storm drainage improvement project
Dear Resident,
June 4, 2013
Charlotte-Mecklenburg Storm Water Services held its second
public meeting on May 8 at St. Sarkis Armenian Apostolic
Church for the Sunnyvale Storm Drainage Improvement
Project. The goal of this project is to reduce flooding of
streets and structures, as well as reduce erosion along the
stream and channel.
The meeting presented general project information on
Capital Improvement Projects and discussed existing storm
water issues within the project area. Meeting highlights:
• Project Manager Jackie Bray welcomed the attendees,
introduced the project team and gave a summary.
• Chris Fleck, Project Manager for our design consultant
Dewberry, described the results of the existing conditions
analysis and the plan for the proposed improvements.
• Mr. Fleck discussed how the project area will be broken
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Sunnyvale Project Update
HIGHLIGHTS FROM PUBLIC MEETING
YOUR STORM WATER FEES AT WORK
up into smaller projects for the design phase. Lilly
Mill is the first phase and the design began in March
2013. Chandworth is the second phase and will begin in
2013/2014.
• A question/answer session was held.
If you were unable to attend the public meeting or were
unaware that one was being held, the material from the
entire presentation and detailed meeting minutes are
available on our website at http://stormwater.charmeck.org.
Click on Storm Water Projects dropdown menu in the green
bar, then Active Projects and Sunnyvale.
If you have any questions about this project, please contact
Project Manager Jackie Bray at jbray@charlottenc.gov or
704-336-6770.
Download