PINEY POINT Water Management Plan FY04/05

advertisement
PINEY POINT
Water Management Plan FY04/05
Million Gallons
Major Transfer Categories
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
2004
2003
2002
2001
Lime
Treated
Domestic
WWTP
Industrial
Reuse
RO
Barge
Total
15-Day Average Ammonia Loading 2003-2004
NH3 loading, lbs/day
Target loading lbs/day
1600
1400
1200
1000
800
600
400
7/24/04
5/24/04
3/24/04
1/24/04
11/24/03
9/24/03
7/24/03
5/24/03
3/24/03
1/24/03
200
0
7/29/04
7/15/04
7/1/04
6/17/04
6/3/04
5/20/04
5/6/04
4/22/04
4/8/04
NH3 loading, lbs/day
3/25/04
3/11/04
2/26/04
2/12/04
1/29/04
1/15/04
1/1/04
15-Day Average Ammonia Loading - 2004
Target loading lbs/day
350
300
250
200
150
100
50
0
Daily Ammonia Concentration 12/03 - 8/04
NH3, mg/l
40
35
25
20
15
10
5
8/1/04
7/1/04
6/1/04
5/1/04
4/1/04
3/1/04
2/1/04
1/1/04
0
12/1/03
NH3, mg/l
30
20,000,000
R. Osmosis
15,000,000
10,000,000
Double Lime
5,000,000
2/5
/0 4
3/5
/0 4
4/5
/0 4
5/5
/0 4
6/5
/0 4
7/5
/0 4
8/5
/0 4
0
1/5
/0 4
Gallons per Week
Surface Water Discharge
Total
Discharge
The Updated Near-Term and Long-Term
Consumption Rates are as Follow:
• August 2004:
1.0 MGD
• October 2006:
0.5 MGD
• December 2006: 0.3 MGD
May be decreased even further depending on conditions
FY 04/05
Water Management Plan:
•
•
•
•
Reverse Osmosis
New Spray Evaporation System
Slurry Wall
Double Lime and Aeration System
SECOND STAGE
LIME TREATMENT
U.S. FILTER
REVERSE OSMOSIS
SYSTEM
Ph Adjustment
LIME SLUDGE
DISPOSAL CELL
FIRST STAGE
LIME TREATMENT
PLANNED SPRAY
EVAPORATION SYSTEM
AMMONIA
REMOVAL
PONDS
OVERVIEW OF WATER MANAGEMENT SYSTEMS
CURRENT
PROCESS WASTEWATER MANAGEMENT PLAN
Alternative
Jul-Sept. 2003
(gpd)
Total Required
1,000,000
Evaporation
-0Reverse Osmosis
400,000700,000
Lime Precip.
300,000600,000
Oct-Dec 2003
(gpd)
1,000,000
0-200,000
400,000700,000
100,000600,000
Jan-Mar 2004
(gpd)
1,000,000
50,000-200,000
400,000700,000
100,000550,000
Apr-June 2004
(gpd)
1,000,000
50,000-200,000
0-400,000
400,000950,000
FY 2005
(MM Gals)
365
54
146
165
Discharge Quality
Scenario
TN lbs/day
A. Average Full year
32
B. 10-04 thru 6-05 (with
evap)
C. RO early termination
19-27
D. Worst Case
100
50
Piney Point ITN
• Preference for proposals that use proven and tried
methods, and higher ranking given to plans that
minimize ammonia nitrogen loadings to surface
waters.
• Respondents can utilize DEP water management
plan or develop their own.
Late 2006/Early 2007
Water Management Plan
• After site closed process water will consist
of 0.3 MGD seeping from the closed stacks
• Potential Post Closure Water Management
Options
• Spray Evaporation
• Spray Irrigation
• Tie in to Manatee County sewer