Hinsdale/Tinkerbell s t o r m Dear Resident: d r a i n a g e Meeting highlights: • Project Manager Greg Cole introduced the project team and gave a presentation on the project history, boundaries and how the Hinsdale project was selected. • This project is in the planning phase. The phases of the project were explained (Planning, Design, Real Estate, Bid, Construction). • The engineering consultant for this project is Armstrong Glen, PC (AG). • • • AG reviewed the results of their stormwater modeling using maps. A question/answer session was held. Three break-out groups were created to answer specific questions. For more information or detailed meeting summary, visit our website: http://stormwater.charmeck.org. Click on the Storm Water Projects drop down menu in the green bar, then Active Projects and Hinsdale/Tinkerbell. If you have any questions about this project, please contact the Project Manager, Greg Cole at 704-336-4824 or email gcole@charlottenc.gov. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Hinsdale/Tinkerbell Project Update HIGHLIGHTS FROM PUBLIC MEETING p r o j e c t your storm water fees at work April 19, 2013 Charlotte-Mecklenburg Storm Water Services held a public meeting for the Hinsdale/Tinkerbell Storm Drainage Improvement Project on March 28 at the Church of Charlotte. The project goals are to update existing infrastructure, reduce flooding in structures and streets, increase channel stability and reduce erosion. i m p r o v e m e n t