Hinsdale/Tinkerbell

advertisement
Hinsdale/Tinkerbell
storm drainage improvement project
YOUR STORM WATER FEES AT WORK
Dear Resident,
June 2012
Charlotte-Mecklenburg Storm Water Services has
hired consultant Armstrong Glen to study possible
improvements to the storm drainage system in the
Hinsdale/Tinkerbell project area.
Representatives from the Project Team may need
to enter your property to collect survey data on the
existing storm drainage system. While State law
authorizes access to private property for this purpose,
no buildings or structures will be entered or disturbed.
The survey work is scheduled to begin in July.
For more information about this project, please visit
our website at http://stormwater.charmeck.org and
click on Storm Water Projects drop down menu in
the green bar, then Active Projects and Hinsdale/
Tinkerbell.
If you have any questions, please contact Project
Manager Greg Cole at 704-336-4647 or
Y
E
V W
R E D
U R A
S C E
H
A
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Download