PROJECT NAME PRE-WIRE INSPECTION SIGN-OFF EATON’S COOPER CONTROLS LIGHTING MANAGEMENT SYSTEM September 2014 Version 1.3 LIGHTING MANAGEMENT SYSTEM PRE-WIRE INSPECTION SIGN-OFF 1. Review DALI wiring protocol and wiring fundamentals CHECK DETAILS 1.1 Control wire length limitations 1000 Feet Maximum 1.2 Control Wire Class Only Class 1 and Class 2 wiring 1.3 Bus device limitations 1.4 Topology 1.5 Polarity Free DONE () COMMENTS DONE () COMMENTS 64 DALI Devices o 8 DALI Sensors Fixtures can be connected via o T-Tap o Star Tap o Daisy Chain DALI loops are all polarity free when connecting 2 conductor wires 2. Network CHECK DETAILS 2.1 CAT5 Network Length 2.2 Building Network 2.3 IP Address Range No CAT5 cable shall exceed 300ft in length. If runs that exceed 300ft are required, either a fiber network is needed or a CAT5 repeater. Will the lighting network be dedicated or connected to the client network? Inquire about the IP Range which the lighting network will reside in. __________________________ Page 2/7 LIGHTING MANAGEMENT SYSTEM PRE-WIRE INSPECTION SIGN-OFF 3. Review drawing submittal package with EC CHECK 3.1 Confirm Eaton Title Block is on drawings used by EC. 3.2 Ensure the DALI design revision matches the latest submitted by Eaton. 3.3 3.4 3.5 Change Requests MWS Wiring User Input Forms/Sequence of Operations DETAILS Ensure the EC is working from our DALI design. They will often work directly from ENG drawings which do not have all the necessary details. When multiple revisions are required, it is critical that the latest version is being used for the install. Ensure there have been no change orders which have been issued to EC but not incorporated in the latest DALI design. Review modular wiring system (if applicable) with EC to ensure correct installation. Discuss the user input forms that have been provided to ensure design team receives the most up to date requirements regarding schedules and sequences of operation. Page 3/7 DONE () COMMENTS LIGHTING MANAGEMENT SYSTEM PRE-WIRE INSPECTION SIGN-OFF 4. Review Install Sign-off Process CHECK 4.1 Review the use of the DALI Tester/DBC and provide the appropriate instructions and check sheet. 4.2 Ensure EC is aware of lead times. DETAILS Each project will have a specific check sheet listing all busses with the associated devices. There is a standard 3 week lead-time required from when the sign off is received and techs are onsite. Page 4/7 DONE () COMMENTS LIGHTING MANAGEMENT SYSTEM PRE-WIRE INSPECTION SIGN-OFF 5. Review Post Installation Phase (Commissioning, Training, Close Out) CHECK DETAILS 5.1 Commissioning Process Review 5.2 End User/Client Training 5.3 Close out/Commissioning Sign- off Address DALI busses completed and signed-off Turn over list of any deficiencies to EC Launch server after deficiencies rectified Full functional check of all devices, schedules, scenes Training is typically planned for after startup in order to demo the live system. Once all functional checks are complete and the client is content with operation and training material presented, commissioning sign off is obtained. A full documentation package is provided after all sign-offs are complete. Documentation package includes: 5.4 Eaton Documentation Package Control intent Network Details Design drawings Datasheets/Manuals All Sign-offs Warranty Card Page 5/7 DONE () COMMENTS LIGHTING MANAGEMENT SYSTEM PRE-WIRE INSPECTION SIGN-OFF 6. Site Tour CHECK 6.1 Walkthrough entire site DETAILS Visual checks by technician. (depending on access) 6.2 Discuss timelines to ensure most accurate dates are with PM. Expected Install Completion date: ___________________ Expected Commissioning Start date: ___________________ Excellent opportunity to ensure dates currently with PM are accurate. Expected Customer hand-off date: ___________________ Page 6/7 DONE () COMMENTS LIGHTING MANAGEMENT SYSTEM PRE-WIRE INSPECTION SIGN-OFF I acknowledge that a qualified Eaton employee has reviewed all pre-wire checks described above and detailed the process in which commissioning and start-up will be executed. NAME: SIGNATURE: DATE: ROLE: COMPANY: Page 7/7