Course Title: Construction Technology

Session Title: Wall Framing, Assembly

Performance Objective:

Upon completion of this assignment, the student in each group will assemble and complete one wall section. The students will properly identify all parts, gather pre-sized and assembled parts to assemble a complete wall section. This will incorporate using the following completed assignments, "plate unit", "corner post unit", "partition corner unit", "precut stud unit",

"window unit", and the "door unit". The student will communicate using proper framing terminology.

Specific Objectives:

Students will be able to:

1) Define and use terminology related to wall framing.

2) Identify and collect materials and tools needed to complete the assignment. 3)

Evaluate and explain areas in this assignment where safety is needed.

4) List the steps and procedures to be successful

A) Use the blue prints to check material sizes and correct layouts.

B) Gather materials and tools to be used.

C) Work together as a group.

D) Practice safety.

E) Ability to Measure and Layout

F) Ability to size and cut.

G) Ability to assemble unit.

H) Define terminology and understand what and where it is used.

I) Pass a written test.

5) Demonstrate the ability to perform the task- assignment

6) Demonstrate proper safety practices though out the lesson / assignment.

7) Participate in quality control through each step of the assignment.

8) Clean up and organize the materials, tools, and lab areas.

Preparation

TEKS Correlations:

This lesson, as published, correlates to the following TEKS. Any changes/alterations to the activities may result in the elimination of any or all of the TEKS listed.

130.54. Building Maintenance Technology

(c) Knowledge and skills.

(2) Students will understand all aspects of contract documents, including architectural, engineering and shop drawings and interpret; and

(9) Students will install metal doors and related hardware in steel-framed, woodframed, and masonry walls

130.51. Construction Technology

Copyright © Texas Education Agency, 2011. All rights reserved. 1

(c) Knowledge and skills.

(6) Students will know how to lay out and frame walls and ceilings, rough-in door and window openings, construct corners and partition tees, brace walls and ceilings, and apply sheathing and:

(A) identify the components of a wall and ceiling layout;

(B) describe the procedure for laying out a wood frame wall, including plates, corner posts, door and window openings, partition tees, bracing, and fire-stops;

(C) describe the correct procedure for assembling and erecting an exterior wall; and

(E) lay out, assemble, erect, and brace exterior walls for a frame building.

Interdisciplinary Correlations:

Instructor/Trainer

References:

Instructor knowledge.

Instructional Aids:

1) Wall Framing Assembly PowerPoin.t

Materials Needed:

1) A) Unit completed assignment from the "plate unit".

B) Unit completed assignment from the "corner post unit".

2) C) Unit completed assignment from the "partition corner unit".

D) Unit completed assignment from the "precut stud unit".

3) E) Unit completed assignment from the "window unit".

F) Unit completed assignment from the "door unit".

G) Quantity 124 #12 V. C. Nails

Equipment Needed:

1) Skillsaw

2) Extension Cord

3) Framing Square

4) 25' Tape Measure

5) Utility Knife

6) Carpentry Pencil

7) Speed Square

8) Safety Glasses

9) 20 oz. Straight claw hammer

10) Cats claw

11) Ripping Bar

Learner

Knowledge of safety in the shop.

Copyright © Texas Education Agency, 2011. All rights reserved. 2

Introduction

Introduction (LSI Quadrant I):

• Ask: How many students have looked at a set of blueprints and are able to take

• blueprints information and construct a wall?

(show of hands)

Ask; What is some of the information we find in a set of blueprints needed to

• build a wall section?

Example:

• 16" on center studs

Wall thickness

Rough openings

Intersecting walls

Studs line - up with floor joists

• Studs line - up with Rafters / Ceiling Joists

Ask; Does any one have any experiences framing a wall section?

Shed, Garage, House

• Introduction;

This assignment covers the wall framing assembly unit. Wall framing members are said to be like the human body's skeleton, the structural strength. Wall framing units are engineered to provide strength and support through out the structure. A wall framed unit provides a space in the wall for plumbing, heating/air conditioning, and electrical to travel as well as space for the insulation to be installed. The exterior of the wall framing is used to attach anything from insulation board to sheetrock to siding to even brick veneer. The wall framing units provide passage and viewing opening such as doors and windows. Wall framing also supports the second stories, ceilings, and roof loads.

Outline

Outline (LSI Quadrant II):

1) Define the Terminology

• Blueprints, Floor plans, Schedules

• Lay outs

• Sole (Bottom) plates

• Top plates

• Double top plates

• On center

• Rough opening, windows, doors, fireplaces

• Intersecting walls

• Corner post

• Layout symbols, X, T, C, D, K, S,

• Cripples

• Trimmers

Copyright © Texas Education Agency, 2011. All rights reserved. 3

• Butt-walls

• By-walls

• Header

(Review with the students, students should have the following definitions)

• Blueprints are the plans that the Architect uses to communicates to a

Builder, through lines, symbols, and dimensions, a project to be constructed.

Layout is the process of marking the locations of framing members to be

• cut and assembled.

Sole (Bottom) plate is a framing member, laid horizontally to connect and support the lower ends of the vertical-framing members. The sole plate is then secured to the floor.

Top plate is a framing member, laid horizontally to connect and support the upper ends of the vertical-framing members.

Double top plates lay horizontally on top of the top plate to help keep the wall straight; to tie connecting walls together, and as support strength for the rafters and/or floor joists to rest upon.

On center is a layout that is in the middle of a framing, or sheathing, or •

• other materials or layouts such as intersecting walls, rough opening for windows, doors, and fireplaces.

Rough openings are areas in framing that are left open for doors, windows, and fireplaces.

Intersecting walls, (partition walls), (king studs), are where two or more walls cross one another to form a "T" or "X" shape intersection.

Corner post, where two walls come together to form a "L" shape corner that can be located interiorly and exteriorly on a structure.

Layout symbols, "D" double stud, "X" stud, "C" cripple stud, "T" trimmer,

"S" spacer, "K" king stud, intersecting wall.

Cripples are short studs that are placed 16" or 24" on center where a full length stud can not be used, found mostly above headers and below sills.

Trimmers are studs, which support the headers over a rough opening.

Studs are slender vertical members, usually 2"x4" or 2"x6" materials that

• are placed 16" or 24" on center. Studs support the top plates and provide a surface for sheathing to be nailed.

Butt-walls, are walls that fit in between By-walls.

By-walls, are walls that run from the outside of the sub-floor to the outside edge of the opposite end of the sub-floor.

Headers are used over door and window openings. Headers provide strength to the double top plate for floor joists, ceiling joists, and rafters.

2. The students will use the blueprints with the Instructor to obtain the following

Information. (Use Handouts page 1 and 2 from the "plate unit".)

• The students will note that most doors, windows, and partition walls are laid-out to their centers. (middle of the door / window / walls.)

• The students will be building a wall framing unit for a 2" x 4" thick wall.

Copyright © Texas Education Agency, 2011. All rights reserved. 4

3. With the information obtained from step 2, the students will gather the needed materials for the layout, sizing, and assembling of an assigned wall framing unit

• The students will be gathering the following completed unit assignments; the top and bottom plates, a corner post, a partition corner, ___ quan. precut studs, a window unit, and a door unit.

After all the materials above have been gathered the students will check each piece for defects and quality control from pre-assembly.

Example; a. Warp b. Checks - Cracks c. Bow d. Twist e. Cup f. Knots g. Other damages h. Damage related from nailing, assembling

4. Laying out / placing of the members of the wall unit to be assembled. The student will select the two plates, top and bottom plates, as their horizontal framing members. All the other members to be used will be vertical members, examples; precut studs, window unit, etc.

The students will place the two plates on the floor, on their edges, parallel to one another, yet have about eight feet between them. Next, all the vertical members will be place, on their edges, between the two plates, perpendicular. Aligned and ready to be nailed the student will construct the wall framing unit.

• Gather together the two plates. Make sure that both layout lines on the plates are running in the same direction. Determine the top plate from the bottom plate and lay both plates on the floor, on their edges parallel to each other with about eight feet between them. At this point the lay out lines should be running in the same direction and facing each other.

• Next lets place the verticals framing members, starting with the window unit place it flat between the top plate and bottom plate where the lay out lines indicate it should go, place the door unit flat where it should go, keep in mind the top and bottom. Place the corner post, the partition corner, and all the precut studs. Check the laid out and placed members for squareness and placement.

• Review with the students all areas and operations where safety practices may be required.

5. Assemble the wall framing unit.

• Three #12 v. c. nails will be used to fasten each end of each vertical framing member to the plates.

• Starting with the window unit, align the top plate lay out lines with the precut studs, upper trimmers, and upper cripples. Make sure that all the edges are flush and that each member is on the line.

Copyright © Texas Education Agency, 2011. All rights reserved. 5

• Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the top plate into the end of each vertical framing members. After all the top members of the window unit have been nailed, do the same to the bottom of the window unit to the bottom plate. *Note, make sure the nails are driven straight and the nail heads are flush with the material.

• The next member to be installed will be the door unit, align the bottom plate lay out lines with the precut studs, lower trimmers, and lower cripples. Make sure that all the edges are flush and that each member is on the line.

• Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the bottom plate into the end of each vertical framing members. After all the bottom members of the window unit have been

• nailed, you are ready to move on to installing the corner post. *Note, make sure the nails are driven straight and the nail heads are flush with the material.

The corner post will be our next member to be installed, align the left top corner of the top plate lay out lines with the corner post. Make sure that all the edges are flush and that each member is on the line.

Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the top plate into the end of each vertical framing members, six nails will be used per end. After the top member of the corner post has been nailed, you are ready to move on to installing the corner post bottom to the bottom plate.

Align the left bottom corner of the bottom plate lay out lines with the corner post. Make sure that all the edges are flush and that each member is on the line.

Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the bottom plate into the end of each vertical framing members, six nails will be used per end. After the bottom member of the

• corner post has been nailed, you are ready to move on to installing the partition corner. *Note, make sure the nails are driven straight and the nail heads are flush with the material.

The partition corner is the next member to be installed, align the top section of the partition corner to the lay out lines on the top plate. Make sure that all the edges are flush and that each member is on the line.

Aligned and ready, the students will start with three #12 v. c. nails and nail

• through the face of the top plate into the end of each vertical framing members, six nails will be used per end. After the top member of the partition corner has been nailed, you are ready to move on to installing the partition corner bottom section to the bottom plate.

Align the bottom section of the partition corner to lay out lines found on the bottom plate. Make sure that all the edges are flush and that each member is on the line.

Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the bottom plate into the end of each vertical framing members, six nails will be used per end. After the bottom member of the

Copyright © Texas Education Agency, 2011. All rights reserved. 6

• partition corner has been nailed, you are ready to move on to installing the precut studs. *Note, make sure the nails are driven straight and the nail heads are flush with the material.

The last vertical members to be installed will be the precut studs, align the top section of the precut studs to the lay out lines on the top plate. Make sure that all the edges are flush and that each member is on the line.

Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the top plate into the end of each vertical framing members, three nails will be used per end. After the top section of each

• precut stud has been nailed, you are ready to move on to installing the bottom section of the precut studs to the bottom plate.

Align the bottom section of the precut studs to lay out lines found on the bottom plate. Make sure that all the edges are flush and that each member is on the line.

Aligned and ready, the students will start with three #12 v. c. nails and nail through the face of the bottom plate into the end of each vertical framing members, three nails will be used per end. After the bottom sections of the precut studs have been nailed, you have now completed the assembly of wall framing unit. *Note, make sure the nails are driven straight and the nail heads are flush with the material.

6. Have students check for quality control.

• All measurements within a plus or minus of a sixteenth.

• Layout lines are sharp and straight.

• Proper installation of all framing members.

• Craftsmanship, nailing, assembling.

7. All students will participate in clean up.

• Proper cleaning and storage of tools.

• Organize and store both assignment and extra materials.

• Sweep up work areas and dispose of waste.

Application

Guided Practice (LSI Quadrant III):

The students will observe, ask questions, and analyze the demonstration to be presented by the Instructor.

The Students will write down the steps of procedures as completed.

Independent Practice (LSI Quadrant III):

At this phase the students will work collaboratively in small groups to start and complete the assignment.

Copyright © Texas Education Agency, 2011. All rights reserved. 7

Summary

Review (LSI Quadrants I and IV):

Review the student's Data sheet to evaluate if the group compiled the correct data and followed the correct procedures to complete the assignment.

Evaluation

Informal Assessment (LSI Quadrant III):

The Instructor will monitor each group as they independently work to complete the assignment. If a re-teach is needed on any information or procedure, all the groups will stop and participate in the re-teach

Formal Assessment (LSI Quadrant III, IV):

The students will be assessed by the accuracy of the completed assignment. The

Instructor will be looking for correct layout measurements, sharpness of lines, proper labeling, accurate sizing, square-ness of assembly, craftsmanship, etc. 100 points will be the high and minus 5 points for each mistake found. The students will also be given at this time a written test that will cover all the information found and provided in the wall framing units.

Extension/Enrichment (LSI Quadrant IV):

The students will use the correctly sized and assembled wall framing unit in a future lesson on constructing a small portable building.

Copyright © Texas Education Agency, 2011. All rights reserved. 8

Wall Framing Assembly

Quiz

Name:__________________________

1. True or False?

You should be able to identify headers when done with this lesson.

2. True or False?

You don’t really need to use blueprints for this type of job.

3. True or False?

Assembling the unit is NOT part of the steps.

4. True or False?

Safety should always be considered.