S u g a r C r e e k We s t storm drainage improvement project YOUR STORM WATER FEES AT WORK Dear Resident: Charlotte Mecklenburg Storm Water Services and its consultant engineer, USInfrastructure, are designing drainage improvements along Raleigh Street and Greensboro Street west of Sugar Creek Road. These improvements are being designed in coordination with Charlotte Area Transit Systems (CATS) Blue Line Extension Project. Representatives from the Project Team may need to enter your property to collect survey data on the existing drainage system. While State law authorizes access to private property for this purpose, no buildings or structures will be entered or disturbed. USInfrastructure has contracted with Joel E. Wood & Associates to drill approximately 5 borings and collect soil and ground water samples. The proposed boring locations are along Raleigh Street and Greensboro Street. For more information about this project, please visit our website at stormwater. charmeck.org and click on Storm Water Projects drop down menu in the green bar, then Active Projects and Sugar Creek West. If you have any questions, please contact Project Manager Kate Labadorf at klabadorf@charlottenc.gov or 704-336-3653. March 2014 SURVEY CREW AHEAD Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202