PINEY POINT Water Management Plan FY04/05 Million Gallons Major Transfer Categories 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 2004 2003 2002 2001 Lime Treated Domestic WWTP Industrial Reuse RO Barge Total 15-Day Average Ammonia Loading 2003-2004 NH3 loading, lbs/day Target loading lbs/day 1600 1400 1200 1000 800 600 400 7/24/04 5/24/04 3/24/04 1/24/04 11/24/03 9/24/03 7/24/03 5/24/03 3/24/03 1/24/03 200 0 7/29/04 7/15/04 7/1/04 6/17/04 6/3/04 5/20/04 5/6/04 4/22/04 4/8/04 NH3 loading, lbs/day 3/25/04 3/11/04 2/26/04 2/12/04 1/29/04 1/15/04 1/1/04 15-Day Average Ammonia Loading - 2004 Target loading lbs/day 350 300 250 200 150 100 50 0 Daily Ammonia Concentration 12/03 - 8/04 NH3, mg/l 40 35 25 20 15 10 5 8/1/04 7/1/04 6/1/04 5/1/04 4/1/04 3/1/04 2/1/04 1/1/04 0 12/1/03 NH3, mg/l 30 20,000,000 R. Osmosis 15,000,000 10,000,000 Double Lime 5,000,000 2/5 /0 4 3/5 /0 4 4/5 /0 4 5/5 /0 4 6/5 /0 4 7/5 /0 4 8/5 /0 4 0 1/5 /0 4 Gallons per Week Surface Water Discharge Total Discharge The Updated Near-Term and Long-Term Consumption Rates are as Follow: • August 2004: 1.0 MGD • October 2006: 0.5 MGD • December 2006: 0.3 MGD May be decreased even further depending on conditions FY 04/05 Water Management Plan: • • • • Reverse Osmosis New Spray Evaporation System Slurry Wall Double Lime and Aeration System SECOND STAGE LIME TREATMENT U.S. FILTER REVERSE OSMOSIS SYSTEM Ph Adjustment LIME SLUDGE DISPOSAL CELL FIRST STAGE LIME TREATMENT PLANNED SPRAY EVAPORATION SYSTEM AMMONIA REMOVAL PONDS OVERVIEW OF WATER MANAGEMENT SYSTEMS CURRENT PROCESS WASTEWATER MANAGEMENT PLAN Alternative Jul-Sept. 2003 (gpd) Total Required 1,000,000 Evaporation -0Reverse Osmosis 400,000700,000 Lime Precip. 300,000600,000 Oct-Dec 2003 (gpd) 1,000,000 0-200,000 400,000700,000 100,000600,000 Jan-Mar 2004 (gpd) 1,000,000 50,000-200,000 400,000700,000 100,000550,000 Apr-June 2004 (gpd) 1,000,000 50,000-200,000 0-400,000 400,000950,000 FY 2005 (MM Gals) 365 54 146 165 Discharge Quality Scenario TN lbs/day A. Average Full year 32 B. 10-04 thru 6-05 (with evap) C. RO early termination 19-27 D. Worst Case 100 50 Piney Point ITN • Preference for proposals that use proven and tried methods, and higher ranking given to plans that minimize ammonia nitrogen loadings to surface waters. • Respondents can utilize DEP water management plan or develop their own. Late 2006/Early 2007 Water Management Plan • After site closed process water will consist of 0.3 MGD seeping from the closed stacks • Potential Post Closure Water Management Options • Spray Evaporation • Spray Irrigation • Tie in to Manatee County sewer