Center. Efficiency for College Operations Met 268 11000-12001 VP Resource Mgmnt SAN (Storage Area The Orion Project represents a unique opportunity for our community to deliver distance learning classes, provide teacher mentoring and recruitment programs, share library resources, and gain access to Internet 2. Increased high speed Continue meetings to discuss connectivity in the El options and continue to Paso community will explore funding possibilities. enable increased educational attainment, address growing teacher shortages, facilitate professional and paraprofessional development, and promote workforce integration. Met Withdra wn Train current staff in the Train two employees for Select two employees for Objective was met effective utilization of the the effective use of the training so they can train other OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rptAssessmentResultsDetailLinedWithProg 88% Wednesday, April 18, 2007 Page 156 of 157 Resource Management Total Number Plans Submitted (Duplicated if for more than 1 goal) 48 Total Number of Assessed Plans Met: 38 Total Number of Assessed Plans Not Met: 0 0% Total Number of Assessed Plans In Progress 5 12% 100% Vice President, Resource Management Plan Budget No. Acct No. Area Plan Name Projected Cost. Objective Network) Project Measure Standard current software tools for reporting software. reporting needs. Total Number of Non-withdrawn Plans Assessed 43 Total Number of Non-withdrawn Plans Not Assessed 0 0% Total Number of Plans Withdrawn 5 10% Total Number Plans Submitted (Duplicated if for more than 1 goal) 8 Total Number of Assessed Plans Met: 7 100% Total Number of Assessed Plans Not Met: 0 0% Number of Assessed Plans In Progress: 0 0% Number of Non-withdrawn Plans Assessed 7 100% Number of Non-withdrawn Plans Not Assessed 0 0% Number of Plans Withdrawn: 1 13% Strategies Assessment Results Use of Results Expected Objective's Completion Date Status Information Center employees. 273 11000-75100 Telecommunicatio SAN (Storage 6,000 Improve services the Telecommunications ns Area Department staff. Network) Project Train current staff in the Train two employees for Select two employees for Objective was met effective utilization of the the effective utilization training so they can train other current equipment. of the equipment. Telecommunications employees. Efficiency for College Operations Met 274 11000-75300 Records Management SAN (Storage Area Network) Project 0 Improve quality service produced by records management. Improve turnaround and quality of reproduced items. Purchase new reproducer unit. Moved to Imaging Services Met 275 11000-75400 Information Technology Systems SAN (Storage Area Network) Project 0 Replace departmental copier with Digital Printer/Copier. Reduce monthly maintenance cost for copies. Will be used as network A trade agreement with a lease Objective was met printer with enhanced in place for a new copier. copier capabilities. Reduction of Costs Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Replace outdated equipment with new producer. rptAssessmentResultsDetailLinedWithProg 88% Objective was met Wednesday, April 18, 2007 Page 157 of 157