-1- Council Working Group for the Elaboration of the Draft Strategic Plan and the Draft Financial Plan, 2008-2011 Document: WG-SP-FP-06/27 8 June 2006 English GENEVA, 27 AND 28 JUNE 2006 Draft Financial Plan 2008-2011 Income and expenditure revised estimates A Outcome of the 2006 Council and other considerations: 1 In accordance with Resolution 1260 of Council 2006, the Working Group on the elaboration of the Draft Strategic Plan and the Draft Financial Plan 2008-2011 is continuing its activities in order to prepare a report for the final meeting of the 2006 Council prior to PP06 on the Draft Financial Plan for 2008-2011. 2 In this context, the following documents should be taken into account: 2.1 2.2 2.3 2.4 3 The draft Strategic Plan (DT/10, Rev. 2). The draft Financial Plan (C06/23, + add. 1). The comments from the Reflexion Group (DT/11), and the replies of the Secretariat to these comments as well as to the questions raised by the USA as contained in the report of the Chairman of the Finance Committee (C06/56, + add.1). The questions raised by the USA to the WG at the 18 April meeting (WG-SPFP-06-21), and the answers by the secretariat (WG-SP-FP-06-22). The following issues should be considered: 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 The provisional amount of the contributory unit as decided by Council, i.e. CHF 318.000. The conditions as of 1 May 2006, in particular the number of contributory units in force from Sector Members and from Associates. The potential loss of income resulting from the free online access policy for the ITU-T Recommendations (C06/3 and C06/60, Rev.1). The ratio for establishing the amount of the contributory unit payable by Sector Members. The unaudited financial operating report for 2004-2005 (C06/26). The cost accounting results of the 2004-2005 biennium (EP/6). The costs of languages and related documentation (DT/8). The pending items remaining unfunded (C06/23, Annex II). 6/9/2006 -2- B Income and Expenditure revised estimates: Amount of the contributory unit (in CHF) 318'000 000'CHF 1 Income estimates (ref. C06/23, Add.) Assessed contributions (408 9/20 full units) Cost Recovery income Other income 2 Increase in the number of contributory units as of 1 May 2006 (+ 1 1/17 full unit) 3 Reduction due to the free access to ITU-T recommendations 4 Revised total income estimates: 519'548 103'685 10'800 634'033 1'347 -7'000 628'380 Options for increasing the income: 5 Increase of the ratio from 1/5 to 1/4 for the contributory unit payable by Sector Members 6 Increase of the price of publications (10% on average) 21'249 4'000 7 Revised total income estimates including the above options 653'629 8 Expenditure estimates (ref. Document C06/23) 673'662 9 10 11 12 13 14 Security Projects WSIS RRC-06 post-conference work * WTSA-04 outcomes ** WTDC-06 outcomes ** WTDC-06 Doha Action Plan 0 3'800 5'200 2'400 3'400 4'500 15 16 17 18 19 20 Options for reducing the expenditure: Reduction in staff costs Reduction in travels on duty Reduction in fellowships Reduction in external consultants Reduction in public services Reduction in the volumes of documentation 21 Revised expenditure estimates -2'000 -1'000 -500 -1'000 -1'000 -1'500 685'962 22 Shortage of income (ratio maintained at 1/5) 53'582 23 Shortage of income (ratio modified to 1/4) 32'333 * Preliminary estimate pending the final decisions of RRC-06 ** Requests expected, either explicitly or implicitly, to be carried out within existing resources 6/9/2006 -3- C Notes to the items 1 to 23 in the table under chapter B: 1. Income estimates as per addendum 1 to Document C06/23. Scenario 4 representing the provisional amount of the contributory unit of CHF 318.000 (Zero Nominal Growth). 2. Increase in the number of contributory units as of 1 May 2006 as compared to the situation at 1 January 2006: 1 new Member State (1/16 unit), 3 5/16 additional units from Sector Members and 10 additional units from new associates. 3. Reduction of income resulting from the free access policy to ITU-T recommendations (document C06/60, Rev.1). 4. Revised income estimates as per the above items. 5. Option for increasing from 1/5 to ¼ the ratio for establishing the contributory unit to be paid by Sector Members. 6. Option for increasing the price of publications by 10% on average. 7. Revised income estimates as per the above items including the two options for increasing the income. 8. Programme expenditure estimates as per document C06/23, excluding the pending items in Annex II. 9. The strengthening of security arrangements in the ITU offices in Geneva aims at maintaining the prescribed security standards (Headquarter MOSS). The resources required for increased safety and security measures for the buildings and staff are planned to be funded through special assessment. Hence no provision is included in the draft financial plan. A separate document on security requirements is under preparation. 10. Additional resources for a total of three officers in the Coordination, External Affairs and Communication Units (CEC) are needed for new tasks in relation to post-WSIS activities. Reference is made to the statement provided in addendum 1 to document C06/56 on the question of the WSIS implementation tasks. See also paragraph 2.2 and goal number one of the draft Strategic Plan 2008-2011 (CHF 2.2 million). Further, with particular responsibility for Action Lines C2 and C5, additional resource demands will be placed on the Development Bureau in order to fulfill its role in the WSIS implementation. One coordinator and one officer are required for the WSIS mandates (CHF1.6 million). 11. The outputs of the Regional Radiocommunication Conference 2006 will require some post-conference work to be undertaken by the Radiocommunication Bureau. For the ongoing application of the new Agreement and for software related tasks, the Bureau will need 7 additional staff, 5 professionals and 2 general service staff. It is to be noted that these preliminary estimates relate to the one-time costs regarding the 6/9/2006 -4- implementation of the RRC-06 decisions in the post-conference period, as well as the recurrent costs for the application of the procedures referred to in Articles 4 and 5 of the Geneva 2006 Agreement. These estimates are pending the final decisions to be taken by the Regional Radiocommunication Conference 2006. Reference is made to document RRC06/116. 12. TSB is requesting an increase of the staff resources in the Bureau for the implementation of the decisions of the WTSA-04. The request estimated at a cost of CHF 2.4 million is for the following: a reinforcement of the staffing level of the Study group secretariat is necessary to compensate for the increase work arising from WTSA-04. Based on Resolution 50 “Cybersecurity”, Resolution 51 “Combating spam” and Resolution 52 “Countering spam by technical means”, one engineer is required to fulfill the following tasks: Management of the ICT Security Roadmap, Editing and updating of the ITU-T “Cybersecurity Manual”, Management of the Cybersecurity Portal, Organization of Cybersecurity workshops, Presenting ITU at conferences on security. Based on Resolution 17 “Telecommunication standardization in relation to the interests of developing countries” and Resolution 44 “Bridging the standardization gap between developing and developed countries, one engineer is required to implement the action plan in line with Resolution 123 (Marrakesh, 2002) of the Plenipotentiary Conference in close collaboration with BDT. A third junior engineer is required to assist study group councilors on specific projects, or to take care of urgent topics under the guidance of Heads of Departments. 13. BDT is requesting an increase of the staff resources in the Bureau for the implementation of the decisions of the WTDC-06. The request estimated at a cost of CHF 3.4 million is for the following: Pursuant to the decisions of the recently completed WTDC, Member States have established additional priorities as part of the overall Doha Action Plan. Under Programme 6, Small Island States and Emergency Telecommunications have been added to its portfolio, with strong emphasis being placed on the need for the BDT to increase its activity in face of the recent natural disasters. It is foreseen to add one P4 and one P1 to meet the demands. Further, one P5 is requested in view of the need that has been identified to reinforce the regional presence in the Asia Pacific Region (Bangkok/Jakarta offices) in light of the increased activity in the region. Moreover, the WTDC has again underlined the importance of activities related to youth and gender. In prior years, a post for youth and gender was funded via an extra-budgetary contribution. This funding has been fully utilized and it is now proposed to integrate a P5 youth and gender coordinator into the regular budget. 14. The Doha Action Plan (DAP) as approved by the WTDC-06 includes a new programme for Regional Initiatives, estimated at a cost of CHF 4.5 million. Reference is made to document WTDC06/184(rev3). 15. Adjustment of the average rates for home leave and education grants in line with the 2004-2005 actual levels. 16. A reduction of the projected levels of travels on missions is proposed in view of the 2004-2005 actual amounts. 17. A reduction of the projected amounts for fellowships is proposed in view of the 20042005 actual levels. 6/9/2006 -5- 18. A reduction of the projected amounts for external consultants is proposed in view of the 2004-2005 actual levels. 19. A reduction of the projected amounts for public services is proposed in view of the 2004-2005 actual levels. 20. Reduction of the planned volumes of documentation in view of the 2004-2005 actual levels. Planned resources for the services of translation, composition and reprography should be reduced accordingly. 21. Revised expenditure estimates as per the above. 22. Shortage of income, or the difference between the revised expenditure estimates and the revised income estimates, with the assumption of maintaining the ratio for establishing the contributory unit to be paid by Sector Members at 1/5. 23. Shortage of income with the assumption that the ratio for establishing the contributory unit to be paid by Sector Members is modified to 1/4. 6/9/2006