Record of Final Inspection For use by the A/E, Construction Manager and/or KSU-OUA Project Manager according to Article 10 of the General Conditions. Suite 101 Harbourt Hall, 615 Loop Road, P. O. Box 5190, Kent, Ohio 44242-0001 v: 330-672-3880 • f: 330-672-2648 • web site: www.kent.edu/universityarchitect Project/Contract No.: OFFICE OF THE UNIVERSITY ARCHITECT Contractor: Project Name: Final Inspection Attendees: Contractor’s list of incomplete or deficient items associated with the work: Date to be Completed Note of any deficiency in Contractor’s Project Record Document Submittals: Note of any deficiency in Contractor’s As Built Drawing submittal: Note of any deficiency in Warranties required by the Contract Documents: Note of the quality of final cleaning performed by Contractor: Architect / Engineer (A/E), Construction Manager (CM), and/or KSU-OUA Project Manager notes: Submitted by: A/E or Construction Manager KSU-OUA 10/2011 Date KSU-OUA Project Manager Date RECORD OF FINAL INSPECTION