BR activities on the transition in Region 1 - Coordination meetings- 1 Main objectives • Re-evaluate, as a matter of priority, the GE-06 taking into account: – Short and medium term Spectrum needs of broadcasting and mobile and ensure equitable and efficient access to the spectrum – Establishment of proper timelines and activities for the review and modification of GE06 plan 2 GE06D Plan modification in the UHF Band Number of modification and (% of increase) Evolution in the GE06D Plan (number of modification) GE06D Plan modification activity (% of increase) 35.00% 30.00% 60000 25.00% 50000 20.00% 40000 30000 15.00% 20000 10.00% 10000 5.00% 0 0.00% -10000 Seminar 2006 470-694 Seminar 2008 Seminar 2012 694-790 -5.00% Seminar 2014 790-862 3 Increase 20062008 Increase 20082012 Increase 20122014 470-694 Increase 2006-2008 3.85% Increase 2008-2012 16.14% Increase 2012-2014 30.32% 694-790 3.51% 14.52% 20.62% 790-862 -2.03% 8.48% 2.78% BR Process of coordination -Available channels- Adm. Requirements Compatibility analysis (iteration)- BR ITU Database: - GE06 Plan - GE06L - MIFR After last iteration Modification of the GE06 Plan Database of results Coordination btw Adm. GE06 .. ATU General ATU Recommendations • Maximum acceptable margin is 4dB • the ATU summit: – to consider the adoption of the MPEG4 and DVB-T2 standards at regional African level. – to consider the adoption of the dual HDTV/SD format at African regional level for the set-top boxes • those administrations currently having more than this resource be encouraged to make the utmost effort to release part of it to enable neighbouring countries to reach up to that level of resource. 6 0.00 BOT MWI ZWE LBR SSD ERI KEN ETH SDN RRW BFA AGL UGA SOM GHA MTN TZA MOZ CTI NMB ZMB TGO TCD SWZ STP SRL SEN NIG NGR MLI MDG LSO GUI GNE GNB GMB GAB DJI CPV COM COG COD CME CAF BEN BDI ZWE UGA TZA TGO SWZ STP SRL RRW NMB NIG MWI MOZ MAU LSO LBR KEN GUI GNE GNB GMB GHA GAB ETH DJI CTI CPV COM CAF BOT BFA BEN BDI AGL AFS SOM TCD CME MTN COG MLI ERI COD SDN NGR SEN ZMB MDG 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 AFS 1st and last iterations for SSA Iteration 1, percentage of assigned channels 100.00 Iteration 33- Nairobi-2 80.00 60.00 40.00 20.00 Percentage Assignable/submitted 7 Results of the GE06 coordination meeting for Sub Saharan Africa • • • • • • • Average of satisfied requirements: 97.37%: Duration: 18 months. 47 countries participated (except Mauritius). 2 African summits: Nairobi 2011 and Accra 2012 to launch the process. 3 planning and coordination meetings: Bamako, Kampala and Nairobi. BR participation in the sub regional meetings: EACO, ECOWAS, SADC, … 33 iterations for the compatibility analysis, based on the requirements submitted by administrations. The BR generated the requirements for the absent countries following the ATU request. • 7107 submitted frequency requirements in 470-694 MHz (11406 at the RRC-06 for the entire band 470-862 MHz). DDs: Coordination meetings for Sub-saharan Africa Countries having modified the GE06 Plan Layer 2 Layer 3 Layer 4 470-694 MHz DD1? No 26% Yes 74% Percentage of assignable channels 694-862 MHz DD2? ASO in Sub-Saharan Africa 100.00 Terminée 2% 90.00 80.00 Stade planifica tion 83% 70.00 60.00 Lancée 15% 50.00 40.00 30.00 Identified DD (21 Countries) 20.00 0.00 AFS BDI BEN CAF CME COD COG COM CPV DJI GAB GMB GNB GNE GUI LSO MDG MLI NGR NIG SEN SRL STP SWZ TCD TGO ZMB NMB CTI MOZ TZA MTN GHA SOM UGA AGL BFA RRW SDN ETH KEN ERI SSD LBR ZWE MWI BOT 10.00 790-862 15% 694-790 10% 694-862 50% ND 25% Mobile? Layer 1 GE06 .. ASMG GE06 Plan for the Arab countries 0% 0% 4+ Channels (%) 0% 0% Number of layers in GE06 Plan- May 2014 3% 1% 3% 16% 80 7% 14% 8% 70 8% 13% 10% 60 6% 10% 50 40 2% 30 3% 20 2% 2% 0 Channel (%) 0% 2% 0% 5% 0% 26% 7% 0% 10 13% 18% 0 12% 0 Channels (%) From Bad 1 Channel (%) 2 Channels (%) 3 Channels (%) 4+ Channels (%) To better 8% BHR QAT UAE YEM KWT LBN EGY IRQ JOR MRC ARS OMA SYR ALG LBY TUN BHR QAT UAE YEM KWT LBN EGY IRQ JOR MRC ARS OMA SYR ALG LBY TUN Recommendations and decisions of Dubai (May 2014) meeting • Invite the Arab countries that did not start the introduction of DTT to use modern techniques for such service: DVB-T2/MPEG-4 or later. • Maximum acceptable margin is : – 4dB, this margin will be used in the coordination between the Arab countries, giving the freedom of States to use more or less stringent margins during bilateral coordination meetings . – 3 dB: Tunisia, Saudi Arabia and Oman specified that for coordination with them, the maximum acceptable margin would be of 3dB concerning the channels recorded in the GE06 Plan and 4dB if against the requirements. • 4 layers per Administration for this coordination period, knowing that this number can be increased in the future, individually, and according to the needs of the Arab states, according to GE06 Article 4 Procedures. • An iteration each other Monday until the 3d meeting Evolution of assignable channels 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ALG ARS BHR Iteration 0 EGY IRQ Iteration 11 JOR KWT LBN iter18-ignoring all LBY MRC Iter23-Ignore all OMA PSE QAT Iter26-ignore all SYR TUN UAE YEM Iter 27-ignore all 13 ASMG Average of assignable channels Average assignable 90.00 80.00 70.00 Axis Title 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Series1 Av. iter.0 Av. iter.3 Av. iter.6 5.34 57.93 62.75 Av. iter.9 Av. iter.15 Av. iter.18 Av. iter.19 Av. iter.20 Av. iter.21 Av. iter.22 Av. iter.23 Av. iter.24 Av. iter.25 Av. iter.26 Av. iter.27 47.87 68.18 72.05 72.59 71.83 71.68 72.76 75.03 70.14 71.53 71.62 76.87 14 Results of the GE06 coordination meeting for ASMG • • • • • Average of satisfied requirements: 76.87%: Duration: 11 months. 17 countries participated. 3 planning and coordination meetings: Dubai, Hammamet and Marrakech. 27 iterations for the compatibility analysis, based on the requirements submitted by administrations. The BR generated the requirements for the absent countries following the ASMG request. • 4346 submitted frequency requirements in 470-694 MHz (9151 at the RRC06 for the entire band 470-862 MHz). Conclusion on BR actions • Generated the initial requirements with flexible channels (to reach at least 4 layers); • Provided the necessary software and tools; • Workshops and training on the GE06 tools and frequency planning; • Assistance in sub regional coordination meetings; • An Iteration each 2 weeks (from the beginning of the process until its end); • Generates the requirements for the ‘absent’ administrations (4 layers); • Assistance all along the process. 16 DTT frequency channels .. Other Regions coming… Thank you for your attention